The bar chart outlines the schedule for construction of a new retail outlet over 90 days. It details 28 items of work and their planned durations across the project timeline. Initial levels and finalization of the foundation design is scheduled for the first week. Earthworks like excavation and retaining walls are planned for weeks 2 through 5. Foundation works including concrete and masonry are allocated weeks 3 through 7. The sales building works from concrete to finishes runs from weeks 6 through 14. Other external works like road works and services installation are scheduled for weeks 8 through completion at 90 days.

Uploaded by

sandeepraina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
426 views2 pages

05 B Bar Chart

The bar chart outlines the schedule for construction of a new retail outlet over 90 days. It details 28 items of work and their planned durations across the project timeline. Initial levels and finalization of the foundation design is scheduled for the first week. Earthworks like excavation and retaining walls are planned for weeks 2 through 5. Foundation works including concrete and masonry are allocated weeks 3 through 7. The sales building works from concrete to finishes runs from weeks 6 through 14. Other external works like road works and services installation are scheduled for weeks 8 through completion at 90 days.

Uploaded by

sandeepraina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

NEW RETAIL OUTLET

WORK SCHEDULE - BAR CHART

S.
No.

Item Of Work

1 Initial Levels & Finalisation of FDL


2 Filling Murrum

week 1
3

week 2

week 3

3 Earth Pit ( HD ) Tank works

a) Marking, Excavation & Dressing

b) PCC & Bar bending works


c) Setting out for HD beam

e) Brick Masonry Wall

f) Lowering the Tank

g) Back filling & Consolidation

h) Tank kerb wall

a) Marking, Excavation & Dressing


b) PCC

c) RR Masonry

e) Brick Masonry Wall

f) Plastering

g) Painting compound wall


a) Marking, Exc., & Dressing
b) PCC & Bar bending

d) RCC Footing Concrete


e) RCC Canopy Column

f) Back Filling & Consolidation


a) Marking & Exc. ( Entry Side )
b) PCC

c) Laying Hume pipe

d) Back filling & Consolidation

a) Marking & Exc. ( Exit Side )


b) PCC

c) Laying Hume pipe

d) Back filling & Consolidation

7 Sales Building

a) Marking & Exc. & Dressing

b) PCC & Reinforcement works


c) Placing Reinforcement

d) RCC Footing Concrete


e) RCC Column upto Plinth bottom

2
2

2
3

k) RCC Column upto Lintel

l) BW upto FFL

m) Back filling basement

n) Sand filling & PCC for flooring


o) Brick work up to Lintel level

p) Lintel bar bending & shuttering

q) RCC for Lintel

r) RCC Column upto Roof beam


s) BW upto Roof beam

t) Bar bending & Shuttering for roof


u) RCC Roof Concrete
v) Curing Period
w) Deshuttering

x) Plastering Internal & External


y) Plumping, Sanitary

z) Electrical Consealed works


aa) Weathering course
ab) Flooring works

ac) Panel Board fixing & wiring

ad) Aluminium Joineries Erection


ae) Painting works

11 Product Pipe Line Works / trench


13 BM Inspection Chambers
14 Driveway WBM / WMM

week 14

#
3

j) RCC for Plinth Beam

12 Yard Light

week 13

#
1

i) Shuttering for PB

9 Construction of Pump Island

week 12

h) Placing of PB Reinforcement

10 MPD & STP Installation

week 11

g) Exc., & PCC for Plinth beam

8 Hume Pipe Laying

week 10

f) Back filling foundation

af) Fixing Elect. Fittings

week 9

c) Positioning of Reinforcement

6 Culvert ( Hume Pipe )

week 8

d) RCC Grade beam

5 Canopy Foundation

week 7

d) HD Beam Concrete

4 Retaining Wall & Fencing

DURATION : 90 DAYS
week 5
week 6

week 4

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94

#
5

3
8
6

NEW RETAIL OUTLET


WORK SCHEDULE - BAR CHART

S.
No.

Item Of Work

15 Kerb Wall, Buffer & Monolith Foundation

week 1
3

week 2

week 3

week 4

DURATION : 90 DAYS
week 5
week 6

week 7

week 8

16 Laying Cables

17 Approach Cutting & WBM / WMM


18 Pump Island Finishing

19 Panel Board Commissioning


20 Driveway CC Pavers

6
2

21 Kerb Beam for CC Pavers


22 Approach FINISHING

23 Painting Work for Buffer & Kerb


24 CANOPY FAB ERECTION
25 Erecting Signages

HINDRANCES

week 9

week 10

week 11

week 12

week 13

week 14

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94

TOTAL DURATION = 90 Days

4
3

You might also like