The project is 20% complete and focuses on developing a product release. Alex B. is the project manager. Key tasks include agreeing on objectives, developing hardware and technical requirements, building the database, API, and user interface. The development phase is currently in progress, with testing and launch scheduled before the October 9th end date.

Uploaded by

BIJOY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Work Plan Template

The project is 20% complete and focuses on developing a product release. Alex B. is the project manager. Key tasks include agreeing on objectives, developing hardware and technical requirements, building the database, API, and user interface. The development phase is currently in progress, with testing and launch scheduled before the October 9th end date.

Uploaded by

BIJOY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 15

Project Name

Project Manager
Project Deliverable

Product Release
Alex B.

Start Date
End Date
Overall Progress
Tasks

2-Sep
9-Oct
20%

Responsible

Start

End

Set kick-off meeting

Alex B.

9/2

9/2

Agree on objectives

Frank C.

3-Sep

7-Sep

Detailed Reqs.

Jacob S.

7-Sep

9-Sep

Hardward Reqs.

Jacob S.

9-Sep

11-Sep

Final Resource Plan

Jacob S.

11-Sep

15-Sep

Staffing

Alex B.

15-Sep

17-Sep

Techincal Reqs.

Frank C.

17-Sep

21-Sep

DB Development

Shari W.

21-Sep

23-Sep

API Development

Shari W.

23-Sep

25-Sep

UI Client

Alex B.

25-Sep

29-Sep

Testing

Kennedy K.

29-Sep

2-Oct

Dev. Complete

Jacob S.

2-Oct

5-Oct

Hardware Config.

Alex B.

5-Oct

7-Oct

System Testing

Kennedy K.

7-Oct

9-Oct

9-Oct

9-Oct

3/16/2016

Initiation

Development

Operations

Launch

Days

Status

Complete

Complete

Complete

Overdue

In progress

In progress

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

9/2

9/3

9/4

9/5

9/6

9/7

9/8

9/9 9/10

Or, Click Here to Create Your W

9/11 9/12 9/13 9/14 9/15 9/16 9/17 9/18 9/19 9/20 9/21 9/22 9/23 9/24

reate Your Work Plan in Smartsheet

9/25 9/26 9/27 9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6 10/7 10/8

10/9

You might also like