C5 Surau

The document provides a cost summary for the construction of a C5-Surau building. It details 17 categories of work with quantities, rates, and total amounts for each. The total cost of all works is RM407,765.00.

Uploaded by

Acai Kira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views38 pages

C5 Surau

The document provides a cost summary for the construction of a C5-Surau building. It details 17 categories of work with quantities, rates, and total amounts for each. The total cost of all works is RM407,765.00.

Uploaded by

Acai Kira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 38

C5-Surau

WORK BELOW LOWEST FLOOR FINISH LEVEL

NO

Description

Unit
M3

1 Excavation
2 Pad Footing
Excavation
Lean Concrete
Formwork

M3
M3
Not exceed 250mm
250mm-500mm

M
M

Y12
Y16
R10

KG
KG
KG
M3

Y20
R10

KG
KG
M2
M3

Main Bar

Link
Insitu Concrete

3 Column

Main bar
Link
Formwork
Insitu concrete

4 Ground Beam
Excavation
Lean Concrete
formwork

M3
M3
250mm-500mm
500mm-1.00m

M2
M

Y12
Y20
R10

KG
KG
KG
M3

Main bar

Link
Insitu Concrete

5 Ground Slab
Lean Concrete
Damp-Proofing
Wiremesh
Insitu Concrete

6 Anti-Termite

A393

M3
M2
M2

Thk 100-150

M3
Item

7 JKR probe test


Confirmatory JKR probe test
7 Collection

NO

Quantity

Rate(RM)
Amount
50
15.00
750.00

166
6

15.00
300.00

2490.00
1800.00

155
76

10.00
20.00

1550.00
1520.00

1321
1032
413
36

4.00
4.00
4.00
450.00

5284.00
4128.00
1652.00
16200.00

1152
69
46
4

4.00
4.00
40.00
450.00

4608.00
276.00
1840.00
1800.00

24
3

15.00
300.00

360.00
900.00

372
103

20.00
40.00

176
2398
872
34

4.00
4.00
4.00
450.00

8
88
350

300.00
10.00
25.00

17

450.00

7440.00
4120.00
0.00
704.00
9592.00
3488.00
15300.00
0.00
0.00
2400.00
880.00
8750.00
0.00
7650.00
0.00
1500.00

32

400

12800.00
119782.00

C5-Surau
RAMPS AND APRON

No

Description

Unit

1 Apron
Excavation
Filling
Lean Concrete
Damp-proofing
Formwork
Wiremesh
Insitu Concrete

3 Collection

150mm thk to receive apron

A393

M3
M2
M3
M2
M
M2
M3

Quantity

Rate(RM)
16
55
3
55
47
55
5

15.00
50.00
300.00
10.00
40.00
25.00
450.00

Amount
240.00
2750.00
900.00
550.00
1880.00
1375.00
2250.00
9945.00

C5-Surau
Frame
No

Description
1 Structural steel work

Unit
KG

Steel frame

100mm*100mm*6mm

Main Bar
Link
Formwork
Insitu Concrete

Y20
R10

KG
KG
M2
M3

Main bar
Link
Insitu concrete

Y20
R10

KG
KG
M3

2 Column

3 In floor beam

4 In roof Beam
Formwork
Main bar
Link
Insitu Concrete

5 Collection

Y20
R10

M2
KG
KG
M3

Quantity

Rate(RM)
Amount
615
10.00
6150.00

1316
440
113
7

4.00
4.00
40.00
450.00

5264.00
1760.00
4520.00
3150.00

504
164
4

4.00
4.00
450.00

2016.00
656.00
1800.00

28
376
178
4

40.00
4.00
4.00
450.00

1120.00
1504.00
712.00
1800.00
30452.00

C4-Block transit
Roof
No
1 Roof trusses

Description
Steel roof trusses (2 degree)
Steel roof trusses (10 degree)

2 Roof decking and wall cladding


Covering sloping

3 Underlay
Alluminium foil insulation
Rockwool Insulation

4 Sheet metal flashing


Gutter; galvanised iron sheet
Flashing; galvanised iron sheet

5 Rainwater installation
Arensi marley
Extra over for stop ends
UPVC RWDP

7 Collection

Unit
Item
Item

Quantity

Rate(RM)

Amount

1
1

21450.00
11250.00

21450.00
11250.00

M2
M2

143
74

120.00
120.00

17160.00
8880.00

M2
M2

217
217

15.00
25.00

3255.00
5425.00

M
M

94
22

50.00
50.00

4700.00
1100.00

125mm*170mm

M
NO

23
2

30.00
30.00

690.00
60.00

120mm*80mm downpipe
120mm*80mm in concrete slab
Extra over for swan deck
Extra over for bend
Extra over for shoes

M
M
NO
NO
NO

11
2
2
2
2

40.00
40.00
40.00
40.00
40.00

440.00
80.00
80.00
80.00
80.00

Pitch 2 degrees
Pitch 10 degrees

Fascia cladding

550mm girth flashing

74730.00

C5-Surau
External wall and balustrading
Description
No
1 Fibreglass reinforced concrete
100mm*100mm*8mm

1 Non-load bearing superstructure


115 thk; strecther bond
Extra over for ventalation

2 Damp proof course


3 Collection

Unit

100mm*100mm

Quantity

Rate(RM)

Amount

NO

200

400

M2

369

55.00

20295

NO
M

66
41

100.00
10.00

6600
410

27705

C5-Surau
Internal wall and partition
Description
No
1 Non-load bearing superstructure
115 thk; strecther bonds

2 Metalwork
Alluminium bronze adonised finish

Alluminium louvers panel

3 Woodwork
Hardwork shelf complete with
vanished finishes
4 Collection

Unit

Quantity

Rate(RM)

Amount

M2

129

55

7095.00

1750mm*1200mm

NO

735

2750mm*1200mm

NO

1150

2940.00
1150.00

2700mm*2700mm (T1)
2700mm*2700mm (T2)

NO
NO

3
1

1500
1500

4500.00
1500.00

4750mm*200mm*20mm(thk)

NO

2000

4000.00

21185.00

C5-Surau
External floor finishing
Description
No
1 Screeding

2 Collection

Insitu finishing

Unit
M2

QuantitRate(RM)
173

20.00

Amount
3460.00
3460.00

C5-Surau
Internal floor finishing
No
Description
1 Bed and backing
13mm thk to receive tiles on concrete base

2 Tiles, Slab and Block Finishing


Glazed homogeneous floor tiles
300mm*300mm*8.5mm

Collection

Unit

Floor
Skirting

Quantity

Rate(RM)

Amount

M2

72

20.00

1440.00

M2
M

72
42

80.00
8.00

5760.00
336.00
7536.00

C5-Surau
Internal Ceiling finishing
No
Description
Ceiling board

Unit

Quantity

Cement board ceiling

M2

72

On cement board ceiling

M2

72

Painting and decorating

Collection

Rate(RM)

Amount

60.00

4320.00

12.00

864.00
5184.00

C5-Surau
EXTERNAL CEILING FINISHES

No

Description

1 Ceiling board
Cement board ceiling

2 Painting and decorating


On cement board ceiling

3 Collection

Unit

3.5m-5.0m above ground level

Quantity

Rate(RM)

Amount

M2

173

60.00

10380.00

M2

173

12.00

2076.00
12456.00

C5-Surau
External wall finishing
No
Description
1 Plastering

2 Fibreglass reinforced concrete

3 Tile, slab and block finishing

Painting and decorating

Collection

Unit

Quantity

Rate(RM)

20mm thk Brickwork, blockwork or concrete work base

M2

171

20.00

100mm*100mm*8mm

548

50.00

To wall

M2

44

80.00

On plastered wall

M2

171

12.00

Amount
3420.00

27400.00

3520.00

2052.00
36392.00

C5-Surau
Internal wall finishing
No Description
1 Plastering

2 Painting and decorating


Emulsion paint

3 Collection

Unit

Quantity

Rate(RM)

20mm thk Brickwork, blockwork or concrete work base

M2

269

20.00

On plastered wall

M2

269

12.00

Amount
5380.00

3228.00
8608.00

C5-Surau
Fittings and furnishes
No
Description
1 Book shelves

Unit Quantity
1800mm*3000mm*300mm

2 Railtrack
3 Collection

Rate(RM)

NO

2000.00

100.00

Amount
4000.00
900.00
4900

C4-Block Transit
Sanitary Fittings
No
1 Stop cock
2 Tap
3 Floor trap
4 Ablution kerb
15 Collection

Description

Description
Wall flanged stop cock
Ablution tap
Stainless steel floor trap 150mm*150mm*100mm(diameter)
4900mm*400mm*170mm

Unit Quantity Rate(RM) Amount


NO
2
50.00
100.00
NO

10

50.00

500.00

NO

50.00

300.00

NO

1500.00

3000.00
3900.00

C4-Block Transit
Plumbing Installation
No
Description
1 Cold water system
Stainless steel (ss) pipe
ABS pipe

3 Sanitary installation pipework

UPVC pipes class D

4 Testing
Pipework
5 Sanitary installation
6 Collection

Unit
50mm
20mm
40mm

Quantity

Rate(RM)

LS
LS
LS

Amount
800.00
800.00
1000.00

Item

1000

Item

1000

Item

1000
5600.00

C5-Surau
Sundries
No
Description
1 Signages
5mm thk perspex with reverse inkjet sticker fixed
with hanging clips

5mm thk perspex with reverse inkjet sticker fixed


with tape and glue

acrylic boxed up sign with pin point


2 Step
3 Concrete bench
2750mm*400mm*510mm
1200mm*400mm*510mm
2 Collection

Unit Quantity

250mm*250mm high wall


150mm*450mm high wall

NO

1
4

300mm*90mm high directional signages


300mm*90mm high door signages

NO
NO

4
4

"SURAU" building sign

NO

NO

NO
NO

2
2

Rate(RM)

Amount

300.00
200.00

300.00
800.00

300.00
300.00

1200.00
1200.00

1000.00

1000.00

4500.00

9000.00

1000.00
1000.00

2000.00
2000.00
17500.00

C5-Surau
Summary
No
Description
1 Work below lower floor finish level
2 Ramps and apron
3 Frame
4 Roof
5 External wall and balustrading
6 Internal walls
8 External floor finishing
9 Internal floor finishing
10 External ceiling finishes
11 Internal Ceiling finishing
12 External wall finishing
13 Internal wall finishing
14 Fittings and furnishes
15 Sanitary Fittings
16 Plumbing Installation
17 Sundries
Total

Amount
119782.00
9945.00
30452.00
74730.00
27705.00
41615.00
3460.00
7536.00
12456.00
5184.00
36392.00
8608.00
4900.00
3900.00
5600.00
17500.00
409765.00