C5 Surau
C5 Surau
NO
Description
Unit
M3
1 Excavation
2 Pad Footing
Excavation
Lean Concrete
Formwork
M3
M3
Not exceed 250mm
250mm-500mm
M
M
Y12
Y16
R10
KG
KG
KG
M3
Y20
R10
KG
KG
M2
M3
Main Bar
Link
Insitu Concrete
3 Column
Main bar
Link
Formwork
Insitu concrete
4 Ground Beam
Excavation
Lean Concrete
formwork
M3
M3
250mm-500mm
500mm-1.00m
M2
M
Y12
Y20
R10
KG
KG
KG
M3
Main bar
Link
Insitu Concrete
5 Ground Slab
Lean Concrete
Damp-Proofing
Wiremesh
Insitu Concrete
6 Anti-Termite
A393
M3
M2
M2
Thk 100-150
M3
Item
NO
Quantity
Rate(RM)
Amount
50
15.00
750.00
166
6
15.00
300.00
2490.00
1800.00
155
76
10.00
20.00
1550.00
1520.00
1321
1032
413
36
4.00
4.00
4.00
450.00
5284.00
4128.00
1652.00
16200.00
1152
69
46
4
4.00
4.00
40.00
450.00
4608.00
276.00
1840.00
1800.00
24
3
15.00
300.00
360.00
900.00
372
103
20.00
40.00
176
2398
872
34
4.00
4.00
4.00
450.00
8
88
350
300.00
10.00
25.00
17
450.00
7440.00
4120.00
0.00
704.00
9592.00
3488.00
15300.00
0.00
0.00
2400.00
880.00
8750.00
0.00
7650.00
0.00
1500.00
32
400
12800.00
119782.00
C5-Surau
RAMPS AND APRON
No
Description
Unit
1 Apron
Excavation
Filling
Lean Concrete
Damp-proofing
Formwork
Wiremesh
Insitu Concrete
3 Collection
A393
M3
M2
M3
M2
M
M2
M3
Quantity
Rate(RM)
16
55
3
55
47
55
5
15.00
50.00
300.00
10.00
40.00
25.00
450.00
Amount
240.00
2750.00
900.00
550.00
1880.00
1375.00
2250.00
9945.00
C5-Surau
Frame
No
Description
1 Structural steel work
Unit
KG
Steel frame
100mm*100mm*6mm
Main Bar
Link
Formwork
Insitu Concrete
Y20
R10
KG
KG
M2
M3
Main bar
Link
Insitu concrete
Y20
R10
KG
KG
M3
2 Column
3 In floor beam
4 In roof Beam
Formwork
Main bar
Link
Insitu Concrete
5 Collection
Y20
R10
M2
KG
KG
M3
Quantity
Rate(RM)
Amount
615
10.00
6150.00
1316
440
113
7
4.00
4.00
40.00
450.00
5264.00
1760.00
4520.00
3150.00
504
164
4
4.00
4.00
450.00
2016.00
656.00
1800.00
28
376
178
4
40.00
4.00
4.00
450.00
1120.00
1504.00
712.00
1800.00
30452.00
C4-Block transit
Roof
No
1 Roof trusses
Description
Steel roof trusses (2 degree)
Steel roof trusses (10 degree)
3 Underlay
Alluminium foil insulation
Rockwool Insulation
5 Rainwater installation
Arensi marley
Extra over for stop ends
UPVC RWDP
7 Collection
Unit
Item
Item
Quantity
Rate(RM)
Amount
1
1
21450.00
11250.00
21450.00
11250.00
M2
M2
143
74
120.00
120.00
17160.00
8880.00
M2
M2
217
217
15.00
25.00
3255.00
5425.00
M
M
94
22
50.00
50.00
4700.00
1100.00
125mm*170mm
M
NO
23
2
30.00
30.00
690.00
60.00
120mm*80mm downpipe
120mm*80mm in concrete slab
Extra over for swan deck
Extra over for bend
Extra over for shoes
M
M
NO
NO
NO
11
2
2
2
2
40.00
40.00
40.00
40.00
40.00
440.00
80.00
80.00
80.00
80.00
Pitch 2 degrees
Pitch 10 degrees
Fascia cladding
74730.00
C5-Surau
External wall and balustrading
Description
No
1 Fibreglass reinforced concrete
100mm*100mm*8mm
Unit
100mm*100mm
Quantity
Rate(RM)
Amount
NO
200
400
M2
369
55.00
20295
NO
M
66
41
100.00
10.00
6600
410
27705
C5-Surau
Internal wall and partition
Description
No
1 Non-load bearing superstructure
115 thk; strecther bonds
2 Metalwork
Alluminium bronze adonised finish
3 Woodwork
Hardwork shelf complete with
vanished finishes
4 Collection
Unit
Quantity
Rate(RM)
Amount
M2
129
55
7095.00
1750mm*1200mm
NO
735
2750mm*1200mm
NO
1150
2940.00
1150.00
2700mm*2700mm (T1)
2700mm*2700mm (T2)
NO
NO
3
1
1500
1500
4500.00
1500.00
4750mm*200mm*20mm(thk)
NO
2000
4000.00
21185.00
C5-Surau
External floor finishing
Description
No
1 Screeding
2 Collection
Insitu finishing
Unit
M2
QuantitRate(RM)
173
20.00
Amount
3460.00
3460.00
C5-Surau
Internal floor finishing
No
Description
1 Bed and backing
13mm thk to receive tiles on concrete base
Collection
Unit
Floor
Skirting
Quantity
Rate(RM)
Amount
M2
72
20.00
1440.00
M2
M
72
42
80.00
8.00
5760.00
336.00
7536.00
C5-Surau
Internal Ceiling finishing
No
Description
Ceiling board
Unit
Quantity
M2
72
M2
72
Collection
Rate(RM)
Amount
60.00
4320.00
12.00
864.00
5184.00
C5-Surau
EXTERNAL CEILING FINISHES
No
Description
1 Ceiling board
Cement board ceiling
3 Collection
Unit
Quantity
Rate(RM)
Amount
M2
173
60.00
10380.00
M2
173
12.00
2076.00
12456.00
C5-Surau
External wall finishing
No
Description
1 Plastering
Collection
Unit
Quantity
Rate(RM)
M2
171
20.00
100mm*100mm*8mm
548
50.00
To wall
M2
44
80.00
On plastered wall
M2
171
12.00
Amount
3420.00
27400.00
3520.00
2052.00
36392.00
C5-Surau
Internal wall finishing
No Description
1 Plastering
3 Collection
Unit
Quantity
Rate(RM)
M2
269
20.00
On plastered wall
M2
269
12.00
Amount
5380.00
3228.00
8608.00
C5-Surau
Fittings and furnishes
No
Description
1 Book shelves
Unit Quantity
1800mm*3000mm*300mm
2 Railtrack
3 Collection
Rate(RM)
NO
2000.00
100.00
Amount
4000.00
900.00
4900
C4-Block Transit
Sanitary Fittings
No
1 Stop cock
2 Tap
3 Floor trap
4 Ablution kerb
15 Collection
Description
Description
Wall flanged stop cock
Ablution tap
Stainless steel floor trap 150mm*150mm*100mm(diameter)
4900mm*400mm*170mm
10
50.00
500.00
NO
50.00
300.00
NO
1500.00
3000.00
3900.00
C4-Block Transit
Plumbing Installation
No
Description
1 Cold water system
Stainless steel (ss) pipe
ABS pipe
4 Testing
Pipework
5 Sanitary installation
6 Collection
Unit
50mm
20mm
40mm
Quantity
Rate(RM)
LS
LS
LS
Amount
800.00
800.00
1000.00
Item
1000
Item
1000
Item
1000
5600.00
C5-Surau
Sundries
No
Description
1 Signages
5mm thk perspex with reverse inkjet sticker fixed
with hanging clips
Unit Quantity
NO
1
4
NO
NO
4
4
NO
NO
NO
NO
2
2
Rate(RM)
Amount
300.00
200.00
300.00
800.00
300.00
300.00
1200.00
1200.00
1000.00
1000.00
4500.00
9000.00
1000.00
1000.00
2000.00
2000.00
17500.00
C5-Surau
Summary
No
Description
1 Work below lower floor finish level
2 Ramps and apron
3 Frame
4 Roof
5 External wall and balustrading
6 Internal walls
8 External floor finishing
9 Internal floor finishing
10 External ceiling finishes
11 Internal Ceiling finishing
12 External wall finishing
13 Internal wall finishing
14 Fittings and furnishes
15 Sanitary Fittings
16 Plumbing Installation
17 Sundries
Total
Amount
119782.00
9945.00
30452.00
74730.00
27705.00
41615.00
3460.00
7536.00
12456.00
5184.00
36392.00
8608.00
4900.00
3900.00
5600.00
17500.00
409765.00