The document outlines 98 construction activities required to build a structure. It includes activities such as excavation, concrete work, installation of structural elements, plumbing and electrical work. Each activity is assigned a duration in days and estimated manpower requirements. The activities are broken down by phase from initial site work through to completion.

Uploaded by

John Orland
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

CPM Final Output 1

The document outlines 98 construction activities required to build a structure. It includes activities such as excavation, concrete work, installation of structural elements, plumbing and electrical work. Each activity is assigned a duration in days and estimated manpower requirements. The activities are broken down by phase from initial site work through to completion.

Uploaded by

John Orland
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1139

ACTIVITY NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

46
47
48
49
50
51

52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

ACTIVITY
Mobilization
Perimeter Fence
Storage Sheds
Workshops
Clearing and Grubbing
Laying out and staking
Excavation of Footing
Excavation of Wall Footing
Laying of CHB and Reinforcements (Wall Footing)
Fabrication of Reinforcements (Footing)
Installation of Reinforcements (Footing)
Pouring of Concrete (Footing)
Curing of Concrete (Footing)
Backfilling of Footing
Compaction of Footing
Laying of Gravel Base
Fabrication of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab)
Fabrication of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab)
Curing of Concrete (Ground Floor Slab)
Removal of Formworks (Ground Floor Slab)
Fabrication of Reinforcements (Ground Floor Column)
Installation of Reinforcements (Ground Floor Column)
Fabrication of Formworks (Ground Floor Columns)
Installation of Formworks (Ground Floor Column)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Column)
Curing of Concrete (Ground Floor Column)
Removal of Formworks (Ground Floor Column)
Fabrication of Formworks (2nd Floor Beams and Slabs)
Installation of Formworks (2nd Floor Beams and Slabs)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)
Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Pouring of Concrete ( 2nd Floor Beams and Slabs)
Curing of Concrete (2nd Floor Beams and Slabs)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Reinforcements (2nd Floor Columns)
Fabrication of Formworks (2nd Floor Columns)

Installation of Formworks (2nd Floor Columns)


Pouring of Concrete (2nd Floor Column)
Curing of Concrete (2nd Floor Column)
Removal of Formworks (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Installation of Formworks (Roof Beam)

Fabrication of Scaffoldings (Roof Beams)


Installation of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)
Installation of Reinforcements (Roof Beams)
Pouring of Concrete (Roof Beams)
Curing of Concrete (Roof Beams)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Fabrication of Purlins
Installation of Purlins
Installation of Roofs
Installation of Roof Accessories
Installation of Reinforcements (Second Floor Wall)
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Plastering of Wall (Ground Floor)
Fabrication of Wood Stairs
Installation of Wood Stairs
Installation of Doors and Windows (Second Floor)
Installation of Doors and Windows (Ground Floor)
Tile Lay out (2nd Floor)
Tile Lay out (Ground Floor)
Installation of Water Closet
Installation of Kitchen Sink
Installation of Shower Drain
Installation of Lavatory
Installation of Shower Head
Installation of Electrical Accessories
Installation of Ceiling Insulators
Installation of Wood Ceiling
Painting (Interior)
Painting (Exterior)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank
Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank
Installation of Formworks for Septic Tank
Pouring of Concrete (Septic Tank)
Curing of Concrete (Septic Tank)
Septic pipes fix
Backfilling of Septic Tank
Cleaning of Site and Structure
Demobilization

ACTIVITY NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

89
90
91
92
93
94
95
96
97
98

ACTIVITY
Mobilization
Perimeter Fence
Storage Sheds
Workshops
Clearing and Grubbing
Laying out and staking
Excavation of Footing
Excavation of Wall Footing
Laying of CHB and Reinforcements (Wall Footing)
Fabrication of Reinforcements (Footing)
Installation of Reinforcements (Footing)
Pouring of Concrete (Footing)
Curing of Concrete (Footing)
Backfilling of Footing
Compaction of Footing
Laying of Gravel Base
Fabrication of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab)
Fabrication of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab)
Curing of Concrete (Ground Floor Slab)
Removal of Formworks (Ground Floor Slab)
Fabrication of Reinforcements (Ground Floor Column)
Installation of Reinforcements (Ground Floor Column)
Fabrication of Formworks (Ground Floor Columns)
Installation of Formworks (Ground Floor Column)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Column)
Curing of Concrete (Ground Floor Column)
Removal of Formworks (Ground Floor Column)
Fabrication of Formworks (2nd Floor Beams and Slabs)
Installation of Formworks (2nd Floor Beams and Slabs)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)
Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Pouring of Concrete ( 2nd Floor Beams and Slabs)
Curing of Concrete (2nd Floor Beams and Slabs)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Columns)


Fabrication of Formworks (2nd Floor Columns)
Installation of Formworks (2nd Floor Columns)
Pouring of Concrete (2nd Floor Column)
Curing of Concrete (2nd Floor Column)
Removal of Formworks (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Installation of Formworks (Roof Beam)
Fabrication of Scaffoldings (Roof Beams)
Installation of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)
Installation of Reinforcements (Roof Beams)
Pouring of Concrete (Roof Beams)
Curing of Concrete (Roof Beams)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Fabrication of Purlins
Installation of Purlins
Installation of Roofs
Installation of Roof Accessories
Installation of Reinforcements (Second Floor Wall)
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Plastering of Wall (Ground Floor)
Fabrication of Wood Stairs
Installation of Wood Stairs
Installation of Doors and Windows (Second Floor)
Installation of Doors and Windows (Ground Floor)
Tile Lay out (2nd Floor)
Tile Lay out (Ground Floor)
Installation of Water Closet
Installation of Kitchen Sink
Installation of Shower Drain
Installation of Lavatory
Installation of Shower Head
Installation of Electrical Accessories
Installation of Ceiling Insulators
Installation of Wood Ceiling
Painting (Interior)
Painting (Exterior)
Excavation for Septic Tank

Fabrication of Reinforcements for Septic Tank


Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank
Installation of Formworks for Septic Tank
Pouring of Concrete (Septic Tank)
Curing of Concrete (Septic Tank)
Septic pipes fix
Backfilling of Septic Tank
Cleaning of Site and Structure
Demobilization

DURATION
3
3
2
2
1
1
6
6
6
5
7
7
7
7
4
1
14
14
4
7
5
7
2
7
14
5
14
15
5
7
2
21
20
3
21
21
28
8
10
7
3
3
13

days
days
days
days
day
day
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days

14
5
6
5
7
2
7
8
5
5
7
6
5
7
2
2
7
21
21
21
7
28
28
7
28
28
28
28
7
5
7
7
20
20
2
2
2
2
2
5
5
5
30
30
2

days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days
days

2
1
1
1
1
7
2
1
6
2

days
days
days
days
days
days
days
days
days
days

MANPO

ACTIVITY NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

MANPOWER SCHEDUL

ACTIVITY

Mobilization
Perimeter Fence
Storage Sheds
Workshops
Clearing and Grubbing
Laying out and staking
Excavation of Footing
Excavation of Wall Footing
Laying of CHB and Reinforcements (Wall Footing)
Fabrication of Reinforcements (Footing)
Installation of Reinforcements (Footing)
Pouring of Concrete (Footing)
Curing of Concrete (Footing)
Backfilling of Footing
Compaction of Footing
Laying of Gravel Base
Fabrication of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab)
Fabrication of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab)
Curing of Concrete (Ground Floor Slab)
Removal of Formworks (Ground Floor Slab)
Fabrication of Reinforcements (Ground Floor Column)
Installation of Reinforcements (Ground Floor Column)
Fabrication of Formworks (Ground Floor Columns)
Installation of Formworks (Ground Floor Column)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Column)
Curing of Concrete (Ground Floor Column)
Removal of Formworks (Ground Floor Column)
Fabrication of Formworks (2nd Floor Beams and Slabs)
Installation of Formworks (2nd Floor Beams and Slabs)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)
Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs

Pouring of Concrete ( 2nd Floor Beams and Slabs)


Curing of Concrete (2nd Floor Beams and Slabs)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Reinforcements (2nd Floor Columns)
Fabrication of Formworks (2nd Floor Columns)
Installation of Formworks (2nd Floor Columns)
Pouring of Concrete (2nd Floor Column)
Curing of Concrete (2nd Floor Column)
Removal of Formworks (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Installation of Formworks (Roof Beam)
Fabrication of Scaffoldings (Roof Beams)
Installation of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)
Installation of Reinforcements (Roof Beams)
Pouring of Concrete (Roof Beams)
Curing of Concrete (Roof Beams)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Fabrication of Purlins
Installation of Purlins
Installation of Roofs
Installation of Roof Accessories
Installation of Reinforcements (Second Floor Wall)
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Plastering of Wall (Ground Floor)
Fabrication of Wood Stairs
Installation of Wood Stairs
Installation of Doors and Windows (Second Floor)
Installation of Doors and Windows (Ground Floor)
Tile Lay out (2nd Floor)
Tile Lay out (Ground Floor)
Installation of Water Closet
Installation of Kitchen Sink
Installation of Shower Drain
Installation of Lavatory
Installation of Shower Head
Installation of Electrical Accessories

Installation of Ceiling Insulators


Installation of Wood Ceiling
Painting (Interior)
Painting (Exterior)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank
Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank
Installation of Formworks for Septic Tank
Pouring of Concrete (Septic Tank)
Curing of Concrete (Septic Tank)
Septic pipes fix
Backfilling of Septic Tank
Cleaning of Site and Structure
Demobilization
TOTAL
Unit Cost (PHP)
Unit

2
2

2
2

1
1
2
1

DRIVER/MECHANIC

PAINTER

ELECTRICIAN

PLUMBER

STEEL MAN

1
1

2
1

1
2

TOTAL

LABORER

CARPENTER

MASON

2
1
1

6
4
5
3
5
3
4
5
5
4
5
6
2
6
3
5
4
5
2
6
4
2
2
6
6
4
4
4
5
2
2
4
4
2
4
4
7
5

TIME KEEPER

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

SURVEYOR

ENGINEER

ANPOWER SCHEDULE

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

6
6
6
4
5
3
4
5
7
6
5
6
2
6
3
5
5
6
4
8
4
2
2
8
7
6
6
6
5
2
2
5
5
4
5
5
9
5

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1

2
2
1
2

2
2
2
1

5
2
2
2
5
7
5
5
6
5
2
4
7
7
5
5
8
5
2
2
2
6
8
6
5
5
4
3
5
5
3
4
4
3
5
3
3
4
4
5
6
3
4
6
2

2
1

2
2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5
2
2
2
7
8
6
6
6
5
2
6
9
8
7
7
10
5
2
2
2
6
8
6
5
6
4
3
6
5
3
6
6
5
6
3
3
4
4
5
6
3
4
6
2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1250

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

7
4
4
4

2
2

400

475

450

5
4
5
4
4
2
2
4
4
4
4
350

450

450

450

400

350

350

7
5
4
4
5
6
5
6
6
2
2
6
4
4
4

COST
11,450.00
5,500.00
9,400.00
2,650.00
2,100.00
1,450.00
16,100.00
13,700.00
16,200.00
11,500.00
16,150.00
16,700.00
4,900.00
11,200.00
4,200.00
1,750.00
45,800.00
45,150.00
6,400.00
17,750.00
12,300.00
16,100.00
4,600.00
25,550.00
53,950.00
12,400.00
27,650.00
29,600.00
13,200.00
16,100.00
4,600.00
67,550.00
56,050.00
4,800.00
41,650.00
70,950.00
109,200.00
14,000.00

22,300.00
16,100.00
6,900.00
2,100.00
34,850.00
40,600.00
13,100.00
16,550.00
13,000.00
19,600.00
4,600.00
15,150.00
23,800.00
13,100.00
11,650.00
18,550.00
22,200.00
16,750.00
16,100.00
4,600.00
1,400.00
19,950.00
64,400.00
53,300.00
39,200.00
15,400.00
65,150.00
29,400.00
14,900.00
81,850.00
29,400.00
86,175.00
91,925.00
13,650.00
11,000.00
7,350.00
9,350.00
28,000.00
28,000.00
3,500.00
4,200.00
2,100.00
2,800.00
4,200.00
4,000.00

12,250.00
9,250.00
64,000.00
48,000.00
3,500.00
4,600.00
1,750.00
2,300.00
2,300.00
700.00
4,900.00
4,600.00
700.00
9,800.00
2,800.00
2,053,950.00

Equipment
Minitruck
Loader
Service Vehicle
Welding Machine
Hand Drill
Bar Cutter
One Bagger Mixer
Cutting Outfit
Angle Grinder
Pipe Threader
Concrete Vibrator
Manpower
Project Engineer
Mason
Carpenter
Steelman
Plumber
Electrician
Painter
Warehouseman
Driver/Mechanic
Surveyor
Equipment controller
Laborer
Security
Time keeper
Management and Office Staff
Materials
fence materials
intruments for surveying and layouting
clearing materials
materials for excavation (Shovel, Wheel Barrel, etc.)
materials for backfilling and tampering
portland cement,crushed gravel G-1,washed sand( for foundation)
portland cement,crushed gravel G-1,washed sand(column footing)
portland cement,crushed gravel G-1,washed sand(tie beams)
portland cement,crushed gravel G-1,washed sand(column)
portland cement,crushed gravel G-1,washed sand(beams & girders)
portland cement,crushed gravel G-1,washed sand(stairs)
portland cement,crushed gravel G-1,washed sand(roof beams)
steel bars for reinforcement
scaffoldings
doors and windows
welding machine & welding rod
formworks(plywood,etc.)
Ceiling and insulator (plywwod, etc)

electrical works materials(wires,etc.)


plumbing works materials(pipes,etc)
plastering materials( adhesive)
painting materials(paints,etc.)
portland cement (concrete topping - tiles)
flooring materials(tiles,etc.)
CHB

Rate per Hour


921.49
3096.00
125.00
271.76
109.35
109.35
257.14
62.13
57.12
57.12
80.00
Rate per day
1250.00
475.00
450.00
450.00
450.00
450.00
400.00
350.00
350.00
400.00
420.00
350.00
350.00
350.00
450.00
Rate
18000.00
25200.00
5000.00
47168.00
17550.00
135158.80
29263.60
35605.60
56822.40
69153.10
48775.80
21847.60
293284.05
33000.00
113727.30
27589.00
127260.00
712879.45

Rate per Day


7371.92
24768.00
1000.00
2174.08
874.80
874.80
2057.12
497.04
456.96
456.96
640.00
0.00
Rate per month
30000.00
11400.00
10800.00
10800.00
10800.00
10800.00
9600.00
8400.00
8400.00
9600.00
10080.00
8400.00
8400.00
8400.00
10800.00
Overhead Cost
Overhead Cost

Overhead Cost
Overhead Cost

64397.15
86284.00
44964.00
70614.96
203964.00
264075.45
69872.00
2621456.26

EQUIPMENT SCHE

ITEM NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81

82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

EQUIPMENT SCHEDULE

ACTIVITY

Mobilization
Perimeter Fence
Storage Sheds
Workshops
Clearing and Grubbing
Laying out and staking
Excavation of Footing
Excavation of Wall Footing
Laying of CHB and Reinforcements (Wall Footing)
Fabrication of Reinforcements (Footing)
Installation of Reinforcements (Footing)
Pouring of Concrete (Footing)
Curing of Concrete (Footing)
Backfilling of Footing
Compaction of Footing
Laying of Gravel Base
Fabrication of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab)
Fabrication of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab)
Curing of Concrete (Ground Floor Slab)
Removal of Formworks (Ground Floor Slab)
Fabrication of Reinforcements (Ground Floor Column)
Installation of Reinforcements (Ground Floor Column)
Fabrication of Formworks (Ground Floor Columns)
Installation of Formworks (Ground Floor Column)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Column)
Curing of Concrete (Ground Floor Column)
Removal of Formworks (Ground Floor Column)
Fabrication of Formworks (2nd Floor Beams and Slabs)
Installation of Formworks (2nd Floor Beams and Slabs)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Pouring of Concrete ( 2nd Floor Beams and Slabs)
Curing of Concrete (2nd Floor Beams and Slabs)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Reinforcements (2nd Floor Columns)
Fabrication of Formworks (2nd Floor Columns)
Installation of Formworks (2nd Floor Columns)
Pouring of Concrete (2nd Floor Column)
Curing of Concrete (2nd Floor Column)
Removal of Formworks (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Installation of Formworks (Roof Beam)
Fabrication of Scaffoldings (Roof Beams)
Installation of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)
Installation of Reinforcements (Roof Beams)
Pouring of Concrete (Roof Beams)
Curing of Concrete (Roof Beams)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Fabrication of Purlins
Installation of Purlins
Installation of Roofs
Installation of Roof Accessories
Installation of Reinforcements (Second Floor Wall)
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Plastering of Wall (Ground Floor)
Fabrication of Wood Stairs
Installation of Wood Stairs
Installation of Doors and Windows (Second Floor)
Installation of Doors and Windows (Ground Floor)
Tile Lay out (2nd Floor)
Tile Lay out (Ground Floor)
Installation of Water Closet
Installation of Kitchen Sink
Installation of Shower Drain
Installation of Lavatory

Installation of Shower Head


Installation of Electrical Accessories
Installation of Ceiling Insulators
Installation of Wood Ceiling
Painting (Interior)
Painting (Exterior)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank
Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank
Installation of Formworks for Septic Tank
Pouring of Concrete (Septic Tank)
Curing of Concrete (Septic Tank)
Septic pipes fix
Backfilling of Septic Tank
Cleaning of Site and Structure
Demobilization
Unit Cost (PHP)

6
6

Sevice Vehicle

3
3

21
7

6
6
5
7

14
4

7
5

21

Tile Cutter

Wood Saw

Concrete Vibrator

Hand Drill

Bagger Mixer

Bar Cutter

Welding Machine

Mini Truck

3
3
2
2
1
1
6
6
6
5
7
7
7
7
4
1
14
14
4
7
5
7
2
7
14
5
14
16
5
7
2
21
21
3
21
21
Loader

Duration

HEDULE

28
8
10
7
3
3
13
14
5
6
5
7
2
7
8
5
5
7
6
5
7
2
2
7
21
21
21
7
28
28
7
28
28
28
28
7
5
7
7
20
20
2
2
2
2

10

10

13
5
5

7
5
7
5

21

7
5
7
7

5
7
7
20
20

2
5
5
5
30
30
2
2
1
1
1
1
7
2
1
7
2

2
2
1
1
1

22
3096
unit

2
2
26
5
40
69
921.49 125 271.76 109.35
unit
unit
unit
unit

38
357
unit

24
109.35
unit

38
228
unit

58
40
88.5 84
unit unit

COST
3,139.47
3,096.00
24,104.94
24,104.94
546.75
4,095.00
28,122.43
1,530.90
354.00
2,925.00
765.45
442.50
2,925.00
1,858.50
265.50
2,296.35

5,850.00
1,421.55
442.50
2,925.00
619.50
442.50
765.45
2,925.00
5,706.96
619.50
1,905.55
2,667.77
2,667.77
1,680.00
1,680.00
-

546.75
8,034.98
218.70
88.50
228.00
357.00
2,092.98
144,458.69

ACTIVITY NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

97
98

ACTIVITY

Mobilization
Perimeter Fence
Storage Sheds
Workshops
Clearing and Grubbing
Laying out and staking
Excavation of Footing
Excavation of Wall Footing
Laying of CHB and Reinforcements (Wall Footing)
Fabrication of Reinforcements (Footing)
Installation of Reinforcements (Footing)
Pouring of Concrete (Footing)
Curing of Concrete (Footing)
Backfilling of Footing
Compaction of Footing
Laying of Gravel Base
Fabrication of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab)
Fabrication of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab)
Curing of Concrete (Ground Floor Slab)
Removal of Formworks (Ground Floor Slab)

Fabrication of Reinforcements (Ground Floor Column)


Installation of Reinforcements (Ground Floor Column)
Fabrication of Formworks (Ground Floor Columns)
Installation of Formworks (Ground Floor Column)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Column)
Curing of Concrete (Ground Floor Column)
Removal of Formworks (Ground Floor Column)
Fabrication of Formworks (2nd Floor Beams and Slabs)
Installation of Formworks (2nd Floor Beams and Slabs)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)
Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Pouring of Concrete ( 2nd Floor Beams and Slabs)
Curing of Concrete (2nd Floor Beams and Slabs)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Reinforcements (2nd Floor Columns)
Fabrication of Formworks (2nd Floor Columns)
Installation of Formworks (2nd Floor Columns)
Pouring of Concrete (2nd Floor Column)
Curing of Concrete (2nd Floor Column)
Removal of Formworks (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Installation of Formworks (Roof Beam)

Fabrication of Scaffoldings (Roof Beams)


Installation of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)
Installation of Reinforcements (Roof Beams)
Pouring of Concrete (Roof Beams)
Curing of Concrete (Roof Beams)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Fabrication of Purlins
Installation of Purlins
Installation of Roofs
Installation of Roof Accessories
Installation of Reinforcements (Second Floor Wall)
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Plastering of Wall (Ground Floor)
Fabrication of Wood Stairs
Installation of Wood Stairs
Installation of Doors and Windows (Second Floor)
Installation of Doors and Windows (Ground Floor)
Tile Lay out (2nd Floor)
Tile Lay out (Ground Floor)
Installation of Water Closet
Installation of Kitchen Sink
Installation of Shower Drain
Installation of Lavatory
Installation of Shower Head, Gate Valve, Water Meters, Check Valves & Faucet
Installation of Electrical Accessories
Installation of Ceiling Insulators
Installation of Wood Ceiling
Painting (Interior)
Painting (Exterior)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank
Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank
Installation of Formworks for Septic Tank
Pouring of Concrete (Septic Tank)
Curing of Concrete (Septic Tank)
Septic pipes fix
Backfilling of Septic Tank

Cleaning of Site and Structure


Demobilization

DURATION
3
3
2
2
1
1
6
6
6
5
7
7
7
7
4
1
14
14
4
7
5
7
2

7
14
5
14
16
5
7
2
21
21
3
21
21
28
8
10
7
3
3
13
14
5
6
5
7
2
7
8

5
5
7
6
5
7
2
2
7
21
21
21
7
28
28
7
28
28
28
28
7
5
7
7
20
20
2
2
2
2
2
5
5
5
30
30
2
2
1
1
1
1
7
2
1

7
2

ACTIVITY NO.

DAY

1
2

1
2

1
5
2

3
4
6

3
4
7

7
8
19
10

7
8
19
10

7
8
19
10

7
8
19
10

10

8
10
26
7

11

8
24
26

12

24
26
16

13

24
26
11

14

26
24
11

15

24
34
11
25

16

24
11
25
34

17

24
11
25
34

18

11
25
12

19

11
25
12

20

25
12
9

21

25
12
9

22

25
12
9

23

25
12
9

24

25
12
9

25

25
9
13
17

26

25
13
17
14

27

25
13
17
14

28

25
13
17
14

29

13
17
28
14

30

13
17
28
14
15

31

13
17
28
14
15

32

17
18
28
14
15

33

17

18
28
15

34

17
18
28

35

17
18
28

36

17
18
28

37

17
18
28

38

17
18
28

39

18
28
20

40

18
20

28

41

18
20
28

42

18
20
28
21

43

18
20
28
21

44

18
20
28
21

45

18
20
21
32

46

21
32
36

47

22
32
36

48

22
32
36

49

22
32
36

50

22
32
36

51

22
32
36

52

22
32
36

53

22
32
36

54

23
32
36
27

55

23
32
36
27

56

32
36
27

57

32
36
27

58

32
36
27

59

32
36
27

60

32
36
27

61

32
36
27

62

32
36
43
27

63

32
36
43
27

64

32
36
43
27

65

32
36
43
27

66

36
43
27
29

67

43
27
29

68

29
43
33
35

69

29
33
35
43

70

29
33
35
43

71

30
33
35
43

72

30
33
35
43

73

30
33
35
43

74

30
33
35
43

75

30
33
35
37

76

30

33
35
37

77

30
33
35
37

78

31
33
35
37

79

31
33
35
37

80

33
35
37

81

33
35
37

82

33
35
37

83

33
35

37

84

33
35
37

85

33
35
37

86

33
35
37

87

33
35
37

88

33
35
37
38

89

37
38
44

90

37
38
44

91

37
38
44

92

37
38
44

93

37
38
44

94

37
38
44

95

37
38
44

96

37
44
39

97

37
44
39

98

37
44
39

99

37
44
39

100

37
44
39

101

37
44
39

102

37
44
39

103

39
45
52

104

39
45
52

105

39
45
52

106

40
45
52
54

107

40
45
52
54

108

40
54
46
50

109

40
54
46
50

110

40
54
46
50

111

40
54
46
50

112

40
54
46
50

113

41
42
46
47
50

114

41
42
47
50
60

115

41
42
47
60

116

47
60
53

117

47
60
53

118

48
60
53

119

48

60
53
51

120

48
60
53
51

121

48
55
51

122

48
55
51

123

48
55
51

124

48
55
51

125

49
55
51

126

49
55

51

127

56
64
61

128

56
64
61

129

56
64
61

130

56
64
61

131

56
64
61

132

57
64
61
62

133

57
64
61

62

134

57
61
62
66
65

135

57
61
62
66
65

136

57
61
62
66
65

137

57
61
62
66
65

138

57
61
62
66
65

139

58
59
61
62
66
65
58
59
61
62

140

141

66
65
61
62
66
65

142

61
62
66
65

143

61
62
66
65

144

61
62
66
65

145

61
62
66
65

146

61
62
66
65

147

61
62
66
65

148

62
66
67
65

149

62
65
67
66

150

62
65
66
67

151

62
65
66
67

152

62
65
66
67

153

65
67
66
68
69

154

65
66
67
68
69

155

65
68
66
63
69

156

65
68
66
63
69

157

65
68
66
63
69

158

65
68
66
63
69

159

65
68
66
63
69

160

65
68
66
63
69

161

65
68
66
63
69

162

68

63
69
74
72
163

68
63
69
74
72

164

68
63
69
74
72

165

68
63
69
74
72

166

68
63
69
74
72

167

68
63
69
74
72

168

68
63
69
74
72

169

68
63

69
70

170

68
63
69
70

171

68
63
69
70

172

68
63
69
70

173

68
63
69
70

174

68
63
69
70

175

68
63
69
70

176

68
69
70

84

177

68
69
70
84

178

68
69
70
84

179

68
69
70
84

180

68
69
70
84

181

70
75
78
80
81

182

70
75
78
80
81

183

70
75
82
79

184

70
75
82
79

185

70
75
73
85

186

70
75
73
85

187

70
75
73
85

188

70
71
73
85

189

70
71
73
85

190

70
71
88
89

191

70
71
88
89

192

70
71
90
91

193

70
71
92

194

70
71
95

195

70
71
95

196

70
71
86
93

197

71
86
94
76

198

71
86
94
76

199

71
86
94
76

200

71
86
94
76

201

71
86
94
76

202

71
86
94
76

203

71
86
94
76

204

71
86
76
96

205

71

86
76

206

71
86
76

207

71
86
76

208

71
86
76

209

71
86
76

210

71
86
76

211

71
86
76

212

71
86

76

213

71
86
76

214

71
86
76

215

71
86
76

216

86
76
87
83

217

86
87
83
77

218

86
87
83
77

219

86
87
83

77

220

86
87
83
77

221

86
87
77

222

86
87
77

223

86
87
77

224

86
87
77

225

86
87
77

226

87
77

227

87
77

228

87
77

229

87
77

230

87
77

231

87
77

232

87
77

233

87
77

234

87
77

235

87
77

236

87
77

237

87

238

87

239

87

240

87

241

87

242

87

243

87

244

87

245

87

246

97

247

97

248

97

249

97

251

97

252

97

253

97

254

98

255

98

ACTIVITY

Mobilization
Perimeter Fence

Mobilization
Perimeter Fence

Mobilization
Clearing and Grubbing
Perimeter Fence

Storage Sheds
Workshops
Laying out and staking

Storage Sheds
Workshops
Excavation of Footing

Excavation
Excavation
Fabrication
Fabrication

of
of
of
of

Footing
Wall Footing
Formworks (Ground Floor Slab)
Reinforcements (Footing)

Excavation
Excavation
Fabrication
Fabrication

of
of
of
of

Footing
Wall Footing
Formworks (Ground Floor Slab)
Reinforcements (Footing)

Excavation
Excavation
Fabrication
Fabrication

of
of
of
of

Footing
Wall Footing
Formworks (Ground Floor Slab)
Reinforcements (Footing)

Excavation
Excavation
Fabrication
Fabrication

of
of
of
of

Footing
Wall Footing
Formworks (Ground Floor Slab)
Reinforcements (Footing)

Excavation
Fabrication
Fabrication
Excavation

of
of
of
of

Wall Footing
Reinforcements (Footing)
Formworks (Ground Floor Columns)
Footing

Excavation of Wall Footing


Fabrication of Reinforcements (Ground Floor Column)
Fabrication of Formworks (Ground Floor Columns)

Fabrication of Reinforcements (Ground Floor Column)


Fabrication of Formworks (Ground Floor Columns)
Laying of Gravel Base

Fabrication of Reinforcements (Ground Floor Column)


Fabrication of Formworks (Ground Floor Columns)
Installation of Reinforcements (Footing)

Fabrication of Formworks (Ground Floor Columns)


Fabrication of Reinforcements (Ground Floor Column)
Installation of Reinforcements (Footing)

Fabrication of Reinforcements (Ground Floor Column)


Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (Footing)
Installation of Reinforcements (Ground Floor Column)

Fabrication of Reinforcements (Ground Floor Column)


Installation of Reinforcements (Footing)
Installation of Reinforcements (Ground Floor Column)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)

Fabrication of Reinforcements (Ground Floor Column)


Installation of Reinforcements (Footing)
Installation of Reinforcements (Ground Floor Column)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)

Installation of Reinforcements (Footing)


Installation of Reinforcements (Ground Floor Column)
Pouring of Concrete (Footing)

Installation of Reinforcements (Footing)


Installation of Reinforcements (Ground Floor Column)
Pouring of Concrete (Footing)

Installation of Reinforcements (Ground Floor Column)


Pouring of Concrete (Footing)
Laying of CHB and Reinforcements (Wall Footing)

Installation of Reinforcements (Ground Floor Column)


Pouring of Concrete (Footing)
Laying of CHB and Reinforcements (Wall Footing)

Installation of Reinforcements (Ground Floor Column)


Pouring of Concrete (Footing)
Laying of CHB and Reinforcements (Wall Footing)

Installation of Reinforcements (Ground Floor Column)


Pouring of Concrete (Footing)
Laying of CHB and Reinforcements (Wall Footing)

Installation of Reinforcements (Ground Floor Column)


Pouring of Concrete (Footing)
Laying of CHB and Reinforcements (Wall Footing)

Installation of Reinforcements (Ground Floor Column)


Laying of CHB and Reinforcements (Wall Footing)
Curing of Concrete (Footing)
Fabrication of Reinforcements (Ground Floor Slab)

Installation of Reinforcements (Ground Floor Column)


Curing of Concrete (Footing)
Fabrication of Reinforcements (Ground Floor Slab)
Backfilling of Footing

Installation of Reinforcements (Ground Floor Column)


Curing of Concrete (Footing)
Fabrication of Reinforcements (Ground Floor Slab)
Backfilling of Footing

Installation of Reinforcements (Ground Floor Column)


Curing of Concrete (Footing)
Fabrication of Reinforcements (Ground Floor Slab)
Backfilling of Footing

Curing of Concrete (Footing)


Fabrication of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Backfilling of Footing

Curing of Concrete (Footing)


Fabrication of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Backfilling of Footing
Compaction of Footing
Curing of Concrete (Footing)
Fabrication of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Backfilling of Footing
Compaction of Footing
Fabrication of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Backfilling of Footing
Compaction of Footing
Fabrication of Reinforcements (Ground Floor Slab)

Installation of Reinforcements (Ground Floor Slab)


Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Compaction of Footing

Fabrication of Reinforcements (Ground Floor Slab)


Installation of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)

Fabrication of Reinforcements (Ground Floor Slab)


Installation of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)

Fabrication of Reinforcements (Ground Floor Slab)


Installation of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)

Fabrication of Reinforcements (Ground Floor Slab)


Installation of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)

Fabrication of Reinforcements (Ground Floor Slab)


Installation of Reinforcements (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)

Installation of Reinforcements (Ground Floor Slab)


Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Installation of Formworks (Ground Floor Slab)

Installation of Reinforcements (Ground Floor Slab)


Installation of Formworks (Ground Floor Slab)

Securing a place for Electrical and Plumbing in Slabs (Ground Floor)

Installation of Reinforcements (Ground Floor Slab)


Installation of Formworks (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)

Installation of Reinforcements (Ground Floor Slab)


Installation of Formworks (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Slab)

Installation of Reinforcements (Ground Floor Slab)


Installation of Formworks (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Slab)

Installation of Reinforcements (Ground Floor Slab)


Installation of Formworks (Ground Floor Slab)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Slab)

Installation of Reinforcements (Ground Floor Slab)


Installation of Formworks (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab)
Fabrication of Formworks (2nd Floor Beams and Slabs)

Pouring of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Curing of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Curing of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Curing of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Curing of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Curing of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Curing of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Curing of Concrete (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)

Removal of Formworks (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Removal of Formworks (Ground Floor Slab)


Fabrication of Formworks (2nd Floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Formworks (Ground Floor Column)

Fabrication of Reinforcements ( 2nd floor Beams and Slabs)


Fabrication of Reinforcements (2nd Floor Columns)
Installation of Formworks (Ground Floor Column)
Pouring of Concrete (Ground Floor Column)

Fabrication of Reinforcements (2nd Floor Columns)


Installation of Formworks (Ground Floor Column)
Pouring of Concrete (Ground Floor Column)

Pouring of Concrete (Ground Floor Column)


Fabrication of Reinforcements (2nd Floor Columns)
Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)

Pouring of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)

Pouring of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)

Curing of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)

Curing of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)

Curing of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)

Curing of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)

Curing of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Curing of Concrete (Ground Floor Column)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Curing of Concrete (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Removal of Formworks (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Removal of Formworks (Ground Floor Column)


Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)

Installation of Formworks (2nd Floor Beams and Slabs)


Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)
Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Installation of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Installation of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Installation of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Installation of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Installation of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Installation of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Installation of Reinforcements (2nd Floor Columns)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Installation of Reinforcements (2nd Floor Columns)
Pouring of Concrete ( 2nd Floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Installation of Reinforcements (2nd Floor Columns)
Pouring of Concrete ( 2nd Floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Installation of Reinforcements (2nd Floor Columns)
Pouring of Concrete ( 2nd Floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Installation of Reinforcements (2nd Floor Columns)
Pouring of Concrete ( 2nd Floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Installation of Reinforcements (2nd Floor Columns)
Pouring of Concrete ( 2nd Floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Installation of Reinforcements (2nd Floor Columns)
Pouring of Concrete ( 2nd Floor Beams and Slabs)

Installation of Reinforcements (2nd Floor Beams and Slabs)


Installation of Reinforcements (2nd Floor Columns)
Pouring of Concrete ( 2nd Floor Beams and Slabs)

Pouring of Concrete ( 2nd Floor Beams and Slabs)


Fabrication of Formworks (2nd Floor Columns)
Fabrication of Scaffoldings (Roof Beams)

Pouring of Concrete ( 2nd Floor Beams and Slabs)


Fabrication of Formworks (2nd Floor Columns)
Fabrication of Scaffoldings (Roof Beams)

Pouring of Concrete ( 2nd Floor Beams and Slabs)


Fabrication of Formworks (2nd Floor Columns)
Fabrication of Scaffoldings (Roof Beams)

Curing of Concrete (2nd Floor Beams and Slabs)


Fabrication of Formworks (2nd Floor Columns)
Fabrication of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)

Curing of Concrete (2nd Floor Beams and Slabs)


Fabrication of Formworks (2nd Floor Columns)
Fabrication of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)

Curing of Concrete (2nd Floor Beams and Slabs)


Fabrication of Reinforcements (Roof Beams)
Installation of Formworks (2nd Floor Columns)
Fabrication of Formworks (Roof Beams)

Curing of Concrete (2nd Floor Beams and Slabs)


Fabrication of Reinforcements (Roof Beams)
Installation of Formworks (2nd Floor Columns)
Fabrication of Formworks (Roof Beams)

Curing of Concrete (2nd Floor Beams and Slabs)


Fabrication of Reinforcements (Roof Beams)
Installation of Formworks (2nd Floor Columns)
Fabrication of Formworks (Roof Beams)

Curing of Concrete (2nd Floor Beams and Slabs)


Fabrication of Reinforcements (Roof Beams)
Installation of Formworks (2nd Floor Columns)
Fabrication of Formworks (Roof Beams)

Curing of Concrete (2nd Floor Beams and Slabs)


Fabrication of Reinforcements (Roof Beams)
Installation of Formworks (2nd Floor Columns)
Fabrication of Formworks (Roof Beams)

Removal of Formworks ( 2nd Floor Beams and Slabs)


Removal of Scaffoldings (2nd floor Beams and Slabs)
Installation of Formworks (2nd Floor Columns)
Pouring of Concrete (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Pouring of Concrete (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Fabrication of Purlins
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Pouring of Concrete (2nd Floor Column)
Fabrication of Purlins

Pouring of Concrete (2nd Floor Column)


Fabrication of Purlins
Installation of Scaffoldings (Roof Beams)

Pouring of Concrete (2nd Floor Column)


Fabrication of Purlins
Installation of Scaffoldings (Roof Beams)

Curing of Concrete (2nd Floor Column)


Fabrication of Purlins
Installation of Scaffoldings (Roof Beams)

Curing of Concrete (2nd Floor Column)

Fabrication of Purlins
Installation of Scaffoldings (Roof Beams)
Installation of Formworks (Roof Beam)

Curing of Concrete (2nd Floor Column)


Fabrication of Purlins
Installation of Scaffoldings (Roof Beams)
Installation of Formworks (Roof Beam)

Curing of Concrete (2nd Floor Column)


Installation of Reinforcements (Roof Beams)
Installation of Formworks (Roof Beam)

Curing of Concrete (2nd Floor Column)


Installation of Reinforcements (Roof Beams)
Installation of Formworks (Roof Beam)

Curing of Concrete (2nd Floor Column)


Installation of Reinforcements (Roof Beams)
Installation of Formworks (Roof Beam)

Curing of Concrete (2nd Floor Column)


Installation of Reinforcements (Roof Beams)
Installation of Formworks (Roof Beam)

Removal of Formworks (2nd Floor Column)


Installation of Reinforcements (Roof Beams)
Installation of Formworks (Roof Beam)

Removal of Formworks (2nd Floor Column)


Installation of Reinforcements (Roof Beams)

Installation of Formworks (Roof Beam)

Pouring of Concrete (Roof Beams)


Installation of Reinforcements (Second Floor Wall)
Installation of Purlins

Pouring of Concrete (Roof Beams)


Installation of Reinforcements (Second Floor Wall)
Installation of Purlins

Pouring of Concrete (Roof Beams)


Installation of Reinforcements (Second Floor Wall)
Installation of Purlins

Pouring of Concrete (Roof Beams)


Installation of Reinforcements (Second Floor Wall)
Installation of Purlins

Pouring of Concrete (Roof Beams)


Installation of Reinforcements (Second Floor Wall)
Installation of Purlins

Curing of Concrete (Roof Beams)


Installation of Reinforcements (Second Floor Wall)
Installation of Purlins
Installation of Roofs

Curing of Concrete (Roof Beams)


Installation of Reinforcements (Second Floor Wall)
Installation of Purlins

Installation of Roofs

Curing of Concrete (Roof Beams)


Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)
Curing of Concrete (Roof Beams)
Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)
Curing of Concrete (Roof Beams)
Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)
Curing of Concrete (Roof Beams)
Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)
Curing of Concrete (Roof Beams)
Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Installation of Purlins
Installation of Roofs

Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)
Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)

Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)

Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)

Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)

Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)

Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)

Installation of Purlins
Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Second Floor Wall)

Installation of Roofs
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Second Floor Wall)

Installation of Roofs
Placing of CHB (Second Floor Wall)
Installation of Reinforcements (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)

Installation of Roofs
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)

Installation of Roofs
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)

Installation of Roofs
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)

Placing of CHB (Second Floor Wall)


Installation of Reinforcements (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)

Placing of CHB (Second Floor Wall)


Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Second Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Second Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Second Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Second Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Second Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Second Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Placing of CHB (Ground Floor Wall)

Installation of Roof Accessories


Securing a place for Electrical and Plumbing (Ground Floor Walls)
Installation of Doors and Windows (Second Floor)
Fabrication of Wood Stairs
Placing of CHB (Ground Floor Wall)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Installation of Doors and Windows (Second Floor)
Fabrication of Wood Stairs
Placing of CHB (Ground Floor Wall)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Installation of Doors and Windows (Second Floor)
Fabrication of Wood Stairs
Placing of CHB (Ground Floor Wall)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Installation of Doors and Windows (Second Floor)
Fabrication of Wood Stairs
Placing of CHB (Ground Floor Wall)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Installation of Doors and Windows (Second Floor)
Fabrication of Wood Stairs
Placing of CHB (Ground Floor Wall)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Installation of Doors and Windows (Second Floor)
Fabrication of Wood Stairs
Placing of CHB (Ground Floor Wall)
Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Installation of Doors and Windows (Second Floor)
Fabrication of Wood Stairs
Placing of CHB (Ground Floor Wall)
Installation of Roof Accessories

Securing a place for Electrical and Plumbing (Ground Floor Walls)


Plastering of Wall (2nd Floor)

Placing of CHB (Ground Floor Wall)


Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Placing of CHB (Ground Floor Wall)


Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Placing of CHB (Ground Floor Wall)


Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Placing of CHB (Ground Floor Wall)


Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Placing of CHB (Ground Floor Wall)


Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Placing of CHB (Ground Floor Wall)


Installation of Roof Accessories
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Placing of CHB (Ground Floor Wall)


Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Installation of Ceiling Insulators

Placing of CHB (Ground Floor Wall)


Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Installation of Ceiling Insulators

Placing of CHB (Ground Floor Wall)


Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Installation of Ceiling Insulators

Placing of CHB (Ground Floor Wall)


Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Installation of Ceiling Insulators

Placing of CHB (Ground Floor Wall)


Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Installation of Ceiling Insulators

Plastering of Wall (2nd Floor)


Installation of Doors and Windows (Ground Floor)
Installation of Water Closet
Installation of Shower Drain
Installation of Lavatory
Plastering of Wall (2nd Floor)
Installation of Doors and Windows (Ground Floor)
Installation of Water Closet
Installation of Shower Drain
Installation of Lavatory
Plastering of Wall (2nd Floor)
Installation of Doors and Windows (Ground Floor)
Installation of Shower Head
Installation of Kitchen Sink

Plastering of Wall (2nd Floor)


Installation of Doors and Windows (Ground Floor)
Installation of Shower Head
Installation of Kitchen Sink

Plastering of Wall (2nd Floor)


Installation of Doors and Windows (Ground Floor)
Installation of Wood Stairs
Installation of Wood Ceiling

Plastering of Wall (2nd Floor)


Installation of Doors and Windows (Ground Floor)
Installation of Wood Stairs
Installation of Wood Ceiling

Plastering of Wall (2nd Floor)


Installation of Doors and Windows (Ground Floor)
Installation of Wood Stairs
Installation of Wood Ceiling

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Installation of Wood Stairs
Installation of Wood Ceiling

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Installation of Wood Stairs
Installation of Wood Ceiling

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Installation of Formworks for Septic Tank

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Septic pipes fix

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Septic pipes fix

Plastering of Wall (2nd Floor)


Plastering of Wall (Ground Floor)
Painting (Interior)
Pouring of Concrete (Septic Tank)

Plastering of Wall (Ground Floor)


Painting (Interior)
Curing of Concrete (Septic Tank)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Curing of Concrete (Septic Tank)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Curing of Concrete (Septic Tank)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Curing of Concrete (Septic Tank)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Curing of Concrete (Septic Tank)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Curing of Concrete (Septic Tank)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Curing of Concrete (Septic Tank)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)
Backfilling of Septic Tank

Plastering of Wall (Ground Floor)

Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)

Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Plastering of Wall (Ground Floor)


Painting (Interior)
Tile Lay out (2nd Floor)

Painting (Interior)
Tile Lay out (2nd Floor)
Painting (Exterior)
Installation of Electrical Accessories

Painting (Interior)
Painting (Exterior)
Installation of Electrical Accessories
Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Installation of Electrical Accessories
Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Installation of Electrical Accessories

Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Installation of Electrical Accessories
Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Interior)
Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)
Tile Lay out (Ground Floor)

Painting (Exterior)

Painting (Exterior)

Painting (Exterior)

Painting (Exterior)

Painting (Exterior)

Painting (Exterior)

Painting (Exterior)

Painting (Exterior)

Painting (Exterior)

Cleaning of Site and Structure

Cleaning of Site and Structure

Cleaning of Site and Structure

Cleaning of Site and Structure

Cleaning of Site and Structure

Cleaning of Site and Structure

Cleaning of Site and Structure

Demobilization

Demobilization

TOTAL
Unit Cost (PHP)

Unit

6
6
0
0
0
0
6
6
0
0
0
0
5
5
2
0
0
0
8
4
3

1
2

6
4

6
4

5
5
2

1
1
1

7
3
3

PLUMBER

STEEL MAN

LABORER

CARPENTER

MASON

SURVEYOR

MANPOWER

ENGINEER

MANPOWER

0
0
0
6
3
6
0
0
0
4
5
4
6
0
0
4
5
4
6
0
0
4
5
4
6
0
0
4
5
4
6
0
0
5
6
4
4
0
0
5
8
6
0

1
1

1
2

1
2

1
2

1
2

1
2

1
2

5
2
6

4
5
2
4

4
5
2
4

4
5
2
4

4
5
2
4

5
4
2
4

5
6
4

0
0
8
6
5
0
0
0
8
6
5
0
0
0
6
8
5
0
0
0
5
4
5
7
0
0
5
5
7
4
0
0
5
5
7
4
0
0
6
9
6
0
0

6
4
5

6
4
5

4
2
5
6

4
5
6
2

4
5
6
2

4
6
5

6
7
6

0
6
9
6
0
0
0
8
6
7
0
0
0
8
6
7
0
0
0
8
6
7
0
0
0
8
6
7
0
0
0
8
6
7
0
0
0
7
7
2
5
0
0

6
7
6

6
6
5

6
6
5

6
6
5

6
6
5

6
6
5

6
5
2
4

1
2

7
2
6
6
0
0
7
2
6
6
0
0
7
2
6
6
0
0
2
8
5
6
0
0
2
8
5
3
3
0
2
8
5
3
3
0
5
6
5
2
3
0
7

6
2
5
6

6
2
5
6

6
2
5
6

2
6
4
6

2
6
4
3
3
2
6
4
3
3

2
1

2
1

2
1

4
5
4
2
3

1
1

6
5
3
0
0
7
6
5
3
0
0
7
6
5
3
0
0
7
6
5
3
0
0
7
6
5
3
0
0
7
6
5
3
0
0
8
5
8
0
0
0
8
8

5
4
3

6
5
4
3

1
1

6
5
4
3

1
1

6
5
4
3

1
1

6
5
4
3

1
1

6
5
4
3

1
1

6
4
6

6
6

5
0
0
0
8
8
5
0
0
0
6
6
5
4
0
0
6
6
5
4
0
0
6
6
5
4
0
0
7
5
4
5
0
0
6
6
9
0
0
0
2
8
11

1
2

1
2

1
2

1
2

1
1
1

1
2

1
2

6
6
4

4
4
4
4

4
4
4
4

4
4
4
4

5
4
4
4

6
4
7

2
6
9

0
0
0
2
8
11
0
0
0
2
8
11
0
0
0
2
8
11
0
0
0
2
8
11
0
0
0
2
8
11
0
0
0
2
8
11
0
0
0
2
5
8
6

1
2

1
2

1
2

1
2

1
2

1
2

1
1
1

2
6
9

2
6
9

2
6
9

2
6
9

2
6
9

2
6
9

2
4
5
6

0
0
2
5
10
6
0
0
7
9
5
0
0
0
7
9
5
0
0
0
7
9
5
0
0
0
7
9
5
0
0
0
7
9
5
0
0
0
7
9
5
0
0

1
1
1

1
1

1
1

1
1

1
1

1
1

1
1

2
4
7
6

6
7
4

6
7
4

6
7
4

6
7
4

6
7
4

6
7
4

0
5
6
5
5
0
0
5
6
5
5
0
0
5
6
5
5
0
0
5
6
5
5
0
0
5
5
6
5
0
0
8
7
6
0
0
0
5
6
5
5
0
0

1
2

1
2

1
1
1

4
5
4
4

1
1

4
5
4
4

1
1

4
5
4
4

1
1

4
5
4
4

1
1

4
4
4
5

1
1

6
5
6

5
4
4
4

4
5
5
7
0
0
4
5
5
7
0
0
2
5
5
9
0
0
2
5
5
9
0
0
2
5
5
9
0
0
2
5
5
9
0
0
2
5
5
9
0
0
2

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

4
4
4
5

4
4
4
5

2
4
4
7

2
4
4
7

2
4
4
7

2
4
4
7

2
4
4
7

5
5
9
0
0
2
5
5
9
0
0
2
5
5
9
0
0
2
5
5
9
0
0
6
6
9
0
0
0
6
6
9
0
0
0
6
6
9
0
0
0
6
6

1
1

1
1
1

1
1
1

1
1
1

1
1

1
1

1
1

1
1

4
4
7

2
4
4
7

2
4
4
7

2
4
4
7

5
5
7

5
5
7

5
5
7

5
5

9
0
0
0
6
6
9
0
0
0
6
6
9
0
0
0
6
6
9
0
0
0
6
6
9
0
0
0
5
5
7
4
0
0
8
5
8
0
0
0
8
5
8

1
1

1
1

1
1

1
1

1
1

5
5
7

5
5
7

5
5
7

5
5
7

4
4
5
4

7
5
7

7
5
7

0
0
0
8
5
8
0
0
0
8
5
8
0
0
0
8
5
8
0
0
0
8
5
8
0
0
0
8
5
8
0
0
0
8
8
5
0
0
0
8
8
5
0

7
5
7

7
5
7

7
5
7

7
5
7

7
5
7

7
7
5

1
1

7
7
5

1
1

0
0
8
8
5
0
0
0
8
8
5
0
0
0
8
8
5
0
0
0
8
8
5
0
0
0
8
8
5
0
0
0
5
8
8
0
0
0
5
8
8
0
0

7
7
5

1
1

7
7
5

1
1

7
7
5

1
1

7
7
5

1
1

7
7
5

1
1

1
1
1

5
7
7

1
1

5
7
7

0
5
8
8
0
0
0
2
6
6
7
0
0
2
6
6
7
0
0
2
7
6
6
0
0
2
7
6
6
0
0
2
7
6
6
0
0
2
7
6
6
0
0

1
1
1

1
1
1

1
1
1

5
7
7

2
5
5
5

2
5
5
5

1
1

2
5
5
5

1
1

2
5
5
5

1
1

2
5
5
5

1
1

2
5
5
5

2
7
6
6
0
0
2
2
7
5
5
0
2
2
5
6
6
0
2
2
6
11
0
0
6
8
7
0
0
0
6
8
7
0
0
0
6
8
7
0
0
0
5

1
1
1

1
1
1
1

2
2
6
5
4
2
2
5
4
4

2
2
6
9

6
6
5

6
6
5

6
6
5

2
5
5
5

6
5
5
0
0
5
6
5
5
0
0
2
10
9
0
0
0
2
10
9
0
0
0
2
10
9
0
0
0
2
10
9
0
0
0
2
10
9
0
0
0
2
10

1
1

4
4
4

1
1

5
4
4
4

2
8
7

2
8
7

2
8
7

2
8
7

2
8
7

2
8

9
0
0
0
5
6
10
0
0
0
5
6
10
0
0
0
5
6
10
0
0
0
5
6
10
0
0
0
5
6
10
0
0
0
2
6
7
6
0
0
2
6
7

5
5
9

1
1

5
5
9

1
1

5
5
9

1
1

5
5
9

1
1

5
5
9

1
1

2
5
6
6

2
5
6

1
1

1
1

6
0
0
2
6
6
3
4
0
2
6
6
3
4
0
2
6
6
3
4
0
2
6
6
3
4
0
2
6
6
3
4
0
2
2
5
5
3
4
2
2
5
5

2
5
5
3
4
2
5
5
3
4
2
5
5
3
4
2
5
5
3
4
2
5
5
3
4
2
2
4
4
3
4
2
2
4
4

1
1

1
1

1
1

1
1

1
1

1
1

1
1

3
4
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0

3
4
5
5
3
6

1
1

5
5
3
6

1
1

5
5
3
6

1
1

5
5
3
6

1
1

5
5
3
6

1
1

5
5
3
6

1
1

5
5
3
6

1
1

0
6
3
6
6
0
0
6
6
6
3
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
5
5
3
5
3
0
5
3
5
5
3
0

5
3
5
6

5
6
5
3

5
6
3
5

5
6
3
5

5
6
3
5

5
3
3
5
3
5
3
3
5
3

5
5
3
5
3
0
5
5
3
5
3
0
5
5
3
5
3
0
5
5
3
5
3
0
5
5
3
5
3
0
5
5
3
5
3
0
5
5
3
5
3
0
5

5
5
3
5
3

5
5
3
5
3

5
5
3
5
3

5
5
3
5
3

5
5
3
5
3

5
5
3
5
3

5
5
3
5
3

5
3
3
5
0
5
5
3
3
5
0
5
5
3
3
5
0
5
5
3
3
5
0
5
5
3
3
5
0
5
5
3
3
5
0
5
5
3
3
5
0
6
6

5
3
3
3

5
5
3
3
3

5
5
3
3
3

5
5
3
3
3

5
5
3
3
3

5
5
3
3
3

5
5
3
3
3

6
6

3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
6
6
3
6
0
0
5
3
6

3
4

6
6
3
4

6
6
3
4

6
6
3
4

6
6
3
4

6
6
3
4

6
6
3
4

5
3
4

7
0
0
5
3
6
7
0
0
5
3
6
7
0
0
5
3
6
7
0
0
5
3
6
7
0
0
6
3
5
3
4
0
6
3
5
3
4
0
6
3
6
6

1
2

1
2

1
2

1
2

5
3
4
7

5
3
4
7

5
3
4
7

5
3
4
7

4
3
5
3
4

4
3
5
3
4

4
3
6
6

0
0
6
3
6
6
0
0
6
4
6
5
0
0
5
5
6
5
0
0
5
5
6
5
0
0
5
5
6
5
0
0
5
5
6
5
0
0
5
5
5
6
0

4
3
6
6

2
1
1

4
4
5
4

1
1

4
4
5
4

1
1

4
4
5
4

1
1

4
4
5
4

1
1

4
4
5
4

1
1

1
1

1
1

1
1

1
1

4
4
5
4

0
5
5
5
6
0
0
5
5
5
6
0
0
5
5
6
0
0
0
5
5
6
0
0
0
5
5
6
0
0
0
5
5
4
2
0
0
6
4
2
4
0
0

1
1

4
4
5
4

1
1
2

4
4
5
4

4
4
4

1
1

1
1

1
1

1
1

4
4
4

4
4
4

4
4
2

4
2
4

6
4
2
4
0
0
6
4
2
4
0
0
6
4
2
4
0
0
6
4
2
4
0
0
6
4
2
4
0
0
6
4
2
4
0
0
6
4
4
2
0
0
6

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
4
2

4
4
0
0
0
6
4
4
0
0
0
6
4
4
0
0
0
6
4
4
0
0
0
6
4
4
0
0
0
6
4
4
0
0
0
6
4
4
0
0
0
6
4

4
4

4
4

4
4

4
4

4
4

4
4

4
0
0
0
6
4
4
0
0
0
6
4
4
0
0
0
6
4
4
0
0
0
4
4
4
2
0
0
4
4
2
4
0
0
4
4
2
4
0
0
4
4
2

4
4

4
4

4
4

1
4
1

1
1
4

1
1
4

1
1

4
0
0
4
4
2
4
0
0
4
4
4
0
0
0
4
4
4
0
0
0
4
4
4
0
0
0
4
4
4
0
0
0
4
4
4
0
0
0
4
4
0
0

1
1
4

1
4

1
4

1
4

1
4

1
4

0
0
4
4
0
0
0
0
4
4
0
0
0
0
4
4
0
0
0
0
4
4
0
0
0
0
4
4
0
0
0
0
4
4
0
0
0
0
4
4
0
0
0

0
4
4
0
0
0
0
4
4
0
0
0
0
4
4
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0

4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4

0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4
0
0
0
0
0
4613

254
1250

1
400

106
475

208
450

3740
350

294
450

20
450

man

man

man

man

man

man

man

1
1

WEEKLY COST

TIME KEEPER
1

COST

DRIVER/MECHANIC

PAINTER

ELECTRICIAN

4,050.00
2,300.00
4,050.00
2,300.00
3,350.00
2,100.00
900.00
4,500.00
1,500.00
1,450.00

3,800.00
1,150.00
2,100.00
3,000.00
1,750.00
1,600.00
2,300.00
3,000.00
1,750.00
1,600.00
2,300.00
3,000.00
1,750.00
1,600.00
2,300.00
3,000.00
1,750.00
1,600.00
2,300.00
3,350.00
2,300.00
1,600.00
1,400.00
3,350.00
3,000.00
2,300.00
-

42,200.00

4,600.00
2,300.00
1,750.00
4,600.00
2,300.00
1,750.00
3,900.00
3,000.00
1,750.00
3,450.00
1,600.00
1,750.00
2,550.00
3,450.00
1,750.00
2,550.00
1,600.00
3,450.00
1,750.00
2,550.00
1,600.00
3,700.00
3,350.00
2,100.00
-

51,900.00

54,500.00

3,700.00
3,350.00
2,100.00
4,600.00
2,100.00
2,700.00
4,600.00
2,100.00
2,700.00
4,600.00
2,100.00
2,700.00
4,600.00
2,100.00
2,700.00
4,600.00
2,100.00
2,700.00
4,150.00
2,700.00
700.00
1,850.00
-

54,500.00

56,150.00

4,150.00
700.00
2,200.00
2,100.00
4,150.00
700.00
2,200.00
2,100.00
4,150.00
700.00
2,200.00
2,100.00
2,300.00
3,000.00
1,850.00
2,100.00
2,300.00
3,000.00
1,850.00
1,050.00
1,050.00
2,300.00
3,000.00
1,850.00
1,050.00
1,050.00
3,450.00
2,200.00
1,850.00
700.00
1,050.00
4,150.00

55,350.00

2,200.00
1,850.00
1,050.00
4,150.00
2,200.00
1,850.00
1,050.00
4,150.00
2,200.00
1,850.00
1,050.00
4,150.00
2,200.00
1,850.00
1,050.00
4,150.00
2,200.00
1,850.00
1,050.00
4,150.00
2,200.00
1,850.00
1,050.00
4,600.00
1,850.00
3,000.00
4,600.00
3,000.00

55,500.00

1,850.00
4,600.00
3,000.00
1,850.00
3,900.00
2,300.00
1,850.00
1,400.00
3,900.00
2,300.00
1,850.00
1,400.00
3,900.00
2,300.00
1,850.00
1,400.00
4,250.00
1,850.00
1,400.00
1,850.00
3,700.00
2,300.00
3,350.00
2,300.00
3,000.00
4,050.00

56,300.00

2,300.00
3,000.00
4,050.00
2,300.00
3,000.00
4,050.00
2,300.00
3,000.00
4,050.00
2,300.00
3,000.00
4,050.00
2,300.00
3,000.00
4,050.00
2,300.00
3,000.00
4,050.00
2,300.00
1,850.00
3,100.00
2,100.00

56,300.00

56,100.00

2,300.00
1,850.00
3,800.00
2,100.00
4,150.00
3,350.00
1,850.00
4,150.00
3,350.00
1,850.00
4,150.00
3,350.00
1,850.00
4,150.00
3,350.00
1,850.00
4,150.00
3,350.00
1,850.00
4,150.00
3,350.00
1,850.00
-

56,100.00

56,800.00

3,450.00
2,200.00
1,850.00
1,850.00
3,450.00
2,200.00
1,850.00
1,850.00
3,450.00
2,200.00
1,850.00
1,850.00
3,450.00
2,200.00
1,850.00
1,850.00
3,450.00
1,850.00
2,300.00
1,750.00
4,600.00
2,650.00
2,100.00
3,350.00
2,300.00
1,850.00
1,850.00
-

56,100.00

3,000.00
1,850.00
1,850.00
2,650.00
3,000.00
1,850.00
1,850.00
2,650.00
2,300.00
1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
3,350.00
2,300.00

56,100.00

1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
3,350.00
3,800.00
2,200.00
3,350.00
3,800.00
2,200.00
3,350.00
3,800.00
2,200.00
3,350.00
3,800.00
2,200.00

56,100.00

3,350.00
3,800.00
2,200.00
3,350.00
3,800.00
2,200.00
3,350.00
3,800.00
2,200.00
3,350.00
3,800.00
2,200.00
3,350.00
3,450.00
1,850.00
2,650.00
1,400.00
4,500.00
1,750.00
2,900.00
4,500.00
1,750.00
2,900.00

56,100.00

55,700.00

4,500.00
1,750.00
2,900.00
4,500.00
1,750.00
2,900.00
4,500.00
1,750.00
2,900.00
4,500.00
1,750.00
2,900.00
4,500.00
1,750.00
2,900.00
4,500.00
2,900.00
1,750.00
4,500.00
2,900.00
1,750.00
-

55,700.00

54,900.00

4,500.00
2,900.00
1,750.00
4,500.00
2,900.00
1,750.00
4,500.00
2,900.00
1,750.00
4,500.00
2,900.00
1,750.00
4,500.00
2,900.00
1,750.00
3,350.00
2,900.00
2,900.00
3,350.00
2,900.00
2,900.00
-

54,900.00

3,350.00
2,900.00
2,900.00
2,300.00
2,200.00
2,200.00
2,650.00
2,300.00
2,200.00
2,200.00
2,650.00
2,300.00
2,650.00
2,200.00
2,200.00
2,300.00
2,650.00
2,200.00
2,200.00
2,300.00
2,650.00
2,200.00
2,200.00
2,300.00
2,650.00
2,200.00
2,200.00
-

55,500.00

2,300.00
2,650.00
2,200.00
2,200.00
2,300.00
700.00
2,550.00
1,750.00
1,850.00
2,300.00
700.00
1,750.00
2,300.00
2,300.00
2,300.00
700.00
2,100.00
4,050.00
3,700.00
3,000.00
2,650.00
3,700.00
3,000.00
2,650.00
3,700.00
3,000.00
2,650.00
3,350.00

55,900.00

2,300.00
1,850.00
1,850.00
3,350.00
2,300.00
1,850.00
1,850.00
2,300.00
3,700.00
3,350.00
2,300.00
3,700.00
3,350.00
2,300.00
3,700.00
3,350.00
2,300.00
3,700.00
3,350.00
2,300.00
3,700.00
3,350.00
2,300.00
3,700.00

55,900.00

56,100.00

3,350.00
3,350.00
2,200.00
3,600.00
3,350.00
2,200.00
3,600.00
3,350.00
2,200.00
3,600.00
3,350.00
2,200.00
3,600.00
3,350.00
2,200.00
3,600.00
2,300.00
2,200.00
2,550.00
2,100.00
2,300.00
2,200.00
2,550.00

56,100.00

54,900.00

2,100.00
2,300.00
2,200.00
2,200.00
1,050.00
1,400.00
2,300.00
2,200.00
2,200.00
1,050.00
1,400.00
2,300.00
2,200.00
2,200.00
1,050.00
1,400.00
2,300.00
2,200.00
2,200.00
1,050.00
1,400.00
2,300.00
2,200.00
2,200.00
1,050.00
1,400.00
2,300.00
700.00
1,850.00
1,850.00
1,050.00
1,400.00
2,300.00
700.00
1,850.00
1,850.00

54,900.00

1,050.00
1,400.00
3,800.00
2,200.00
1,050.00
2,100.00
3,800.00
2,200.00
1,050.00
2,100.00
3,800.00
2,200.00
1,050.00
2,100.00
3,800.00
2,200.00
1,050.00
2,100.00
3,800.00
2,200.00
1,050.00
2,100.00
3,800.00
2,200.00
1,050.00
2,100.00
3,800.00
2,200.00
1,050.00
2,100.00
-

54,900.00

3,800.00
1,050.00
2,200.00
2,100.00
3,800.00
2,100.00
2,200.00
1,050.00
3,800.00
2,100.00
1,050.00
2,200.00
3,800.00
2,100.00
1,050.00
2,200.00
3,800.00
2,100.00
1,050.00
2,200.00
3,350.00
1,950.00
1,050.00
1,750.00
1,050.00
3,350.00
1,050.00
1,950.00
1,750.00
1,050.00
-

54,900.00

3,350.00
1,750.00
1,050.00
1,750.00
1,050.00
3,350.00
1,750.00
1,050.00
1,750.00
1,050.00
3,350.00
1,750.00
1,050.00
1,750.00
1,050.00
3,350.00
1,750.00
1,050.00
1,750.00
1,050.00
3,350.00
1,750.00
1,050.00
1,750.00
1,050.00
3,350.00
1,750.00
1,050.00
1,750.00
1,050.00
3,350.00
1,750.00
1,050.00
1,750.00
1,050.00
3,350.00

54,500.00

1,750.00
1,050.00
1,050.00
1,950.00
3,350.00
1,750.00
1,050.00
1,050.00
1,950.00
3,350.00
1,750.00
1,050.00
1,050.00
1,950.00
3,350.00
1,750.00
1,050.00
1,050.00
1,950.00
3,350.00
1,750.00
1,050.00
1,050.00
1,950.00
3,350.00
1,750.00
1,050.00
1,050.00
1,950.00
3,350.00
1,750.00
1,050.00
1,050.00
1,950.00
3,700.00
2,100.00

53,900.00

54,900.00

1,050.00
2,350.00
3,700.00
2,100.00
1,050.00
2,350.00
3,700.00
2,100.00
1,050.00
2,350.00
3,700.00
2,100.00
1,050.00
2,350.00
3,700.00
2,100.00
1,050.00
2,350.00
3,700.00
2,100.00
1,050.00
2,350.00
3,700.00
2,100.00
1,050.00
2,350.00
3,350.00
1,050.00
2,350.00

55,200.00

2,450.00
3,350.00
1,050.00
2,350.00
2,450.00
3,350.00
1,050.00
2,350.00
2,450.00
3,350.00
1,050.00
2,350.00
2,450.00
3,350.00
1,050.00
2,350.00
2,450.00
3,950.00
1,050.00
1,750.00
1,050.00
1,400.00
3,950.00
1,050.00
1,750.00
1,050.00
1,400.00
3,950.00
1,050.00
2,100.00
2,100.00

55,200.00

3,950.00
1,050.00
2,100.00
2,100.00
3,950.00
1,400.00
2,200.00
1,850.00
3,475.00
1,875.00
2,200.00
1,850.00
3,475.00
1,875.00
2,200.00
1,850.00
3,475.00
1,875.00
2,200.00
1,850.00
3,475.00
1,875.00
2,200.00
1,850.00
3,475.00
1,875.00
1,750.00
2,300.00
-

55,600.00

1
4

1
4

3,475.00
1,875.00
1,750.00
2,300.00
3,475.00
1,875.00
1,750.00
2,300.00
3,475.00
1,875.00
2,300.00
3,475.00
1,875.00
2,300.00
3,475.00
1,875.00
2,300.00
3,475.00
1,875.00
1,600.00
700.00
3,950.00
1,600.00
700.00
1,400.00
-

56,400.00

1
4

1
4

1
4

1
4

1
4

1
4

1
4

3,950.00
1,600.00
700.00
1,400.00
3,950.00
1,600.00
700.00
1,400.00
3,950.00
1,600.00
700.00
1,400.00
3,950.00
1,600.00
700.00
1,400.00
3,950.00
1,600.00
700.00
1,400.00
3,950.00
1,600.00
700.00
1,400.00
3,950.00
1,600.00
1,400.00
700.00
3,950.00

45,900.00

45,900.00

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00

41,700.00

1
4

1
4

1
4

4
1

4
4

4
4

4
4

1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,950.00
1,600.00
1,400.00
3,200.00
1,400.00
1,600.00
800.00
3,200.00
1,600.00
800.00
1,400.00
3,200.00
1,600.00
800.00
1,400.00
3,200.00
1,600.00
800.00

41,750.00

4
4

4
4

4
4

4
4

4
4

4
4

1,400.00
3,200.00
1,600.00
800.00
1,400.00
3,200.00
1,600.00
1,400.00
3,200.00
1,600.00
1,400.00
3,200.00
1,600.00
1,400.00
3,200.00
1,600.00
1,400.00
3,200.00
1,600.00
1,400.00
1,600.00
1,400.00
-

40,400.00

1,600.00
1,400.00
1,600.00
1,400.00
1,600.00
1,400.00
1,600.00
1,400.00
1,600.00
1,400.00
1,600.00
1,400.00
1,600.00
1,400.00
-

27,600.00

1,600.00
1,400.00
1,600.00
1,400.00
1,600.00
1,400.00
1,600.00
1,600.00
1,600.00
1,600.00
-

18,000.00

12,400.00

1,600.00
1,600.00
1,600.00
1,600.00
1,600.00
1,400.00
1,400.00
1,400.00

9,400.00

1,400.00
1,400.00
1,400.00
1,400.00
1,400.00
1,400.00
5
450

240
400

3
350

254
350

2,053,950.00

8,400.00

2,800.00

man

man

man

man

EQUIPMENT

1
SERVICE VEHICLE

1
1

1
1

1
1

WOOD SAW

CONCRETE VIBRATOR

HAND DRILL

BAGGER MIXER

BAR CUTTER

WELDING MACHINE

MINI TRUCK

2
0
0
0
0
0
2
0
0
0
0
0
2
1
0
0
0
0
0
0
0
LOADER

EQUIPMENT

0
0
0
0
0
2
0
0
0
2
2
1
1
0
0
2
2
1
1
0
0
2
2
1
1
0
0
2
2
1
1
0
0
2
1
1
2
0
0
2
1
1
0

1
1

1
1
1
1

1
1

1
1
1
1

1
1

1
1
1
1

1
1

1
1
1
1

1
1
1

1
1
1

0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
0
0
1
0
0
1
0
0
1
0
0
0
0
2
0
0

1
1

1
1

1
1

1
1

0
0
0
2
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
0
0
1
0
0

0
0
1
2
0
0
0
0
1
2
0
0
0
0
1
2
0
0
0
1
0
2
0
0
0
1
0
2
0
0
0
1
0
2
0
0
1
0
0
0
0
0
1

1
1

1
1

1
1

1
1

1
1

0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
2
1
0
0
2
1
1
0
0
0
0
1
1

1
1

1
1

1
1

0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0

1
1

1
1

1
1

1
1

1
1

1
1

1
1

0
0
0
1
1
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
0
0
0
0
1
1
1
0
0

1
1

1
1

1
1

1
1

1
1

1
1

1
1
1

0
1
1
1
0
0
0
1
1
1
0
0
0
1
1
1
0
0
0
1
1
1
0
0
0
1
1
0
2
0
0
1
0
2
0
0
0
2
1
0
0
0
0

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

2
0
0
1
0
0
2
0
0
1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
2
0

0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
2
1
1
0
0
0
2
0
1
1
0

1
1
1

1
1
1

0
2
1
1
0
0
0
0
1
1
1
0
0
0
1
1
1
0
0
0
1
0
1
0
0
0
1
0
1
0
0
0
1
0
1
0
0
0
1
0
1
0
0

1
1
1

1
1
1

1
1
1

1
1

1
1

1
1

1
1

0
1
0
1
0
0
0
0
0
2
1
0
0
0
2
1
0
0
0
0
2
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0

1
1

1
1

1
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
2
0
1
0
0
0
2
0
1
0
0
0
2
0
1
0
0
0
2
0
1
0
0
0
2
0
1
0
0
0
0
0
1
0
0
0
0
0
1

0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
1
0

0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
2
1
0
0
0
0
2
1
0
0
0
0
2
0
1
0
0
0
2
1
0
0
0
0
2
1
0
0
0
0
2
1
0
0
0
0
2
1
0
0
0

1
1

1
1

1
1

1
1

1
1

1
1

1
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
2
0
0

0
0
0
2
0
0
0
0
0
2
2
1
0
0
0
2
2
1
0
0
0
2
2
1
0
0
0
0
2
1
0
0
0
0
2
1
0
0
0
0
2
1
0

1
1

1
1
1

1
1

1
1
1

1
1

1
1
1

1
1

1
1

1
1

0
0
0
2
1
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
1
0
0

1
1

0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
1
2
0
0
0

0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0

1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0

1
0
0
0
0
0
1
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
1
0
0

0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0

0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
360

22
3096

26
921.49

5
125

40
69
271.76 109.35

38
357

24
109.35

38
58
228 88.5

unit

unit

unit

unit

unit

unit

unit

unit

unit

1,046.49
1,046.49
1,046.49
3,096.00
Portland Cement, Northern Cement or Equivalent

WEEKLY COST

COST

TILE CUTTER

CONC

12

12

12

4,017.49
4,017.49
4,017.49
88.50
109.35
4,017.49
4,017.49
88.50
109.35
4,017.49
4,017.49
88.50
109.35
4,017.49
4,017.49
88.50
109.35
4,017.49
109.35
88.50
4,017.49
4,017.49
109.35
88.50
-

15

15

18,485.79

19

19

19

19

19

109.35
88.50
109.35
88.50
88.50
109.35
109.35
88.50
109.35
88.50
109.35
88.50
585.00
-

19

37,344.51

19

19

19

21

21

21

18

1,574.25

585.00
585.00
585.00
585.00
585.00
585.00
109.35
-

1,574.25

21

18

21
18
42.1667

21
18
42.1667

21
18
42.1667

21
18
42.1667

21
18
42.1667

3,510.00

21
42.1667

21

109.35
4,017.49
109.35
4,017.49
109.35
4,017.49
109.35
4,017.49
109.35
4,017.49
109.35
4,017.49
109.35
109.35

21

21

21

21

20,743.55

21

21

21

109.35
109.35
109.35
109.35
109.35
-

21

21

21

4,673.59

21

21

21

21

585.00
585.00
585.00
585.00
88.50
585.00
88.50
109.35
88.50
109.35

21

21

81
803.70

21

81
21

81
21

81

21
81

21

88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
-

21

3,022.05

21

21

21

21

21

21

1,187.10

88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
88.50
109.35
109.35
-

1,187.10

21

23

21

21

21

21

1,187.10

21

88.50
109.35
109.35
88.50
109.35
109.35
88.50
109.35
109.35
88.50
109.35
109.35
109.35
109.35
585.00
109.35
585.00
585.00
109.35
-

21

21

21

21

21

15
2,339.70

21

15

21
15

21

585.00
109.35
585.00
109.35
109.35
109.35
109.35
-

15

21
15

21

21

2,886.75

21

21

21

21

21

21

218.70

21

21

21

21

21

21

21

21

21

21

21

21

585.00
585.00
-

21

21

21

21

21

21

38.9

585.00

21

38.9

585.00
585.00
585.00
585.00
585.00
585.00
88.50
88.50
585.00
88.50
88.50
-

21

38.9

21

38.9

21

38.9

21

38.9

21

38.9

3,510.00

21
38.9

21
38.9

585.00
88.50
88.50
88.50
88.50
109.35
88.50
88.50
109.35
109.35
88.50
109.35
88.50
109.35
88.50
109.35
88.50
-

21
38.9

21

21

21

3,056.55

21

21

21

21

109.35
88.50
585.00
88.50
585.00
88.50
585.00
585.00
585.00
-

21

12.6
21

12.6

2,138.40

21

12.6

21
12.6

21
12.6

21

21

21

1,755.00

21

21

21

21

21

21

585.00
271.76
585.00
271.76
585.00
271.76
585.00
271.76
585.00
271.76
271.76
271.76

21
22.4

21
22.4

21
22.4

21
22.4

21
22.4

21

4,555.56

21

271.76
271.76
271.76
271.76
271.76
271.76
271.76
-

21

17.25
21

17.25
21

17.25
21

17.25
21

17.25
1,630.56

21

21

17.25

271.76
271.76
271.76
271.76
271.76
271.76
271.76
-

21

17.25

17.25
21

17.25
21

17.25
21

17.25
1,630.56

21

17.25
21

17.25
21

17.25

21

17.25
21
17.25

21
17.25

815.28

21
17.25

21
17.25

21
17.25

18.9286
-

21
17.25

18.9286
21

17.25
18.9286

21
17.25
18.9286

21
17.25
18.9286

21
17.25
18.9286

21
17.25
18.9286

21
17.25
18.9286

21
17.25
18.9286

21
18.9286

381.11
88.50
381.11
88.50
381.11
88.50
381.11
88.50
381.11
88.50
381.11
88.50
381.11
88.50
-

469.61

21
18.9286

21
18.9286

21
18.9286

21
18.9286

21
18.9286

21
18.9286

2,817.66

21
18.9286

7.14286
21
18.9286

7.14286
21
18.9286

7.14286
-

21
18.9286

7.14286
21
18.9286

7.14286
21
18.9286

7.14286
21
18.9286

7.14286
21
18.9286
7.14286

381.11
381.11
381.11
-

21
18.9286
7.14286

21
18.9286
7.14286

21
18.9286
7.14286

21
18.9286
7.14286

21
7.14286

21
7.14286

21
7.14286

381.11
381.11
381.11
109.35
381.11
381.11
109.35
381.11
381.11
109.35
381.11
109.35
381.11
109.35
4,017.49
109.35
-

21
7.14286

21
7.14286

21
7.14286

3,267.58

21
7.14286

21
7.14286
8.28571

21
7.14286
8.28571

21
7.14286
8.28571

4,017.49
109.35
88.50
585.00
84.00
-

21
7.14286
8.28571

21
7.14286
8.28571

10,194.67

21
7.14286
8.28571

16
7.14286
8.28571

16
7.14286
8.28571

16
7.14286
8.28571
4
16
8.28571

16

84.00
84.00
84.00
84.00
84.00
84.00
84.00
4,017.49
-

8.28571

753.00

16
8.28571

16
8.28571

16
8.28571

16
8.28571

16
8.28571

16
8.28571

4,521.49

16
8.28571

84.00
84.00
84.00
84.00
84.00
84.00
84.00
-

14
8.28571

14
8.28571

14
8.28571

14
8.28571

14
8.28571

504.00

14
8.28571

14
8.28571

84.00
84.00
84.00
84.00
84.00
84.00
84.00
-

14
8.28571

14
8.28571

14
8.28571

14

504.00

14

14

14

84.00
84.00
84.00
84.00
84.00
84.00
84.00
84.00
-

14

14

12

504.00

12

12

12

12

84.00
84.00
84.00
84.00
84.00
84.00
84.00
-

504.00

84.00
84.00
84.00
-

504.00

168.00

1,046.49
1,046.49
40
84

144,458.69

2,092.98

4
4613

2872
220

unit

bags

Tie Wire No.16 for Tying

16mm x 6.00 meters

12mm x 6.00 meters

10mm x 6.00 meters

Concrete Hollow Blocks, 100 x 200 x 400mm

Concrete Hollow Blocks, 150 x 200 x 400mm

3/4" Gravel, Crushed

G-1 Gravel, Crushed

Washed Sand

CONCRETE WORKS
STEEL WORKS

87.21429

187.506

0.068

187.506

0.068

187.506

0.068

187.506

0.068

187.506

0.068

238.1

0.14

87.21429

238.1

0.14

87.21429

238.1

0.14

87.21429

238.1

0.14

87.21429

238.1

0.14

87.21429

238.1

0.14

87.21429

238.1

0.14

37

1
3.6667

1
3.6667

1
3.6667

1
3.6667

1
3.6667

3.6667

503.5

503.5

503.5

503.5

503.5

503.5
274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

274.11429

0.3693

4.6

4.6

4.6

4.6

4.6

9
158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648

158.9238 182.74286 982.7143 0.3648


46.96154
128.2077 0.0754

158.9238 182.74286 982.7143 0.3648


46.96154
128.2077 0.0754

158.9238 182.74286 982.7143 0.3648


46.96154
128.2077 0.0754

158.9238 182.74286 982.7143 0.3648


46.96154
128.2077 0.0754

158.9238 182.74286 982.7143 0.3648


46.96154
128.2077 0.0754
1.4

2.4

1.4

2.4

1.4

2.4

46.96154

128.2077 0.0754

46.96154

128.2077 0.0754

1.4

1.4

2.4

46.96154

128.2077 0.0754

46.96154

128.2077 0.0754

46.96154

128.2077 0.0754

46.96154

128.2077 0.0754

46.96154

128.2077 0.0754

46.96154

128.2077 0.0754

2.4

2.4

3.3

2.4

3.3

2.4

3.3

2.4

3.3

2.4

3.3

2.4

3.3

2.4

3.3

2.4

3.3

2.4

3.3

2.4

3.3

266.4

238.1

0.1

266.4

238.1

0.1

266.4

238.1

0.1

266.4

238.1

0.1

266.4

238.1

0.1

266.4

238.1

0.1

266.4

0.8

1.6

0.8

1.6

0.8

1.6

0.8

1.6

0.8

1.6

238.1

0.1

1.4

2.6

1.4

2.6

1.4

2.6

1.4

2.6

1.4

2.6

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.5357

212.2857142857

7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.5357
1.8571

212.2857142857
215.3928571429

7.928571
28.61 7.928571

0.0989
0.0989

1.5357
1.8571

212.2857142857
215.3928571429

7.928571
28.61 7.928571

0.0989
0.0989

1.5357
1.8571

212.2857142857
215.3928571429

7.928571
28.61 7.928571

0.0989
0.0989

1.5357
1.8571

212.2857142857
215.3928571429

7.928571
28.61 7.928571

0.0989
0.0989

1.5357
1.8571

212.2857142857
215.3928571429

7.928571
28.61 7.928571

0.0989
0.0989

1.5357
1.8571

212.2857142857
215.3928571429

7.928571
28.61 7.928571

0.0989
0.0989

1.5357
1.8571

212.2857142857
215.3928571429

7.928571
28.61 7.928571

0.0989
0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

1.8571

215.3928571429

28.61 7.928571

0.0989

0.7857

1.8571

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

0.7857

1.8571

0.7857

1.8571

0.7857

1.8571

0.7857

1.8571

0.7857

1.8571

0.7857

1.8571
0.7857

1.8571

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

215.3928571429

28.61 7.928571

0.0989

0.7857

1.8571
0.7857

1.8571
0.7857

1.8571
0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857
0.7857

0.7857
0.7857

0.7857
0.7857
140.57

0.7857
0.7857

0.7857
0.7857

0.7857
0.7857

0.7857
0.7857

0.7857
0.7857

0.7857
0.7857
1

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

0.7857

234
410

37
750

126
950

14996
14

801
12

7007.77
36

7675.2
46

26574.63 21.37
56
65

cu.m

cu.m

cu.m

pcs

pcs

kg

kg

kg

kg

PVC Pipe (20mm dia x 3.00m)

2"x3"x12' Scaffolds

FORMWORKS

2"x2"x12' Scaffolds

6mm x 120mm x 240mm, Plywood

2"x2"x12' Formworks

31mm (1 1/4")

75mm (3")

50mm (2")

Skim Coats, Betonit or Equivalent

NAILS
SCAFFOLDING

0.4125 0.3325 0.3325 46.40625

10

0.4125 0.3325 0.3325 46.40625

10

0.4125 0.3325 0.3325 46.40625

10

0.4125 0.3325 0.3325 46.40625

10

0.774

0.41

0.41

498.96

4.8

0.774

0.41

0.41

498.96

4.8

0.774

0.41

0.41

498.96

4.8

0.774

0.41

0.41

498.96

4.8

0.774

0.41

0.41

498.96

4.8

1.01667 0.9033 0.9033

336

1360.93333

1.01667 0.9033 0.9033

336

1360.93333

1.01667 0.9033 0.9033

336

1360.93333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

210.018571 2.33333
0.30667 0.1538 0.1538

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.30667 0.1538 0.1538 210.018571 2.33333

0.774
0.468

0.41
0.41
0.232 0.232

162.624

0.774
0.468

0.41
0.41
0.232 0.232

162.624

1.8
178.4

226

178.4

226

1.8

0.774
0.468

0.41
0.41
0.232 0.232

162.624

0.774
0.468

0.41
0.41
0.232 0.232

162.624

0.774
0.468

0.41
0.41
0.232 0.232

162.624

1.8
178.4

226

178.4

226

178.4

226

1.8

1.8

0.35714 0.2071 0.2071 326.401429 1.14286

0.35714 0.2071 0.2071 326.401429 1.14286

0.35714 0.2071 0.2071 326.401429 1.14286

0.35714 0.2071 0.2071 326.401429 1.14286

0.35714 0.2071 0.2071 326.401429 1.14286

0.35714 0.2071 0.2071 326.401429 1.14286

0.35714 0.2071 0.2071 326.401429 1.14286

1
1.4286

1
1.4286

1
1.4286

1
1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286
2

1.4286
1

1.4286

1.4286

1.4286

1.4286
1.4286

1.4286
1.4286

1.4286
1.4286

1.4286
1.4286

1.4286
1.4286
1.28

1.4286
1.4286

1.4286
1.4286

1.4286
1.4286

1.4286
1.4286

1.4286

0.97

0.97

83.98

18

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

1.4286

80
420

25
44

14.95 14.95 10272.725


46
50
21

148
350

1900
21

5212.8
21

43
105

bags

kg

kg

kg

bd.ft

pcs

bd.ft

bd.ft

pcs

Wye (150 x 150mm)

Wye Reducer (150 x 100mm dia)

Tee (100mm x 3.00m)

Tee (150mm x 3.00m)

PVC Pipe (100mm dia x 3.00m)

Faucet (12mm x 100mm)

Water Meter

Gate Valve (20mm dia)

Check Valve (20mm dia)

PVC Cement

Coupling (20mm dia)

Elbow (20mm x 90 deg)

Tee Plain (20mm dia)

PLUMBING PIPES AND

0.08

0.1

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.08

0.8

0.6

25

25

0.6

25

25

0.5

40
15

120
16

120
16

3
38

10
350

10
330

10
400

10
330

20.2
575

1
250

2
190

10
120

10
100

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

Vent Pipe (50mm dia x 3.00m)

Wye (50 X 50mm dia x 45 deg)

Elbow (50mm x 90 deg)

Elbow (50mm x 45 deg)

Tee Reducer (100 x 50mm dia)

Wye Reducer (100 x 50mm dia)

Wye Reducer (100 x 50mm dia)

P-trap (50mm dia)

PVC Pipe (50mm dia x 3.00m)

PVC Pipe (100mm dia x 3.00m)

PVC Cement

Clean-out w/ plug (150 mm dia)

PLUMBING PIPES AND FITTINGS

10
88

12
38

49
575

15
235

40
85

10
120

20
120

10
120

10
35

10
35

10
45

15
235

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs pcs

pcs

pcs

2 #14mm2

Metering Center

Dupplex Convinient

Refrigerator

Outlet

Main Disconnectng Panel

Wall Light

Lightning Outlet

PVC Pipe (75mm dia x 3.00m)

Vent Pipe (50mm dia x 3.00m)

PVC Cement

Elbow (50mm x 90 deg)

MATERIAL
ELECTRICAL MATERIALS

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

33

30

30

30

30

22
35

7
38

20
235

40
435

40
90

10
250

10
8500

30
90

10
149

40
118

10
890

153
16

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

pcs

Paint Brush

Paint Roller

Sandpapers

Paint thinner

Boysen Permacoat Flat Latex

BOYSEN Acrytex

Lighting Switch

Switch Wire

15mm dia. PVC Pipe

1 #1.6mm2 TW

2 #3.5mm2 TW

1 #11mm2

MATERIALS
PAINTING MATERIALS

41

41

0.7

0.7

0.7

41

41

41

36

36

36

36

36

36

36

36

36

36

36

36

36

36

36

36

16
3

37

16

36

3
2

36

3
2

36

3
2

16
3

36

16

16
3

36

16

16
3

36

15

36

3
2

36

3
2

36

3
2

36

3
2

36

3
2

36
15

3
2

15

16
3

36

15

15

15

15

15

0.3

0.3

0.3

15

15

15

15

15

15

15

15

15

15

15

15

15

15

15

15

15

15

15

15
12

181
10

18
8

70
80

78
10

30
150

455
500

1105
500

157
620

1
2000

1
750

1
600

pcs

pcs

lot

lot

lot

Lavatory Faucet

Lavatory

Kitchen Sink

Stair Handrails

D3 (0.6x2.1)

D2 (0.85x2.1)

D1 (2.1x0.9)

W3 (0.70x0.55)

W2 (1.4x0.75)

W1 (1.4x1.2)

DOOR, WINDOWS AND ACCESSORIES


PLUMBING FIXTURES AND ACCESSO

2
5

1
5

1
2

1
2

1
2

20
7000

10
2500

10
1800

10
8500

20
6330

20
6330

10
16000

10
2600

10
5830

10
3800

pcs

pcs

pcs

pcs

pcs

pcs

set

pcs

pcs

pcs

Corrugated G.I. Sheets (2.7 m x 0.6 m)

Ceiing Insulator

Wood Ceiling Board

Grout

Kitchen (6"x6") Tiles

T&B (6"x6") Tiles

Tiles (6"x6") (2nd Floor)

Tiles (6"x6") (1st Floor)

Water Closet

Shower Head and Shower Valve

Stainless Floor Drain

G FIXTURES AND ACCESSORIES


CEILING, FLOORS AND OTHER INTERIOR WORKS
ROOF FR

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

5.714286

0.2

0.2

0.2

0.2

0.2

5
5

5
5

231

231

231

231

231

10

10

10

10

10

10

10

10

10

10

10

10

10

11

11

11

11

11

11

11

11

11

11

10

10

10

10

10

10

10

10

10

10

10

10

10
250

10
8900

10
12125

210
19

193
19

81
19

47
19

145
110

1155
65

1
12530

250

pcs

pcs

pcs

pcs

pcs

pcs

pcs

bags

pcs

lot

COST

Roof Gutter (quad gutter 115 vic and nsw )

Ceiling Board ( 24 '' x 24'' )

Purlins ( 100 x 50 x 2mm ) (commercial size: 2''x4''x20' )

Grout for tiles(2kg)

Umbrella Nails

ROOF FRAMING AND ROOFING MATERIALS

4,524.60
10,504.76
4,524.60
10,504.76
4,524.60
10,504.76
4,524.60
10,504.76
10,504.76
12,231.58
16,482.41
12,231.58
-

16,482.41
12,231.58
27,750.00
16,482.41
12,231.58
12,231.58
16,482.41
16,482.41
35,767.05
16,482.41
35,767.05
16,482.41
35,767.05
6,270.00
-

6,270.00
6,270.00
17,829.00
6,270.00
17,829.00
6,270.00
17,829.00
6,270.00
17,829.00
6,270.00
17,829.00
17,829.00
12,633.26
-

12,633.26
12,633.26
12,633.26
12,633.26
5,252.04
12,633.26
4,102.80
12,633.26
3,955.04
12,633.26
3,955.04
12,633.26

3,835.04
12,633.26
3,835.04
12,633.26
3,835.04
12,633.26
3,835.04
12,633.26
3,750.04
12,633.26
3,750.04
2,809.04
-

2,809.04
2,809.04
2,809.04
28,256.00
2,809.04
28,256.00
2,574.04
28,256.00
28,256.00
5,255.32
28,256.00
5,255.32
69,183.14
5,255.32
69,183.14

5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
-

5,255.32
69,183.14
5,227.06
69,211.40
5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
5,255.32
69,183.14
-

5,255.32
69,183.14
8,875.15
5,255.32
69,183.14
8,875.15
5,255.32
69,183.14
8,875.15
5,255.32
69,183.14
8,875.15
69,183.14
8,875.15
6,154.00
8,875.15
6,154.00
6,154.00
8,875.15
-

6,154.00
8,875.15
6,154.00
8,875.15
8,875.15
8,875.15
8,875.15
8,875.15
-

560.00
560.00
480.00
-

480.00
480.00
480.00
480.00
480.00
12,677.00
12,677.00
-

12,677.00
12,677.00
12,677.00
12,677.00
12,677.00
12,677.00
4,118.52
8,535.26
12,677.00
4,118.52
8,535.26
-

12,677.00
4,118.52
8,535.26
4,118.52
8,535.26
22,930.50
4,118.52
8,535.26
22,930.50
22,930.50
7,290.03
22,930.50
7,290.03
22,930.50
7,290.03
22,930.50
7,290.03
-

18.14286

18.14286

18.14286

18.14286

18.14286

22,930.50
7,290.03
4,620.00
7,290.03
4,620.00
7,290.03
17,235.71
4,620.00
17,235.71
4,620.00
17,235.71
4,620.00
17,235.71
17,235.71
-

18.14286

18.14286

17,235.71
17,235.71
-

3.809524

7,972.00
7,972.00
7,972.00
7,972.00
7,972.00
2,838.10
-

3.809524

3.809524

3.809524

3.809524

3.809524

3.809524

3.809524

3.809524

2,838.10
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10

3.809524

3.809524

3.809524

3.809524

3.809524

3.809524

3.809524

80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
2,838.10
80.00
7,688.50
-

3.809524

3.809524

3.809524

3.809524

3.809524

2,838.10
80.00
7,688.50
2,838.10
7,688.50
80.00
2,838.10
7,688.50
80.00
2,838.10
7,688.50
80.00
2,838.10
7,688.50
80.00
7,688.50
80.00
8,576.36
1,330.80
7,688.50
8,576.36
1,270.00
-

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

7,688.50
8,576.36
1,167.86
1,270.00
7,688.50
8,576.36
1,167.86
1,270.00
7,688.50
8,576.36
1,167.86
1,270.00
7,688.50
8,576.36
1,167.86
695.00
7,688.50
8,576.36
1,167.86
695.00
7,688.50
8,576.36
1,167.86
657.00
7,688.50
8,576.36
1,167.86
657.00
8,576.36

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1,167.86
657.00
39,320.00
8,576.36
1,167.86
657.00
39,320.00
8,576.36
1,167.86
657.00
39,320.00
8,576.36
1,167.86
657.00
19,660.00
8,576.36
1,167.86
657.00
19,660.00
8,576.36
1,167.86
657.00
19,660.00
8,576.36
1,167.86
422.00
19,660.00
8,576.36
1,167.86

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

1.428571 4.714286

422.00
2,493.57
8,576.36
1,167.86
422.00
2,493.57
8,576.36
1,167.86
422.00
2,493.57
8,576.36
1,167.86
422.00
2,493.57
8,576.36
1,167.86
35.00
2,493.57
8,576.36
1,167.86
35.00
2,493.57
8,576.36
297.86
2,493.57
8,576.36
2,493.57

2,506.00
8,576.36
2,493.57
2,506.00
8,576.36
2,493.57
2,506.00
8,576.36
2,493.57
2,506.00
8,576.36
2,493.57
2,506.00
2,493.57
64,920.00
60,625.00
1,250.00
48,150.00
2,493.57
64,920.00
60,625.00
1,250.00
48,150.00
2,493.57
64,920.00
52,582.80
13,000.00

924

924

924

924

924

2,493.57
32,460.00
52,474.00
13,000.00
2,493.57
32,460.00
32,000.00
36,267.00
2,493.57
32,460.00
32,000.00
36,267.00
2,493.57
32,460.00
32,000.00
36,267.00
2,493.57
2,745.00
32,000.00
36,267.00
2,493.57
2,745.00
32,000.00
36,267.00
2,493.57
2,745.00
5,060.52
-

2,493.57
2,745.00
2,493.57
2,745.00
8,213.02
2,493.57
2,745.00
2,493.57
2,745.00
1,243.00
2,493.57
2,745.00
2,493.57
2,745.00
25,325.00
2,240.00
2,745.00
22,980.00
520.00
-

2,745.00
22,980.00
520.00
2,745.00
22,980.00
520.00
2,745.00
22,980.00
520.00
2,745.00
20,480.00
520.00
2,745.00
20,480.00
520.00
2,745.00
20,480.00
520.00
2,745.00
20,480.00
520.00
2,745.00

20,480.00
520.00
2,745.00
20,480.00
520.00
2,745.00
20,480.00
520.00
2,745.00
20,480.00
520.00
2,745.00
20,480.00
520.00
2,745.00
20,480.00
391.00
2,745.00
20,480.00
391.00
2,745.00
20,480.00

391.00
2,745.00
20,480.00
391.00
2,745.00
20,480.00
391.00
2,745.00
20,480.00
391.00
20,480.00
391.00
9,240.00
23,808.00
19,860.00
9,240.00
23,750.00
930.00
19,860.00
9,240.00
23,750.00
911.00
19,860.00
9,240.00
23,732.00

911.00
19,860.00
9,240.00
23,732.00
911.00
19,860.00
8,740.00
911.00
19,860.00
8,740.00
911.00
19,860.00
8,740.00
911.00
19,860.00
8,740.00
911.00
19,860.00
8,740.00
911.00
9,745.00
911.00
-

8,740.00
930.00
8,740.00
930.00
8,740.00
801.00
8,740.00
801.00
8,740.00
801.00
8,120.00
630.00
8,120.00
630.00
-

8,120.00
630.00
8,120.00
630.00
8,120.00
630.00
8,120.00
8,120.00
8,120.00
8,120.00
-

8,120.00
8,120.00
8,120.00
8,120.00
8,120.00
-

60

45

950

23

370

6,177,106.48

TOTAL WEEKLY COST

WEEKLY COST

15,029.36

75,715.15

153,002.38

220,446.38

242,246.89

220,446.38

276,520.63

126,765.00

186,425.00

102,983.40

179,076.95

99,049.80

159,223.39

72,258.76

129,362.46

346,977.76

446,630.72

406,299.81

446,630.72

503,917.82

446,630.72

504,617.82

491,905.14

550,344.84

77,866.88

136,853.63

17,750.29

74,068.99

56,100.00

1,600.00

1,600.00

57,300.00

15,077.00

70,562.00

76,062.00

134,472.00

177,381.45

235,938.00

161,937.89

219,976.29

117,274.29

174,929.29

56,100.00

42,698.10

102,153.66

55,871.08

112,401.64

63,639.58

120,170.14

63,639.58

119,354.86

93,829.15

148,329.15

140,858.81

195,228.42

219,452.30

277,169.96

75,184.73

130,384.73

79,247.44

134,447.44

794,742.23

853,609.81

279,220.97

345,815.64

102,252.29

148,905.29

147,470.00

197,891.49

142,341.00

184,545.00

171,999.00

214,253.00

274,049.00

314,953.00

118,529.00

146,633.00

54,873.00

73,377.00

49,980.00

62,548.00

40,600.00

50,000.00

8,400.00

4,892.98
8,375,515.17

CT TITLE: PROPOSED 10-DOOR APARTMENT BUILDING


BLK 25, A. MABINI ST., SAN BARTOLOME, NOVALICHES, QUEZON CITY
OWNER: MR. & MRS. RODRIGO NIEVA JR.

ACTIVITY NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

DOOR APARTMENT BUILDING


N BARTOLOME, NOVALICHES, QUEZON CITY
ODRIGO NIEVA JR.

ACTIVITY
Mobilization
Perimeter Fence
Storage Sheds
Workshops
Clearing and Grubbing
Laying out and staking
Excavation of Footing
Excavation of Wall Footing
Laying of CHB and Reinforcements (Wall Footing)
Fabrication of Reinforcements (Footing)
Installation of Reinforcements (Footing)
Pouring of Concrete (Footing)
Curing of Concrete (Footing)
Backfilling of Footing
Compaction of Footing
Laying of Gravel Base
Fabrication of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab)
Fabrication of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab)
Curing of Concrete (Ground Floor Slab)

Removal of Formworks (Ground Floor Slab)


Fabrication of Reinforcements (Ground Floor Column)
Installation of Reinforcements (Ground Floor Column)
Fabrication of Formworks (Ground Floor Columns)
Installation of Formworks (Ground Floor Column)
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Column)
Curing of Concrete (Ground Floor Column)
Removal of Formworks (Ground Floor Column)
Fabrication of Formworks (2nd Floor Beams and Slabs)
Installation of Formworks (2nd Floor Beams and Slabs)
Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)
Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Pouring of Concrete ( 2nd Floor Beams and Slabs)
Curing of Concrete (2nd Floor Beams and Slabs)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Installation of Reinforcements (2nd Floor Columns)
Fabrication of Formworks (2nd Floor Columns)
Installation of Formworks (2nd Floor Columns)
Pouring of Concrete (2nd Floor Column)
Curing of Concrete (2nd Floor Column)
Removal of Formworks (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Installation of Formworks (Roof Beam)
Fabrication of Scaffoldings (Roof Beams)
Installation of Scaffoldings (Roof Beams)
Fabrication of Reinforcements (Roof Beams)
Installation of Reinforcements (Roof Beams)
Pouring of Concrete (Roof Beams)
Curing of Concrete (Roof Beams)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Fabrication of Purlins
Installation of Purlins
Installation of Roofs
Installation of Roof Accessories
Installation of Reinforcements (Second Floor Wall)
Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)

Plastering of Wall (Ground Floor)


Fabrication of Wood Stairs
Installation of Wood Stairs
Installation of Doors and Windows (Second Floor)
Installation of Doors and Windows (Ground Floor)
Tile Lay out (2nd Floor)
Tile Lay out (Ground Floor)
Installation of Water Closet
Installation of Kitchen Sink
Installation of Shower Drain
Installation of Lavatory
Installation of Shower Head
Installation of Electrical Accessories
Installation of Ceiling Insulators
Installation of Wood Ceiling
Painting (Interior)
Painting (Exterior)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank
Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank
Installation of Formworks for Septic Tank
Pouring of Concrete (Septic Tank)
Curing of Concrete (Septic Tank)
Septic pipes fix
Backfilling of Septic Tank
Cleaning of Site and Structure
Demobilization
TOTAL COST

DURATION
3
3
2
2
1
1
6
6
6
5
7
7
7
7
4
1
14
14
4
7
5
7

MANPOWER
11,450.00
5,500.00
9,400.00
2,650.00
2,100.00
1,450.00
16,100.00
13,700.00
16,200.00
11,500.00
16,150.00
16,700.00
4,900.00
11,200.00
4,200.00
1,750.00
45,800.00
45,150.00
6,400.00
17,750.00
12,300.00
16,100.00

EQUIPMENTS
3,139.47
3,096.00
24,104.94
24,104.94
546.75
4,095.00
28,122.43
1,530.90
354.00
2,925.00
-

2
7
14
5
14
16
5
7
2
21
21
3
21
21
28
8
10
7
3
3
13
14
5
6
5
7
2
7
8
5
5
7
6
5
7
2
2
7
21
21
21
7
28
28
7
28
28
28

4,600.00
25,550.00
53,950.00
12,400.00
27,650.00
29,600.00
13,200.00
16,100.00
4,600.00
67,550.00
56,050.00
4,800.00
41,650.00
70,950.00
109,200.00
14,000.00
22,300.00
16,100.00
6,900.00
2,100.00
34,850.00
40,600.00
13,100.00
16,550.00
13,000.00
19,600.00
4,600.00
15,150.00
23,800.00
13,100.00
11,650.00
18,550.00
22,200.00
16,750.00
16,100.00
4,600.00
1,400.00
19,950.00
64,400.00
53,300.00
39,200.00
15,400.00
65,150.00
29,400.00
14,900.00
81,850.00
29,400.00
86,175.00

765.45
442.50
2,925.00
1,858.50
265.50
2,296.35
5,850.00
1,421.55
442.50
2,925.00
619.50
442.50
765.45
2,925.00
5,706.96
-

28
7
5
7
7
20
20
2
2
2
2
2
5
5
5
30
30
2
2
1
1
1
1
7
2
1
7
2

91,925.00
13,650.00
11,000.00
7,350.00
9,350.00
28,000.00
28,000.00
3,500.00
4,200.00
2,100.00
2,800.00
4,200.00
4,000.00
12,250.00
9,250.00
64,000.00
48,000.00
3,500.00
4,600.00
1,750.00
2,300.00
2,300.00
700.00
4,900.00
4,600.00
700.00
9,800.00
2,800.00

619.50
1,905.55
2,667.77
2,667.77
1,680.00
1,680.00
546.75
8,034.98
218.70
88.50
228.00
357.00
2,092.98

2,053,950.00

144,458.69

MATERIALS
106,974.00
52,523.78
43,890.00
27,860.41
176,865.65
23,098.41
141,280.00
-

TOTAL COST
14,589.47
5,500.00
9,400.00
2,650.00
5,196.00
1,450.00
40,204.94
37,804.94
123,174.00
64,570.53
16,150.00
64,685.00
4,900.00
39,322.43
4,200.00
29,610.41
224,196.55
45,150.00
29,852.41
17,750.00
156,505.00
16,100.00

WEIGHT %
0.1741919118
0.0656676024
0.1122319023
0.0316398448
0.0620379749
0.0173123679
0.4800294572
0.4513745034
1.4706438651
0.7709439801
0.1928239598
0.772310702
0.058503864
0.4694926725
0.0501461691
0.3535353277
2.6768090735
0.5390713179
0.3564247022
0.2119272623
1.8686014752
0.1922269816

115,378.02
61,157.88
59,609.40
35,770.00
110,361.53
107,301.16
1,452,847.24
7,000.00
126,770.00
115,378.02
20,592.60
23,100.00
51,030.21
42,676.32
160,514.62
39,860.00
120,650.00
64,600.00
30,655.00
215,278.05
4,600.00
240,138.05
15,236.80
69,820.00

4,600.00
141,693.47
53,950.00
74,000.38
27,650.00
89,209.40
51,895.00
16,100.00
4,600.00
179,770.03
56,050.00
112,366.66
41,650.00
1,526,093.59
109,200.00
21,000.00
154,920.00
16,100.00
6,900.00
2,100.00
151,649.57
40,600.00
34,135.10
16,550.00
39,025.00
19,600.00
4,600.00
66,799.71
23,800.00
56,218.82
11,650.00
179,830.07
22,200.00
59,535.00
16,100.00
4,600.00
1,400.00
140,600.00
70,106.96
117,900.00
69,855.00
15,400.00
280,428.05
34,000.00
14,900.00
321,988.05
44,636.80
155,995.00

0.0549219947
1.6917582637
0.6441394817
0.8835322784
0.3301289466
1.0651213472
0.6196036775
0.1922269816
0.0549219947
2.1463757318
0.6692125663
1.3416089367
0.4972828436
18.2208922461
1.3038003967
0.2507308455
1.8496772661
0.1922269816
0.0823829921
0.0250730846
1.8106297576
0.4847463013
0.4075582136
0.1975997854
0.4659414879
0.2340154558
0.0549219947
0.7975594176
0.2841616249
0.6712282035
0.1390959214
2.1470926429
0.2650583224
0.7108219471
0.1922269816
0.0549219947
0.0167153897
1.6787027086
0.8370465408
1.4076746041
0.8340382483
0.1838692867
3.3481886707
0.4059451785
0.1778995047
3.8443969535
0.5329439336
1.8625122975

76,860.00
160,000.00
196,600.00
324,600.00
16,497.00
16,542.00
121,250.00
26,000.00
2,500.00
58,300.00
105,056.80
118,772.00
12,530.00
181,335.00
623,665.00
257,025.00
5,060.52
8,213.02
2,240.00
1,243.00
-

168,785.00
14,269.50
172,905.55
206,617.77
336,617.77
46,177.00
46,222.00
124,750.00
30,200.00
4,600.00
61,100.00
109,256.80
122,772.00
24,780.00
191,131.75
687,665.00
305,025.00
11,534.98
9,879.22
1,750.00
10,601.52
2,528.00
3,297.00
4,900.00
5,843.00
700.00
9,800.00
4,892.98

6,177,106.48

8,375,515.17

2.015219322
0.1703716095
2.0644168927
2.4669261034
4.0190694328
0.5513332502
0.5518705306
1.489460618
0.360574835
0.0549219947
0.7295073648
1.304478564
1.4658441603
0.2958623977
2.2820297754
8.2104203279
3.6418655312
0.1377226328
0.1179535802
0.0208942371
0.1265775273
0.030183218
0.0393647427
0.058503864
0.0697628729
0.0083576949
0.1170077279
0.0584200482
100.00
TOTAL WEEKLY COST
CUMMULATIVE COST
PERCENTAGE

WEEK 1
75,715.15
75,715.15
0.9

WEEK 2
242,246.89
317,962.04
3.8

WEEK 3
276,520.63
594,482.68
7.1

WEEK 4
186,425.00
780,907.68
9.32

WEEK 5
179,076.95
959,984.63
11.46

2
6

2
6

2
6

WEEK 6
159,223.39
1,119,208.02
13.36

WEEK 7
129,362.46
1,248,570.49
14.91

WEEK 8
406,299.81
1,654,870.29
19.76

WEEK 9
503,917.82
2,158,788.12
25.77

WEEK 10
504,617.82
2,663,405.94
31.8

WEEK 11
550,344.84
3,213,750.78
38.37

WEEK 12
136,853.63
3,350,604.40
40

WEEK 13
74,068.99
3,424,673.40
40.89

WEEK 14
56,100.00
3,480,773.40
41.56

WEEK 15
57,300.00
3,538,073.40
42.24

WEEK 16
70,562.00
3,608,635.40
43.09

WEEK 17
134,472.00
3,743,107.40
44.69

WEEK 18
235,938.00
3,979,045.40
47.51

WEEK 19
219,976.29
4,199,021.69
50.13

WEEK 20
174,929.29
4,373,950.98
52.22

WEEK 21
56,100.00
4,430,050.98
52.89

WEEK 22
102,153.66
4,532,204.63
54.11

WEEK 23
112,401.64
4,644,606.27
55.45

WEEK 24
120,170.14
4,764,776.41
56.89

WEEK 25
119,354.86
4,884,131.27
58.31

WEEK 26
148,329.15
5,032,460.43
60.09

WEEK 27
195,228.42
5,227,688.84
62.42

WEEK 28
277,169.96
5,504,858.80
65.73

WEEK 29
130,384.73
5,635,243.52
67.28

WEEK 30
134,447.44
5,769,690.96
68.89

WEEK 31
853,609.81
6,623,300.77
79.08

WEEK 32
345,815.64
6,969,116.41
83.21

WEEK 33
148,905.29
7,118,021.70
84.99

WEEK 34
197,891.49
7,315,913.19
87.35

WEEK 35
184,545.00
7,500,458.19
89.55

WEEK 36
214,253.00
7,714,711.19
92.11

WEEK 37
314,953.00
8,029,664.19
95.87

WEEK 38
146,633.00
8,176,297.19
97.62

WEEK 39
73,377.00
8,249,674.19
98.5

WEEK 40
62,548.00
8,312,222.19
99.24

WEEK 41
50,000.00
8,362,222.19
99.84

WEEK 42
8,400.00
8,370,622.19
99.94

WEEK 43
4,892.98
8,375,515.17
100

PROJECT TITLE: PROPOSED 10-DOOR APARTMENT BUILDING


LOCATION: LOT 36/37, BLK 25, A. MABINI ST., SAN BARTOLOME, NOVALICHES, QUEZON CITY
OWNER: MR. & MRS. RODRIGO NIEVA JR.
ITEM NO.

ITEM

A.

SITEWORKS

UNIT

Clearing and Grubbing


Excavation

lot
F-1
WF-1(1)
WF-1(2)
WF-2(1)
WF-2(2)
Septic Tank

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

F-1
WF-1(1)
WF-1(2)
WF-2(1)
WF-2(2)

cu.m
cu.m
cu.m
cu.m
cu.m

F-1
WF-1(1)
WF-1(2)
WF-2(1)
WF-2(2)
Slab on fill

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

Backfilling

Gravelfill

ITEM
B.

UNIT
CONCRETE WORKS

Ground Floor
using Class "A" Mix
F-1
Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

C-1

C-2

WF-1(1)

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand

bags
cu.m

WF-1(2)

WF-2(1)

WF-2(2)

Slab on Fill

Second Floor
C-1

C-2

S-1(1)

S-1(2)

S-2

S-Dep.

B(1)

Gravel

cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

Cement
Sand
Gravel

bags
cu.m
cu.m

B(2)

RB(1)

RB(2)

C.

ITEM

UNIT

6m x 16mm

kg

6m x 10mm

kg

6m x 10mm

kg

6m x 10mm

kg

6m x 10mm

kg

6m x 12mm

kg

6m x 10mm
6m x 16mm

kg
kg

6m x 10mm
6m x 16mm

kg
kg

6m x 10mm

kg

6m x 12mm

kg

6m x 10mm
6m x 16mm

kg
kg

6m x 10mm
6m x 16mm

kg
kg

STEEL WORKS
Ground Floor
F-1
WF-1(1)
WF-1(2)
WF-1(3)
WF-2
Slab on Fill
C-1

C-2

Wall GF
Second Floor
Slab
B-1 (1)

B-1 (2)

C-1
6m x 10mm
6m x 16mm

kg
kg

6m x 10mm
6m x 16mm

kg
kg

6m x 10mm

kg

6m x 10mm
6m x 16mm

kg
kg

ITEM

UNIT

C-2

Wall 2F
RB-1

D.

SCAFFOLDING
Ground Floor
C-1
2"x2"Horizontal Support(bd. ft.)
2"x2"Diagonal Support(bd. ft.)
2"x3"Vertical Support(bd. ft.)
C-2
2"x2"Horizontal Support(bd. ft.)
2"x2"Diagonal Support(bd. ft.)
2"x3"Vertical Support(bd. ft.)
Second Floor
S-1
2"x3" LUMBER (bd. ft.)
B-1 (1)
2"x2"Horizontal Support(bd. ft.)
2"x3"Vertical Support(bd. ft.)
B-1 (2)
2"x2"Horizontal Support(bd. ft.)
2"x3"Vertical Support(bd. ft.)
C-1
2"x2"Horizontal Support(bd. ft.)
2"x2"Diagonal Support(bd. ft.)
2"x3"Vertical Support(bd. ft.)
C-2

m
m
m
m
m
m

m
m
m
m
m
m
m
m

2"x2"Horizontal Support(bd. ft.)

2"x2"Diagonal Support(bd. ft.)


2"x3"Vertical Support(bd. ft.)

m
m

2"x2"Horizontal Support(bd. ft.)

2"x3"Vertical Support(bd. ft.)

RB(1)

RB(2)

2"x2"Horizontal Support(bd. ft.)


2"x3"Vertical Support(bd. ft.)

m
m

ITEM

UNIT

E.

FORMWORKS
Ground Floor
Slab (side)
F-1
C-1
C-2
WF-1(1)
WF-1(2)
WF-1(3)
WF-1(4)
WF-1(5)
WF-2
Second Floor
C-1
C-2
B(1)
B(2)
B(3)
RB(1)
RB(2)
S-1(1)
S-1(2)
S-1(3)
RB-(1)
Septic Tank

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
ITEM

UNIT

MASONRY WORKS

F.
WF-1 (Unit 1)
CHB(15 cm):
Cement:
Sand:
WF-1 (Unit 2-10)
CHB(15 cm):
Cement:
Sand:
GF (Unit 1)
CHB(10 cm):
CHB(15 cm):
Cement:
Sand:

pcs
bags
cu.m
pcs
bags
cu.m
pcs
pcs
bags
cu.m

GF (Unit 2-10)
CHB(10 cm):
CHB(15 cm):
Cement:
Sand:
2F (Unit 1)
CHB(15 cm):
Cement:
Sand:
2F (Unit 2-10)
CHB(15 cm):
Cement:
Sand:
PLASTERING
GF (Unit 1&10)
Cement:
Sand:
GF (Unit 2-9)
Cement:
Sand:
2F (Unit 1&10)
Cement:
Sand:
2F (Unit 2-9)
Cement:
Sand:

pcs
pcs
bags
cu.m
pcs
bags
cu.m
pcs
bags
cu.m

bags
cu.m
bags
cu.m
bags
cu.m
bags
cu.m
ITEM

DOORS AND WINDOWS


Ground Floor
W1 (1.4x1.2)
W2 (1.4x0.75)
W3 (0.70x0.55)
D1 (2.1x0.9)
D2 (0.85x2.1)
D3 (0.6x2.1)
D4 (0.6x 2.1)
Second Floor
W1 (1.4x1.2)
D2 (0.85x2.1)
D3 (0.6x2.1)

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs

ITEM
FLOOR FINISHES
Tiles (6"x6") (1st Floor)

UNIT

UNIT
pcs

Grout
Tiles (6"x6") (2nd Floor)
Grout
T&B (6"x6") Tiles
Grout
Kitchen (6"x6") Tiles
Grout
ITEM
PAINTING
Exterior
BOYSEN Acrytex
Paint thinner
Interior
Boysen Permacoat Flat Latex
Paint thinner
Sandpapers
Paint Roller
Paint Brush
ITEM
Construction of Septic Tank
Cement:
Sand:
Gravel:
RSB 6m(10 mm dia.)
GI
Formworks
PVC Sewer (100 mm dia)L=6m:
UPVC Vent Pipe (100 mm dia.):
ITEM

bags
pcs
bags
pcs
bags
pcs
bags
UNIT
sq.m
liters
liters
sqm
liters
liters
lot/s
lot/s
lot/s
UNIT
bags
cu.m
cu.m
kg
kg
pcs
pcs
pcs
UNIT

2 #14mm2

Unit
pcs
pcs
pcs
pcs
pcs
pcs
pcs
m

1 #11mm2
2 #3.5mm2 TW
1 #1.6mm2 TW
PVC Pipe (3m x 15mm dia)
Switch Wire
Lightning Switch

m
m
m
pcs
m
pcs

ELECTRICAL
Lightning Outlet
Wall Light
Main Disconnectng Panel
Outlet
Refrigerator
Dupplex Convinient
Metering Center

ITEM

UNIT

COLD WATER LINE


PVC Pipe (20mm dia x 3.00m)
Tee Plain (20mm dia)
Elbow (20mm x 90 deg)
Coupling (20mm dia)
PVC Cement
Check Valve (20mm dia)
Gate Valve (20mm dia)
Water Meter
Faucet (12mm x 100mm)

pcs.
pcs.
pcs.
pcs.
L
pcs.
pcs.
pcs.
pcs.

SEWER PIPE
PVC Pipe (100mm dia x 3.00m)
Tee (150mm x 3.00m)
Tee (100mm x 3.00m)
Wye Reducer (150 x 100mm dia)
Wye (150 x 150mm)
Clean-out w/ plug (150 mm dia)
PVC Cement

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
L

Kitchen Sink
Lavatory
Lavatory Faucet
Stainless Floor Drain
Shower Head and Shower Valve
Water Closet

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

DRAIN PIPE
100 mm dia.
PVC Pipe (100mm dia x 3.00m)
50 mm dia.
PVC Pipe (50mm dia x 3.00m)
P-trap (50mm dia)
100 x 50
Wye Reducer (100 x 50mm dia x 90 deg)
100 x 50
Wye Reducer (100 x 50mm dia x 45 deg)
100 x 50
Tee Reducer (100 x 50mm dia)
50 mm dia.
Elbow (50mm x 45 deg)
50 mm dia.
Elbow (50mm x 90 deg)
50 mm dia.
Wye (50 X 50mm dia x 45 deg)
50 mm dia.
Vent Pipe (50mm dia x 3.00m)
50 mm dia.
Elbow (50mm x 90 deg)
PVC Cement
50 mm dia.
Vent Pipe (50mm dia x 3.00m)
6 m (75mm dia.)
PVC Pipe (75mm dia x 3.00m)

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
L
m
pcs.

CHES, QUEZON CITY

TOTAL QUANTITY

VOLUME per
UNIT

TOTAL
QUANTITY

TOTAL VOLUME

600

600

78.078
22.399
127.341
2.288
27.225
5.928

2.366
22.399
14.149
2.288
3.025
5.928

33
1
9
1
9
1

78.078
22.399
127.341
2.288
27.225
5.928

64.1355
17.3081
98.3979
1.768
19.89

1.9435
17.3081
10.9331
1.768
2.21

33
1
9
1
9

64.1355
17.3081
98.3979
1.768
19.89

2.7885
1.018
0.643
0.936
1.17
30

0.0845
1.018
0.643
0.104
0.13
30

33
1
1
9
9
1

2.7885
1.018
0.643
0.936
1.17
30

QUANTITY per UNIT

VOLUME per
UNIT

QUANTITY

TOTAL VOLUME

4
1
1

0.4225
0.4225
0.4225

33
33
33

13.9425
13.9425
13.9425

3
1
1

0.252
0.252
0.252

33
33
33

8.316
8.316
8.316

2
1
1

0.189
0.189
0.189

11
11
11

2.079
2.079
2.079

46
3
6

5.0906
5.0906
5.0906

1
1
1

5.0906
5.0906
5.0906

5
1
1

0.52
0.52
0.52

1
1
1

0.52
0.52
0.52

29
2
4

3.2156
3.2156
3.2156

9
9
9

28.9404
28.9404
28.9404

6
1
1

0.65
0.65
0.65

9
9
9

5.85
5.85
5.85

405
23
45

45
45
45

1
1
1

45
45
45

2
1
1

0.165
0.165
0.165

33
33
33

5.445
5.445
5.445

2
1
1

0.1234
0.1234
0.1234

11
11
11

1.3574
1.3574
1.3574

12
1
2

1.32
1.32
1.32

10
10
10

13.2
13.2
13.2

14
1
2

1.52
1.52
1.52

10
10
10

15.2
15.2
15.2

2
1
1

0.13
0.13
0.13

10
10
10

1.3
1.3
1.3

1
1
1

0.09
0.09
0.09

10
10
10

0.9
0.9
0.9

8
1

0.84
0.84

10
10

8.4
8.4

0.84

10

8.4

4
1
1

0.392
0.392
0.392

10
10
10

3.92
3.92
3.92

8
1
1

0.84
0.84
0.84

10
10
10

8.4
8.4
8.4

4
1
1

0.392
0.392
0.392

10
10
10

3.92
3.92
3.92

QUANTITY of REBARS

WEIGHT

QUANTITY

TOTAL WEIGHT

28.41

33

937.53

56

205.905

1853.145

101

372.405

372.405

24.42

20

488.4

10.0936

20

201.872

72

383.76

10

3837.6

4
4

14.8
37.88

33
33

488.4
1250.04

3
4

11.1
37.88

11
11

122.1
416.68

22.2

10

222

72

383.76

10

3837.6

14
30

51.8
284.1

40
40

2072
11364

19
54.4

70.3
515.168

18
18

1265.4
9273.024

4
4

14.8
37.88

33
33

488.4
1250.04

3
4

11.1
37.88

11
11

122.1
416.68

22.2

10

222

12
30

44.4
284.1

42
42

1864.8
11932.2

QUANTITY of Wood

LENGTH

QUANTITY

TOTAL QUANTITY of
WOOD

59
33
20

2.8
2.8
2.8

33
33
33

1947
1089
660

59
33
20

2.8
2.8
2.8

11
11
11

649
363
220

10

2802.8

280.28
18
23

3.775
3.775

40
40

720
920

16
20

3.4
3.4

18
18

288
360

58
32
19

2.75
2.75
2.75

33
33
33

1914
1056
627

58

2.75

32
19

2.75
2.75

11
11
11

638
352
209

18

3.775

30

540

30

690

23

3.775

16
20

3.4
3.4

22
22

352
440

Plywood pcs.

QUANTITY of
Member

AREA

LUMBER (2"x2") Bd.ft

6.325
0.598
2.024
1.656
1.035
0.598
0.506
0.24725
0.276
0.345

1
33
33
11
11
11
31
11
11
10

13.75
1.3
4.4
3.6
2.25
1.3
1.1
0.5375
0.6
0.75

185.625
17.55
59.4
48.6
30.375
17.55
14.85
7.25625
8.1
10.125

1.3915
1.1385
1.4076
1.56285
0.5382
1.4076
1.56285
5.796
5.52
0.644
2.392
5.9432

33
11
18
40
9
22
30
10
10
10
10
1

3.025
2.475
3.06
3.3975
1.17
3.06
3.3975
12.6
12
1.4
5.2
12.92

19.36
15.84
41.31
45.86625
15.795
41.31
45.86625
81.9
78
9.1
33.8
83.98

No. of Unit

Total Quantity

456
37
4

1
1
1

456
37
4

285
24
2

9
9
9

2565
216
18

89
937
80
7

1
1
1
1

89
937
80
7

Quantity per Unit

89
566
50
5

9
9
9
9

801
5094
450
45

958
78
7

1
1
1

958
78
7

554
45
4

9
9
9

4986
405
36

32
3

2
2

64
6

21
2

8
8

168
16

32
3

2
2

64
6

17
2

8
8

136
16

QUANTITY per Unit

AREA per Unit

QUANTITY

TOTAL AREA

1
1
1
1
1
1
1

1.68
1.05
0.385
1.89
1.785
1.26
1.26

10
10
10
10
10
10
10

16.8
10.5
3.85
18.9
17.85
12.6
12.6

2
1
2

1.68
1.786
1.68

10
10
10

16.8
17.86
16.8

AREA per UNIT

QUANTITY

TOTAL AREA

TOTAL per unit

32

10

320

49

29.4
12.2
7.1
TOTAL AREA

10
10
10
10
10
10
10
Primer

Top Coat

6
45
5
19
2
11
1
Total Quantity

175
18

280
28

455
46

425
43

680
68

1105
111
1
1
1

294
122.325
70.6

876

2125

Total

(38 pcs)

4
0.7
0.9
140.57
2.81
1
2

Total

TOTAL
QUANTITY

4.0
1.0
1.0
3.0
1.0
4.0
1.0

40.0
10.0
10.0
30.0
10.0
40.0
10.0

15.3

152.5

1.5
18.1
1.8
7.0
7.8
3.0

15.2
180.6
18.0
70.0
77.8
30.0

QUANTITY per UNIT

NO. OF UNITS

126.86
4
12
12
3
1
1
1
1

59
1
2
1
1
1
12

10
10
10
10
10
10
10

10
10
10

TOTAL
QUANTITY
43
40
120
120
3
10
10
10
10

20
1
2
10
10
10
12

1
1
1
1
1
1

10
10
10
10
10
10

10
10
10
10
10
10

15
4
4
1
2
1
1
1
1
4
2
7
6
4

10
10
10
10
10
10
10
10
10
10
11

49
15
40
10
20
10
10
10
10
15
22
7
20
40

10
10

3
2
1
1
2
30
TOTAL QUANTITY of UNIT

126
7
14
75
5
9
19
2
3

46
3
6
5
1
1
261
15
29
53
3
6
405
23
45

50
3
6
13
1
2
119
7
14
137
8
16
12
1
2
9
1
1
76
5

9
36
2
4
76
5
9
36
2
4
No. 16 G.I. Wire

0.34
0.34
0.34
0.34
0.34
5.17
0.56

0.42
2.77

5.17
1.06

1.43

0.56

0.42
2.77
0.70
CWN NAILS (20d)

2.044
2.044
2.044
2.044
2.044
2.044

5.236
2.7558
2.7558
2.482
2.482
2.0075
2.0075
2.0075
2.0075
2.0075
2.0075
2.7558
2.7558

2.482
2.482
LUMBER (2"x2") Pcs.

40
4
13
11
6
4
3
2
2
2

4.667
4.67
4.67
4.67
5.3333
5.3333
5.3333
5.3333
5.3333
5.3333

5
4
4
4
4
4
4
18
17
2
8
18

4.67
4.67
11.152
12.382
4.264
11.152
12.382
4.667
4.667
4.667
4.667
4.667

TOTAL
210

57
193
53
81
22
47
13

CORRUGATED
ROOFING SHEETS
Apartment No.
1
2
3
4
5
6
7
8
9
10

PURLINS
Apartment No.
1
2
3
4
5
6
7
8
9
10

ROOFING NAILS
Apartment No.
1
2

3
4
5
6
7
8
9
10

CEILING BOARD
Apartment No.
1
2
3
4
5
6
7
8
9
10

ITEM
G.I. Sheet
Umbrella Nails
ITEMS
Tiles for Ground Floor 2
Tiles for Second Floor 2

NAILS

TOTAL AREA

TOTAL
QUANTITY (2"
x 2")

0.35
0.03
0.11
0.09
0.06
0.03
0.03
0.01
0.02
0.02

13.75
42.9
145.2
39.6
24.75
14.3
34.1
5.9125
6.6
7.5
0
99.825
27.225
55.08
135.9
10.53
67.32
101.925
126
120
14
52
12.92

185.625
579.15
1960.2
534.6
334.125
193.05
460.35
79.81875
89.1
101.25
0
638.88
174.24
743.58
1834.65
142.155
908.82
1375.9875
819
780
91
338
83.98

0.08
0.06
0.08
0.09
0.03
0.08
0.09
0.32
0.30
0.04
0.13
0.33

Roof Dimensions (m)


10.81
10.81
10.81
10.81
10.81
10.81
10.81
10.81
10.81
10.81

Total Roof Area (m)


43.24
43.24
43.24
43.24
43.24
43.24
43.24
43.24
43.24
43.24

4
4
4
4
4
4
4
4
4
4

Commercial Size : 100 x 50 x 2mm


4 m purlins
Length of Roof(m)
Purlins Spacing(m)
10.81
0.6
10.81
0.6
10.81
0.6
10.81
10.81
10.81
10.81
10.81
10.81
10.81

0.6
0.6
0.6
0.6
0.6
0.6
0.6

19
19
19
19
19
19
19
Total =

No. of nails/sheet
18
18

No. of Purlins
19
19
19

No. of Roofing Sheets


19
19

190
Pcs. of purlins

No. of Nails
342
342

18
18
18
18
18
18
18
18

19
19
19
19
19
19
19
19

342
342
342
342
342
342
342
342
total =

3420
pcs. Of nails

SIZE: 24''x 24''


Area of Ceiling(m)
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
Total =

No. pcs./sq. m
115.464
115.464
115.464
115.464
115.464
115.464
115.464
115.464
115.464
115.464
1154.64
pcs. Of ceiling board
24'' x 24''

QUANTITY(pcs)
14
308

Weight (kg)
----3

10
10

Area(m)
32
29.435

No. of Pcs
87
80

Amt. of Grout
0.075
0.069

Commercial Size: 32'' x 12''


Effective Coverage(m)
2.335
2.335
2.335
2.335
2.335
2.335
2.335
2.335
2.335
2.335
Total No. of Roof sheet =

linear meter
76
76
76
76
76
76
76
76
76
76
760
linear meter

Weight of Nails (kg)


4
4

No. of Roofing Sheet


19
19
19
19
19
19
19
19
19
19
190
pcs

4
4
4
4
4
4
4
4
40
kg of nails

GUTTER
Apartment No.
1
2
3
4
5
6
7
8
9
10

Length of Gutter (l.m.)


8
8
8
8
8
8
8
8
8
8
Total =

80
linear meter

Total
140
30

10
10

Total
0.75
0.69

PROJECT TITLE: PROPOSED 10-DOOR APARTMENT BUILDING


LOCATION: LOT 36/37, BLK 25, A. MABINI ST., SAN BARTOLOME, NOVALICHES, QUEZON CITY
OWNER: MR. & MRS. RODRIGO NIEVA JR.

NO.
A.

B.

ROJECT TITLE: PROPOSED 10-DOOR APARTMENT BUILDING


OCATION: LOT 36/37, BLK 25, A. MABINI ST., SAN BARTOLOME, NOVALICHES, QUEZON CITY
WNER: MR. & MRS. RODRIGO NIEVA JR.

DESCRIPTION OF MATERIAL
FOUNDATION, CONCRETE COLUMNS, BEAMS,
SLABS AND CONCRETE HOLLOW BLOCKS WALL
Excavation
Backfill
Gravelfill
Portland Cement, Northern Cement or Equivalent
Washed Sand
G-1 Gravel, Crushed
3/4" Gravel, Crushed
Concrete Hollow Blocks, 150 x 200 x 400mm
Concrete Hollow Blocks, 100 x 200 x 400mm
Steel Reinforcing Bars, Deformed
10mm x 6.00 meters
12mm x 6.00 meters
16mm x 6.00 meters
Tie Wire No.16 for Tying
Skim Coats, Betonit or Equivalent
Common Wire Nails
50mm (2")
75mm (3")
31mm (1 1/4")
Form Lumber and Scaffolds, Coco Lumber
2"x2"x12' Formworks
6mm x 120mm x 240mm, Plywood
2"x2"x12' Scaffolds
2"x3"x12' Scaffolds
DOORS AND WINDOWS
D1: 0.9x2.1 Solid Door Panel
D2: 0.85x2.1 Solid Door Panel
D3: 0.8x2.1 Flush Type Hollow Core Door
D4: 0.6x2.1 PVC Door Panel
W1: 1.4x1.2 Sliding Glass Window
W2: 1.4x0.75 Sliding Glass Window
W3: 0.70x0.55 Sliding Glass Window

QUANTITY

UNIT

UNIT COST

TOTAL COST

4,820,802.01
263.259
201.4995
1
3252
250
39
180
14996
890

cu.m
cu.m
truckload
bags
cu.m
cu.m
cu.m
pcs
pcs

80.00
60.00
8,500.00
220.00
410.00
750.00
950.00
14.00
12.00

21,060.72
12,089.97
8,500.00
715,440.00
102,500.00
29,250.00
171,000.00
209,944.00
10,680.00

9783.022
7675.2
36840.194
22.75
80

kg
kg
kg
kg
bags

36.00
46.00
56.00
65.00
420.00

25
15
15

kg
kg
kg

44.00
46.00
50.00

352,188.79
353,059.20
2,063,050.86
1,478.96
33,600.00
0.00
1,100.00
690.00
750.00

6038.12875
175
1900
5212.8

bd. Ft.
pcs
bd. Ft.
bd. Ft.

21.00
350.00
21.00
21.00

10
20
20
10
20
10
10

pcs
pcs
pcs
pcs
pcs
pcs
pcs

3,500.00
3,500.00
1,700.00
1,400.00
4,800.00
3,000.00
1,300.00

126,800.70
61,250.00
39,900.00
109,468.80
292,000.00
35,000.00
70,000.00
34,000.00
14,000.00
96,000.00
30,000.00
13,000.00

A
B
C
D
E
F
G
H
I
J
K
K1
L
L1
M
N
N1
O
O1
P
Q
Q1
R
R1
R2
S
T
T1
U
U1
V
W
X
X1
Y
Y1
Z
AA
AA1
AB
AC
AC1
AD
AE

AF
AF1
AG
AG1
AH
AI
AI1
AJ
AJ1
AK
AK1
AK2
AL
AM
AM1
AN
AO
AP
AQ
AQ1
AQ2
AR
AR1
AS
AT
AU
AV
AW
AX
AY
AZ
BA
BA1
BB
BC
BD
BE
BF
BG
BH
BH1
BH2
BI
BJ
BK

BL
BM
BN
BO
BO1
BP
BQ
BR
BR1
BS
BT
BU
BV
BW
BX
BY
BZ
CA
CB
CC
CD
CE
CF
CG
CH
CH1
CI
CJ
CK
CL
CM
CN
CO
CP
CQ
CR
CS
CT

ACTIVITY

Mobilization
Perimeter Fence
Storage Sheds
Workshops
Clearing and Grubbing
Laying out and staking
Excavation of Footing
Excavation of Wall Footing
Laying of CHB and Reinforcements (Wall Footing)
Fabrication of Reinforcements (Footing)
Installation of Reinforcements (Footing)
Installation of Reinforcement (Footing) -1
Pouring of Concrete (Footing)
Pouring of Concrete (Footing) -1
Curing of Concrete (Footing)
Backfilling of Footing
Backfilling of Footing-1
Compaction of Footing
Compaction of Footing -1
Laying of Gravel Base
Fabrication of Reinforcements (Ground Floor Slab)
Fabrication of Reinforcements (Ground Floor Slab) -1
Installation of Reinforcements (Ground Floor Slab)
Installation of Reinforcements (Ground Floor Slab) -1
Installation of Reinforcements (Ground Floor Slab) -2
Fabrication of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab)
Installation of Formworks (Ground Floor Slab) -1
Pouring of Concrete (Ground Floor Slab)
Pouring of Concrete (Ground Floor Slab) -1
Curing of Concrete (Ground Floor Slab)
Removal of Formworks (Ground Floor Slab)
Fabrication of Reinforcements (Ground Floor Column)
Fabrication of Reinforcements (Ground Floor Column) -1
Installation of Reinforcements (Ground Floor Column)
Installation of Reinforcements (Ground Floor Column) -1
Fabrication of Formworks (Ground Floor Columns)
Installation of Formworks (Ground Floor Column)
Installation of Formworks (Ground Floor Column) -1
Securing a place for Electrical and Plumbing in Slabs (Ground Floor)
Pouring of Concrete (Ground Floor Column)
Pouring of Concrete (Ground Floor Column) -1
Curing of Concrete (Ground Floor Column)
Removal of Formworks (Ground Floor Column)

Fabrication of Formworks (2nd Floor Beams and Slabs)


Fabrication of Formworks (2nd Floor Beams and Slabs) -1
Installation of Formworks (2nd Floor Beams and Slabs)
Installation of Formworks (2nd Floor Beams and Slabs)-1
Fabrication of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs)
Installation of Scaffoldings (2nd floor Beams and Slabs) -1
Fabrication of Reinforcements ( 2nd floor Beams and Slabs)
Fabrication of Reinforcements ( 2nd floor Beams and Slabs) -1
Installation of Reinforcements (2nd Floor Beams and Slabs)
Installation of Reinforcements (2nd Floor Beams and Slabs)-1
Installation of Reinforcements (2nd Floor Beams and Slabs)-2
Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs
Pouring of Concrete ( 2nd Floor Beams and Slabs)
Pouring of Concrete ( 2nd Floor Beams and Slabs)-1
Curing of Concrete (2nd Floor Beams and Slabs)
Removal of Formworks ( 2nd Floor Beams and Slabs)
Removal of Scaffoldings (2nd floor Beams and Slabs)
Fabrication of Reinforcements (2nd Floor Columns)
Fabrication of Reinforcements (2nd Floor Columns)-1
Fabrication of Reinforcements (2nd Floor Columns)-2
Installation of Reinforcements (2nd Floor Columns)
Installation of Reinforcements (2nd Floor Columns)-1
Fabrication of Formworks (2nd Floor Columns)
Installation of Formworks (2nd Floor Columns)
Pouring of Concrete (2nd Floor Column)
Curing of Concrete (2nd Floor Column)
Removal of Formworks (2nd Floor Column)
Fabrication of Formworks (Roof Beams)
Installation of Formworks (Roof Beam)
Fabrication of Scaffoldings (Roof Beams)
Installation of Scaffoldings (Roof Beams)
Installation of Scaffoldings (Roof Beams)-1
Fabrication of Reinforcements (Roof Beams)
Installation of Reinforcements (Roof Beams)
Pouring of Concrete (Roof Beams)
Curing of Concrete (Roof Beams)
Removal of Formworks (Roof Beams)
Removal of Scaffoldings (Roof Beams)
Fabrication of Purlins
Fabrication of Purlins -1
Fabrication of Purlins -2
Installation of Purlins
Installation of Roofs
Installation of Roof Accessories

Installation of Reinforcements (Second Floor Wall)


Placing of CHB (Second Floor Wall)
Securing a place for Electrical and Plumbing in Walls (Second Floor Walls)
Installation of Reinforcements (Ground Floor Wall)
Installation of Reinforcements (Ground Floor Wall)-1
Placing of CHB (Ground Floor Wall)
Securing a place for Electrical and Plumbing (Ground Floor Walls)
Plastering of Wall (2nd Floor)
Plastering of Wall (2nd Floor)-1
Plastering of Wall (Ground Floor)
Installation of Wood Stairs
Installation of Doors and Windows (Second Floor)
Installation of Doors and Windows (Ground Floor)
Tile Lay out (2nd Floor)
Tile Lay out (Ground Floor)
Installation of Water Closet
Installation of Kitchen Sink
Installation of Shower Drain
Installation of Lavatory
Installation of Shower Head, Gate Valve, Water Meters, Check Valves & Faucet
Installation of Electrical Accessories
Installation of Ceiling Insulators
Installation of Wood Ceiling
Painting (Interior)
Painting (Interior)-1
Painting (Exterior)
Excavation for Septic Tank
Fabrication of Reinforcements for Septic Tank
Installation of Reinforcements for Septic Tank
Fabrication of Formworks for Septic Tank
Installation of Formworks for Septic Tank
Pouring of Concrete (Septic Tank)
Curing of Concrete (Septic Tank)
Septic pipes fix
Backfilling of Septic Tank
Cleaning of Site and Structure
Demobilization

DURATION

3 days
3 days
2 days
2 days
1 day
1 day
6 days
6 days
6 days
5 days
5 days
2 days
2 days
5 days
7 days
4 days
3 days
3 days
1 day
1 day
7 days
7 days
7 days
3 days
4 days
4 days
3 days
4 days
4 days
1 day
7 days
2 days
4 days
3 days
3 days
11 days
7 days
12 days
2 days
16 days
2 days
3 days
7 days
2 days

9 days
12 days
7 days
14 days
3 days
7 days
14 days
16 days
5 days
14 days
7 days
7 days
7 days
7 days
3 days
7 days
2 days
2 days
5 days
1 day
7 days
7 days
7 days
5 days
5 days
5 days
7 days
2 days
7 days
8 days
5 days
3 days
2 days
7 days
6 days
5 days
7 days
2 days
2 days
2 days
3 days
2 days
21 days
21 days
21 days

7 days
28 days
28 days
5 days
2 days
28 days
28 days
12 days
16 days
28 days
7 days
5 days
7 days
7 days
20 days
2 days
2 days
2 days
2 days
2 days
2 days
5 days
5 days
5 days
10 days
10 days
2 days
2 days
2 days
1 day
1 day
1 day
7 days
2 days
1 day
7 days
2 days

NETWORK DIAGRAM

A
3

0
0
0
0

1
0
2

B
3
E
1

3
3
3
3

3
3
3
3

2
3
3

C
2

3
3

D
2
F
1

5
5

5
5
5
5

5
4

3
4
4

5
4

S
4

9
9

9
9

G
6

Z
7

AH
3

19
19

10

19
19
11
10

P
1

12
11

12
11

K1
5

17
16

11
10

H
6
J
5

16
16

11
10
5

5
4

16
16

10
9

X1
4

14
13

9
17
18

21
21

11
19
18

10
9

L1
2

K2
2

21
16

21
21

L2
5

26
26

26
26

M
7

33
33

26
26

Q1
7

33
33

13

31
31

12
21
21

I
6

27
27

14

27
27

N1
4

31
31

15

28
29

15

28
29

34
34
16

31
31
Y2
11

N2
3

O1
3

34
34

34 O2 35
34 1 35

33
33

Q2
7

40
40

18

40 R2 43
40 3 43
19

33
33

R1
7

40
40

43 R3 47
43 4 47
20

40 T1 43
40 3 43

43 U1 47
43 4 47
43 T1 47
43 4 47

17

AB
16

44
45

22

44
45

47
47

U2
1

48
48

23

48
48

V
7

55
55

24

55
55

W
2

57
57

21
47
47

AJ1
16

AF1
9

53
54

53
54

AF2
12

53
54

AA1
12

25

26

26
63 AQ1 68
63 5 68
63
63

28

30

68
68

AQ2
1

69
69

31

69
69

63 AJ2 68
63 5 68

65
66

65
66

AA2
2

67
68

27
65
66

69
70
29

65
66

AC1
2

67
68

AG1
7

69
70

AI1
7
69
70

AC2
3

72
73

32

72
73

AQ3
7

76
76

33

76
76

AK1
14

76
77

76
77
34

76
77
AD
7

AG2
13

76
77

AI2
13
79
80

35

79
80

AE
2

81
82

36

89
89
89
89

38

89
89

89
90

37

96
96

AL
7
89
89

89
90

AK2
7

AR1
7

96
96
96
96

39

96
96

103
103

96
96

AK3
7

AR2
7

106
106

41

103
103

AM1
7
96
96

AM2
3

103
103
103
103

40

103
103

AS
5
103
103

108
108
AZ
5

108
108

106
106
106
106

BB
7

113
113

AN
7

113
113

44

113
113

AO
2

113
113

AP
2

113
113

AU
5
BA1
115
115

108
108

AT1
5

113
113

43

113
113

BH1
2

115
115

42
108
108

AX
7

115
115

45
115
115

BH2

115
115
115
115

118
118

46

AV
7

125
125

49

125
125

118
118
BA1
3

118
118

124
124

118
118
47

BH2
3

AY
8

118
118

118
118

BA2
2

120
120

118
118

BH3
2

120
120

48

120
120

BC
6

126
126

50

AW
2

127
127

51

132
144

51

127
127

BD
5

132
132

52

BE
7

139
151

139
151

BF
2

139
151

BG
2

54

132
132

127
127

BI
21

134
135

127
127

BL
7

134
134

53

134
134

141
153
55
141
153
BJ
21

153
154
153
154

148
149

56

148
149

BO1
5

153
154

58

153
154
153
154

BM
28

BN
28

57
BO2
2

155
156

59

155
156

BK
21
BF
28

162
163

162
163

BQ
28
BV
7

169
170

60
162
162

61
162
162

BT
7

169
169

169
169

176
177

62

176
177

CF
5

181
182
181
181

181
182
181
182

BR1
12

181
181

63

181
180

181
181

BZ
2

183
183

181
181

CB
2

183
183

181
181

CC
2

183
183

BW
7

188
188

66

188
188
BR2
16

183 CA 185
193 2 195
64

185
195

BU
5

190
200

65
183 CD 185
193 2 195

190
200

CJ
2

192
202

67
185
195

CG
5

190
200

68
190
200

CK
2

192
202

BS
28
197
196
192
202

CL
1

193
203

68

196
207
69

192
202

CM
1

71

193
203

193
203

CN
1

194
204

70

194
204

CQ
2

196
206

72
196
206

CO
1

197
208

216
216
216
216

73

197
198

CP
7

197
196

204
215

74

204
215

205
216

CR
1

BX
20
CH1
10

217
216
206
216

75

216
236
216
216

76

77

217
226

CE
5

221
221

BY
20

237
246

CH2
10

226
246

CI
30

246
246

78

246
246

CS