Msog-m1611-Qaqc-gp-002 - Code 2 - Itp Piping and Structures

This document provides an inspection and test plan for the fabrication and erection works for piping and structures for a product pipeline project in Bintulu, Sarawak. It outlines the responsibilities of the owner, engineering procurement and construction management contractor, and contractor. It then lists the various inspection activities, including procedures, materials, welding, non-destructive testing, pressure testing, installation and tie-ins. Hold points and responsible parties are identified for each activity, along with the documentation and records required. The purpose is to ensure quality assurance and quality control of the fabrication and construction works.

Uploaded by

Mohd Saffririzal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
296 views

Msog-m1611-Qaqc-gp-002 - Code 2 - Itp Piping and Structures

This document provides an inspection and test plan for the fabrication and erection works for piping and structures for a product pipeline project in Bintulu, Sarawak. It outlines the responsibilities of the owner, engineering procurement and construction management contractor, and contractor. It then lists the various inspection activities, including procedures, materials, welding, non-destructive testing, pressure testing, installation and tie-ins. Hold points and responsible parties are identified for each activity, along with the documentation and records required. The purpose is to ensure quality assurance and quality control of the fabrication and construction works.

Uploaded by

Mohd Saffririzal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

MAIN MECHANICAL & PIPING WORK FOR PRODUCT PIPELINE PROJECT AT BINTULU,SARAWAK

INSPECTION AND TEST PLAN ( ITP ) - FABRICATION AND ERECTION WORKS FOR PIPING & STRUCTURES

SCOPE OF RESPONSIBILITY
OWNER - : SHELL MDS (Malaysia) Sdn Bhd (SMDS)
EPCM - : AMEC FOSTER WHEELER E& C (Malaysia) (AMEC-FW)
CONTRACTOR - : MISI SETIA OIL & GAS SDN. BHD
TPI - : THIRD PARTY INSPECTION

LEGENDS

X - Responsible for implementing the action and the quality of the final product . This is generaly used for the CONTRACTORS only

I - Responsible for inspecting work on a surveillance or monitoring basis

R - Responsible for Reviewing and authorizing submissions

W - Responsible for Witnessing and signing work release Or HOLD

NA - Not Applicable

Doc No.:

MSOG -M1611-QAQC-GP-002

Rev.:

Date:

23 Aug'2016

Page:

2of 5

Doc No.:

MAIN MECHANICAL & PIPING WORK FOR PRODUCT PIPELINE PROJECT AT BINTULU,SARAWAK
INSPECTION AND TEST PLAN ( ITP ) - FABRICATION AND ERECTION WORKS FOR PIPING & STRUCTURES

MSOG -M1611-QAQC-GP-002

Rev.:

Date:

23 Aug'2016

Page:

3 of 5

HOLD POINTS
Activity
No.

INSPECTION ACTIVITIES

1.0

DRAWING

1.1

Construction drawing / shop drawing, Pipeline


Drawings and Pipe Support layout drawing
details

2.0

DOCUMENTS APPROVAL

2.1

Welding Procedures Specification ( WPS )

2.2

Procedure Qualification Report ( PQR )

2.3

Welder Qualification Testing ( WQT )

2.4

NDE Procedures

REFERENCE DOCUMENT /
CONTROLLING PROCEDURES /
ACCEPTANCE STANDARDS

-P&ID, Isometricdrawing, 1243A-8270-B004


Rev.P1

INSPECTION PARAMETERS

Approved AFC Drawings

1243A-8720-A004 Rev.P1

-Approved Welding Procedure ( WPS )

- Check approval of Prequalified WPS / or


Establish New WPS

-ASME IX , API 1104, ASME B31.4

- Welding parameter, weld joint & preparation


details.

-ASME IX , API 1104, ASME B31.4

Welding consumables and welding process

-ASME IX , API 1104, ASME B31.4

Checklist of approval of welder

VERIFYING DOCUMENTS /
RECORDS

RESPONSIBLE
PERSON

FORM

REMARKS

MSOG

TPI

AMECFW

SHELL

AFC

Projct Engineer,
Engineering

NA

Weld Map

QC Inspector

NA

Approved WPS & WQT,Welder


Certificate

WPS Format

QAQC Lead / 'QC


Inspector

W,R

I, R

PQR Format

QAQC Lead / 'QC


Inspector

W,R

I, R

MSOG-QAQC-F-19

QAQC Lead / 'QC


Inspector

W,R

W,R

I, R

QAQC Lead / 'QC


Inspector

NA

W,R

I, R

WQT Record, Welder List,


ID Card

1243A-8230-PR-0002

1. Radiography Testing (RT)

-As per API 1104, ASME B31.4,AWS D1.1

Approved Procedure

N/A

2. Magnetic Particle Testing (MPI)

-As per API 1104, ASME B31.4,AWS D1.1

Approved Procedure

N/A

3. Penetrant Testing (PT)

-As per API 1104, ASME B31.4,AWS D1.1

Approved Procedure

N/A

4. Hardness Testing

-As per API 1104, ASME B31.4,AWS D1.1

Approved Procedure

N/A

3.0

RAW MATERIAL

3.1

Material receiving, verification and visual


Inspection

- Delivery Order (DO), Mill certificate


- Specification, P.O

Check quantity, grade,Identification and


Material Equipment Receiving
physical inspection: free from visible damage,
Inspection Report
dimensional check

MSOG-QAQC-F-22

Material Controller /
QC Inspector

N/A

I,R

3.2

Review Mill Certificate

- Specification, ASME B31.4

As per Project Specification Requirement

MSOG-QAQC-F-20

N/A

3.3

Client Free Issued Material

- Delivery Order (DO), Mill certificate

As per Project Specification Requirement

N/A

4.0

INSPECTION BEFORE AND AFTER WELDING

4.1

Welding - Piping
a. Dimension / Marking & Cutting

1243A-8230-PR-0002

Identification (Heat No Transfer) and ID


Marking

b. Fit-up Inspection

-ASME B31.4, WPS

Inspection high low condition, Dimension and


Fit-up Inspection Report ( Piping )
Alignment

MSOG-QAQC-F-50

QC Inspector

N/A

I,R

c. Visual Inspection

-ASME B31.4, WPS

Checking for under cut / spatter and

Visual Inspection Report ( Piping )

MSOG-QAQC-F-51

QC Inspector

N/A

I,R

Approved Drawing

insufficient welding condition

Weld Summary ( Piping )

MSOG-QAQC-F-52

QC Inspector

N/A

I,R

DLK-Q-FRM-0053

QC Inspector

N/A

I,R

DLK-Q-FRM-0054

QC Inspector

N/A

I,R

Mill Certificates
Mill Certificates

MSOG-QAQC-F-22

Dimensional check and orienation


4.2

Welding - Pipe Supports & Structure


a. Fit-up Inspection
b. Visual Inspection

MSOG-QAQC-F-22
1243A-8230-SP-0001

Inspection high low condition

D.E.P 31.38.01.29-G

Checking for under cut / spatter and


insufficient welding conditions

Fit-up Inspection Report


( Structural )
Visual Inspection Report
( Structural )

Testing
Witnessed 3RD
Party Inspector

Doc No.:

MAIN MECHANICAL & PIPING WORK FOR PRODUCT PIPELINE PROJECT AT BINTULU,SARAWAK
INSPECTION AND TEST PLAN ( ITP ) - FABRICATION AND ERECTION WORKS FOR PIPING & STRUCTURES

Activity
No.

INSPECTION ACTIVITIES

5.0

NDT EXAMINATION -PIPING

5.1

RT/MPI/PT

REFERENCE DOCUMENT /
CONTROLLING PROCEDURES /
ACCEPTANCE STANDARDS

-Approved NDT Procedure

MSOG -M1611-QAQC-GP-002

Rev.:

Date:

23 Aug'2016

Page:

4 of 5

HOLD POINTS
VERIFYING DOCUMENTS /
RECORDS

INSPECTION PARAMETERS

ASME Sec V ; ASME B31.4 - Acceptance


criteria

Non Destructive Test Request

-ASME Sec V

FORM

MSOG-QAQC-F-21

RESPONSIBLE
PERSON

QC Inspector

REMARKS

MSOG

TPI

AMECFW

SHELL

N/A

W,R

N/A

I,R

N/A

I,R

Third Party Report

Test Conducted
by 3RD Party NDT
Contractor

-API 1104; ASME B31.4


5.2

% of NDT - Piping & Structures

6.0

WELD REPAIR - Piping & Structures

7.0

7.1

7.2

As per Extent of Examnation (NDE) of Welds - 1243A-8830-PR-0002 Rev.F1

- Fit-up

- Approved WPS, ASME B31.4 Weld repair

Any member cut shall be dressed and

- Visual

1243A-8230-PR-0002

smooth edge or re-paint accordance spec.

- NDT Examination

AWS D1,1

Fit-up Inspection Report ( Piping )

MSOG-QAQC-F-50

Pressure Test ( Hydrotest )

QC Inspector

Visual Inspection Report ( Piping )

MSOG-QAQC-F-51

Non Destructive Test Request

MSOG-QAQC-F-21

N/A

W,R

N/A

W,R

W,R

N/A

W,R

W,R

TESTING

Line check before pressure test

QC Inspector

MSOG-QAQC-F-22

MSOG-QAQC-F-22

1243A-8820-PR-0006

Levelness, alignment, support & to check


welding completed, pipe shoe etc and:
a. To ensure internal pipe clean from dirt
before Installation.
b. Check holding pressure and time for
hydrotesting the pipe.

D.E.P 31.40.40.38

Test Pressure, Leakage & cleaning

- Approved Drawing / Test Package

QC Inspector ,
Construction
Manager, Project
Engineer

Punch List Form

MSOG-QAQC-F-129

Hydrotesting log

MSOG-QAQC-F-56

- ASME B31.4

Test Package Hydrotest

- Test Package

Isometric Drawing list

Piping Internal Cleaning

MSOG-QAQC-F-131

QC Inspector, Project
Engineer

N/A

W,R

W,R

QC Inspector

N/A

W,R

W,R

N/A

I,R

QC Inspector ,
Construction
Manager, Project
Engineer

- Equipment calibration cert.


7.3

7.4

8.0

Dewatering, Internal Pipes cleaning & Air


Blowing

Reinstatement

- Flushing & Blowing Procedure

Visual - Confirm flushing point to point and

- Test Package

ensure Internal Pipes cleanlines

-Test Package, P & ID, ISO Drawing

To confirm all Temporary Material

Punch List Form

MSOG-QAQC-F-129

Punch List Form

removed and permanent items are installed

Test Package

SURFACE PREPARATION
Refer MSOG-M1611-QAQC-GP-004
Refer Blasting and Painting ITP

9.0
9.1

INSTALLATION - Piping & Structures

MSOG-QAQC-F-22

Grout Padding Level

D.E.P 31.38.01.29-G,

Grouting of Structures & Pipe Supports

1243A-8720-A004 Rev.P1

9.2

Elevation & Verticality check

9.3

Fit-up

9.4

Visual Inspection all welds

9.5

Bolt tightening

9.6

Check alignment for anchor bolt structure

9.7

Non- Destructive Test - 5% DPT / MPI for all


joint member.)

- Check each Sleeper / foundation /


Approved drawing
Dimensional check
- Check levelling plates or grout pads in place
& grouted.

MSOG-QAQC-F-134 QC Inspector

Check level and line for bolts and nuts


position

Fit-up Inspection Report


( Structural )
Fit-up Inspection Report
True alignment and position
( Structural )
Weldment quality, Weld aapearance size and Visual Inspection Report
defect
( Structural )

MSOG-QAQC-F-053

QC Inspector

MSOG-QAQC-F-054

QC Inspector

Bolt tightening will be checked after


installation

MSOG-QAQC-F-134

QC Inspector

True alignment and position


AWS D1.1

External & Internal defects on weldments

Visual Inspection Report


( Structural )
Visual Inspection Report
( Structural )
Third Party report

TPI - Authority
DOSH Witness

Doc No.:

MAIN MECHANICAL & PIPING WORK FOR PRODUCT PIPELINE PROJECT AT BINTULU,SARAWAK
INSPECTION AND TEST PLAN ( ITP ) - FABRICATION AND ERECTION WORKS FOR PIPING & STRUCTURES

Activity
No.

INSPECTION ACTIVITIES

10.0

TIE-IN

10.1

Welding - Piping

REFERENCE DOCUMENT /
CONTROLLING PROCEDURES /
ACCEPTANCE STANDARDS

MSOG -M1611-QAQC-GP-002

Rev.:

Date:

23 Aug'2016

Page:

5 of 5

HOLD POINTS
INSPECTION PARAMETERS

VERIFYING DOCUMENTS /
RECORDS

FORM

RESPONSIBLE
PERSON

REMARKS

MSOG

TPI

AMECFW

SHELL

MSOG-QAQC-F-22

a. Fit-up Inspection

-ASME B31.4

Inspection high low condition, Dimension and


Fit-up Inspection Report ( Piping )
Alignment

MSOG-QAQC-F-50

QC Inspector

N/A

I,R

b. Visual Inspection

-ASME B31.4

Checking for under cut / spatter and

Visual Inspection Report ( Piping )

MSOG-QAQC-F-51

QC Inspector

N/A

I,R

Approved Drawing

insufficient welding condition

Weld Summary ( Piping )

MSOG-QAQC-F-52

QC Inspector

N/A

I,R

Non Destructive Test Request

MSOG-QAQC-F-21

QC Inspector

N/A

W,R

W,R

W,R

W,R

W,R

W,R

W,R

Dimensional check and orienation


10.2

NDT
a.Root, Hot Pass and Capping - 100 % MPI

-Approved NDT Procedure

b. RT 100 %

-ASME Sec V

ASME Sec V ; ASME B31.4 - Acceptance


criteria

Third Party Report

-API 1104; ASME B31.4


11.0

FINAL VISUAL INSPECTION


- P & ID, ISO Drawing

a. Final Walk Through

Final Visual Inspection Report

MSOG-QAQC-F-130

QC Inspector

- Punch List Summary

b. Inspection on completed fabricated

Punch List Form

MSOG-QAQC-F-129

Construction Manager

sections condition and marking.

Project Engineer

c. Check any defect.


d. Removal of temporary attachment.
e. Distorsion / dimension check.
f. Perform leak test.
g. Final Paint touch-up
12.0

DOCUMENTATION

Project Specification

Review all Quality records and compile

Test Package

QC Inspector

Test Conducted
by 3RD Party NDT
Contractor