Estimate For The Construction of Iind Floor Building For Library at Shanti Bhawan
Estimate For The Construction of Iind Floor Building For Library at Shanti Bhawan
1. Brick Work
2. Lintel
3. Door
4. Window
5. Beam (RCC)
= Rs. 167040.00
= Rs. 17325.00
= Rs. 172800.00
= Rs. 151520.00
7. RCC Slab
= Rs. 154000.00
8. Steel
9. Plastering
1 x 20.34 x 3.30 x 2 x2
1 x 7.17 x 3.30 x 2x 2
10. Cupboard
= Rs. 365100
= 268.50
= 94.70
363.20 m2
= Rs. 72640.00
2 x 6 x2 .4 x 5
= 144
=144 Sft @ Rs. 900 / Sft.
= Rs. 129600.00
= Rs. 61249.00
= Rs. 7560.00
31.95 m2 x 2 = 64
64 m2 @ Rs. 130 / m2
= Rs. 8320.00
15. Electrification
= Rs. 56245.00
16. Flooring
= Rs. 138080.00
= Rs. 65120.00
= Rs. 36220.00
Total Amount
= Rs. 16,47,779.00
CANAL
1. Earth Work
1 x 50 x 10 x 6 = 3000
3000 cft @ Rs. 5/ cft
2. P.C.C.
= Rs. 15000.00
1 x 50 x 10 4 = 165 cft.
165 cft @ Rs. 100 / cft.
3. Stone Work
= Rs. 16500.00
2 x 50 x 2 6 x 2 = 500
2 x 50 x 2 x 2 =400
2 x 50 x 1 6 x 2 = 300
1200 cft.
1200 cft. @ Rs. 70 / cft.
= Rs. 84000.00
= Rs. 10000.00
Total
= Rs. 1,25,500.00
MOTOR SHED
1. Earth Work
4 X 4 X 4 X 5 = 320 cft.
320 cft @ Rs. 8/ cft
2. P.C.C.
= Rs. 2560.00
4 x 4 x 4 x 6 = 32
1 x 10 x 10 x 4= 33
65
65 cft @ Rs. 100 / cft.
3. Sand Filling
= Rs. 6500.00
4 x 4 x 4 x 3 6 = 224
1 x 10 x 10x1 8= 166
390
390 cft. @ Rs. 15 / cft.
= Rs. 5850.00
4. R.C.C.
4 x 4 x 4 x 1
4 x 4 x 4 x 8
4 x 9 x 1 x 5
3 x 40 x 9 x 1
4 x 9 x 1 x 19
40 x 9 x 6
1 x 10 x 10 x 5
1 x 40 x 5 x 4
1 x 10 x 10 x 4
1 x 10 x 10 x 4
2x1 x40x 9 x 1
= 64
= 42
= 15
= 90
= 57
= 15
= 42
= 66
= 33
= 33
= 60
517
=517 cft @ Rs. 250/ sft.
= Rs. 129250.00
= Rs. 90000.00
5. Reinforcement
6. Brick Work
1 x 40 x 9 x 2
1 x 40 x 9 x 9
1 x 40 x 9 x 5
= 60
= 270
= 150
480
7. Plastering
= Rs. 48000.00
2 x 1 x 40 x 10 = 800
1 x 10 x 10
= 100
1 x 40 x 5 = 200
2 x 1 x 40 x 10 = 200
1300
1300 Sft. @ Rs 18 / sft.
= Rs. 23400.00
8. Tank Platform 1 x 40 x 5
= 200
1 x 10 x 10= 100
300
300 sft @ Rs.22 / Sft..
9. Door (Iron)
= Rs. 6600.00
1 x 3 6 x 7
25 x 3 k
= 25
= 75 Kg.
= Rs. 5250.00
Submersible Motor
1.5 HP Single phase
Wire & Tx
Pipe 200 2 Role Pipe
Labour charges
15000
10000
10000
10000
Total
= Rs. 45000.00
= Rs. 362410.00
POND
2. PCC
3. Stone Work
1 x 50 x 50 x 20 = 50000
4 x 50 x 3 6 x 1= 700
4 x 50 x 15 x 5 = 15000
65700 x 3
= Rs. 197100.00
4 x 50 x 3 x 6
= Rs. 30000.00
= 300 x 100
4 x 50 x 3 x 10 = 6000 x 70
4. RCC
= Rs. 420000.00
= Rs. 102850.00
4 x 60 x 15 = 3600 x 25 / sft.
= Rs. 90000.00
4 x 70 x 1 6 x 2 6= 1050 x 70
= Rs. 73500.00
4 x 70 x 1 6 x 4= 139 x 100
= Rs. 13900.00
6. Stonbe Patching
7. Stone work
8. P.C.C.
8. Earth dressing
= Rs. 100000.00
Total
= Rs. 1177350.00
V-CARE CONSTRUCTIONS
Architects, Engineers & Builders
BUDHARAJA, AINTHAPALI, SAMBALPUR (ODISHA)
Ref. No. ________
Date _______
Rs. 14,69,820.00
2. Rainwater Pipe
Rs.
50,000.00
Rs.
30,000.00
Rs. 16,39,820.00
(Rupees sixteen lakhs thirty nine thousand eight hundred and twenty only)