Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
100%
(1)
100% found this document useful (1 vote)
771 views
Eltek-2 Outdoor Instal Guide
Eltek-2 Outdoor Instal Guide
Uploaded by
PavelKuzovkin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Eltek-2 Outdoor Instal Guide For Later
Download
Save
Save Eltek-2 Outdoor Instal Guide For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
100%
(1)
100% found this document useful (1 vote)
771 views
Eltek-2 Outdoor Instal Guide
Eltek-2 Outdoor Instal Guide
Uploaded by
PavelKuzovkin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Eltek-2 Outdoor Instal Guide For Later
Carousel Previous
Carousel Next
Save
Save Eltek-2 Outdoor Instal Guide For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 20
Search
Fullscreen
Installation Guide Flatpack2 PS System DC Power Supply System, 16kW, 48VDC Outdoor 2.0m Fan Cooled Cabinet 951476.0331 Welcome Table of Contents 1, Welcome ‘About this Guide Location of Components ~ General Arrangement. External AC Fuses ~ Recommended Ratings Mains Reconfiguration ~ AC Terminal Block .. Terminals & Pin-out Location, GMT Fuses. Alarm Relays & Digital Inputs Terminals & Pin-out Location, Alarm Interface Card Terminals & Pin-out Location, System Interface Card. LVD Latching Contactors... Monitoring, Control and Signal nterfac ‘System Monitoring . Fan and Heater Operatior 10 System Specification 3.__Installation Safety Precautions. General Safety Precautions Electrical Safety Mechanical Safety... Battery Safety Installing the Modules. Mounting or Removing Smartpack and Flatpack2 Modul Mounting and Removing Blind Panels Correct Rectifier Position in Power Sheives .. ‘System Installation. Site Preparation Mechanical installation... Electrical installation 4. Commissioning Pre-Start Check Commissioning Steps, Startup ‘Startup and No-Load Adjustment Load Adjustments 5.__Maintenance Replacement of Door Filter Replacement of Fan Filter... 6. Forms, Schematics & Drawings Installation Check List Commissioning Procedure... Maintenance Procedure General Arrangement Seariooul> ala Cabinets Neoprene Mat Table, Dring Template, Plinth’ fastening hoes 28 Cabinet Clearance Drawing. 28 System Schematic Drawing... 28 Configuration Settings ~ Flatpack2 PS System, 16kW, 48VDC, OCab, FanC 2.0m ...28 Load Distribution List.. Insatation Guide Fatpeck2 PS System, 16K, 48VDC, Oukioor20m Fan Cooled Cabinet imanuare ~2 System Description Location of Components ~ General Arrangement Battery DC (+) terminals ‘Bus bar, 35mm2, AWG 2 DE (+) Load Terminals Somme ANG 20 DC () Load Terminals (erSvcee) Senn, AWG 4, 70mm’, AWG 20 {omtep'of each ioad breakon Battery DC (-) terminals Bus bar, Somm2, AWG 2 Terminals for GMT 19A Load Fuses, Se AWG 16 . Smanpeckconroter aterm terminate ie Bese oS ui rear AC Earth Mains Protectve Earth (PE) ‘Connection (Cabinet main ground bar) AC Mains Terminals Ac 5S AUXAC MCB (heater, AC socket, air-conditioner) ™ Figure 1 General Door Filter Outlet ——- Arrangement Flatpack2 PS System, 16kW, Fan Filter Inlet 48V0C, OCab, Fanc 2.0m Battery strings and fuses in the lower part of the cabinet Instatation Guide Fietpack? PS System, 16K, 48VDC, Outdoor 2.0m Fen Gooled Cabinet sstraoss v4z00782 System Description Terminals & Pin-out Location, GMT Fuses GMT fuses Max. 10A each — FS Figure 2. GMT fuse board (max. cable size 1.5mm’, AWG 16) ‘The table below shows the pin-out location for the GMT load fuse card: Pin Assignment for GMT Fuse rae Signal Function inal Function, + GRIT fuse 1 (FS) + “GAT fuse 5 (FB) = GRIT fase 2 (FS) + GHT fase 6 (FIO) + GMT fuse 3 (F7) + GMT fase 7 (Fi) + “Gri fase 4 (FB) + GMT fase 8 (Fi2) = = (fan fuse) Alarm Relays & Digital Inputs ‘The alarm outputs in Flatpack2 systems use the Fail-Safe Operation Mode (relay colls energized in the system’s normal operation mode). When the system Is in alarm mode, the alarm relay coils are de-energized, The figure shows the position of the relay contacts when the relay coils are de-energized (PS system in alarm mode) ‘Alarm Relays & Digital Inputs apis n a BOW (resistive load) _ Maximum switching power 220v0C | Madam swiching vonage | 2ADC Maximum switching curent "oman | ‘rmgaes co) In order to implement monitored fail-safe 75 am tote digital inputs circuits, the external relay coil weep must be energized and the contacts closed in the system’s normal mode of operation. frapct2 8 ya C Us Digital Inputs (example) Instaation Guide Flatpack2 PS System, 16K, 48VDC, Outdoor 20m Fan Cooled Cable astro v.05 72 System Description Terminals & Pin-out Location, System Interface Card Flatpack2 systems are shipped from factory with the CONS signals already connected. Some of the Smartpack controller's Internal system signals are accessible on D-Sub connector CONS, on the controller’s rear panel. Using the System Interface Card (Art. 200625) and a standard 15 pins D-Sub cable, the signals on CONS may be accessible at any suitable location inside your system. For detailed information about the card's pin-out location and terminal block connections, refer to the figures in this section. For Internal Use Only! ioral Canetti) JP1 and JP2 are used to configure the system for Negative DC distribution (48 and GOV systems) or Positive DC distribution (24V systems) LVD Latching Contactors Flatpack2 systems’ LVBD and LVLD' functionality is implemented by the Smartpack controlling magnetically latching contactors. Latching Contactors, LVD1 & LVD2 Taiching contador changes late ony when toversed pulse vatage lapped ffs sor 1 Oe we + Puse Puise The bidretonal ce “run aways, be ‘mounted fo avoo” dane sarge cone Bidirectional diode x Latching Contactor L _filtpeck2 PS System (i Correct Use of Latching Contactors (example) | The coll of latching contactors Is not energized in any state. They change state from open to close, or vice versa, when a reversed pulse is applied to the coll. §LvBb, Low Voltage Battery Disconnect; LVLD, Low Voltage Load Disconnect Insalaion Guide Faipack2 PS System, 16K, 48VDC, Outdoor 2.0m Fan Cooled Cabinet ssurecs oan03 92 System Description Technical Specification ae Flatpack2 PS System, 16kW, 48VDC, OCab, FanC 2.0m. 9 nner Te eae piste 5 (2 eres re a poe Beene eaten aga oad aa ean connections ‘cable, 70mm? cable clamps 3 phase 208VAC ( 4) ‘Common positive bus bar, 70mm? 3 phase 230VAC (4) cable clamps. — pesos ce ese Lr pase eget ‘Maximum ‘See Flatpack2 48VDC datasheet INo. of DC Load Up to 4 x 3pole 150A Current. (241115.001.0S3) breakers oe SE Ree ey —|Up wo 4x 150K MOBs moun TORTS (Optional Neutral - spark gap. breakers. ‘each battery shelf Sear att rea hses— [Stok eT pe =< type Re ao eee eS ia SO eee SN mS rar ee ‘local operation | Menu driven software via Keypads 1.5 KVAC - input earth and LCD, USB or PC (PowerSuite) 1,0 KVDC - output earth. Remote operation | PowerSuite via modem or Web ‘Operating temp 40 to +50°C (-40 to +122°F) *** oats Sot cae Sees — [ape saee Gane naan sama —— ana Ser ae Ae eae rn DA GOS aan aon [Crean teo Sysen OF ee [eee eer Weight Gablaeks 180 kg 6xC. optional BIAEh, See we sem) reine atau 1p eer ot rasan oy [BaRaTapIE —| Star Sane eal meen ene soustes es” 250 ke wees ae caren measurements Rectifier current ES ees ecuieces Sa ae oes a 1 oes Senate sen ei PS ea 300 36 TacommaTToR Low Battery Voltage network) eae ae mee, 3 (ematon, tit ‘Temperature alarm industry) ee Ce 2 cmmunty, industry) Pesaro cavrsamen Test en sao ates Sen Bret anaop on Te eae as complant ‘5% Note that the cabinet’s operating temperature range does not apply to batteries. Refer to the manual for used batteries. om CCT Nominal 230 275 | Full ouput power ange: Tas — 275 | Full output power 275 =300 | Full power, reduced poner BEOe ow volage- i [0-85 | Shutdown. "300 = 350-| shutdown ow voltage 2 | @5 — 165 | Lear between SSOW and 7O00W. '350-- 420-| Shutdown™ (gee note below) + Note: If te input voltage > 300VaC the recifir wil go into self protective mode. AE no load, the recter wil survive 350vec. With Toad cor battery connected, ell survive 420VaC Specifications are subject to change without notice Inston Guide Flatpeck2 PS System, 16k, 48VDC, Outdoor 2.0m Fan Cooled Cabinet stra. w0rc0 11eagoeaa 3 Installation General Safety Precautions Please read and follow all safety instructions or warnings before installing or maintaining the power system. Review any supporting documentation regarding the power system and its components prior to installation. “The enclosure must be installed, serviced, maintained, and operated by a qualified technician who is familar with electrical wiring, electrical equipment, and enclosure deployment techniques and best practices for safety “The enclosure must remain locked at all times, except when authorized service personnel are present Remove all conductive jewelry or personal equipment prior to servicing equipment, parts, connectors, wiring, or batteries Read and follow all instalation, equipment grounding, usage, and service instructions included in this manual Use proper lifting techniques whenever handling the enclosure, equipment, parts, or batteries Do not rol the cabinets on their sides Do not store anything on top of the cabinet Electrical Safety Lethal voltages are present within the power supply and electrical boxes. Never assume that an electrical ‘connection or conductor is not energized. Check the circuit with a volt meter with respect to the ‘grounded portion of the enclesure (both AC and DC) prior to any installation or removal procedure ‘An external electrical service disconnect must be used that is properly sized as required by the NEC ‘andor local codes. ‘The supply neutral conductor must be bonded to earth ground at the disconnect panel Do not work alone under hazardous conditions A licensed electrician is required to install permanently wired equipment Ensure that utility power is disabled before beginning instalation or removal Ensure no liquids or wet clothes contact internal components Hazardous electrically live parts inside the enclosure are energized by batteries even when the AC input power Is disconnected. Make sure the power is removed via the battery disconnect breaker before Servicing any of the equipment ‘The internal equipment may be powered by AC circuits. Make sure power is removed via the appropriate breaker before servicing any of the equipment Prior to installation, verify that the AC Input voltage to the enclosure and its equipment with respect to voltage and frequency Prior to installation, verity that the output voltage from the enclosure or its equipment match the voltage requirements of the connected equipment loads Prior to installation, verify that the enclosure’s utlity service panel is equipped with a properly rated Creuit breaker for use with the equipment inside. Refer to the manufacturer's recommendations. Prior to installation, contact local utlites, local building maintenance departments, and cable/piping locating services to ensure that installation does not interfere with existing utlities or building cables/piping Fuses/circult breakers may not be provided with the equipment. Refer to the documentation for the proper hardware. Use only the parts specified in the documentation. Installing fuses or circuit breakers not specified for use inthis equipment may result in injury to service personnel or equipment damage ‘Where required for installations in the United States or Canada, use listed/certified compression ‘connectors to terminate listed/certfied fleld-Intalled conductors. If the proper connector for the country of installation is not provided, obtain the appropriate connectors and follow all manufacturer and local requirements for proper connections ‘Torque the electrical connections to the values specified on labels or in the product documentation “The DC distribution is considered a Safety Extra Low Voltage (SEL V) with the return side connected to the chassis (earth ground) inside the enclosure ‘The supply neutral conductor must be grounded at the external service supply disconnect panel Insiaton Guide Fspeck2 PS System, 16K, 48VDC, Outdoor 2.0m Fan Cooled Cabinet ses wezor
Output Test) 10.Make sure the System Setup is in accordance with configuration © Verify system settings using the controller's front keys or via PowerSuite Use the opportunity to enter site related information, number of used AC phases, type of batteries, etc. Load Adjustments power Now, you can begin with stage III, where you will adjust again the output voltage to the battery voltage, and connect the batteries and the load. Carry out the following: 11.Adjust DC output voltage to equal measured battery voltage © Measure the battery voltage is within range (check connections have correct polarity) 0 Adjust DC output voltage — using the controller's front keys or via g PowerSuite— to equal the measured battery voltage. faced (Important adjustment to avoid arcing when connecting the batteries) 12.Unplug all rectifiers but one, and connect the battery fuses /MCBs (CAUTION: Have only one rectifier connected, when switching ON the battery a& fuses. Thus, avoiding damaging all rectifiers, due to possible incorrect polarity Seep. connections, etc.) hazard ‘© Disconnect all rectifiers but one, by unlocking the handles and pulling them <€]__ partially out (fan housing visible). Do NOT physically remove them from the power shelves © Switch ON all battery fuses or MCBS 13.Adjust DC output voltage again to equal the nominal battery voltage © Adjust DC output voltage — using the controller's front keys or via PowerSuite — to equal the nominal battery voltage (or the nominal load voltage, when not using batteries) 14.Plug in again all rectifiers, and verify the rectifiers’ current sharing ‘© Connect all rectifiers again by pushing them firmly inwards — Repeat step 4, in stage II © Wait for about 2 min., and check — using the PowerSuite application —that each of the rectifiers delivers the same output current. A deviation of 1A i acceptable. 15.Connect the load breakers and verify that no al ‘© Switch ON all load MCBs/ fuses ©. Verify correct operation: rectifiers and controller display no alarms ms are displayed Inston Guide Faipack2 PS System, 16K, 48VDC, Outdoor 2.0m Fen Cooled Cabinet sswrsas, zt 255 Maintenance Replacement of Door Filter ‘Stop ‘Ketion OK 1. Remove Refer to “Figure 3 Location of the cabinet’s door filter and fan filter filter”, on page 26. Remove the Air baffle plate(s) that cover the filter grid on the inside of the cabinet door (plates not shown in Figure 3). o Remove the filter grid by loosening the screws around it. Pull the grid towards you when loose 2. ‘© Exchange the old filter with a new. Make sure that the rough side of the filter faces the inside of the cabinet 3. Mount the o Mount the grid to the door again, fastening the screws around frame it © Mount the Air baffle plate(s) back on again and tighten the screws Replacement of Fan Filter ‘Step Comments: OK. 1. Disconnect co Remove the fan fuse, the fan located at the GMT fuse card (fuse 8). Refer to “Terminals & Pin-out Location, GMT Fuses” on page 7 2. Open the Fan | Refer to "Figure 3 Location of the cabinet’s door filter and fan Filter Door filter”, on page 26. © Open the fan filter door by turning the two knobs on the door (upper and lower right side) 3. Remove the co Remove the filter grid filter grid by loosening the screws around it. Pull the grid towards you when loose (4. Exchange the | © Exchange the old filter with a new. Make sure that the filter smooth side of the filter faces the inside of the cabinet 5. Mountthe | o Mount the grid again, fastening the screws around it |" gria 6. Close the Fan © Close the fan filter door, and turn the knobs closed L Filter door 7. Connect the o Replace the fan fuse, and verify that the system is fan operating normally instalation Guide Flatpack2 PS System, 16kW, 48VDC, Outdoor 2.0m Fan Cooled Cabhet ssracs, 200708 27ae rege cevce Racers Blectie shock eleoe ‘shook INSTALLATION CHECK LIST System Data Flatpack2 PS System Flapack2 Powe Sophy Se, WP RN: Sie rae Sean: Sars, varsen Ne Recto, ype aber ‘Cog Vee, asirod | Baa Typa any Copy | aaa aod cub, nae Snaaaenn 4. Organize the installation site Site Preparations Power is OFF! os a 2. Prepare the installation tools a 3. Prepare AC Supply: AC input cable(s) and fuses: a Craiacees ‘4. Remove packaging and check equipment Mechanical Installation Power is OFF! En o 6. Use the Neoprene Mat a 6. Position and fasten the cabinet QO 7. Mount the batteries on the shelves © Donot terminate the battery cables yet! 2 Do not remove the Condensation Stopper! o ‘8. Make the system completely voltage free Electrical Installation Poweris OFF! ‘9. Open the cabinet’s roof 10. insert the cables 11. AC Conne ‘2 Cheak AC configuration: The AC terminals are coect contigured tothe extemal AC supply © Connect the AC Earth wire (PE) to the terminals AC Earth (PE) ‘2 Connect the AG input cabl(s) io the terminals. Cable and ternal block labeling are to corespond 12. AC Socket Connection 13. DC Connections — Load Circuits ‘3 ” Terminate DC Earth (TE): Common OC Output Rallis connected to TE at only one place © Fareach DC foad, connect one ofthe cables tothe common DC output ral, andthe oh directly tothe MCB Terminate the GMT load creuts 14. DC Connections — Alarm & Signal Circuits 18. DC Connections — Battery Cables Careful! Use correct polarity. For each battery set, ‘2 Mount 3infercellinks to connect in series 4 battery blocks, (In 24V systems: 1 link and 2 blocks) © Connect battery cables to fuses and common DC ral, and tothe sheits outer ternal; black (¥; blue () ‘2 Connect the temperature sensor cable, apiicable othe D-Sub plug or input terminal, and fix the sensr (atthe tend ofthe cable) toa suitable place Inthe midal ofthe installed battery bank qo ao aqgga ‘Approval esponnbi of raaaion, 39h ae Teproed esi Sp Inetaaton Guide Flatpack2 PS System, 16HW, 48VDC, Outdoor 2.0m Fan Cooled Cabhet ssuraoss 2038 29COMMISSIONING PROCEDURE ‘System Data Flatpack2 PS System Soopers Oe No Fuck Pner Sppy Sten Woe Tie Sie rane Sa Saar en Ne Rosie ype Enbor o TC pd Vane, weasel Tala Tipe =o Canta earnOT OY, TaN Pre-Start Check Powers OFF Cena ‘OK 1. Flatpack2 system installation is completed; The Fistpack? nsiataion Check Lists ed |] \ ‘Ai cabling is securely terminated with corect polarity couse [2 Allbattery and load MCBs/ fuses are disconnected o Razord 3. AC input cable(6) and AC earth wire (PE) are terminated o 4. Site specific parameters and settings are known o 5. AC supply and all MCBs/ fuses are switched OFF Oo paral No-Load & Load Adjustments Power ON! 1. Disconnect all rectifier modules, without removing them (keep original location) Oo Sage [ % Remove the Condensation Stopper oO sazard 3. Switch ON the system (external AC fuses ON) oO 4. AC input voltage is correct, Measure and verty | %. Insert all Flatpack2 rectifiers in their original locations in the power shelves oO 6. The Smaripack and all rectifier modules are working, LEDs are ON; veaty | 7. Connect a PC to the PS system instal the PowerSute sofware, fvequred | [-] &. DC output votage; Measure and agust | [J 9. Alarm relay test, ‘erty al alarm eays are woringcoreety | [] 17 [40. System Setup is in accordance with configuration Enter ste epee intoin PowerSute | [7] Jp | 44. Adjust DC output voltage to equal measured battery voltage ‘Check conect planiy’ |] ber | 12. Unplug all rectifiers but one, and connect all battery fuses/ MCBs oO Racers 13. Adjust DC output voltage to equal nominal battery or load voltage Oo 14, Plug in again all rectifiers, and verify the rectifiers’ current sharing Oo 16. Connect all load MCBs/ fuses, and verify no alarms are displayed Oo Approval Response aaa Da apoyo Inetaaton Guide Fltpeck2 PS System, 16KW, 48VDC, Outdoor 2.0m Fan Cooled Cabinet sox 23 31MAINTENANCE PROCEDURE [Eltek] System Data Flatpack2 PS System Fett? Powe Spey SSW Taio: a name, Sao ‘Sars wea: Recto, ype bar ok Tp Vala, messes | Baio Type Baty Caper, | Martane cared onan 4 ‘equipment is only to be performed by authorized and eerie a Hazardous voltages inside may cause terminal injury. shock me System Inspection Power is ON! Enausaseeict 7 ‘1. Site specific parameters and settings are known. ‘User manuals and site specie connection & arrangement crawings are avaiable. 2. The battery bank has been fully charged in advance. ‘Aleaa! for #2 hours since sta-up of mans fare. Enebles correct measurements & calration ry 3. The equipment and door fiers are free from damage, dust or dit; very Carefully vacuum clean or remove any accumuation of dust, cortosion or dit, Perform iter maintenance. “4. All cabling and copper bars are securely terminated and supported. Correct any loose cannectons, excessive cable temperature, defective insulation, etc. 5. The Smartpack & all rectifier modules are ON, no alarm present: verity (Otherwise, comect and put the PS system in normal mode of operation. 6. All rectifiers functionality & Smartpack’s keys and display work OK; verify Correct possible abnormalities before contruing 7. Connect the PS system fo a PC (install the PowerSuite application if required) “The PowerSuite program in the PC enables systam cariguration from the PC. 8. Rectifiers’ load current sharing, verify. Use the PowerSuite PC application fo check al rectifiers output the Same amount of cuent (21) ‘9. Display the stored log of Alarm Messages. Using the Keypad on the Sarak controller or rom the PC. qogqq ga Qa o System Adjustment eee ee 11. DC Output Voltage Calibration; ensure correct display readings. Hf measured DC output voltage atthe loa terminals deviates more than +1% from the display reading, callbrate the ‘output voltage from the Smertpack’s keypad othe PC. 2. Load & Battery Current Calibration; verify correct display read ‘Measure with a clip-on ammeter the batiery current & avery load cuit current. Calcite the total load & battery current. I the calculated Tol values deviate more than 1% from the display readings, callbrate the current from the PC (calioration value>50% of systems max. capacty) ‘3. DC Output Voltage Adjustment; measure and adjust, ‘Measure and, I required, adjust the cutput vliage tothe nominal voltage recommended bythe battery manufacturer. (Votage messurements io be done at the DC ral, wtn te load current) 4, Alarm Relay Test; verity all alarm relays are working correcth From the Smerfpack’s Keypad 0: PC use the Relay Test function. verify activation of extemal equipment oo og} ga '5. Battery bank control; measure and verify battery specifications. Follow the recommendations ofthe actul battery manufacture. Approval Response ofa canta Sn Dal ROO Co, TO Instatsion Guide Faipack2 PS System, 16K, 48VDC, Oudoor 2.0m Fan Cooled Cabinet ssureas, m.03 33mm. Cabinet’s Neoprene Mat Specifications DIN 53 505 ‘Shore hardness A ‘Tenste strength ss eee nS Elongation at rupture 45% DIN 53 5: ‘Dens UREN a Se RE Mass per unit area 730g/m2/mm ; Operational temperature 40 to +155°C Table 1 Neoprene Mat Specifications Note: The mat is only to be used when the cabinet is placed directly on concrete floor and a cabinet plinth is not mounted. Figure 5 Drilling Template, top Ex view of the cabinet’s bottom plate. For ge cabinet fastening directly to the floor or © toa plinth \ 75 mm 75 mm oeeeeeeeeeeneeeee £ e E EE 8 5 8 08,80. 72.59, z 2m Cabinotte-Plinth Fastening Hote (4x) ‘One hole in each comer 1.3m Cabinetto-Pint Fastening Hole (4x) ‘One ole in each comer (315,00 (575,00 } Figure 6 Cabinet's plinth, top and 3D view. Cabinet's and plinth’s fastening holes 35 Installation Guide Fatpack2 PS System, 1SkW, 48VDC, Outdoor 2.0m Fan Cooled Cabinet s1ersoxs, w.2070037 Boe men 40 Figure 8 System! Schematic Flatpack2 PS System, 16kW, 48VDC, OCab, FanC 2.0m ntalton Gude. Fateeck2 PS System, 1h, 48V0C, Outdoor 20m Fan Cold Cabinet sere 4.8System Data LOAD DISTRIBUTION LIST Fatt? PSS. We Tessa Sia rae ier Carers Pra “Optional fuses/breakers. F3 & F4 are only fitted if optional BTS breaker kit(s) are installed in the cabinet. For Pak MCB a eae ee pe ‘GMT FUSES: ai, gee chapter “eran pe beaten oi Ba oo F13-F20 are only fitted if optional LTE kit is installed in the cabinet Breakers F'1, F2 and GMT fuses F5-F12 are always part of cabinet LTE MCB" (Optional) For detass, see nsaiaion marl Tor LTE wt (351480 033) oe - Eitek Energy AS Tel, +47 3220 32.00 Internet: wn atekeneray.com E-Mail: eek @eltekeneray.com
You might also like
ZXESM R422 (V1.0) Lithium-ion Battery Quick Installation Guide0927
PDF
No ratings yet
ZXESM R422 (V1.0) Lithium-ion Battery Quick Installation Guide0927
6 pages
Guide For 150B1 01074848 Parameter Modification Through Maintenance Tool
PDF
No ratings yet
Guide For 150B1 01074848 Parameter Modification Through Maintenance Tool
6 pages
DC Distribution Expansion Unit DCDB48-200-16B (01074731) Datasheet 02 - (20190817)
PDF
No ratings yet
DC Distribution Expansion Unit DCDB48-200-16B (01074731) Datasheet 02 - (20190817)
1 page
05 DPC-LFP48150 Datasheet V1.1 200908
PDF
No ratings yet
05 DPC-LFP48150 Datasheet V1.1 200908
2 pages
PS48300-1800 Power Supply System User Manual
PDF
No ratings yet
PS48300-1800 Power Supply System User Manual
61 pages
Coslight 48 VBMS MODBUS Communication Protocol Simplified Version
PDF
100% (1)
Coslight 48 VBMS MODBUS Communication Protocol Simplified Version
14 pages
Mini TP48300B-N04C2 Power System Datasheet PDF
PDF
No ratings yet
Mini TP48300B-N04C2 Power System Datasheet PDF
2 pages
Flatpack 2 Power System Installation Guide
PDF
100% (1)
Flatpack 2 Power System Installation Guide
30 pages
Flatpack2 PS System, 16kW, 48VDC, Outdoor 1.3m Fan Cooled Cabinet (DS - CF1017.003.DS3 - 1 - 1)
PDF
0% (1)
Flatpack2 PS System, 16kW, 48VDC, Outdoor 1.3m Fan Cooled Cabinet (DS - CF1017.003.DS3 - 1 - 1)
2 pages
User's Guide: Smartpack2 Master Controller
PDF
100% (1)
User's Guide: Smartpack2 Master Controller
32 pages
Installation Guide: DC Power Supply System, 16kW, 48VDC
PDF
0% (1)
Installation Guide: DC Power Supply System, 16kW, 48VDC
36 pages
DT40-DT45S (50 HZ)
PDF
No ratings yet
DT40-DT45S (50 HZ)
3 pages
ZXDU68 B451 V6.0R20M02 DC Power System Quick Installation Guide
PDF
No ratings yet
ZXDU68 B451 V6.0R20M02 DC Power System Quick Installation Guide
7 pages
iPowerCube R4875G5 Rectifier Datasheet 02 - (20190328)
PDF
No ratings yet
iPowerCube R4875G5 Rectifier Datasheet 02 - (20190328)
3 pages
User Manual For New HR11 6-10kVA Rack Mounted UPS (PF 1) - V1.4
PDF
No ratings yet
User Manual For New HR11 6-10kVA Rack Mounted UPS (PF 1) - V1.4
38 pages
05-CE-LVD Certificate-Battery Cabinet PDF
PDF
100% (1)
05-CE-LVD Certificate-Battery Cabinet PDF
3 pages
Outdoor Integrated Intelligent Site: MTS9514A-AM2001
PDF
No ratings yet
Outdoor Integrated Intelligent Site: MTS9514A-AM2001
3 pages
Shoto 6GFM150 12v150ah
PDF
No ratings yet
Shoto 6GFM150 12v150ah
2 pages
DPU30A-N06A1, DPU30D-N06A1, and DPU40D-N06A1 Distributed Power Quick Guide
PDF
100% (1)
DPU30A-N06A1, DPU30D-N06A1, and DPU40D-N06A1 Distributed Power Quick Guide
14 pages
DC Genset: For BACK UP (PV or Grid)
PDF
No ratings yet
DC Genset: For BACK UP (PV or Grid)
4 pages
Cabinet Air Conditioner User Manual: (产品型号/MODEL: DC0500X1)
PDF
No ratings yet
Cabinet Air Conditioner User Manual: (产品型号/MODEL: DC0500X1)
34 pages
RM3048HE
PDF
No ratings yet
RM3048HE
2 pages
AC Power Connection SOP
PDF
No ratings yet
AC Power Connection SOP
26 pages
MTS9000A V100R001 Multiple Telecommunication System Installation Guide PDF
PDF
No ratings yet
MTS9000A V100R001 Multiple Telecommunication System Installation Guide PDF
241 pages
ZXESM D121 Smart Lithium-Ion Battery Datasheet V1.0 - 20231122 - EN
PDF
No ratings yet
ZXESM D121 Smart Lithium-Ion Battery Datasheet V1.0 - 20231122 - EN
2 pages
DUMW 4850H Outdoor Power System Datasheet
PDF
100% (1)
DUMW 4850H Outdoor Power System Datasheet
2 pages
Netsure 701 A51 Datasheet
PDF
No ratings yet
Netsure 701 A51 Datasheet
2 pages
EPC 4860 Datasheet v01
PDF
No ratings yet
EPC 4860 Datasheet v01
2 pages
Delta ChargerUser Manual
PDF
No ratings yet
Delta ChargerUser Manual
30 pages
Rainbow Plus Usage
PDF
50% (2)
Rainbow Plus Usage
11 pages
Quick Guide Instalasi System Rectifier Huawei - TBG - 2023
PDF
No ratings yet
Quick Guide Instalasi System Rectifier Huawei - TBG - 2023
28 pages
GELH14 (3-Phase) : Diesel Generator Set
PDF
No ratings yet
GELH14 (3-Phase) : Diesel Generator Set
5 pages
PowerCube 500 V200R001C00 User Manual (ICC50)
PDF
100% (1)
PowerCube 500 V200R001C00 User Manual (ICC50)
127 pages
Peco II 6875009BLK-62 Instruction Manual
PDF
No ratings yet
Peco II 6875009BLK-62 Instruction Manual
88 pages
Rectificador HW Etp48400-C9a2 v500r001 User Manual 01
PDF
No ratings yet
Rectificador HW Etp48400-C9a2 v500r001 User Manual 01
88 pages
Huawei DC1 With AH1500 - Datasheet
PDF
No ratings yet
Huawei DC1 With AH1500 - Datasheet
2 pages
Atp
PDF
No ratings yet
Atp
6 pages
Huawei OPM15M - Description and Installation
PDF
No ratings yet
Huawei OPM15M - Description and Installation
12 pages
TP48200A-AX09D3 & TP48300A-AX09D1 & TBC800A-ACD1 Outdoor Power System Installation Guide (Columbia, Claro) PDF
PDF
No ratings yet
TP48200A-AX09D3 & TP48300A-AX09D1 & TBC800A-ACD1 Outdoor Power System Installation Guide (Columbia, Claro) PDF
116 pages
Aspiro Instruction Manual 2RU BCG.00075 - AB
PDF
100% (1)
Aspiro Instruction Manual 2RU BCG.00075 - AB
103 pages
InteliLite Telecom - Ficha Tecnica
PDF
No ratings yet
InteliLite Telecom - Ficha Tecnica
12 pages
Zings Deg User'Manual
PDF
No ratings yet
Zings Deg User'Manual
55 pages
R48100G1
PDF
100% (1)
R48100G1
2 pages
TP48300/a
PDF
No ratings yet
TP48300/a
43 pages
ZTE Power Solution (V2.0)
PDF
No ratings yet
ZTE Power Solution (V2.0)
30 pages
TP48200A-D15A1 & H15A3 & H15A5 V300R001 User Manual 04
PDF
No ratings yet
TP48200A-D15A1 & H15A3 & H15A5 V300R001 User Manual 04
79 pages
GCM01 Mu GB 12.2
PDF
No ratings yet
GCM01 Mu GB 12.2
33 pages
TP48300-A-N07A3 Maintenance Guide (V100R001 - 04)
PDF
0% (1)
TP48300-A-N07A3 Maintenance Guide (V100R001 - 04)
53 pages
ETP48600-C5B1, ETP48400-C4B1 V100R002 Regulatory Compliance Statement
PDF
No ratings yet
ETP48600-C5B1, ETP48400-C4B1 V100R002 Regulatory Compliance Statement
7 pages
Maintaining Monitor Software Operation Guide For ESM-4870
PDF
No ratings yet
Maintaining Monitor Software Operation Guide For ESM-4870
11 pages
Fact Sheet CellD 300 en PDF
PDF
No ratings yet
Fact Sheet CellD 300 en PDF
2 pages
C60H DC
PDF
No ratings yet
C60H DC
7 pages
BD3 6KTL RL1 User Manual V1.4
PDF
No ratings yet
BD3 6KTL RL1 User Manual V1.4
42 pages
SJ-20210629145437-002-ZXDU68 W451 (V6.0R03M02 - V6.0R03M03) DC Power System Quick Installation Guide
PDF
No ratings yet
SJ-20210629145437-002-ZXDU68 W451 (V6.0R03M02 - V6.0R03M03) DC Power System Quick Installation Guide
11 pages
50 kVA Perkins Diesel Generator Set - Non EPA - 50Hz TP-P50-T1-50 PDF
PDF
No ratings yet
50 kVA Perkins Diesel Generator Set - Non EPA - 50Hz TP-P50-T1-50 PDF
5 pages
NUM CNC Error List
PDF
No ratings yet
NUM CNC Error List
9 pages
Installation Guide Flatpack2 PS System Outdoor v4
PDF
No ratings yet
Installation Guide Flatpack2 PS System Outdoor v4
40 pages
103 QStart Flatpack2 PSSyst PDF
PDF
No ratings yet
103 QStart Flatpack2 PSSyst PDF
32 pages
103 QStart Flatpack2 PSSyst PDF
PDF
No ratings yet
103 QStart Flatpack2 PSSyst PDF
32 pages
Eletek SmartPack
PDF
100% (1)
Eletek SmartPack
38 pages
Flexi Fibre FSFB
PDF
No ratings yet
Flexi Fibre FSFB
1 page
Alcatel-Lucent 9500 MPR PDF
PDF
No ratings yet
Alcatel-Lucent 9500 MPR PDF
3 pages
May 2011 9500 MPR Etsi r3 en Datasheet
PDF
No ratings yet
May 2011 9500 MPR Etsi r3 en Datasheet
3 pages
FHEL
PDF
100% (3)
FHEL
5 pages
TP48200A-D12A1 Quick Installation Guide V300R001 01 PDF
PDF
No ratings yet
TP48200A-D12A1 Quick Installation Guide V300R001 01 PDF
2 pages
Allgon UXM-65-90 - 7701
PDF
No ratings yet
Allgon UXM-65-90 - 7701
5 pages
RFS APXV9RxxB
PDF
No ratings yet
RFS APXV9RxxB
2 pages
PowerWave 7233.04
PDF
No ratings yet
PowerWave 7233.04
2 pages
Kathrein 800 10426
PDF
No ratings yet
Kathrein 800 10426
2 pages
Tongyu TDQ-172718DE-65F
PDF
No ratings yet
Tongyu TDQ-172718DE-65F
1 page
RFS Apxv9r13b-C-A20
PDF
0% (1)
RFS Apxv9r13b-C-A20
2 pages
Kathrein 730 378
PDF
No ratings yet
Kathrein 730 378
1 page
Kathrein 732 690
PDF
No ratings yet
Kathrein 732 690
2 pages
Allgon 9215.01
PDF
No ratings yet
Allgon 9215.01
1 page
Comba CM-DW2-ODxx
PDF
No ratings yet
Comba CM-DW2-ODxx
1 page
Comba CM-KY2-OD4B
PDF
No ratings yet
Comba CM-KY2-OD4B
1 page
Comba CM-KY2-OD4B
PDF
No ratings yet
Comba CM-KY2-OD4B
1 page