Constrain
o Original Parameter is fixed and cannot be changed
Enhance
o Optimizing certain criterion over others
Accept
o Criterion for which it is acceptable not to meet original
parameters
Project Priority Matrix
Work Packages
-
Defines:
o Levels and elements of the WBS
o Organization elements
o Work packages
o Budget and cost information
Responsibility matrices
Responsibility Matrix (RM)
-
R = Responsible S = Support
Task
Dave
Identify target
R
consumer
Develop Survey
R
Pilot survey
Final report
R
Dan
S
John
S
R
S
S
Information Needs
Project status reports
Deliverable issues
Changes in scope
Team status meetings
Gating decisions
Accepted request changes
Action items
Milestone reports
3. Sources of information
- When information needs are identified, the next step is to determine
the sources of information
o Where does the information reside?
o How will it be collected?
4. Dissemination reports
5. Responsibility and Timing
- Determine who will send out the information