Labour and Material Calculation Sheet

The document appears to be a bill of quantities for construction materials and labor. It contains 27 line items with descriptions of construction works along with quantities, units of measurement, rates for labor and materials, and calculations of total labor and material costs. The totals at the bottom show the labor cost is approximately Rs. 1.33 crores, material cost is approximately Rs. 1.78 crores, and the combined total cost is Rs. 3.11 crores. The document provides a detailed breakdown and cost estimate for a construction project.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
226 views

Labour and Material Calculation Sheet

The document appears to be a bill of quantities for construction materials and labor. It contains 27 line items with descriptions of construction works along with quantities, units of measurement, rates for labor and materials, and calculations of total labor and material costs. The totals at the bottom show the labor cost is approximately Rs. 1.33 crores, material cost is approximately Rs. 1.78 crores, and the combined total cost is Rs. 3.11 crores. The document provides a detailed breakdown and cost estimate for a construction project.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

ITEM NO

QUANTITY

32

Rm

Rm

44

M3

M3

3.6

M3

55

M2

8.2

M3

1340

KG

140

M2

10

24

NOS

11

17090

KG

12

233

M2

13

74

M3

14

81

M2

15

10

M3

16

1682

KG

17

370

M2

18

384.7

M2

19

33

M2

20

M3

21

11.1

M2

22

364

M2

23

382

M2

24

2.4

M2

25

M2

26

124

RM

27

DESCRIPTION OF WORK

PER

Forming vertical pile of 600 mm dia of RCC 1 :5: 3 with 20mm


downgraded metal in

Rm

Empty boring for piles of 600 mm dia (length measured from GL to


cut off level of pile )

Rm

Earth work excavation using well point system for dewtering in all
soils such as

M3

dismantling RCC of grown up pile and removing the same including


cost of labours,T & P

M3

Providing and lying PCC 1:5:10 using HSRC with 40mm metal
including dewatering

M3

Providing and removing formwork at all elevations below to give


mediumsmooth finishg using plain sawn

M2

Providing RCC 1:1:5:3 using OP/PP CEMENT WITH 20MM MACHINE


CRUSHED hbg METAL FOR roof slap,lintel

M3

supplying cutting bending,and tying in psition RTS/MS rods including


cost of all materials,leads,lifts,including

KG

Prooviding nitrozinc primer/equivalent as anticorrosive treatment for


RTS rod rate including cost of all materials

M2

Supplying and placing in position MS Bolts and nuts 25mm dia,1m


length including

NOS

Supplying fabrication and fixing for vertical column of ISMC


200,Horizontal beam of ISMC 150 ,ISMC 125 AND ISA

KG

Painting (Airless painting ) of steel sructures of vertical


columns,horizantal beams & bracings of lift in ICHS areas

M2

supplying fabricationand fixing for vertical column of ISMC 200,


horizontal beam of

M3

Providing formwork including shuttering to RCC slab,beam,column at


various levels upto 31 m height for both

M2

Providing and laying of RCC 1:1:5:3 using OPC and 20mm down
graded machine crushed metal upto elevation EL

M3

supplying and providing in position RTS/MS rod s including cost of all


materials,leads,lifts,including without

KG

providing 12mm thick plain cement plaster (1:4) RCC,brickwork


erc..,including

M2

Providing 20mm thick plain cement with cm 1:4 for external surface
plastering in 2 layer of 14mm & 6mm at all

M2

Providing 20mm thick plain cement with cm 1:3 for external surface
plastering in 2

M2

Providing surki concrete with broken jelly of size 20mm in pure slaked
line over RCC roof slab with proportion (32:12:5)

M3

Terrace flooring with one course of pressed tiles 200 x 200 20 mm


over the bed

M2

Providing two coats with ready mixed plastic emulsion (interior walls )
of first class quality paint & approved colour over

M2

Providing two coats with ready mixed plastic emulsion (exterior


walls ) of first class quality paint & approved colour over

M2

supplying and fixing steel door of required size with single leaf frame
using 30 x 30x5 mm M.S angle and flat of size
Supplying and fixing windows of required size with frame using 30
x30x5 mm M.S angle and flat of size 25 x 5 mm as stiffeners and
shutters
Providinbg & fixing 100 mm dia AC down fall rain water pipe including
cost of 100mm dia pipe

TOTAL

M2
M2
RM

LABOUR RATE MATERIAL RATE


LABOUR COST MATERIAL COST
AS PER DATA
AS PER DATA
3662

4062.89

117184

130012.36

1200

800

9600

6400

253.64

928.25

11160.16

40843

3800

11400

1979.17

1127.76

7125.02

4059.94

331.74

454.67

18245.59

25007.06

3178.2

4824.91

26061.24

39564.28

13.97

60.09

18713.1

80520.6

26.53

163.17

3714.69

22843.8

1800

43200

31.17

43.08

532758.63

736237.2

294.81

401.37

68690.73

93519.21

1328.22

4175.12

98288.28

308958.88

78.39

786.41

6349.59

63699.21

4658.65

6646

46586.5

66460

43.51

13.97

73184.32

23489.13

166.4

38.92

61569.48

14401.8

274.72

61.17

105685.55

23530.52

249.13

78.21

8221.41

2580.77

986.86

1622.83

986.86

1622.83

235.77

459.71

2617.01

5102.75

59.53

85.49

21670.19

31118.72

59.53

85.49

22741.8

32657.56

1162.12

2532.74

2789.1

6078.56

1033.5

2123

3100.5

6369

67.4

139.53

8357.6

17301.72

1330001.35
3112380.26

1782378.91