0% found this document useful (0 votes)
72 views5 pages

New CV Fase Service

This document summarizes the professional experience of an individual with 26 years of experience as a Mechanical Technician. They have worked in Libya, Spain, Kazakhstan, and Romania for various oil, gas, and industrial companies performing maintenance, repairs, installations and replacements of pipes, valves, pumps, filters and other mechanical equipment. Responsibilities included preparation of isometric drawings, cutting and joining pipes, conducting tests, and general maintenance and repair work. Languages include English and Italian and availability is listed as immediate.

Uploaded by

miodrag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views5 pages

New CV Fase Service

This document summarizes the professional experience of an individual with 26 years of experience as a Mechanical Technician. They have worked in Libya, Spain, Kazakhstan, and Romania for various oil, gas, and industrial companies performing maintenance, repairs, installations and replacements of pipes, valves, pumps, filters and other mechanical equipment. Responsibilities included preparation of isometric drawings, cutting and joining pipes, conducting tests, and general maintenance and repair work. Languages include English and Italian and availability is listed as immediate.

Uploaded by

miodrag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

-- PROFESSIONAL EXPERIENCE --

Career and work experience: I have worked 26 years as


Mechanical Technician.

Period:
January 2013-April 2016
Position:
Mechanical Static Technician
Company&Location:
Bonatti Spa in Libia to Mellitah Oil&Gas
Responsibilities:
-replacement of pipes, flanged connections and bolts, clean or change the
filters in desalination facility plant

-installation of different types and sizes of pipes, installation of gaskets


and blinds;

-repairing of sulfur conveyor band and guide rollers for loading in ships;
-installation and tested of various equipment and machinery;
-pressurization and leak test of pipe line to operating pressure with inert
gas, checking of integrity of flange joints, line-up of pipe with instruments;
-maintenance of different sizes and types of valves;
-replacement of pipes, flanged connections and bolts;
-change of different types and size of filters;
-preparation the list of necessary materials, tools and other materials
required for the job and propose for approval;
-attend at inspections and tests with client representatives of the installed
works;
-control water level, dampers in boilers fuel supply;

-maintaining the operation of equipment such as boilers, stokers, water


heaters, heat exchangers, steam traps, cooling towers, incinerators,
valves(ball, gate, globe, control, etc)
-making sure that all equipment is in good condition and are operating
properly;
-plant equipment and tools are cleaned.

Period:
July 2009 - November 2012
Position:
Mechanical Static Technician
Company & Location: Muzkis- Petronor Refinery Bilboa-Spain
Responsibilities:
- Removal of underground pipes cut with the help of winches, cranes,
crowbars
- Cutting and chamfering at ground level sections of 20 "(insert the ground
and strung together or flange to flange attached 4 screws)
-Install adjustable bracelets with 4 screws.
-Are awarded using a spacer of 4 mm (4 points)
- Preparing the ground related piping isometrics reactor under
-Selection of the components of the scheme isometric (sections, elbows,
valves drainage, reducers, flanges)
-Place the pieces in plan using level protractor, ruler, tape, under isometric
and welding.
-Mounting brackets and leveling concrete.
-Preparing plants for revision:
- Removing or replacing valves in order to verify
- Installation of stairs, passages
- Installing reinforcement (ceramic handled)
-removing all valves in the system (valves on 1/2 to 20) in order to verify
-partial replacement of corroded plant (as media prepares adjustable
isometric, be debited size, is chamfering, are put into the plan and scores)
-replacement platforms (sheet or grill) corroded
-replacing corroded railings and stairs (device uses autogenous, grinder,
hand drill)
-equipped with fittings and drainage installations.
-Discharge pipes cut with the help of winches, finds, cranes, crowbars
2

-Preparing the surface sections 20.

Period:
January 2007 - August 2008
Position:
Mechanical Static Technician
Company & Location: Tenghiz- Kazakhstan
Responsibilities:
- Assembling of metallic (profile I - 60-200mm L - 80-100mm)
- Mounting brackets and leveling concrete
- Construction under isometric with screws tightened with a torque
wrench.
- Installation of stairs and platforms related reactor crane and hoist (tables
and grills are mounted with screws or bolts 6mm shot in profile).
- Preparing the ground related piping isometrics reactor under.
-Selection of the components of the scheme isometric (sections, elbows,
valves drainage, reducers, flanges)
-Place the pieces in plan using level protractor, ruler, tape, under isometric
and welding
- Install the installation using the crane, winch, race and prepares final
welding.
- Installation of fittings, gaskets.
-preparation for hydraulic test.
- Mounting shafts (nipples, gauges on the 0 and the highest rate of
reactor).
- Conducting air tests the rest of the installation.
- Inlet and outlet collectors underground gasoline and diesel (barrel 20 ").
- Removing drains and valves.
- Cold cutting with adjustable roller bracelets depending on the size of the
pipe.
- Removal of underground pipes cut with the help of winches, cranes,
crowbars.
- Cutting and chamfering at ground level sections of 20 "(insert the ground
and strung together or flange to flange attached 4 screws).
-Install adjustable bracelets with 4 screws.
-All fittings to be removed from the system in order to verify.
-Cut out the grinder or torch, corroded portions installation (pipe, stairs,
sheets or grids).
3

-Debiting size and replace the screws, bolts or welding points shot.

Period:
August 1989 - January 2007
Position:
Mechanical Technician
Company & Location: Heavy Water Plant-Ramnicu Valcea-Romania
Responsibilities:
Repair of centrifugal pumps:
-check on the lathe spindle
-balance
Repair metering pumps:
-checking and repairing gear
-piston-state
-assembly
-greasing
Repair and maintenance of mechanical filters, ionic and cationic:
-filter-state mass
-protective rubber inner-state.
- I have mounted and dismounted manhole covers if was necessary
replacement the filler or indoor cleaning.
- I have replaced gaskets.
- On the system pipes I have mounted and dismounted: valves with the
following types closure: globe valves, gate valves, diaphragm valves. For
these I have performed the following works: I have replaced the worn
fittings, the worn diaphragms, the worn sealings.
For the centrifugal pumps I have performed the following works:
-I have mounted and dismounted couplings pumps;
-I have mounted and dismounted pump rotors;
-I have mounted and dismounted pump bearings;
-I have mounted and dismounted the worn shafts and gaskets;
-I have performed alignment of the pumps.
For the reciprocating dosing pumps I have performed the following works:
4

-Changing of the mechanical parts worn: gaskets, valves; pump plungers;


change of the filters.
For the heat exchangers, coolers, blowers and fans I have participated
with a team of mechanics at overhauls scheduled: changing gaskets,
isolated broken pipes by fitting of plugs; changing the belts, changing
couplings, changing bearings, changing rotors.
Repairs for centrifugal pumps.
-Maintenance repairs separators.
-checking the pallets, drainage.
-water-checking centrifugal pumps.
-check metering pumps for oil and product.
-checking the accompanying steam piping and insulation of pipe routes.
-checking and repairing vertical centrifugal pumps.
Languages: English and Italian
Availability: ASAP

You might also like