Site Test Report Date: Contractor's Name: Customer: Sec-Eoa Name of Substation: Acdb-Mccb Trip Test

This site test report summarizes testing performed on ACDB-MCCB trip circuits at a substation. [1] Visual inspections and mechanical checks were performed to inspect for damage and verify ratings. [2] Insulation resistance tests were conducted on MCCBs in both open and closed positions. [3] Trip time tests were performed by injecting 3 times the rated current to check trip times against curves and contact status.

Uploaded by

maheshknm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

Site Test Report Date: Contractor's Name: Customer: Sec-Eoa Name of Substation: Acdb-Mccb Trip Test

This site test report summarizes testing performed on ACDB-MCCB trip circuits at a substation. [1] Visual inspections and mechanical checks were performed to inspect for damage and verify ratings. [2] Insulation resistance tests were conducted on MCCBs in both open and closed positions. [3] Trip time tests were performed by injecting 3 times the rated current to check trip times against curves and contact status.

Uploaded by

maheshknm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Respon

sibilities
Legend
CSD

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:

SEC EOA Contract No. :

Name of substation:

Page 1 of 1

ACDB-MCCB TRIP TEST


Panel No:

Equip. No.:

Dwg. Ref.:

Record No.:

1. MECHANICAL CHECK AND VISUAL INSPECTION


S. NO:

DESCRIPYION

DONE

Inspect for any physical damaged/ defects.

Check Name Plate information for correctness

Checked tightness of all bolted connections.

Verify correct rating of each MCCB with approved design and drawing

REMARKS

2. INSULATION RESISTANCE TEST:


Applied Voltage = ______ V DC
MCCB CONDITION
MCCB CLOSED
MCCB CONDITION
MCCB OPEN

Time Duration: ________

R- (Y+B+N+E)

Y- (R+B+N+E)

B- (R+Y+N+E)

N- (R+Y+B+E)

R-R

Y-Y

B-B

N-N

MCCB TRIP TIME TEST


Panel Ref & Name : ACDB - MCCB TRIP TEST
Circuit Reference

Sr. No

Type

Manufacturer
Device
Location

Current
Rating (A)
In

:
Applied
Current (A)
3x In

No. of
poles

Trip Time in Sec


From
Curve

1
2

R
e
s
p

Test Equipment:
a. Instrument Name
Model

: Current Injection Kit


:

Manufacturer

DATE:
TESTING ENGINEER

CSD- Engineer

Signature: ________________

Signature: ________________