Resume of Key Personnel: (FOC Technician)

1.2 OPGW Cable & Splice Testing Criteria N. W. WABRAN shall provide fusion splices with an average attenuation below 0.1 dB when measured at 1550nm. any fusion splice with attenuation above 0.1 dB shall be re-spliced and re-tested. The approved methodology comprises measuring in both directions, using an OTDR, the attenuation of each splice for all fibers. The average of the two readings for each fiber will be accepted as the splice attenuation for each fiber. In addition the end to end attenuation of each fiber in each direction shall be measured using a calibrated light source and light meter. All measurements shall be made with an accuracy of 0.01dB and shall not be made over sections greater than the capability of the OTDR in use. Testing of unterminated fibers shall be performed by splicing temporary pigtails to the fibers or by using a Bare Fiber Adapter. A terminated fiber refers to fibers terminated with connectors on patch panels at an ODF and/or at equipment. 1.3 Drum Test The Cable Reel Acceptance Test (Reel Test) is a preliminary test to be performed when N.W.WABRAN receives cable from the shipper. This test should be performed as soon as possible after receipt of the shipment. The Reel Test only requires one end of the cable (normally the inside end), and does not require connectors on the fiber. This test is intended to verify that the fiber is received from the shipper in sound condition and without manufacturing defects. Any anomalies must be reported immediately to the shipper and manufacturer. Cable should not be used until it passes this test.

Uploaded by

Prabu Baskaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views3 pages

Resume of Key Personnel: (FOC Technician)

1.2 OPGW Cable & Splice Testing Criteria N. W. WABRAN shall provide fusion splices with an average attenuation below 0.1 dB when measured at 1550nm. any fusion splice with attenuation above 0.1 dB shall be re-spliced and re-tested. The approved methodology comprises measuring in both directions, using an OTDR, the attenuation of each splice for all fibers. The average of the two readings for each fiber will be accepted as the splice attenuation for each fiber. In addition the end to end attenuation of each fiber in each direction shall be measured using a calibrated light source and light meter. All measurements shall be made with an accuracy of 0.01dB and shall not be made over sections greater than the capability of the OTDR in use. Testing of unterminated fibers shall be performed by splicing temporary pigtails to the fibers or by using a Bare Fiber Adapter. A terminated fiber refers to fibers terminated with connectors on patch panels at an ODF and/or at equipment. 1.3 Drum Test The Cable Reel Acceptance Test (Reel Test) is a preliminary test to be performed when N.W.WABRAN receives cable from the shipper. This test should be performed as soon as possible after receipt of the shipment. The Reel Test only requires one end of the cable (normally the inside end), and does not require connectors on the fiber. This test is intended to verify that the fiber is received from the shipper in sound condition and without manufacturing defects. Any anomalies must be reported immediately to the shipper and manufacturer. Cable should not be used until it passes this test.

Uploaded by

Prabu Baskaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

RESUME OF KEY PERSONNEL

(FOC Technician)
Name
Nationality
Date of Birth

:
:
:

SUBITH MADAVAN

INDIAN
Oct 24, 1985

EDUCATIONAL BACKGROUND:

High School

HSS, Herelassery Palakkad


School Name Year Graduated

2004

College

Institute of Kochi in the State of Kerala, India


School Name Year Graduated

2013

Degree / Occupation

FOC Technician

Propose to work as a FOC Technician for Replacement of 69KV O/H Lines in EOA, From
Qatif BSP to KFIA (Line-1) for Nassir Manea Wabran Co. & Partners.

Worked as a FOC Technician for the Nassir Manea Wabran Co. & Partners
Perform the operation, construction, maintenance and repair work associated with
electronics equipments in a wide range of communication system.
Be familiar with and able to work on any part of the communication system in optic
fiber system.
Be a specialist in at least SDH fiber optic system and digital multiplex. (OTN/MOXA)
Provide first level and module level maintenance and support for the communication
equipment.
Perform the duties associated with the data technician.
Worked as an FOC Technician for SFO Technologies Optronic Division.

Worked as a fiber optic cable technician.


Finding fault in fiber optic network.
Trouble shooting
Installation of SC/APC Cable Connection.
Installation of MT Connection.
Conduct testing (JDS, JGR & EXFO) advanced machine for IL & BR
Checking.
Conduct Optical Power Meter
Splicing and Termination of FOC using Splicing Machine (Fusion & Mechanical
Splicing)
Polishing, Geometry Inspection, End Face Inspection, Routing, and Spool Winding

Course Attended:
Technical Skills

: Optic Transmission system splicing, Digital multiplex


s systems, peripheral power systems PLC, SCADA.

Workshop

: -Nil-

Duties and Responsibilities

Accountable for project as well as Management of trouble shooting of Communication tools


such as Pressure transmitter, temperature controller, flow detector, PNP and NPN sensors,
PLC, Microprocessor, Optic fiber communication cable with single and multicore, etc.
Testing, Charging, Client Inspection with respective documents.
Study of the contract to ensure its effective implementation and technical specification.
Review of design to ensure that it meets the client requirement and technical specification.
Verification of conformance of suppliers technical data to approve design requirement and
technical schedule of the Project.
Implementing Ministerial safety rules for ensuring safety.
Follow ups regularly with Sub-Contractors activities.
Arranging necessary equipment required for the work in advance.

EMPLOYMENT HISTORY
Company Name
Located in
Position Title
Specialization
Industry
Date Joined
Date left
Work Description

:
:
:
:
:
:
:

Nassir Manea Wabran Co. & Partners.


Saudi Arabia
FOC Technician
Communication/ Optic fiber system

Maintenance
September 2015
Present working

Well versed in communication operation and installation, maintenance, repairing


communication, electronics equipments including fiber optic transmission system, digital
multiplex system, and peripheral power systems.
Trouble shooting, fault finding of minor and major communication equipments.
Disconnecting, relocating installing and adjusting the communication equipments.
Reconfiguring, modifying and upgrading the equipment.
Performing initial test and prevention/ corrective maintenance inspection, installing Saudi
Aramco approved operating systems.

Performing complex fault isolation diagnostic tests to determine problem areas when the
equipment fails and ensuring the equipment performs in accordance with its local operating
specifications.
Operation of computer oriented network systems for the fiber optic/ multiplex servers and
routers, new software releases, upgrades and updates.

Company Name
Located in
Position Title
Specialization
Industry
Date Joined
Date Left

:
:
:
:
:
:
:

Work Description

SFO Technologies Optronic Division.


India
FOC Technician
Optic transmission system splicing.
Commissioning & Pre commissioning
September 2012
July 2015

Worked as a fiber optic cable technician.


Finding fault in fiber optic network.
Trouble shooting
Installation of SC/APC Cable Connection.
Installation of MT Connection.
Conduct testing (JDS, JGR & EXFO) advanced machine for IL & BR Checking.
Conduct Optical Power Meter
Splicing and Termination of FOC using Splicing Machine (Fusion & Mechanical Splicing)
Polishing, Geometry Inspection, End Face Inspection, Routing, and Spool Winding

ADDITIONAL INFORMATION

COMPUTER SKILLS
Networking

Local Area Network, Wide Area Network


Switch, Router, Hub, Modem

Operating System

Microsoft Windows

General

Microsoft Word, Excel

I hereby attest to the truthfulness of all the above information to the best of my
knowledge and belief.

Subith Madavan
Signature over printed name

You might also like