NECB Project Summary: Rocky View County Requirements For NECB 2011 Compliance
NECB Project Summary: Rocky View County Requirements For NECB 2011 Compliance
This document outlines project compliance with NECB 2011. It MUST be submitted by all projects required to comply w
Application. NECB 2011 requires a number of calculations be completed to demonstrate compliance. The Authority Hav
comprehensive calculations be provided to verify submissions and compliance.
(as a
Vertic
Horizon
Ho
Vestibule(s) (Y/N):
Horizontal
ASHRAE 62.1-
Compliance Summary
Indicate the compliance path for each Part below. Please note that only one means of compliance is possible pe
Part 3: Building Envelope
OR
Part 8: Performance Energy Model
Consultants
Please indicate the consultants and/or persons responsible for demonstrating compliance with the various Parts
Consultant Name:
Representing Firm:
Part 3: Building Envelope
Consultant Name:
Representing Firm:
Part 4: Lighting
Consultant Name:
Representing Firm:
Part 5: Heating, Ventilating and
Air-Conditioning Systems
Consultant Name:
Representing Firm:
Contact Information: email:
Address:
Consultant Name:
Representing Firm:
Contact Information: email:
Address:
Consultant Name:
Representing Firm:
Part 8: Building Energy Performance
(If Part 3 Detailed Trade-off or Part 8 Performance
Compliance selected)
Applicant:
Safety Codes Technician:
Safety Codes Officer:
all projects required to comply with the NECB at the time of Building Permit
e compliance. The Authority Having Jurisdiction (AHJ) may request
CB 2011
(as applicable) Area of Addition (m):
Vertical Opaque Envelope Area (m):
Vertical Fenestration Area (m):
FDWR (%):
Horizontal Opaque Envelope Area (m):
Horizontal Fenestration Area (m):
Horizontal Fenestration (skylight) ratio (%):
ASHRAE 62.1-2001 except addendum n (Y/N):
ce Summary
Trade-Off
Prescriptive
Trade-Off
Prescriptive
Trade-Off
Prescriptive
Trade-Off
Prescriptive
Prescriptive
OR
ultants
tel:
tel:
tel:
tel:
tel:
tel:
Date:
Date:
Date: