Laboratory Test Report Quality Assurance Department Qard Incoming Raw Coal Storage
Laboratory Test Report Quality Assurance Department Qard Incoming Raw Coal Storage
DATE :
19 12 2012
SAMPLE
DATE
HV(gross)
ULTIMATE ANALYSIS
MC ad
Kcal / Kg
(%)
(%)
(%)
(%)
(%)
(%)
Adaro : Aspac
5750
7.61
1.50
59.84
0.64
5.03
33.00
7133
8.33
1.55
59.87
1.15
4.94
32.50
Adaro
5739
13.94
1.31
59.10
0.10
5.37
34.11
Asia Pacific
7684
5.04
2.03
70.75
1.46
5.55
20.21
Bukit Asam
6164
11.97
1.50
62.82
0.44
5.59
29.65
Bara Multi
5490
17.35
1.30
56.42
0.21
5.67
36.41
Jembayan
6019
10.75
1.74
63.33
0.21
5.15
29.57
Mahakam
5802
12.47
1.78
60.31
0.65
5.38
31.88
SAMPLE NAME
OTHERS COAL
0
Prepared,
Superintendent