0% found this document useful (0 votes)
340 views

MS Road Marking

This document outlines the procedures for road marking, including materials, equipment, safety precautions, and construction methods. Thermoplastic materials and glass beads will be used for the markings. Equipment such as a road marking machine, gas, and cleaning tools are required. Safety measures like protective gear and standby vehicles will be implemented. The process involves setting out the markings, cleaning the road surface, applying temporary markings for approval, heating and spraying the thermoplastic material mixed with glass beads, and protecting the markings until dry. Quality control checks will ensure compliance with the construction steps.

Uploaded by

Muhammad Nauman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
340 views

MS Road Marking

This document outlines the procedures for road marking, including materials, equipment, safety precautions, and construction methods. Thermoplastic materials and glass beads will be used for the markings. Equipment such as a road marking machine, gas, and cleaning tools are required. Safety measures like protective gear and standby vehicles will be implemented. The process involves setting out the markings, cleaning the road surface, applying temporary markings for approval, heating and spraying the thermoplastic material mixed with glass beads, and protecting the markings until dry. Quality control checks will ensure compliance with the construction steps.

Uploaded by

Muhammad Nauman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

Introduction and General Information


This method statement consists of construction procedures of Road
Marking, including material & machineries to be used, method of
constructions, quality control test & verifications, and also the safety
precautions to be implemented at site.

1.1

Location of Works

Road marking location will be decided as per the road marking


drawings issued by the Engineer.

2. Materials
The major materials used for the road marking.

DJ Thermo line thermoplastic road marking materials.

Glass beads.

3. Equipment
The major equipment used for Road marking includes, but are not
limited to the following.

Road Marking Machine.

Gas.

Rope.

Chisel.

Cleaning equipment

Small Tools.

4. Safety Management and Control


Safety precaution will be taken complying with the Traffic & Safety
Plan. Every precaution will be taken to avoid any accidents & damages
to adjoining properties, workers, and road users.
All workers will be advised to wear helmets, boots, and gloves while
working. There will be a stand by vehicle near site always if needed in
a case of accident.
The safety officer inspects several times to inspect safety matters.

5. Method and Procedures


The method and procedures for Road marking will follow the steps
below. Flow chart is also provided in appendix A.

5.1 Center line will be set out and get approvals about the center line
before commencement of line marking.

5.2 Road surface shall be cleaned manually using wire brush and wash
the surface where necessary.

5.3 As per the approved road marking design the road marking lines &
symbols will be set out means of white chalk and approval will take by
Engineer.

5.4 The thermoplastic material is heated in the range of temperature


around 170 ~ 200 C and maintain in the range during the entire laying
process.

5.5 After getting the approval of the temporary marking on the


asphalt surface permanent marking shall be carried out by considering
required color. This machine has the facility of adding glass beads in to
the paint while painting.

5.6 All roads marking shall be protected from traffic until the marked
paint get dry.

6. Quality Control
To ensure that the steps of the procedure are fully complied with the
activities such as setting out, temporary marking , permanent painting
etc. certain inspections and verifications will be carried out as
described in the above procedures.

You might also like