PMI PBA - Practice Test
PMI PBA - Practice Test
COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
Practice Test
Business analysis.
Drafting.
None of these .
2.________ plays an important role to ensure the situation statement correctly denes
the solution else it leads to failure to rene situation statement with the business
Business analyst.
Business shareholder.
Business stakeholders.
None of these.
3._________ initiates and facilitates approval process which can be formal or informal
depends on organization
Business shareholders.
Business analyst .
Business stakeholders.
None of these.
0 Explanation :
Answer : Business analyst
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
Development.
Requirement.
None of these.
5.____ and _____ are important factor used by business analysts to begin the
documenting the business requirements.
Document and plan.
6.________ are used to translate identied goals into actionable plans and objectives by
business analysts
Corporate project.
Corporate structure.
Corporate strategies.
None of these.
7.______ are assembled one of the nal tasks in need assessment which is done by
business analyst
Project goals.
Project objectives.
Business cases .
None of these.
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
8.______ helps to assess organizational strategy, goals and objective used to facilitates
the discussion with stakeholders.
Gap analysis.
SWOT analysis.
Pareto chart.
None of these.
9._____ is widely used to determining high-level views in a business need and used to
create structures framework for cutting down into root causes or contributors.
Gap analysis.
SWOT analysis.
Pareto chart.
None of these.
10.______ type of SWOT analysis is used for organization current strengths to help
solve the problem or opportunity.
External.
Central.
Internal.
None of these.
Internal.
NOTIFICATION
Central.
None of these.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
12.Goal and objectives are used to generate revenue for the organization whereas
programs and projects are key features used to _____
Maximize customer value.
None of these.
13.Determine the key objective for decision making for dening goals and objective
To reduce cost.
Process improvement.
To eliminate cost.
14.Once the business analyst identies current situation of the organization, BA breaks
into _____ for appropriate solution
To reduce cost.
To eliminate cost.
Root cause.
None of these.
15.______ is the technique used to identify basic reason that cause variation, defect and
risk and eliminate the common problem
Opportunity analysis.
None of these.
NOTIFICATION
Threats .
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
16._______ is the major factor of potential opportunity to identify the feasibility for
successful new product launch
Root cause analysis.
Opportunity analysis.
Opportunity analysis.
None of these.
17._______ are used to understand the cause of a problem as not distracted by its
symptoms
Gap analysis.
Cause-and-effect diagrams.
None of these.
18._______ are snapshots of the current situation and high-level causes of problem is
occurring and these diagram are sued for root cause analysis.
Gap analysis.
Fishbone diagrams.
Interrelationship diagrams.
None of these.
19._______ is the special type of diagram used for visualizing complex problems
unwieldy relationship among
0 multiple variables.
NOTIFICATION
Fishbone
diagrams.
Pareto chart.
Interrelationship diagrams.
LIVE CHAT
None of these.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
20._______ provides foundation for measuring investment of time, money and human
resources to achieve a particular outcome.
Gap analysis.
Fishbone diagrams.
Interrelationship diagrams.
None of these.
21.In gap analysis,________ is one of the stage to review the current information system
to understand the current processes ,features and functionalities
Comparison.
Implication .
Review system.
None of these.
22.In gap analysis,_______ is one of the stages describes about different attributes and
features of the current and proposed processes
Recommendations.
Comparison.
Review systems.
None of these.
People,
processes and culture.
NOTIFICATION
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
24.Identify the tool used to nd the strongest cause to address in need assessment
Fishbone diagram.
Brainstorming.
Interrelationship diagram.
Interview .
25._______ is the output for investigating the situation which is a condition for an
internal/external opportunity
Business requirement.
Situation statement.
Business case.
None of these.
Business case.
Business requirement.
None of these .
benetsNOTIFICATION
component lacks sufcient denition and used as base for authorization for
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
Business case.
Business requirements.
MUHAMMAD BILAL
None of these.
Menu (../)
Answer : Business case Explanation :
No explanations for this question.
28._____ type of document given by project initiator sponsor authorizes the existence
of project and gives project manager with the authority to apply organizational
resources for project activities.
Situation statement.
Business case.
Project charter.
Business need.
Pareto chart.
Interview.
Requirement matrix.
Interview.
Pareto chart.
None of these.
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu
(../)
Project cycle.
Project characteristics.
Stakeholder involvement.
Agendas.
33._______ gets guideline from the sponsor, project manager and key stakeholders to
meet the expectation where the deliverables are produced for project.
Stakeholder.
Business analyst.
Project coordinator.
None of these.
34.______ type of analysis model used by business analyst to break down a high-level
object into smaller discrete parts where objects with decomposition for solution scope,
organizational units, work products, process and object types are further subdivided
into smaller elements.
KANO model.
Fishbone diagram.
Decomposition model.
None of these.
0 model Explanation :
Answer : Decomposition
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
35.______ is easy model used to analyze highly complex concepts and those
complexities are broken into manageable elements where hierarchical relationships
are portrayed through levels.
KANO model.
Decomposition model.
Fishbone diagram.
None of these.
36._______ used to identify business analysis task, activities and deliverables, discovers
the goal of stakeholder group.
Fishbone diagram.
Decomposition model.
KANO model .
None of these.
Project manager.
Product owner.
Sponsor.
NOTIFICATION
LIVE CHAT
Persona analysis.
Job analysis.
Brainstorming.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
Collaboration point.
MUHAMMAD BILAL
Menu
Answer(../)
: Job analysis Explanation :
No explanations for this question.
39.Why does business analyst perform job analysis during business analysis planning?
Specic tasks are performed.
Targets are analyzed.
Attitude.
Brainstorming.
Job analysis.
Persona analysis.
Brainstorming.
Attitude.
42.In business analysis plan,________ is used for rst high-level and more detailed level
later in the project when the activities to be performed
0
Rolling
wave planning.
NOTIFICATION
Job analysis.
Persona analysis.
LIVE CHAT
None of these.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
43._________ use the stakeholder analysis results to develop their action plan where it
helps to increase stakeholder support
Project managers.
Policymakers.
Stakeholders.
Sponsors.
44.______ process should be participatory, involves all members of the working group
from beginning to end
Business analysis plan.
Sponsor.
Stakeholder analysis.
None of these.
45.During stakeholder analysis, the policy should be more specic and _____ to avoid
conducting analysis on policy
Deliverable.
Denable.
Detachable.
Detectable.
46.Identify the next step after selecting an appropriate policy in stakeholder analysis
while conducting business analysis plan
0
Reforming
the policy.
NOTIFICATION
LIVE CHAT
Resource identication.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
NGO's.
Labor unions.
Knowledge of policy.
Interest.
Organization.
49.In stakeholder analysis, one of the characteristics is ______, where the stakeholder
supports, opposes or neutral about the policy and it is the key to establishing whether
policy will be implemented
Interest.
Knowledge of policy.
Position.
Organization.
several NOTIFICATION
stakeholders by dealing with key stakeholder
LIVE CHAT
Organization.
Alliances.
Interest.
Knowledge of policy.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
Open-ended.
Specic.
53.______ gives a way to analyze highly complex concepts which allow for the
complexity broken into manageable elements
Pareto chart.
SMART model.
Decomposition model.
None of these.
54._______ develop RACI model to determine roles and responsibilities for the resource
assigned
to the project.
NOTIFICATION
LIVE CHAT
Project manager.
Business analyst.
Sponsor.
Stakeholder.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
55._____ can be used to facilitate, sorted, documented and gain approval for important
decision
Needs assessment.
Planning.
RACI technique.
Analysis.
Elicitation.
Retrospective.
None of these.
58.In business analysis plan, ________ is a way to reduce the possibility of overlooking
stakeholder concern
Review
analysis.
NOTIFICATION
Review process.
Engagement.
None of these.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
59.In business analysis plan, some of the information are commonly shared in plan
varies in each organization develops template which is different depends on ________
Customer need.
Stakeholder need.
Organization needs.
Employee need.
Sponsor.
Stakeholder .
Project manager.
61.Business analyst has to check the documents after taking decision to avoid _______
while formulating business plan
Conict.
Validation.
Requirement.
Confusion.
Predictive.
0
NOTIFICATION
Hybrid.
None of these.
LIVE CHAT
Answer : Predictive MY
Explanation
:
TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
63.In business analysis plan,______ type of approach is change-driven adopted by
project life cycle
Predictive.
Hybrid.
Adaptive.
None of these.
64.In business analysis plan,______ type of approach is between fully plan-driven and
change-driven adopted by project life cycle
Hybrid.
Predictive.
Adaptive.
None of these.
65.Determine the other name referred for predictive life cycle method
Plan-driven.
Traditional.
Waterfall.
66.Identify the characteristics for interactive model project life cycle while analyzing
business plan
Need and solution are more stable for project progress.
High-level scope dened up-front and detailed scope is expanded.
In time-boxed iteration, requirements analysis is performed.
All the above.
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
67.In business analysis planning, some of the characteristics are discussed below,
identify the characteristics is NOT included Adaptive plan
In each variation, time and cost are xed.
BA.
Shareholder.
Project manager.
Answer : BA Explanation :
No explanations for this question.
69.______ are used in process of Kanban, agile approached and in Lead methods
Facilitation.
Sprint.
Retrospectives.
Sprint review.
Implementation.
NOTIFICATION
Initiation.
Decision making.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
71.In project lifecycle,______ phase states about project resource requirements and
tasks are identied
Initiation.
Planning .
Implementation.
None of these.
72.Identify the other name of planning phase in project lifecycle to monitor and control
cost in project implementation
Core value.
Amalgamation.
Dening objective.
Scope management.
Project plan.
Crisis management.
Scope management.
74.________ is dened as the high-threat potential problems are identied along with
the action to be taken on each high-threat problem
Scope management.0
NOTIFICATION
Quality
management.
Crisis management.
Risk management.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
75._____ phase helps to determine project stakeholder and create communication plan
describing information and delivery method to be used to keep the stakeholders
informed
Implementation.
Planning .
Closing.
Initiation.
76._____ phase explains about project plan into action and work of the project is
performed to maintain control and communicate during implementation
Closing.
Initiation.
Implementation .
Planning.
Status report.
Project report.
None of these.
Closing0.
NOTIFICATION
Implementation.
Planning.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
79.In ________ phase, the project team developed an integrated project schedule
coordinated the activities of design, procurement and construction teams
Implementation.
Closing.
Planning.
Initiation.
80.In _______ phase, project sponsors and other key shareholders have to be informed
about project's status based on agreed-on frequency and format of communication
Closing.
Planning.
Implementation.
Initiation.
82._____ is the techniques provides direct way of seeking people in own environment to
perform jobs/tasks and carry out processes
Focus group.
Observation.
NOTIFICATION
Cognitive experiment.
None of these.
LIVE CHAT
Answer : Observation
:
MYExplanation
TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
83._______ called as job shadowing, usually performed by an observer views business
expert performing his/her job
Focus group.
Observation.
Interview.
None of these.
Cognitive experiments.
Business analysts.
None of these.
85.By _______ method, task and decisions are seen and questions can be asked directly
about particular decision being made
Observation.
Focus group.
Interview.
None of these.
Stakeholders.
NOTIFICATION
Focus group.
Observation.
LIVE CHAT
Answer : Observation
:
MYExplanation
TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
87.Identify the benets of observation in data analysis planning
Provides context around the activity.
Provides insight into tasks and activities to describe.
Provides information and visualization together.
Passive observation.
Participatory observation.
Simulation .
89.________ interrupts the process/activity, tasks, and questions about what the worker
is doing, seeking clarication and asks opinions
Participatory observation.
Active observation.
Passive observation.
None of these.
LIVE CHAT
Participatory observation.
None of these.
Passive observation.
Active observation.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
Answer(../)
: Passive observation Explanation :
No explanations for this question.
Passive observation.
Comprehended observation.
Participatory observation.
92.In _____, the observer simulates the activities, operations or processes of work
using tool which can recreates the work of a process worker
Participatory observation.
Simulation.
Active observation.
Passive observation.
93._______ main drawback is the people act differently when they are observed and any
not support interruptions or observations
Prototyping.
Observation.
Active participation.
Simulation.
94.________
is the method to obtain early feedback on requirements by providing a
NOTIFICATION
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
Prototyping.
Observation.
None of these.
MUHAMMAD BILAL
Menu
Answer(../)
: Prototyping Explanation :
No explanations for this question.
Prototypes.
Elicitation .
Stakeholders.
Modications to prototype.
97.________ is nished using pen, paper and maker. Some of the examples are
wireframes, mockups of interface screens, Floor plans and sketches
High-delity prototype.
Medium-delity prototype.
Low-delity prototype.
Very high-delity prototype.
98.______ is to mockup user interface screens and share with intended users to provide
0
visual representation
of what the product/solution look alike
NOTIFICATION
LIVE CHAT
Low-delity prototype.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
Medium-delity prototype.
High-delity prototype.
MUHAMMAD BILAL
Menu
Answer(../)
: Low-delity prototype Explanation :
No explanations for this question.
Low-delity prototype.
High-delity prototyping.
None of these.
100._________ are discarded where interface has been conrmed which is similar to the
product prototypes developed by manufacturing companies
Evolutionary prototypes.
Throwaway prototypes.
Passive prototypes.
Active prototypes.
101._______ are the actual nished product in process where it is reviewed as earliest
workable version of nal product to achieve higher level of quality
Passive prototypes.
Evolutionary prototypes.
Active prototypes.
None of these.
NOTIFICATION
LIVE CHAT
102._______ is one of a MY
prototyping
technique shows the sequence or navigation
TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
Prototype.
Storyboarding.
None of these.
Simulation.
Storyboarding.
None of these.
Wireframes.
Storyboarding.
None of these.
Storyboarding.
Surveys.
Questionnaire.
106.In business analysis planning,______ focus on the product type and while ______
focus on experience
NOTIFICATION
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
107.______ separates look and feel of a site from its function to determine ow of
specic logical and business functions
Prototypes.
Wireframes.
Storyboard.
None of these.
109._______ can be developed as basic blueprint with low delity and serves as an
inexpensive approach to get designs from stakeholders
Surveys.
Wireframes.
Storyboard .
None of these.
Questionnaires.
Surveys.
Storyboard.
LIVE CHAT
Answer : WireframesMY
Explanation
:
TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
111._____ represents diverse population often dispersed over a wide geographical area
which is benecial for collecting large amount of information in a short time
Surveys.
Storyboard.
Questionnaires.
Wireframes.
112.______ method is useful in collecting large amount of information from large group
in short duration which would be little expensive
Wireframes.
Respondents.
Questionnaire.
None of these.
NOTIFICATION
Elicitation
work.
Elicitation process.
Elicitation results.
LIVE CHAT
Answer : Elicitation MY
process
:
TESTSExplanation
(HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
115._______ generates additional questions to clarify ambiguities, solidify vagueness
and add information about particular topic
Analysis.
Implementation.
Elicitation.
Information.
118._______ address the issue by focusing on the information not the individual in
elicitation issues
Stakeholder.
Elicitation activities.
None of these.
NOTIFICATION
Business analysts.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
119._______ is the process of examining, breaking down and synthesizing
requirements-relations information to understand, complete and improve it
Analysis.
Implementation.
Process.
None of these.
Implementation.
Planning.
None of these.
121.______ are created with variety of tools ranging from formal modeling tools to
whiteboards to artistic software
Business rules.
Models.
Design.
Objectives.
Models.
0
Answer : Models Explanation
:
NOTIFICATION
Objectives.
Information.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
123._____ are applied, analysis becomes simple relative to analyzing the information in
pure text form which helps to visualize and summarize complex information
Objectives.
Model.
Rule.
None of these.
124._____ is used to structure and organize the features, functions and boundaries of
business domain being analyzed
Scope models.
Process models.
Rule models.
Data models.
Interface models.
Process models.
Scope models.
Process models.
Interface models.
Scope models.
NOTIFICATION
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
127.____ provides the document where data used in a process or system and its life
MUHAMMAD BILAL
Menu
(../) models.
Interface
Data models.
Rule models.
Process models.
128.____ model describes in understanding specic systems and its relationship with
solution
Data.
Interface.
Rule.
Scope.
129.Before determining the models by the business analyst, what are the criteria to be
checked by BA?
Model category.
Level of abstraction.
Characteristics of project.
130.In analyzing models, _______ is the choice of models or formality and depth of
models can be independent which is suitable to one methodology than another
Level of abstraction.
Methodology.
Time.
Model category.
NOTIFICATION
LIVE CHAT
131.Business process, MY
automation,
customer development, commercial-off-the-shelf,
TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
data migration, workow and reporting are the considerations while selecting the
_________ of the project
Menu
(../)
Methods.
Characteristics.
Category.
Level of abstraction.
132.In dening models, BA has to analyze _______ within the project life cycle for
dening project's value and scope or identifying stakeholders
Abstraction.
Characteristics.
Timing.
Methodology.
133.____ represents different abstraction levels suited for analyzing whole solution and
others for details within an element
Timing.
Method.
Models.
Characteristics.
Models.
Stakeholders.
Iterative process.
135.
NOTIFICATION
LIVE CHAT
_______ describes attributes of business data objects and data objects are reected in
an entity relationship diagram
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
Data model.
Data ow.
Database.
MUHAMMAD BILAL
Data dictionary.
Menu (../)
Cross-checking.
Data dictionary.
Relationship diagram.
137.______ are used to model complex business processes for purpose of making
changes to these processes
Various other modeling languages.
138.________ are used for visually model requirements of easy consumption by all
stakeholders, particularly business stakeholders
Unied modeling language.
None of these.
NOTIFICATION
LIVE CHAT
139.________ are one of the diagram used for organizing and reecting goals, business
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
Goal models.
Basic information.
MUHAMMAD BILAL
None of these.
Menu (../)
Answer : Goal models Explanation :
No explanations for this question.
140.______ represents the value supports feature prioritization decisions and product
scope management
Goal model.
Business case.
Project manager.
None of these.
141.In _______, goal model or business objectives model to be created at any time
during the project which is helpful to create the model as early as possible
Implementing phase.
Execution phase.
Planning phase.
None of these.
Models.
Relationship to requirements.
MMF.
NOTIFICATION
LIVE CHAT
143._______ is a diagram
shows all relevant systems where the relationships between
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
Ecosystem map.
Matrix.
None of these.
144.________ shows direct system and human interfaces to system within a solution
shows in-scope systems and I/O including systems or actors providing or receiving
them
Usage.
Ecosystem map.
Context diagram.
None of these.
145._______ shows the system under development in the center of circle, interfacing
systems as boxes and line connecting them to show actual interface and data passes
between them
Context diagram.
Ecosystem map.
Context diagram.
None of these.
146._______ is the visual representation of all the features of solution arranged in tree
or hierarchical structure where the structure can be horizontal or vertical
Context diagram.
Feature model.
Ecosystem map.
None of these.
NOTIFICATION
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
147._________ shows all in-scope use cases for a system which represented by oval
with
its name
Menu
(../)of use case within diagram
Features.
Connection.
Use case.
None of these.
Use case.
Ecosystem map.
None of these.
149.BA unable to identify the business needs using tracing method and decides to
prefer another method. Identify the situation/condition of an organization
Requirement can be relevant but there may be an incorrectly stated problem or
missing objective.
Without dened requirements, end product, service or result are not add the
value .
Objective is misaligned with current project which belongs to be eliminated.
All the above.
150.______ provides a means to track requirements for entire project lifecycle where it
ensures approved requirements delivered at the end of the project
Requirements.
NOTIFICATION
Traceability.
0
Adaptive projects.
None of these.
LIVE CHAT
Answer : TraceabilityMY
Explanation
:
TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
151.What are the other factors included to determine the optimal amount of
traceability in a project lifecycle
Organizational policies.
Business process.
Traceability degree.
None of these.
152._______ is the responsible for managing project scope where BA is responsible for
managing product scope
Product owner.
Project manager.
Stakeholder.
None of these.
Traceability matrix.
CUBE matrix.
Stakeholder analysis.
RACI matrix.
NOTIFICATION
Traceability matrix.
None of these.
LIVE CHAT
Answer : TraceabilityMY
matrix
:
TESTSExplanation
(HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu (../)
155.In _______, the requirement attributes helps to dene key information about
requirements
RACI matrix.
Traceability matrix.
BCG Matrix.
Need theory.
157.In traceability matrix, number of ____ are selected should be appropriate for the
needs of the organization and chosen project life cycle
Entity.
Requirements.
Attributes.
None of these.
NOTIFICATION
traceability
approach
LIVE CHAT
Organization change.
None of these.
Organization culture.
Organization matrix.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
Answer(../)
: Organization culture Explanation :
No explanations for this question.
Informal.
Logical.
Conict.
161._______ helps to evaluate new requirements against associated with high-level and
lower-level requirements when they are added for alignment in all directions
Organization matrix.
BCG matrix.
Stakeholder analysis.
Traceability matrix.
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu
(../)
None
of these.
Business stakeholders.
Business components.
Traceability matrix.
Organization matrix.
None of these.
Dependency analysis.
BCG matrix.
None of these.
165.Dene subset
requirement may be a subset of another requirement.
Requirement links between two variables.
Traceability considered being complete.
None of these.
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
Traceability matrix.
Traceability analysis.
None of these.
Approval requirements.
Verbal requirements.
Approval process.
169.By determining _________ in early stages, it helps to avoid conicts later when
approval are being sought
Implementation process.
Approval process.
NOTIFICATION
Execution process.
Document process.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
170._________ is one of many organizational environmental factors lie outside the
control of the project team and constrains the project team's options
Work authorization system.
Authorization process.
Authorization process.
171.________ states the process for authorizing work where it includes process steps,
documents, tracking systems and approval levels.
Work authorization system.
Authorization process.
Authorization process.
Authorization level.
Approval level.
None of these.
173._________ provide detail regarding the authority to approve new and changed
requirements A. Approval level B. Authorization level C.Decision approval level D. None
of these
A and B.
B and
0 C.
NOTIFICATION
C and D.
A and D.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
174._____ is designated as the only person responsible for signoff in approval process
Reviewer.
Sponsor.
Owner.
None of these.
Product owner.
Business stakeholder.
None of these.
176.______ can review the requirements but not authorized to approve or reject
requirements
Developer.
Sponsor.
Tester.
Reviewer.
Rejection.
0
Answer : Rejection Explanation
:
NOTIFICATION
Controlled.
Documented.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
Customer.
Social responsibility.
179.Project goals and objectives are associated with one or more _______ to dene the
solutions
KRI.
KPI.
Performance metrics.
NPV.
0
NOTIFICATION
Answer
: Actual project cost Explanation :
IRR.
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
182.Identify the method to determine actual project costs used for input for nancial
evaluations of solutions
Repo rate.
Return on investment.
Quick ratio.
Debt ratio.
183.______ are derived from measurements of cost, effort and duration in evaluation
process
Tracking.
Project volatility.
Metrics.
Tracking.
184.______ is one of the important metrics for many organization while evaluating
projects where they don't evaluate the solution
Return on investment.
Earned values.
Debt ratio.
None of these.
Evaluations method.
None of these.
No explanations
for this question.
NOTIFICATION
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
186.________ is the status of requirement to track the project progress may or may not
Menu
reect
the (../)
completeness of solutions and its purpose
Analysis.
Tracking.
Indicators.
KPI.
187.________ the number of defects are determined and the number have been xed is
indicative of effort to address quality
Analysis.
Tracking.
Indicators.
KPI.
188.______ are expressed in terms of burn-down and velocity of the project where it
reects the efciency of the project and delivered
Metrics.
Measurements.
Tracking.
KPI.
None of these.
NOTIFICATION
LIVE CHAT
MUHAMMAD BILAL
Menu (../)
Evaluation.
Tracking.
KPI.
Management metrics.
Marketing metrics.
Customer metrics.
192._______ for overall increased market share or range for percentage increase in the
amount of business done with existing customers
Original values.
CRR.
Expected values.
KPI.
Marketing metrics.
Operational metrics.
None of these.
NOTIFICATION
LIVE CHAT
Functional requirements.
Nonfunctional requirements.
MUHAMMAD BILAL
Scalability.
Benchmarking.
Menu
(../)
Answer : Nonfunctional requirements Explanation :
No explanations for this question.
Nonfunctional requirements.
Scalability.
Benchmarking.
196._________ is performed at the end of every iteration, sprint or release when the
team provides production-ready functionality for stakeholders
Iteration.
Validation.
Evaluation.
None of these.
Focus groups.
Actual results.
198.Goals
and objectives serves a good clues where needs to be measured in ________
NOTIFICATION
LIVE CHAT
Planning.
Evaluation.
Implementation.
Analysis.
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
MUHAMMAD BILAL
Menu
(../)
No explanations
for this question.
Shareholders.
KPI.
None of these.
200._________ are used to evaluate an organizations progress in achieving its goals and
objectives
Benchmarking.
Organisation policy.
None of these.
SCORES : 0/200
LIVE CHAT
MY TESTS (HTTP://WWW.LEARNCERTIFICATION.COM/PROFILE/MYTESTS)
Home (http://www.learncertication.com/)
MUHAMMAD BILAL
2015 by Learncertication (http://www.learncertication.com/) All Rights Reserved. The certication names are the