Timeline (Final Defense) : December January February W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 (21) W4

This timeline outlines the process for a final defense of a thesis over December, January, and February, including securing materials, preparing and casting cylinder samples to cure for 7, 14, and 28 days, compressive strength testing, analyzing results, writing and submitting the thesis, revisions, and final defense by week 3 of February.

Uploaded by

Hassan Sabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Timeline (Final Defense) : December January February W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 (21) W4

This timeline outlines the process for a final defense of a thesis over December, January, and February, including securing materials, preparing and casting cylinder samples to cure for 7, 14, and 28 days, compressive strength testing, analyzing results, writing and submitting the thesis, revisions, and final defense by week 3 of February.

Uploaded by

Hassan Sabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Timeline (Final Defense)

ACTIVITY

Secure materials and equipment


Preparation of cylindrical forms
Crushing of glass into desired particle sizes
Casting of cylinder samples for 28 day
specimen
Curing of Specimen
Casting of cylinder samples for 14 day
specimen
Casting of cylinder samples for 7 day specimen
Compressive strength testing of cylinder
samples
Analysis of results
Writing of Thesis
Submission of Hardbound Thesis
Final Defense
Writing of revisions for thesis
Submission of Thesis

W1

DECEMBER
W2
W3

W4

W1

JANUARY
W2
W3

W4

W1

FEBRUARY
W2
W3(21)

W4