Knowledge Balancing System
Knowledge Balancing System
air system
Roger D. Holder MSME
Flat Oval
20 Duct Friction loss
20 Duct Velocity
21 Balancing devices
Volume dampers
Turning vanes
23 Air Balancing Tolerances
24 Dual-Duct systems
25 VAV system
26 Fan tracking
26 Volumetric tracking
26 Plenum Pressurization tracking
27 Induction systems
28 Duct system pressure
Static pressure
Velocity pressure
Total pressure
29 Calculation of CFM from Heat flow
Air Density
Enthalpy
47 Kitchen Ventilation
Air Balancing
Multiple Hood system
87 Series Loop
88 One pipe main
90 Primary-Secondary
Preliminary Procedures
1. Review contract documents and plans for all of the HVAC system.
2. Review approved shop drawing and equipment submittals.
3. Prepare system schematics.
4. Insert preliminary data on test report forms.
5. Review electrical characteristics of equipment and assure that safety controls are
operating and that all motor starters have the proper heater coils or overload protection.
6. Review completely the systems ready to be balance and verify that all balancing
devices have been installed.
7. Confirm that all HVAC and temperature control system have been tested, strainers
cleaned, systems flushed, etc., and are ready to be balance. Clean or temporary air filters
should be in place as specified.
8. Confirm that all building components, such as ceiling plenums that affect system
balance, are in place and sealed, and that all windows, door, etc., are installed and
closed.
9. Confirm that all instruments are in good order.
Inspect the job site to see that the building is architecturally ready for balancing. For
instance, are all the walls, windows, door, and ceilings installed? If the conditioned
space isnt architecturally sealed, abnormal pressures and temperatures will adversely
affect the system balance. Next, walk the air and water distribution system to ensure that
they are intact, and arent missing components such as dampers, valves, pressure and
temperature taps, coils, terminal boxes, diffusers, grilles, etc. Lastly, inspect the
equipment. Check that motors, fans, pumps, chillers, compressors, boilers, drives, etc.
are mechanically and electrically ready. The following is a general list of items to be
checked.
Boiler
1. All operating and safety setting for temperature and pressure are correct.
2. Pressure relief valve functional.
3. Boiler started and operating properly.
Chiller and Condenser
1. All operating and safety settings for temperature and pressure are correct.
2. Chiller, condenser started, and operating correctly.
Electrical
1. Motors wired and energized.
2. Proper starter and overload protection installed.
3. Correct fuses installed.
4. Motors properly secured on their frames.
5. Motor bearings lubricated.
Controls
1. Controls complete and functional.
2. Make initial tests on all fans and pump applicable to the system being balanced.
3. Balance and adjust the distribution system.
4. Adjust the fan or pump as needed.
5. Take final reading.
6. Complete reports.
13. Measure and record all required outdoor air, return air, mixed air, and supply air dry
bulb a wet bulb temperatures. Measure and record all plenum static pressures.
14. Measure and record all coil entering air and leaving air dry bulb and wet bulb
temperatures. Measure and record all coil pressure differentials.
15. Measure and record final fan motor full load amperages and voltages.
16. If the airflow is low, proceed with a proportional balancing. Proportional balancing
is purporting the air equally by dividing the total airflow by the design airflow to get the
percentage of airflow. Then multiplying the percentage of airflow to the design airflow for
the percentage of air to set to.
Waterside procedures
1. Continually check system and vent air from high points and circuits with lower flows
during hydronic balancing. Periodically check and clean strainers.
2. Using pump shutoff head, verify each pump head, operating curve and impeller size.
3. Adjust pump to design flow and record data.
4. Adjust boilers and or chillers to design flows and temperatures and record data. If the
Pump is pumping water to coils first start there, always fallow the piping.
5. If flow-measuring devices are used, record the flow data throughout the system before
adjusting the system.
6. Measure and record pressure drops through all coils and or units. Compare with
submittal data for high and low flows.
7. Adjust high flows to near design.
8. Adjust pump flow to design and check pressures, amperages and voltages.
9. Set bypass balancing cocks to 90% of maximum flow through coils that have threeway control valves.
10. Repeat the above procedures until all coils and units are operating within 10% of
design. When coils in parallel are above five coils, balance the coil nearest to the pump
to the coil at the end of the piping. The first coil is set at 80% to 85% of design flow
depending on the number of coils; increase the percentage equally for each coil to the
end of piping, then check the first coil flow.
11. Measure and record final pump pressure, amperages, and voltages.
12. Measure and record all coil and or unit pressure drops entering and leaving water
temperatures.
13. Measure and record all data from all flow measuring devices.
Airflow Measurement
CFM = cubic feet per minute
FPM = velocity in feet per minute
FT = area in foot square
15
Example 3: Find the nearest standard size round duct to handle 4600 cfm at a velocity of
1000 fpm.
Solution
Area of the duct in ft is equal to: Airflow cfm / Velocity fpm
Food square to inch square is equal to: ft X 144 = in
In to duct radius is equal to: square root of; area in / (3.14)
Radius to diameter is equal to: radius X 2 = diameter
4600 cfm / 1000 fpm = 4.6 ft
4.6 ft X 144 = 662.4 in
662.4 in / 3.14 = 210.95
of 210.95 = 14.52
14.52 X 2 = 29.05
29.05 diameter of a duct for 4600 cfm at 1000 fpm
Duct Flow
The preferred method of measuring duct volumetric flow is the pitot-tube traverse
average. The maximum straight run should be obtained before and after the traverse
station. To obtain the best duct velocity profile, measuring points should be located as
shown in Chapter 14 of the 2001 ASHRAE HandbookFundamentals and ASHRAE
Standard 111. When using factory-fabricated volume-measuring stations, the
measurements should be checked against a pitot-tube traverse.
Power input to a fans driver should be used as only a guide to indicate its delivery; it
may also be used to verify performance determined by a reliable method (e.g., pitot-tube
traverse of systems main) that considers possible system effects. For some fans, the
flow rate is not proportional to the power needed to drive them. In some cases, as with
forward-curved-blade fans, the same power is required for two or more flow rates. The
backward-curved-blade centrifugal fan is the only type with a flow rate that varies directly
with the power input.
For traverses taken in round duct equal to or less than 10" (250 mm) in diameter, a l/8" (3
mm) diameter Pitot tube shall be used. The 1/8" (3 mm) diameter Pitot tube must be
marked so that 12 velocity pressures (six for each hole) can be taken at the center of
equal concentric areas. Pitot tube locations for traversing the round duct with 12
readings are given in Figure 3.2:
For any duct with a side greater than 100 (2400 mm), the maximum distance between
holes shall not exceed 12 (300 mm). For all readings, the corner reading shall be located
l/2 the distance between readings. For example, a 12 (300 mm) duct width will have 3
readings 4 (100 m) apart with the first reading taken 2 (50 mm) from the duct wall.
If the width of rectangle EF to GH as shown in Figure 3.4 is less than the diameter of the
semi-circle (Line EG), then traverse as a circle using the Equal Area Method (Figure 3.1 or
3.2) at (A-B) and (C-D). The area of the oval will be computed by adding the area of the
circle to the area of the rectangle.
If the width of rectangle EF to GH as shown in Figure 3.5 is greater than or equal to the
diameter of the semi-circle (Line EG), then traverse as a rectangle (Figure 3.3). For the
two semi-circles traverse the plane (A-B) and (C-D) using the spacing shown in round
duct traverse (Figures 3.1 or 3.2). The area will be computed by adding the area of the
circle to the area of the rectangle.
.06
10
12
14
16
18
20
22
52
85
123
175
240
320
505
775
1100
1500
1940
2450
60
97
143
210
270
365
600
900
1390
1725
2290
2950
68
109 162
240
315
420
690
1000
1460
1975
2610
3150
75
120 178
255
345
485
750
1110
1600
2200
2900
3600
84
130 195
270
387
510
830
1200
1750
2400
3180
3950
.08
.10
.12
.14
10
12
14
16
18
20
22
600
83
120
160
208
265
330
475
650
850
1040
1300
1600
800
110
160
210
280
350
440
625
850
1150
1600
1750
2100
1000
138
195
265
345
440
550
790
1090
1400
1780
2190
2420
FPM
If an installation has an inadequate straight length of ductwork or no ductwork to allow a pitottube traverse, the procedure from Sauer and Howell (1990) can be followed: a vane
anemometer reads air velocities at multiple points across the face of a coil to determine a loss
coefficient.
Volume Dampers
Balancing dampers are a primary component in duct systems, and their importance should not
be ignored. Balancing dampers are used to control the volume of airflow in the system by
creating a resistance to flow. Balancing dampers can produce unnecessary resistance and
noise problems, and will not control the air as intended if improperly selected,
located, installed, or adjusted.
The relationship between the position of a damper and its percentage of airflow with respect to
the airflow through a fully open damper is termed its flow characteristic.
Opposed-blade dampers are generally recommended for large ducts because they provide
better control of the airflow, and therefore have better flow characteristics than parallel blade
dampers. The actual effect of closing a damper can only be determined from field
measurements. Proper location of balancing dampers not only permits efficient air distribution
but also equalizes the pressure drops in the different airflow paths within the system (Figure
6.1). Manually operated opposed-blade or single-blade, quadrant-type volume dampers must be
installed in every zone duct of a multi-zone system and each branch duct takeoff to control the
amount of air entering the branch.
Manual dampers should be provided in each branch takeoff to control the airflow to grilles and
diffusers. Single-blade or opposed-blade volume dampers located immediately behind diffusers
and grilles should not be used for balancing because when throttled they create noise, change
the flow factor, can be easily tampered with and are an unnecessary expense. Proper
installation and location of balancing dampers in the takeoffs eliminates the need for volume
controls at grilles and diffusers. Each damper should be adjustable with a locking quadrant
handle or regulator and end bearings that have sufficient strength and rigidity for the pressures
being controlled. The locking quadrant must be located outside the vapor seal of the insulation.
Generally, parallel-blade dampers are used in mixing plenum applications, and opposed-blade
dampers are used in a volume-control application. It should be noted that only a slight opening
of an opposed blade volume damper might generate a relatively high noise level as the air
passes through. To minimize generated duct noise at volume dampers, dampers should be
located at least two duct diameters from a fitting and as far as possible from an outlet/inlet.
A spin-in collar with a volume damper is used to make a run out to a grille or diffuser. They can
be conical, bell mouth, flanged or notched. They should be used for ducts with velocities below
and under 0.50 static pressure. The round damper must have a square rod
1000 fpm (5.1
with end bearings and standoff for externally insulated ducts and locking quadrants. The square
rod must be continuous for all dampers 12 (300 mm) and above. The damper should also be
stiffened to prevent movement in the airstreams.
Splitter devices offer little or no control of air volume in ducts. They should be regarded as air
diverters only with maximum effectiveness when present in duct systems exhibiting low
resistance to airflow. When used as a diverter, splitter devices must have at least one push rod
with a locking device. The push rod must be connected to the leading edge of the splitter at 90
degrees to the blade, not controlled by the quadrant handle on the pivot shaft. Splitter devices
should be long enough to divert the airflow in the duct. As a minimum, the length should be
twice the size of the smallest throat of the nested connection.
The use of adjustable extractors (Figure 6.2) is not generally recommended because they can
cause turbulence in the main trunk line, thereby increasing the system total pressure and
affecting the performance of other branch outlets downstream. Extractors are not balancing
devices and should not be used at branch or main duct takeoffs to provide volume control.
Extractors are principally used to divert air to branch ducts when they are the full height of the
duct.
Turning vanes (Figure 6.3) reduce the pressure loss and provide a uniform velocity distribution
downstream from mitered rectangular elbows when smooth radius rectangular elbows are not
used. Turning vanes should be installed so that the air entering and leaving the vanes is parallel
to the duct walls. Double thickness or single thickness with a trailing (extended) edge turning
vanes should be used in all rectangular elbows.
Dual-Duct Systems
Most constant-volume dual-duct systems are designed to handle part of the total
systems supply through the cold duct and smaller air quantities through the hot duct.
Balancing should be accomplished as follows:
1. Determine the required maximum air volume to be delivered by the supply and return
air fans. Load diversity usually means that the volume will be somewhat less than the
outlet total.
2. Obtain fan curves on these units, and request information on surge characteristics
from the fan manufacturer.
3. If inlet vortex damper is used, obtain the fan manufacturers data on damper control
(deaeration) of the fan when used with the damper. If speed control is used, find the
maximum and minimum speed that can be used on the project.
4. Obtain from the manufacturer the minimum and maximum operating pressures for
terminal or variable-volume boxes to be used on the project.
5. Construct a theoretical system curve, including an approximate surge area. The
system curve starts at the boxes minimum inlet static pressure, plus system loss at
minimum flow, and terminates at the design maximum flow. The operating range using
an inlet vane damper is between the surge line intersection with the system curve and
the maximum design flow. When variable speed control is used, the operating range is
between.
1. The minimum speed that can produce the necessary minimum box static pressure at
minimum flow still in the fans stable range
2. The maximum speed necessary to obtain maximum design flow
6. Position the terminal boxes to the proportion of maximum fan air volume to total
installed terminal maximum volume.
7. Set the fan to operate at approximate design speed (increase about 5% for a fully open
inlet vane damper).
8. Check a representative number of terminal boxes. If static pressure varies widely, or if
airflow at several boxes is below flow, check every box.
9. Run a total air traverse with a pitot tube.
10. Increase speed if static pressure and/or volume are low. If volume is correct but
static is high, reduce speed. If static is high or correct but volume is low, check for
system effect at the fan. If there is no system effect, go over all terminals and adjust them
to the proper volume.
11. Run Steps (7) through (10) with the return or exhaust fan set at design flow as
measured by a pitot-tube traverse and with the system set on minimum outside air.
12. Proportion the outlets, and verify design volume with the VAV box on maximum flow.
Fan Tracking
As supply system airflows and pressures change, consideration must be given as to how
the return air, outside air and relief air track.
Volumetric Tracking
Volumetric tracking is the preferred method of measurement. Tracking is accomplished
by measuring the airflows of two fan systems. This maintains a difference for constant
minimum outside air volume and building pressurization. Fan selection is critical to
prevent surges or unstable operation of the controls. Surge can occur as the fan
approaches a point where there is insufficient air entering the fan wheel to completely fill
the space between the blades. Surge will be indicated by a fluctuation in CFM and static
pressure, and will create a noisy operation.
Sizing of the calibrated airflow station is also critical in the air handling unit operation.
Unstable operation of controls occurs when the velocity drops below 600 fpm (3 m/s)
where the air measuring station is out of range. Most transducers require at least 0.02wc
of pressure to operate properly. Consideration must also be made on the high end to not
exceed the transducers range.
maximum out-side air damper for economizer is controlled by mixed air temperature.
Prior to setting, the plenum pressure tracking, the supply, return and exhaust system
must be balanced. The supply duct static pressure set point is measured and recorded
(Point A) (Figure 10.1). With the system set for maximum airflow, return air damper
closed, economizer and relief air dampers 100% open, set the return/relief airflow, adjust,
measure and record. Read and record the discharge air static pressure of the return/
relief fan (Point B), which will be the static pressure controller set point. Set the building
pressure controller to maintain and control the relief air dampers. Read and record the
set point. Release the economizer dampers and set to minimum outside condition. Adjust
the mixed air pressure sensor to obtain the minimum outside air. Read and record the
mixed air pressure sensor set point (Point C).
Set the supply system to minimum airflow and verify the mixed air pressure sensor is
controlling by measuring and recording system static profiles with the system at
maximum, a midpoint and minimum airflow.
Induction Systems
Most induction systems use high-velocity air distribution. Balancing should be
accomplished as follows:
1. For apparatus and main trunk capacities, perform general VAV balancing procedures.
2. Determine primary airflow at each terminal unit by reading the unit plenum pressure
with a manometer and locating the point on the charts (or curves) of air quantity versus
The three duct pressure that technicians measure in the field are total pressure (TP),
static pressure (SP), and velocity pressure (Vp). The three pressures are related by the
following equation:
Total pressure in w.g. (TP) = Static pressure in w.g. (SP) + Velocity pressure in w.g. (Vp)
Static pressure
Static pressure (SP) is exerted equally in all directions at any point or cross section of
the duct. It also is a measure of the potential energy to produce and maintain airflow
against duct resistance. Static pressure may be positive or negative to the atmosphere,
but it can be measured indirectly by subtracting the velocity pressure from the total
pressure (SP = TP Vp).
Velocity pressure
Velocity pressure (Vp) is exerted only in the direction of airflow and is a measure of
kinetic energy resulting from the airflow. Velocity pressure cannot be measured directly
by a pitot tube and pressure gauge or manometer, but it can be measured indirectly by
subtracting the static pressure from the total pressure (Vp = TP SP).
Vp = (Velocity in fpm / 4005)
Total pressure
Total pressure (TP) of a duct is measured by the impact of the moving air stream on the
end of a Pitot tube directly facing and perpendicular to the airflow. Total pressure
determines how much energy is in the airflow at any point in the system. Total pressure
always decline in value from the fan to any terminal device (diffuser or grille), but it can
be measured indirectly by adding the static pressure to the Velocity pressure (TP = SP +
Vp).
Example 4: A 48 X 16 in. duct handles 10,700 cfm at 2.3 in. w.g. static pressure. Find the
total pressure and velocity pressure of the duct.
Velocity fpm = cfm / area in ft
Velocity pressure = (velocity fpm / 4005)
Total pressure = static pressure + velocity pressure
10,700 cfm / (48 X 16 / 144) = 2006 fpm
(2006 fpm / 4005) = 0.25 in. w.g. velocity pressure
2.3 in. w.g. static pressure + 0.25 in. w.g. velocity pressure = 2.55 in. w.g. total pressure
External factors affect coil performance. Principal among these are the circulation,
velocity, and distribution of air in the refrigerated space and over the coil. These factors
are closely related and in many cases is dependent one on the other.
Heat from the product or condition space is carried to the evaporator by air circulation.
When air circulation is inadequate, heat is not carried from the product or condition
space to the evaporator at a rate sufficient to allow the evaporator to perform at peak
efficiency or capacity. It is important also that the circulation of air is evenly distributed
in all parts of the refrigerated space and over the coil. Poor distribution of the air
circulating can result in uneven temperatures and dead spots in the air condition space.
Uneven distribution of air over the coil surface causes some parts of the surface to
function less efficiently than other and lowers evaporator capacity and efficiency.
When air velocity is low, the air passing over the coil stays in contact with the coil
surface longer. More heat is removed and is cooled with a greater range. Thus, the
temperature difference increases, the refrigerant temperature decreases, resulting in a
loss of capacity and efficiency because the rate of heat transfer is lowered. As air
velocity increases, a greater quantity of air is brought into contact with the evaporator
coil. Consequently, the temperature difference decreases, the refrigerant temperature
increases, resulting in a gain of capacity and efficiency because the rate of heat transfer
is increases.
Air volume change across the coil will increase or decrease the refrigerant temperature
that increases or decreases the efficiency and capacity of a system. Increasing the heat
by increasing the airflow or increasing the evaporating coil size by 10% will be decrease
of water removed from the air by 2% to 4%, but there will be a 4% to 8% capacity
increase. This will result in a change of the load in the system from a 72% to 74%
sensible heat increase and from a 28% to 26% latent heat decrease. An increase of the
refrigerant temperature of 1F will increase compressor efficiency by 1% to 2%.
The reason for the increase in heat and the increase in refrigeration temperature is due to
the increasing size and/or airflow of the overall coil. Over size an evaporating coil or
increase airflow, decreases the water removing capacity of a coil.
Decrease heat by a decrease of airflow or an evaporating coil size by 10% will result in a
2% to 4% increase of water removed from the air, will cause a 4% to 8% capacity
decrease. The capacity decrease results in a 72% to 70% decrease of sensible heat
change to the load in the system, thereby causing a 28% to 30% latent heat increases. A
decrease of the refrigerant temperature of 1F will decrease compressor efficiency by 1%
to 2%.
The decrease compression efficiency is caused by the decrease in heat, and the
refrigeration temperature that is due to the decreasing size and/or airflow of the overall
coil. Under sizing an evaporating coil or a decrease of refrigerant temperature, increases
Lowering the refrigeration below the airs dew point in an existing evaporator coil to
remove more water from the air or to increase water-removing capacity. This can be
done by lowing the airflow or downsizing the coil but not increasing the coil size. The
coolest refrigerant temperature is 34 degrees (no ice on the coil).
It is possible to check the airflow of a Fan coil by knowing the air entering and the
leaving air-dry bulb and well bulb temperature.
Calculation of heat
Calculation of heat movement from the air to the refrigerant is done by the loss of heat in
the air. Air that enters the evaporator has heat. This heat is called the enthalpy of the air.
Enthalpy of air is defined as the sum of the internal energy of the air. Air heat is called
Enthalpy because it is a combination of sensible and latent heat. Sensible heat raises or
lowers the temperature of the air. Latent heat adds or removes the water from the air.
The formula for this heat movement is.
Btuh is the total heat that has been removed from the air. In a water system the total heat
add to the water in a fan coil or a chiller is equal to
Btuh = GPM X 60 X 8.337 X Temperature water
Air Density
Air density is defined as the mass per unit volume of air. As the temperature of a given
mass of air increases, its volume increases [i.e. thermal expansion] and its density
decreases. As the temperature of a given mass of air decreases, its volume decreases
and its density increases.
100F dry bulb and 30% RH a 1lb of air is 14.4F a density of 0.0694
62F dry bulb and 30% RH a 1lb of air is 13.2F a density of 0.0757
As the relative humidity increases at a given temperature the given mass of air increases
and its, volume increases and density decreases. As the relative humidity decreases at
a given temperature, the given mass of air and volume decreases and its density
increases.
76F dry bulb and 100% RH a 1lb of air is 13.9F a density of 0.0719
76F dry bulb and 0% RH a 1lb of air is 13.5F a density of 0.0740
The Foot for one pound of air must be located first before air density can be calculated
using the formula. Air density is equal to one pound of air divided by the foot per pound
of air (Air Density = 1lb / ft). One pound of air changes its Foot with the dry and wet
bulb (See Table 8A, 8B). The formula of total heat uses the air density of the air leaving
the evaporator. To using, Table 8 A&B for ft and 9 A to C for air density.
To use table 8:
(1) Measure the dry bulb temperature with a digital thermometer of the air leaving the
evaporator.
(2) Measure the wet bulb (water vaporization temperature) temperature with a digital
sling psychrometer of the air leaving the evaporator.
(3) Find the measured indoor entering dry bulb temperature on the left side of the table
and the wet bulb temperature on top line.
(4) Where the lines cross is the Foot. See table 8A & 8B
(5) Divide the Foot by 1 pound for air density.
See Table 9 and 9B & 9C for air density
62F dry bulb and 46 wet bulb 1lb of air is 13.21F with a density of 0.0756
Foot of one pound of air
Table 8A
Dry Bulb on left, Wet Bulb on top
70
68
66
64
62
60
58
56
54
52
50
48
46
44
70
13.69 13.65 13.62 13.59 13.56 13.54 13.51 13.49 13.46 13.44 13.42 13.39 13.37
13.35
69
13.63 13.60 13.57 13.54 13.52 13.49 13.46 13.44 13.42 13.39 13.37 13.35
13.33
68
13.61 13.58 13.55 13.52 13.49 13.67 13.44 13.42 13.39 13.37 13.35 13.33
13.31
67
13.56 13.53 13.50 13.47 13.45 13.42 13.40 13.78 13.35 13.33 13.31
13.29
66
13.54 13.51 13.48 13.45 13.43 13.40 13.38 13.36 13.33 13.31 13.29
13.27
65
13.49 13.46 13.43 13.41 13.38 13.36 13.33 13.31 13.29 13.27
13.25
64
13.47 13.44 13.41 13.39 13.36 13.34 13.31 13.29 13.27 13.25
13.23
63
13.21
62
13.19
61
13.17
60
13.15
Table 8B
Dry Bulb on left, Wet Bulb on top
60
58
56
54
52
50
48
46
44
42
40
38
65
13.43
13.40
13.38
13.35
13.33
13.31
13.29
13.27
13.25
13.23
64
13.41
13.38
13.36
13.33
13.31
13.29
13.27
13.25
13.23
13.21
63
13.39
13.36
13.34
13.31
13.29
13.27
13.25
13.23
13.21
13.19
13.17
62
13.37
13.34
13.32
13.29
13.27
13.25
13.22
13.21
13.19
13.17
13.15
61
13.35
13.32
13.29
13.27
13.25
13.23
13.21
13.19
13.17
13.15
13.13
60
13.33
13.30
13.27
13.25
13.23
13.21
13.19
13.17
13.15
13.13
13.11
59
13.28
13.25
13.23
13.21
13.19
13.17
13.15
13.13
13.11
13.09
13.08
58
13.26
13.23
13.21
13.19
13.17
13.15
13.13
13.11
13.09
13.07
13.05
57
13.21
13.19
13.17
13.15
13.13
13.11
13.09
13.07
13.05
13.03
56
13.19
13.17
13.15
13.13
13.11
13.8
13.07
13.05
13.03
13.01
55
13.15
13.13
13.11
13.08
13.06
13.04
13.03
13.01
12.99
12.97
54
13.13
13.11
13.08
13.06
13.04
13.03
13.01
12.98
12.97
12.95
53
13.08
13.06
13.04
13.03
13.00
12.98
12.97
12.95
12.93
52
13.06
13.04
13.03
13.00
12.98
12.96
12.95
12.93
12.91
12.89
51
13.02
13.00
12.98
12.96
12.95
12.93
12.91
12.89
12.87
50
13.00
12.98
12.96
12.94
12.92
12.91
12.88
12.87
12.85
49
12.96
12.94
12.92
12.90
12.88
12.87
12.85
12.83
48
12.94
12.92
12.90
12.88
12.87
12.85
12.83
12.81
47
12.90
12.88
12.86
12.84
12.83
12.81
12.79
46
12.88
12.86
12.84
12.82
12.80
12.79
12.77
45
12.84
12.82
12.80
12.78
12.77
12.75
44
12.82
12.80
12.78
12.76
12.75
12.73
43
12.78
12.76
12.74
12.73
12.71
42
12.76
12.74
12.72
12.71
12.69
41
12.72
12.70
12.69
12.67
40
12.70
12.68
12.66
12.65
39
12.66
12.64
12.63
38
12.64
12.62
12.61
12.60
12.59
36
34
37
60
58
56
54
52
50
48
46
44
42
40
38
36
34
Table 8A & 8B
Air density change with altitudes table 9 is the correction for altitude
Altitude
Altitude
Altitude
Altitude
Altitude
Altitude
0 Feet
1,000 Feet
3,000 Feet
5,000 Feet
7,000 Feet
9,000 Feet
12.0
0.08333
0.08033
0.07467
0.06933
0.06433
0.05958
12.1
0.08264
0.07967
0.07405
0.06876
0.06380
0.05909
12.2
0.08197
0.07902
0.07344
0.06820
0.06328
0.05861
12.3
0.08130
0.07837
0.07285
0.06764
0.06276
0.05813
12.4
0.08065
0.07774
0.07226
0.06710
0.06226
0.05766
12.5
0.08000
0.07712
0.07168
0.06656
0.06176
0.05720
12.6
0.07937
0.07651
0.07111
0.06603
0.06127
0.05675
12.7
0.07874
0.07591
0.07055
0.06551
0.06079
0.05630
12.8
0.07813
0.07531
0.07000
0.06500
0.06031
0.05586
12.9
0.07752
0.07473
0.06946
0.06450
0.05984
0.05543
13.0
0.07682
0.07415
0.06892
0.06400
0.05938
0.05500
13.1
0.07634
0.07359
0.06840
0.06351
0.05893
0.05458
13.2
0.07576
0.07303
0.06788
0.06303
0.05848
0.05417
13.3
0.07519
0.07248
0.06737
0.06256
0.05805
0.05376
13.4
0.07463
0.07194
0.06687
0.06209
0.05761
0.05336
13.5
0.07407
0.07141
0.06637
0.06163
0.05719
0.05296
13.6
0.07353
0.07088
0.06588
0.06118
0.05676
0.05257
13.7
0.07299
0.07036
0.06540
0.06073
0.05635
0.05219
13.8
0.07246
0.06986
0.06493
0.06029
0.05594
0.05181
13.9
0.07194
0.06935
0.06446
0.05986
0.05554
0.05144
14.0
0.07143
0.06886
0.06400
0.05943
0.05514
0.05107
14.1
0.07092
0.06837
0.06355
0.05901
0.05475
0.05071
14.2
0.07042
0.06789
0.06310
0.05859
0.05437
0.05035
14.3
0.06993
0.06741
0.06266
0.05818
0.05399
0.05000
14.4
0.06944
0.06694
0.06222
0.05778
0.05361
0.04965
14.5
0.06897
0.06648
0.06179
0.05738
0.05324
0.04931
14.6
0.06849
0.06603
0.06137
0.05699
0.05288
0.04897
14.7
0.06803
0.06558
0.06095
0.05660
0.05252
0.04864
14.8
0.06757
0.06514
0.06054
0.05622
0.05216
0.04831
14.9
0.06711
0.06470
0.06013
0.05584
0.05181
0.04799
15.0
0.06667
0.06427
0.05973
0.05547
0.05147
0.04767
Altitude
Altitude
Altitude
Altitude
Altitude
Altitude
0 Feet
1,000 Feet
3,000 Feet
5,000 Feet
7,000 Feet
9,000 Feet
Table 9
Altitude correction for Cu ft per 1 pound of Air: Cu ft per 1 pound of Air / Altitude Ratio
Altitude correction for Air density is: Air density X Altitude Ratio
Table 9 B
Air Density at 29.92
Dry Bulb on left, Wet Bulb on top
70
68
66
64
62
60
58
56
54
52
50
48
46
44
0.0731
0.0732
0.0734
0.0736
0.0737
0.0738
0.0739
0.0741
0.0743
0.0744
0.0745
0.0747
0.0748
0.0749
69
0.0733
0.0735
0.0736
0.0738
0.0739
0.0741
0.0743
0.0744
0.0745
0.0747
0.0748
0.0749
0.0750
68
0.0735
0.0736
0.0737
0.0739
0.0741
0.0743
0.0744
0.0745
0.0747
0.0748
0.0749
0.0750
0.0751
67
0.0737
0.0738
0.0740
0.0742
0.0744
0.0745
0.0746
0.0748
0.0749
0.0750
0.0751
0.0752
66
0.0738
0.0739
0.0742
0.0743
0.0745
0.0746
0.0747
0.0749
0.0750
0.0751
0.0752
0.0754
65
0.0741
0.0743
0.0744
0.0746
0.0747
0.0749
0.0750
0.0751
0.0752
0.0753
0.0754
64
0.0743
0.0744
0.0745
0.0747
0.0748
0.0750
0.0751
0.0752
0.0753
0.0754
0.0755
63
0.0745
0.0746
0.0748
0.0749
0.0751
0.0752
0.0753
0.0754
0.0755
0.0757
62
0.0746
0.0747
0.0749
0.0751
0.0752
0.0753
0.0754
0.0755
0.0757
0.0758
61
0.0748
0.0751
0.0752
0.0753
0.0754
0.0755
0.0757
0.0758
0.0759
60
0.0750
0.0752
0.0753
0.0754
0.0755
0.0757
0.0758
0.0759
0.0760
70
Table 9 C
60
58
56
54
52
50
48
46
44
42
65
0.0744
0.0746
0.0747
0.0749
0.0750
0.0751
0.0752
0.0753
0.0754
0.0755
64
0.0745
0.0747
0.0748
0.0750
0.0751
0.0752
0.0753
0.0754
0.0755
0.0757
63
0.0746
0.0748
0.0749
0.0751
0.0752
0.0753
0.0754
0.0755
0.0757
0.0758
0.0759
62
0.0747
0.0749
0.0751
0.0752
0.0753
0.0754
0.0755
0.0757
0.0758
0.0759
0.0760
61
0.0748
0.0751
0.0752
0.0753
0.0754
0.0755
0.0757
0.0758
0.0759
0.0760
0.0762
60
0.0750
0.0752
0.0753
0.0754
0.0755
0.0757
0.0758
0.0759
0.0760
0.0762
0.0763
59
0.0753
0.0754
0.0755
0.0757
0.0758
0.0759
0.0760
0.0762
0.0763
0.0764
0.0765
58
0.0754
0.0755
0.0757
0.0758
0.0759
0.0760
0.0762
0.0763
0.0764
0.0765
0.0767
57
0.0757
0.0758
0.0759
0.0760
0.0762
0.0763
0.0764
0.0765
0.0767
0.0768
56
0.0758
0.0759
0.0760
0.0762
0.0763
0.0764
0.0765
0.0767
0.0768
0.0769
55
0.0760
0.0762
0.0763
0.0764
0.0765
0.0767
0.0768
0.0769
0.0770
0.0771
54
0.0762
0.0763
0.0764
0.0765
0.0767
0.0768
0.0769
0.0770
0.0771
0.0772
53
0.0764
0.0765
0.0768
0.0769
0.0770
0.0771
0.0772
0.0774
52
0.0765
0.0767
0.0768
0.0769
0.0770
0.0771
0.0772
0.0774
0.0775
0.0776
51
0.0768
0.0769
0.0770
0.0771
0.0772
0.0774
0.0775
0.0776
0.0777
50
0.0769
0.0770
0.0771
0.0772
0.0774
0.0775
0.0776
0.0777
0.0779
49
0.0771
0.0772
0.0774
0.0775
0.0776
0.0777
0.0779
0.0780
48
0.0772
0.0774
0.0775
0.0776
0.0777
0.0779
0.0780
0.0781
47
0.0775
0.0776
0.0778
0.0779
0.0780
0.0781
0.0782
46
0.0776
0.0778
0.0779
0.0780
0.0781
0.0782
0.0783
45
0.0779
0.0780
0.0781
0.0782
0.0783
0.0784
44
0.0780
0.0781
0.0782
0.0784
0.0785
0.0786
43
0.0782
0.0784
0.0785
0.0786
0.0787
42
0.0784
0.0785
0.0786
0.0787
0.0788
41
0.0786
0.0787
0.0789
0.0790
40
0.0787
0.0789
0.0790
0.0791
39
0.0790
0.0791
0.0792
38
0.0791
0.0792
0.0793
0.0793
0.0794
0.0767
37
40
38
36
34
Enthalpy
(H1-H2)
Enthalpy of air is defined as the sum of the internal energy of the air. Air heat is called
Enthalpy because it is a combination of sensible and latent heat. Sensible
heat raises or lowers the temperature of the air. Latent heat adds or removes the water
from the air.
The air that enters an evaporator has heat and that heat can be measured by the wet
bulb temperature. Wet bulb is a good indication of the total heat of the air the enthalpy.
x Air at 67F dry bulb and 67F wet bulb has an enthalpy of 31.62.
x Air at 70F dry bulb and 67F wet bulb has an enthalpy of 31.59.
x Air at 80F dry bulb and 67F wet bulb has an enthalpy of 31.51.
x Air at 90F dry bulb and 67F wet bulb has an enthalpy of 31.43.
When calculating the total heat that an evaporator has removed from the air the wet bulb
is taken from the air going in and out of the evaporator ( enthalpy (h1-h2)).
Example 5: using table 11
x Air going in to an evaporator coil at 80F dry bulb and 67F wet bulb has an enthalpy of
31.62.
x Air coming out of an evaporator coil at 62F dry bulb and 57F wet bulb has an enthalpy
of 24.48.The enthalpy (h1-h2) is 31.62-24.48= 7.14 enthalpy.
Table 11
Enthalpy at saturation, Btu per pound of dry air at 29.92
Wet-Bulb (F)
.0
.1
.2
.3
.4
.5
.6
.7
.8
.9
Wet-Bulb (F)
30
10.92
10.96
11.00
11.04
11.08
11.12
11.16
11.20
11.24
11.29
30
31
11.33
11.37
11.41
11.45
11.49
11.53
11.57
11.61
11.65
11.70
31
32
11.76
11.80
11.84
11.88
11.92
11.96
12.00
12.04
12.08
12.12
32
33
12.17
12.21
12.25
12.29
12.33
12.38
12.42
12.46
12.50
12.54
33
34
12.59
12.63
12.67
12.71
12.75
12.80
12.84
12.88
12.92
12.97
34
35
13.01
13.05
13.09
13.14
13.18
13.22
13.27
13.31
13.35
13.40
35
36
13.44
13.48
13.53
13.57
13.61
13.66
13.70
13.74
13.79
13.83
36
37
13.87
13.92
13.96
14.01
14.05
14.10
14.14
14.19
14.23
14.28
37
38
14.32
14.36
14.41
14.45
14.50
14.54
14.59
14.64
14.68
14.73
38
39
14.77
14.82
14.86
14.91
14.96
15.00
15.05
15.09
15.14
15.18
39
40
15.23
15.28
15.32
15.37
15.42
15.47
15.51
15.56
15.61
15.65
40
41
15.70
15.75
15.80
15.84
15.89
15.94
15.99
16.04
16.08
16.13
41
42
16.17
16.22
16.27
16.32
16.32
16.42
16.46
16.51
16.56
16.61
42
43
16.66
16.71
16.76
16.80
16.80
16.90
16.95
17.00
17.05
17.10
43
44
17.15
17.20
17.25
17.30
17.30
17.40
17.45
17.50
17.55
17.60
44
45
17.65
17.70
17.75
17.80
17.85
17.91
17.96
18.01
18.06
18.11
45
46
18.16
18.21
18.26
18.32
18.37
18.42
18.47
18.52
18.58
18.63
46
47
18.68
18.73
18.79
18.84
18.89
18.95
19.00
19.05
19.10
19.16
47
48
19.21
19.26
19.32
19.37
19.43
19.48
19.53
19.59
19.64
19.70
48
49
19.75
19.81
19.86
19.92
19.97
20.03
20.08
20.14
20.19
20.25
49
50
20.30
20.36
20.41
20.47
20.53
20.58
20.64
20.69
20.75
20.81
50
51
20.86
20.92
20.98
21.03
21.09
21.15
21.21
21.26
21.32
21.38
51
52
21.44
21.49
21.55
21.61
21.67
21.73
21.78
21.84
21.90
21.96
52
53
22.02
22.08
22.14
22.20
22.26
22.32
22.38
22.44
22.50
22.56
53
54
22.62
22.68
22.74
22.80
22.86
22.92
22.98
23.04
23.10
23.16
54
55
23.22
23.28
23.34
23.41
23.47
23.53
23.59
23.65
23.72
23.78
55
56
23.84
23.90
23.97
24.03
24.10
24.16
24.22
24.29
24.35
24.42
56
57
24.48
24.54
24.61
24.67
24.74
24.80
24.86
24.93
24.99
25.06
57
58
25.12
25.19
25.25
25.32
25.38
25.45
25.52
25.58
25.65
25.71
58
59
25.78
25.85
25.92
25.98
26.05
26.12
26.19
26.26
26.32
26.39
59
60
26.46
26.53
26.60
26.67
26.74
26.81
26.87
26.94
27.01
27.08
60
61
27.15
27.22
27.29
27.36
27.43
27.50
27.57
27.64
27.70
27.78
61
62
27.85
27.92
27.99
28.07
28.14
28.21
28.28
28.35
28.43
28.50
62
63
28.57
28.64
28.72
28.79
28.87
28.94
29.01
29.09
29.16
29.24
63
64
29.31
29.39
29.46
29.54
29.61
29.62
29.76
29.83
29.91
29.98
64
65
30.06
30.14
30.21
30.29
30.37
30.45
30.52
30.60
30.68
30.75
65
66
30.83
30.91
30.99
31.07
31.15
31.23
31.30
31.38
31.46
31.54
66
67
31.62
31.70
31.78
31.86
31.94
32.02
32.10
32.18
32.26
32.34
67
68
32.42
32.50
32.59
32.67
32.75
32.84
32.92
33.00
33.08
33.17
68
69
33.25
33.33
33.42
33.50
33.59
33.67
33.75
33.84
33.92
34.01
69
70
34.09
34.18
34.26
34.35
34.43
34.52
34.61
34.69
34.78
34.86
70
71
34.95
35.04
35.13
35.21
35.30
35.39
35.48
35.57
35.65
35.74
71
72
35.83
35.92
36.01
36.10
36.19
36.28
36.38
36.47
36.56
36.65
72
73
36.74
36.83
36.92
37.02
37.11
37.20
37.29
37.38
37.48
37.57
73
74
37.66
37.76
37.85
37.95
38.04
38.14
38.23
38.33
38.42
38.51
74
75
38.61
38.71
38.80
38.90
39.00
39.09
39.19
39.28
39.38
39.47
75
76
39.57
39.67
39.77
39.87
39.97
40.07
40.17
40.27
40.37
40.47
76
3. Using a digital sling psychrometer or the sling psychrometer obtain the wet bulb and
dry bulb reading of the air coming out of the fan coil. Leave the psychrometer in the air
until the wet bulb stops moving (this may take 5minutes).
Wet bulb temperature _____________qF
Dry bulb temperature
4. Using the wet bulb temperature find the enthalpy of the air that is going in and out of
the evaporator (table 11) or with the wet and dry bulb temperature use (Table 11B, C or D)
to find the enthalpy.
Enthalpy air in
____________ EP
Table 11B, 11C and 11D are Enthalpy of air at different dry bulb temperature
Table 11A
98
96
95
94
93
92
91
90
89
88
87
86
85
84
100
71.76 68.23
64.87
63.26
61.69
60.16
58.67
57.22
55.80
54.42
53.08
51.76
50.49
49.24
48.03
98
68.26
64.90
63.29
61.72
60.19
58.70
57.25
55.83
54.45
53.11
51.79
50.52
49.27
48.05
64.94
63.32
61.75
60.22
58.73
57.28
55.86
54.48
53.13
51.82
50.54
49.29
48.08
61.78
60.25
58.76
57.31
55.89
54.51
53.16
51.85
50.57
49.32
48.11
58.79
57.38
55.92
54.54
53.19
51.88
50.59
49.35
48.13
55.94
54.56
53.22
51.90
50.62
49.37
48.15
53.24
51.93
50.65
49.40
48.18
50.67
49.42
48.20
96
94
92
90
88
86
84
48.22
83
82
81
80
79
78
77
76
75
74
73
72
71
70
94
46.91
45.76
44.63
43.53
42.45
41.41
40.38
39.38
38.41
37.46
36.52
35.62
34.73
33.87
92
46.94
45.79
44.65
43.55
42.48
41.43
40.41
39.41
38.43
37.48
36.54
35.64
34.75
33.88
90
46.97
45.81
44.68
43.58
42.50
41.45
40.43
39.43
38.45
37.50
36.57
35.66
34.77
33.90
88
46.99
45.83
44.69
43.60
42.52
41.47
40.45
39.46
38.47
37.52
36.59
35.68
34.79
33.92
86
47.02
45.86
44.72
43.62
42.55
41.50
40.47
39.48
38.49
37.54
36.61
35.70
34.81
33.94
Table 11 B
Enthalpy at saturation, Btu per pound of dry air at 29.92
Dry Bulb on left, Wet Bulb on top
84
83
82
81
80
79
78
77
76
75
74
73
72
71
70
86
48.20
47.02
45.86
44.73
43.62
42.55
41.50
40.47
39.47
38.49
37.54
36.61
35.70
34.81
33.94
84
48.23
47.04
45.88
44.75
43.65
42.57
41.52
40.49
39.49
38.51
37.56
36.63
35.72
34.83
33.96
45.90
44.77
43.67
42.59
41.54
40.51
39.51
38.53
37.58
36.65
35.74
34.85
33.98
43.69
42.62
41.56
40.54
39.53
38.55
37.60
36.67
35.76
34.87
34.00
41.58
40.56
39.55
38.57
37.62
36.69
35.77
34.88
34.02
39.57
38.59
37.64
36.71
35.79
34.90
34.03
37.66
36.72
35.81
34.92
34.05
35.83
34.94
34.07
82
80
78
76
74
72
70
34.09
Table 11 C
Enthalpy at saturation, Btu per pound of dry air at 29.29
Dry Bulb on left, Wet Bulb on top
69
68
67
66
65
64
63
62
61
60
59
58
57
56
86
33.10 32.27 31.46 30.67 29.90 29.14 28.40 27.68 26.98 26.29 25.61 24.95 24.31 23.67
84
33.11 32.29 31.48 30.69 29.91 29.16 28.42 27.70 26.99 26.30 25.62 24.96 24.32 23.68
82
33.13 32.30 31.49 30.70 29.93 29.17 28.43 27.71 27.00 26.31 25.64 24.98 24.33 23.70
80
33.15 32.32 31.51 30.72 29.94 29.19 28.45 27.73 27.02 26.33 25.65 24.99 24.34 23.71
78
33.17 32.34 31.53 30.73 29.96 29.20 28.46 27.74 27.03 26.34 25.66 25.00 24.35 23.72
76
33.18 32.35 31.54 30.75 29.98 29.22 28.48 27.75 27.05 26.35 25.68 25.01 24.37 23.73
74
33.20 32.37 31.56 30.77 29.99 29.23 28.49 27.77 27.06 26.37 25.69 25.03 24.38 23.74
72
33.22 32.39 31.58 30.78 30.01 29.25 28.51 27.78 27.07 26.38 25.70 25.04 24.39 23.75
70
33.24 32.41 31.59 30.80 30.02 29.26 28.52 27.80 27.09 26.39 25.71 25.05 24.40 23.76
68
32.42 31.61 30.81 30.04 29.28 28.54 27.81 27.10 26.41 25.73 25.06 24.41 23.78
66
30.83 30.06 29.30 28.55 27.82 27.11 26.42 25.74 25.07 24.42 23.79
64
62
60
Table 11 D
Enthalpy at saturation, Btu per pound of dry air at 29.92
58
57
56
55
54
53
52
51
50
49
48
47
46
45
68 25.06 24.41 23.78 23.15 22.54 21.94 21.36 20.78 20.21 19.66 19.12 18.61 18.09 17.58
66 25.07 24.42 23.79 23.16 22.55 21.95 21.37 20.79 20.22 19.67 19.13 18.62 18.10 17.59
64 25.09 24.44 23.80 23.17 22.57 21.96 21.38 20.80 20.23 19.68 19.14 18.63 18.11 17.59
62 25.10 24.45 23.81 23.18 22.58 21.97 21.39 20.81 20.24 19.69 19.15 18.64 18.12 17.60
60 25.11 24.46 23.82 23.19 22.59 21.98 21.40 20.82 20.25 19.70 19.16 18.64 18.13 17.60
58 25.12 24.47 23.83 23.20 22.60 21.99 21.41 20.83 20.26 19.71 19.17 18.65 18.13 17.61
56
23.84 23.21 22.61 22.00 21.42 20.84 20.27 19.72 19.18 18.65 18.14 17.61
54
22.62 22.01 21.43 20.85 20.28 19.73 19.18 18.66 18.14 17.62
52
50
48
46
18.16 17.64
To calculate the total heat removed from air that has gone through an
evaporator
Use a digital sling psychrometer or a sling psychrometer and; familiarize yourself with its
operation.
(1) Wet the bulb with distilled water for a sling psychrometer; obtain the wet bulb and dry
bulb reading of the air going into the fan coil. Leave the psychrometer in the air until the
wet bulb stops moving (this may take 5 minutes or more).
Wet bulb temperature_____________qF
Dry bulb temperature _____________qF
(2) Using a digital sling psychrometer or the sling psychrometer obtain
the wet
bulb and dry bulb reading of the air coming out of the fan coil. Leave the psychrometer in
the air until the wet bulb stops moving (this may take 5 minutes).
(6) Using the Wet bulb find the enthalpy of the air that is going in and out
evaporator Tables 11
Enthalpy air in
of the
____________ EP
Solution
76 dry bulb and 66wet bulb has a enthalpy of 30.75
58dry bulb and 54wet bulb has a enthalpy of 22.60 and a air density of 0.0757
Air density X 60 X cfm X enthalpy = Btuh
0.0757 X 60 X 4050 X 8.15 = 149,920 Btuh
Example 7: Find the airflow and velocity fpm of a fan coil with a duct of 48 X 36 and a 75
gpm with an entering water of 45 and a leaving water 56. On the airside, the entering air
temperature is 78 dry bulb and 65 wet bulb with a leaving air temperature of 60 dry
bulb and 56 wet bulb.
Solution
Btuh = gpm X 60 X 8.337 X Temperature water
Cfm = Btuh / (air density X 60 X enthalpy (h1-h2)
Kitchen Ventilation
Air Balancing
Balancing is best performed when the manufacturers of all the equipment can provide a
certified reference method of measuring the airflows, rather than depending on generic
measurements of duct flows or other forms of measurement in the field, which can be in
error by 20% or more. The equipment manufacturer should be able to develop a reference
method of measuring airflow in a portion of the equipment that is dynamically stable in
the laboratory as well as in the field. This method should relate directly to airflow by
graph or formula.
and replacement should be shut off, one-step at a time. Each combination of operation
should be rechecked to ensure that design pressures and flows are maintained in each
zone and between zones. This requires that the replacement airflow rate compensate
automatically with each increment of exhaust. It may require some adjustments in
controls or in damper linkage settings to get the correct proportional response.
4. When the preceding steps are complete, the system is properly integrated and
balanced. At this time, all fan speeds and damper settings (at all modes of operation)
should be permanently marked on the equipment and in the test and balance report. Air
balance records of exhaust, supply, return, fresh air, and individual register airflows
must also be completed. These records should be kept by the food service facility for
future reference.
5. For new facilities, after two or three days in operation (no longer than a week and
usually before the facility opens), all belts in the system should be checked and
readjusted because new belts wear in quickly and could begin slipping.
6. Once the facility is operational, the performance of the ventilation system should be
checked to verify that the design is adequate for actual operation, particularly at
maximum cooking and at outside environmental extremes. Any necessary changes
should be made, and all the records should be updated to show the changes.
Rechecking the air balance should not be necessary more than once every 2 years
unless basic changes are made in facility operation. If there are any changes, such as
adding a new type of cooking equipment or deleting exhaust connections, the system
should be modified accordingly.
SYSTEMS PRINCIPLES AND PROCEDURES FOR
Multiple-Hood Systems
Kitchens exhaust systems serving more than a single hood present several design
challenges not encountered with single-hood systems. One of the main challenges of
multiple-hood exhaust systems is air balancing. Because balancing dampers are not
permitted in the exhaust ducts, the system must be balanced by design. Zoning may be
desirable for a balanced design and to improve energy conservation. Hood accessories
are now available to allow balancing at individual hoods. Additionally, most filters come
in varying sizes to allow pressure loss equalization at varying airflows. Some hoods and
grease filters have adjustable baffles that allow airflow to be adjusted at the hood. These
may be helpful for relatively fine balancing, but the system must provide most of the
balancing. System zoning is preferred, because incorrect installation of a multi branch
system can lead to complex problems. Adjustable filters should not be used when they
can be interchanged between hoods or within the same hood because an interchange
could disrupt the previously achieved balance. Balancing can also be accomplished by
changing the number and/or size of filters.
For correct flow through a branch duct in a multiple-hood system, the static pressure
loss of the branch must match the static pressure loss of the common duct upstream
from the point of connection. Any exhaust points subsequently added or removed must
be designed to comply with the minimum velocities required by code and to maintain the
For greatest success with multiple-hood exhaust systems, minimize pressure losses in
the ducts by keeping velocities low, minimizing sharp transitions, and using hoods with
relatively high-pressure drops. When pressure loss in the ducts is low compared to the
loss through the hood, changes in pressure loss in the ductwork because of field
conditions or changes in design airflow will have a smaller effect on total pressure loss
and thus on actual airflow.
Minimum code-required air velocity must be maintained in all parts of the exhaust
ductwork at all times. If fewer or smaller hoods are installed than the design anticipated,
resulting in low velocity in portions of the ductwork, the velocity must be brought up to
the minimum. One way is to introduce replacement air, preferably untempered, directly
into the exhaust duct where it is required (see Figure 13). The bypass duct should
connect to the top or sides (at least 2 in. from the bottom) of the exhaust duct to prevent
backflow of water or grease through the bypass duct when fans are off. This arrangement
is shown in NFPA Standard 96 and should be discussed with the authority having
jurisdiction.
A fire damper should be provided in the bypass duct, located close to the exhaust duct.
Bypass duct construction should be the same as the exhaust duct construction,
including enclosure and clearance requirements, for at least several feet beyond the fire
damper. Means to adjust the bypass airflow must be provided upstream of the fire
damper. All dampers must be in the clean bypass air duct so they are not exposed to
grease-laden exhaust air. The difference in pressure between replacement and exhaust
air
duct may be great; the balancing device must be able to make a fine airflow adjustment
against this pressure difference. It is best to provide two balancing devices in series,
such as an orifice plate or blast gate for coarse adjustment followed by an opposedblade damper for fine adjustment.
Directly measuring air velocities in the exhaust ductwork to assess exhaust system
performance may be desirable. Velocity (pitot-tube) traverses may be performed in
kitchen exhaust systems, but holes drilled for the pitot tube must be liquid tight to
maintain the fire-safe integrity of the ductwork per NFPA Standard 96. Holes should
never be drilled in the bottom of a duct, where they may collect grease. Velocity traverses
should not be performed when cooking is in progress because grease collects on the
instrumentation
Both air- and water-side balance techniques must be performed with sufficient accuracy
to ensure that the system operates economically, with minimum energy, and with proper
distribution. Airside balance requires precise flow measuring because air, which is
usually the prime heating or cooling transport medium, is more difficult to measure in the
field. Reducing airflow below design airflow reduces heat transfer directly and linearly
with respect to waterside flow. In contrast, the heat transfer rate for the waterside does
not vary linearly with the water flow rate through a heat exchanger (coil), because of the
characteristics of heat exchangers. As a result, waterside heat transfer is less sensitive
to changes in flow, and the required accuracy of flow is lower when using traditional
design criteria. The relatively high pressures associated with hydronic systems allow for
easier measurement of pressure, although application of flow and head relationships
should be thoroughly understood.
Hydronic Terminal
Tests of hydronic coil performance show that when flow is throttled to the coil, the
waterside differential temperature of the coil increases with respect to design selection.
This applies to both constant volume and variable-volume air-handling units. In
constantly circulated coils that control temperature by changing coil entering water
temperature, decreasing source flow to the circuit decreases the waterside differential
temperature.
A secondary concern applies to heating terminals. Unlike chilled water, hot water can be
supplied at a wide range of temperatures. Inadequate terminal heating capacity caused
by insufficient flow can sometimes be overcome by raising supply water temperature.
Design below the 250F limit (ASME low-pressure boiler code) must be considered.
Figure 2 shows the flow variation when 90% terminal capacity is acceptable. Note that
heating tolerance decreases with temperature and flow rates and that chilled-water
terminal are much less tolerant of flow variation than hot-water terminals.
Sometimes, dual-temperature water systems have decreased flow during the cooling
season because of chiller pressure drop; this could cause a flow reduction of 25%. For
example, during the cooling season, a terminal that heated satisfactorily would only
receive 30% of the design flow rate.
Although the example of reduced flow rate at t = 20F only affects heat transfer by 10%,
this reduced heat transfer rate may have the following negative effects:
x Object of the system is to deliver (or remove) heat where required. When flow is
reduced from design rate, system must supply heating or cooling for a longer period to
maintain room temperature.
x As load reaches design conditions, the reduced flow rate is unable to maintain room
design conditions.
x Control valves with average range ability (30:1) and reasonable authority (B = 0.5) may
act as on-off controllers instead of throttling flows to the terminal. The resultant change
in riser friction loss may cause overflow or underflow in other system terminals.
Attempting to throttle may cause wear on the valve plug or seat because of higher
velocities at the vena contract of the valve. In extreme situations, cavitations may occur.
Terminals with lower water temperature drops have greater tolerance for unbalanced
conditions. However, larger water flows are necessary, requiring larger pipes, pumps,
and pumping cost.
System balance becomes more important in terminals with a large temperature difference.
Less water flow is required, which reduces the size of pipes, valves, and pumps, as well as
pumping costs. A more linear emission curve gives better system control. If flow varies by
more than 5% at design flow conditions, heat transfer can fall off rapidly, ultimately causing
poorer control of the wet-bulb temperature and potentially decreasing system air quality.
Test Gauges
The most commonly used gauge for measuring pressure in a hydronic system is the
Bourdon tube gauge. The accuracy of the gauge shall be 0.5% of full scale. The gauge
should be selected so the indicated pressure is between the middle and upper half of the
scale. When measuring hydronic differential pressures across any device with a Bourdon
tube gauge, the same gauge shall be used for all readings. Pulsations shall be dampened
to stop fluctuations in the readings. The gauge must be located at the same elevation for
all readings to eliminate the effect of the weight of the fluid in the system at different
heights. The calibration shall be verified by checking against a sheltered gauge prior to
use on every project and dead weight tested on six-month intervals.
Non-Intrusive Meters
These meters strap on to the pipe and use non-intrusive transducers to measure
acoustical signals and determine the flow. The non-intrusive meter may be a fixed meter
or a portable meter.
The transducers must be attached directly to a clean pipe without insulation. The
following must be known regarding the pipe:
x Pipe internal diameter
x Pipe external diameter
x Pipe material
x W Pipe classification
There are two types of non-intrusive meters: the Transit Time meter and the Doppler
meter.
Transit Time
The Transit Time meter is designed for clean liquid applications and is used in HVAC
hydronic flow measurement. The pipe must be free of air. The manufacturers installation
information must be followed to maintain the meters accuracy of 2% of full scale.
Doppler
The Doppler meter is not suited for HVAC system hydronic measurement because it
requires systems handling particulate matter to be accurate.
Venturi
The venturi is a device permanently installed in the pipe that has been calibrated by
measuring the pressure drop against a known flow. Venturis must be located according
to the manufacturer's recommendations to maintain accuracy of 2% (Figure 11.2).
Example 7A
Find the Gpm of a system that has a Cfm of 10,000 with a entering air of 80F Dry bulb,
67F wet bulb and a leaving air of 62F dry bulb , 57.5F wet bulb. The water entering is
45F and leaving is 55F.
80F dry with a 67F wet is a 31.51 enthalpy and 62F dry 57.5F wet is a enthalpy of
24.77 with a air density of 0.0757
Solution
Gpm = Air Density X CFM X Enthalpy / 8.337 X temperature of the water
0.0757 X 10,000 X 6.74 / 8.337 X 10 = 5102.18 / 83.37 = 61.2 GPM
Pressure
Total pressure
Velocity pressure
Example 8: Find the GPM of a 6 pipe SCH 40 with a pressure of 42.45 and a total
pressure of 42.47. Use fig. 11.3 for Gallons per foot
Solution
x Total pressure pressure = velocity pressure
x 1040 X velocity pressure = FPM
x FPM X Gallons per foot = GPM
x 42.47 total pressure 42.45 pressure = 0.02 velocity pressure
x 1040 X 0.02 = 147.08 FPM
x 147.08 FPM X 1.5 Gallons per foot = 220.62 GPM
Example 9: Find the ton of a chiller of example 8 with an entering water of 55.8 F and a leaving
water of 45.2 F.
Solution 1
x Tons = GPM X 60 X 8.337 X Temperature of the water / 12,000 btuh per ton
x 220.62 gallons X 60 minutes X 8.337 X 10.6 T = 1,169,800.4 btuh
x 1,169,800.4 btuh / 12,000 btuh per ton = 97.48 tons
Solution 2
x Tons = GPM X Temperature of the water X specific heat X specific gravity / 24
x 220.62 gallons X 10.6 T X 1 SH X 1 SG = 2338.57
x 2338.57 / 24 = 97.44 tons
Calibrated balancing valves are designed as a flow meter and a balancing valve. The
valve has pressure taps installed on the inlet and outlet. The manufacturer has calibrated
the valve by measuring the resistance at various valve positions against known flow
quantities. The valve has a graduated scale or dial to indicate the degree open. The
calibration data shows the flow rate in gallons per minute (gpm) (Us) versus the
measured pressure drop. Pressure drops are measured with an appropriate differential
gauge. The flow is determined from the manufacturer's chart. The location of the valve
must follow the manufacturer's recommendations.
Manufacturers of heat exchangers, e.g., coils, evaporators, and condensers, have flow
curves for their exchangers that provide flow in gpm vs. pressure drop in feet of water.
To obtain optimal pressure drops, pressure taps must be located at the inlet and outlet
connection of the exchanger prior to any turns or valves. Dirt, debris and scaling will
provide an inaccurate flow measurement.
Table 1 shows that if the coil is selected for the load and flow is reduced to 90% of load,
three flow variations can satisfy the reduced load at various sensible and latent
combinations.
WATER-SIDE BALANCING
Waterside balancing adjustments should be made with a thorough understanding of
piping friction loss calculations and measured system pressure losses. It is good
practice to show expected losses of pipes, fittings, and terminals and expected
pressures in operation on schematic system drawings.
The waterside should tested by direct flow measurement. This method is accurate
because it deals with system flow as a function of differential pressures, and avoids
compounding errors introduced by temperature difference procedures. Measuring flow at
each terminal enables proportional balancing and, ultimately, matching pump head and
flow to actual system requirements by trimming the pump impeller or reducing pump
motor power. Often, reducing pump-operating cost will pay for the cost of waterside
balancing.
Equipment
Proper equipment selection and preplanning are needed to successfully balance
hydronic systems. Circumstances sometimes dictate that flow, temperature, and
pressure be measured. The designer should specify the water flow balancing devices for
installation during construction and testing during hydronic system balancing. The
devices may consist of all or some of the following:
x Flow meters (ultrasonic stations, turbines, venturi, orifice plate, multiported pitot tubes,
and flow indicators)
x Manometers, ultrasonic digital meters, and differential pressure gages (analog or
digital)
x Portable digital meter to measure flow and pressure drop
x Portable pyrometers to measure temperature differentials when test wells are not
provided
x Test pressure taps, pressure gages, thermometers, and wells.
x Balancing valve with a factory-rated flow coefficient Cv, a flow versus handle position
and pressure drop table, or a slide rule flow calculator
x Dynamic balancing valves or flow-limiting valves (for pre-balanced systems only); field
Record Keeping
Balancing requires accurate record keeping while making field measurements. Dated and
signed field test reports help the designer or customer in work approval, and the owner
has a valuable reference when documenting future changes.
A common valve sizing method is to select for line size; however, balancing valves
should be selected to pass design flows when near or at their fully open position with 12
in. of water minimum pressure drop. Larger P is recommended for accurate pressure
readings. Many balancing valves and measuring meters give an accuracy of 5% of range
down to a pressure drop of 12 in. of water with the balancing valve wide open. Too large
of a balancing valve pressure drop will affect the performance and flow characteristic of
the control valve. Too small a pressure drop will affect its flow measurement accuracy as
it is closed to balance the system. Equation (2) may be used to determine the flow
coefficient Cv for a balancing valve or to size a control valve.
The flow coefficient CV is defined as the number of gallons of water per minute that flows
through a wide-open valve with a pressure drop of 1 psi at 60F. This is shown as {CV =
Q X (SF / P)}
(2)
Q = CV / (SF / P)
Where
CV = flow coefficient at 1 psi drop
Q = design flow for terminal or valve, gpm
P = pressure drop, psi
H = pressure drop, ft of water
Preparation
Minimally, preparation before balancing should include collecting the following:
1. Pump submittal data; pump curves, motor data, etc
2. Starter sizes and overloads protection information
3. Control valve Cv ratings and temperature control diagrams
4. Chiller, boiler, and heat exchanger information; flow head loss
5. Terminal unit information; flow head data
6. Pressure relief and reducing valve setting
7. Flow meter calibration curves
8. Other pertinent data such as readout conversion charts
Grouting
Motor and lubrication
Nameplate data
Pump rotational direction
6. For strainers, confirm
Location and size
Mesh size and cleanliness
7. Confirm location and size of terminal units
8. Control valves:
Confirm location and size
Confirm port locations and flow direction
Set all valves open to coil
Confirm actuator has required force to close valve under loaded conditions
9. Ensure calibration of all measuring instruments, and that all calibration
Data are known for balancing devices
Pump Start-Up
1. Set pump throttle valve to nearly closed position.
2. Start pump and confirm rotational direction; rewire if rotation is incorrect.
3. Open throttle valve slowly until differential head readout applied to the pump curve
indicates that flow approximates design.
4. Slowly close pump throttle valve to shutoff. Read pump differential head from gages.
If shutoff head corresponds with the published curve, the previously prepared velocity
head correction curve can be used as a pump flow calibration curve.
A significant difference between observed and published shutoff head can be caused by
an unvented volute, a partially plugged impeller, or by an impeller size different from that
specified.
Balancing
For single-, multiple-, and parallel pump systems, after pump start-up and confirmation of
system venting,
1. Adjust pump throttle until pump head differential corresponds to design.
2. Record pump motor voltage and amperage, and pump strainer head, at design flow.
3. Balance equipment room piping circuit so that pumped flow remains constant over
alternative flow paths.
4. Record chiller and boiler circuits (for multiple-pump systems, requires a flow meter
installed between header piping). For multiple-pump systems only,
5. Check for variable flow in source circuits when control valves are operated.
6. Confirm
Pump suction pressure remains above cavitations range for all operating conditions.
Pump flow rates remain constant.
Source working pressures are unaffected. For parallel-pump systems, follow Steps (1) to
(4), then shut off pumps alternately and
5. Record head differential and flow rate through operating pump, and operating pump
motor voltage and current.
6. Confirm that operational point is satisfactory (no overload, cavitation potential, etc.).
For every outside temperature other than design, the balancing technician should
construct a similar chart and read off the T for balancing. For example, at 50% load, or
30F outside air, the T required is 10F, or 50% of the design drop.
This method is a rough approximation and should not be used where great accuracy is
required. It is not accurate enough for cooling or heating systems with a large
temperature drop.
1. Analyze the piping network for the largest hydraulic loss based on design flow and
pipe friction loss. The pump should be selected to provide the total of all terminal flows,
and the head required to move water through the hydraulically greatest circuit. Balance
devices in this circuit should be sized only for the loss required for flow measurement
2. Analyze differences in pressure drop in the pumping circuit for each terminal without
using a balancing device. The difference between each circuit and the pump head (which
represents the drop in the farthest circuit) is the required drop for the balancing device.
3. Select a balancing device that will achieve this drop with minimum valve throttling. If
greater than two pipe sizes smaller, shift design drop into control valve or coil (or both),
equalizing pressure drop across the devices.
4. Monitor system elevations and pressure drops to ensure air management, minimizing
pocket collections and false pressure references that could lead to phantom balancing
problems. 5. Use proportional balancing methods as outlined for field-testing and
adjustment.
Proportional Balancing
Proportional waterside balancing may use design data, but relies most on as-built
conditions and measurements and adapts well to design diversity factors. This method
works well with multiple-riser systems. When several terminals are connected to the
same circuit, any variation of differential pressure at the circuit inlet affects flows in all
other units in the same proportion. Circuits are proportionally balanced to each other by
a flow quotient:
Flow quotient = Actual flow rate / Design flow rate
(4)
Note: When all balancing devices are open, flow will be higher in some circuits than
others. In some, flow may be so low that it cannot be accurately measured. The situation
is complicated because an initial pressure drop in series with the pump is necessary to
limit total flow to 100 to 110% of design; this decreases the available differential pressure
for the distribution system. After all other risers are balanced; restart analysis of risers
with unmeasurable flow at Step (2).
4. Identify the riser with the highest flow ratio. Begin balancing with this riser, then
continue to the next highest flow ratio, and so on. When selecting the branch with the
highest flow ratio,
Measure flow in all branches of the selected riser.
In branches with flow higher than 150% of design, close the balancing valves to reduce
flow to about 110% of design.
Readjust total pump flow using the main valve.
Start balancing in branches with a flow ratio greater than or equal to 1. Start with the
branch with the highest flow ratio.
The reference circuit has the lowest quotient and the greatest pressure loss. Adjust all
other balancing valves in that branch until they have the same quotient as the reference
circuit (at least one valve in the branch should be fully open).
When a second valve is adjusted, the flow quotient in the reference valve will also
change; continued adjustment is required to make their flow quotients equal. Once they
are equal, they will remain equal or in proportional balance to each other while other
valves in the branch are adjusted or until there is a change in pressure or flow.
When all balancing valves are adjusted to their branches respective flow quotients, total
system water flow is adjusted to the design by setting the balancing valve at the pump
discharge to a flow quotient of 1.
Pressure drop across the balancing valve at pump discharge is produced by the pump
that is not required to provide design flow. This excess pressure can be removed by
trimming the pump impeller or reducing pump speed. The pump discharge-balancing
valve must then be reopened fully to provide the design flow.
Balancing the waterside in a system that uses diversity must be done at full flow.
Because the components are selected based on heat transfer at full flow, they must be
balanced to this point. To accomplish full-flow proportional balance, shut off part of the
system while balancing the remaining sections. When a section has been balanced, shut
it off and open the section that was open originally to complete full balance of the
system. When balancing, care should be taken if the building is occupied or if load is
nearly full.
Variable-Speed Pumping. To achieve hydronic balance, full flow through the system
is required during balancing, after which the system can be placed on automatic control
and the pump speed allowed changing. After the full-flow condition is balanced and the
system differential pressure set point is established, to control the variable-speed
pumps, observe the flow on the circuit with the greatest resistance as the other circuits
are closed one at a time. The flow in the observed circuit should remain equal to, or more
than, the previously set flow. Water flow may become laminar at less than 2fps, which
may alter the heat transfer characteristics of the system.
Determine the flow head by measuring the discharge pressure and the suction
pressure of the pump using the same calibrated test gauge
"
4. Calculate the psi (pa) rise across the pump by subtracting the suction pressure from
the discharge pressure.
5. Multiply the pump psi rise by 2.31 feet/psi (110 pa) to obtain rise in feet of water.
6. Plot the rise on the pump curve using the determined shut-off head curve and
establish flow (Figure 11.6). Include pump curve in report.
7. Measure the motor amperage and voltage. Compare the amperage to the motor
nameplate. Note: The pump should be non-overloading through the entire operating
range, if not, note what condition will cause overloading.
8. Record the motor nameplate data, the actual rpm, amperage, voltage, and Watts.
9. Record the pump nameplate showing the pump size, impeller size, gpm (Vs), and
head. Record the actual operating head and actual shut-off head, discharge and suction
pressure.
Net positive suction head required (NPSHR) refers to the internal pump losses and is a
characteristic of the pump design. It is the actual absolute pressure required by the
pump to overcome the pumps internal losses and allow the pump to operate
satisfactorily. A pump curve (Figure 11.6) will give the full range of NPSHR values for
each impeller size and capacity.
Net positive suction head available (NPSHA) is a characteristic of the system in which the
pump operates. It depends on such conditions as elevation of the suction supply in
relation to the pump, the friction loss in the suction pipe, the altitude of the installation,
or the pressure on the suction supply, and vapor pressure.
Both available and required NPSH vary with capacity for a given pump and suction
system. The NPSHA is decreased as the capacity is increased due to the increased
friction losses in the suction piping. The NPSHR is a function of the velocity and friction
in the pump inlet, and therefore increases as the capacity increases. If it is necessary to
determine the NPSHA while testing a system, use Equation 11.1. For an example, see
Appendix 11.1.
Automatic Valves
Automatic control valves (ACV) are used to control flow rate or to mix or divert water
streams. They are classified as two-way or three-way construction, and as modulating or
two position. To determine flow value use Equation 11.2.
When valves are selected at low authority (low-pressure drop), the ability to control the
flow near shutoff is reduced. The balancing valve is used to set the flow at peak flow for
the control valve.
Two-way Valves
Two-way valves control the flow rate by closing off when heat transfer is
not required at the terminal. They may be either single-seated or double seated. Singleseated valves (Figure 11.22) are the most common.
All automatic control valves must be installed with the direction of flow opposing the
closing action of the valve. In other words, the direction of flow must be such that the
flow and pressure tend to hold the valve open. If the valve is installed the opposite
way, it will produce chattering. Double-seated or balanced valves (Figure 11.23) are
generally used when high differential pressures are encountered and tight shutoff is
not required. The flow direction through these valves tends to close one port while
opening the other port. This design creates a balanced thrust condition that lets the
valve close smoothly, without water hammer, regardless of the differential pressure.
Three-way Valves
Three-way valves are generally classified as mixing or diverting. This refers to the
internal construction of the valve, not the application. The internal differences are
necessary so that the valve seats against flow. Mixing valves have two inlets and one
outlet (Figure 11.24). Diverting valves have one inlet and two outlets (Figure 11.25).
Either valve may perform a temperature-control action (mixing application) or a flowcontrol action (bypassing application) depending on its location in the system (Figure
11.26). Diverting valves, however, should not be substituted for mixing valves and
vice-versa. Using either design for the wrong application would tend to cause chatter.
Another type of three-way valve is used in the supply line to coils in a three-pipe
system (Figure 11.27). This valve has two inlets and one outlet. One inlet is supplied
with heating water and the other is supplied with chilled water. Depending on the
thermostatic controls in the
occupied space, the valve opens to allow either heating water or chilled water into the
coil.
Procedures
Constant Volume Water Balancing Procedure
The entire water system must be operational: all inspections performed as described in
Chapter 6, final strainers installed and clean, all controls operational with all valves fully
open. Set the system for balancing in the following manner:
1. Determine the total coil flow and determine how many pumps will operate
2. Record the pump (model and serial number, the motor name-plate, the design gpm
flow, and the design head
3. Verify the impeller size on each pump
4. Read and record the actual pump head and flow, actual motor amperage and voltage,
starter data and motor overload protection devices size and ratings.
5. Set each pump to provide approximately 10% more water flow than designed.
6. Record all flow meter nameplate data. Read all flow meter flows and pressure drops
throughout the entire system, ( i.e. chillers, converters, coils etc.), and establish flow
using: Compare heat exchanger flow and flow meter flow with pump flow.
7. Starting with the coil having the greatest flow, adjust the coils to the design flow. With
full flow through the coil, measure and set the pressure differential at A-B by adjusting
the balancing valve 1. Read the differential pressure at A-C. Set the three-way valve to
bypass the coil. Adjust balancing Valve 2 in the bypass to match the pressure
differential through the valve and coil (A-C) (Figure 1.45).
8. Continue to proportion the water to each coil until all coils are balanced within 10% of
their design flow with at least one balancing valve in the system remaining 100% open.
9. Re-verify and record the final pump gpm and head, amperages and voltage of each
pump, discharge valve position, each heat exchange gpm and pressure drop, each coil
gpm and pressure drop, and each flow meter flow. If the discharge valve has to be
throttled to obtain design flow, note the valve position and, if possible, the differential
across the valve. It should be recommended that the impeller be trimmed to meet final
system requirements with the discharge valve full open.
10. Verify the systems control sequence, observing if the correct controller controls the
correct valve.
11. Verify the coil or heat exchangers controller calibration and record the entering and
leaving air and water temperatures with the coil air and water set to design (cooling coil
db/wb, heating coil db).
12. Record the coil design and actual flows on a coil summary sheet and verify total coil
flow is within 10% of total pump flow, total primary heat exchanger flow and total flow
meter flow.
13. Show the actual gpm (Vs) and head on the pump curve and establish and record the
BHP (W).
The entire water system must be operational: all inspections performed, final strainers
installed and clean, all controls operational with all valves fully open. Set the system for
balancing in the following manner:
1. Determine the total coil flow and determine:
2. Diversity-is there enough pumping capacity to provide 100% design water flow to each
coil? If there is not enough pumping capacity to provide 100% design water flow to each
coil, close the valves to the coils closest to the pump until the pump can provide 100%
flow to the open coils. If there are three-way valves or a bypass valve in the system,
observe that it is closed prior to balancing.
3. Record the pump (s) model and serial number, the motor nameplate, the design gpm
flow, and the design head. Record the variable frequency drive (VFD) data if installed.
4. If a VFD is installed, set the VFD bypass for 100%. Verify the impeller size on each
pump.
5. Read and record the actual pump head and flow with actual motor amperage and
voltage. Record starter data and motor over-load protection devices size and rating.
6. Set each pump to provide approximately 10% more water flow than designed.
7. Record all flow meter nameplate data. Read all flow meter flows and pressure drops
throughout the entire system, (ie. chillers, converters, coils, etc.), and establish flow
using Equation 11.4.
8. Starting with the coil having the greatest flow, adjust the coil to the design flow.
9. Continue to proportion the water to each coil until all coils are balanced within 10%
of design flow with the balancing valve of at least one coil remaining 100% open. If the
system has diversity, close an equal amount of valves nearest to the pump and open the
initially closed valves. Continue to proportion the water to each coil (starting with the coil
closest to the pump) until all the coils are balanced within 10% of the design flow.
10. Re-verify and record the final pump gpm and head, amperage and voltage of each
pump (discharge valve position if the system does not have a variable frequency drive).
When the system has a VFD and the VFD is at 100% with the discharge valve throttled to
obtain design flow, it is recommended that the impeller be trimmed or the VFD limited
with the discharge valve fully open.
11. Record the systems pressure differential at the pressure transmitter with the system
at full flow. Adjust the coil closest to the pump closed and verify the pressure transmitter
setting. Continue with the next coil until enough coils are closed to equal the minimum
speed of the pump or the minimum flow through the primary heat exchangers. Verify that
the closed valves closest to the pump remain closed and are not lifting off their seats.
Note that most bypasses in two-way valve systems act as a relief valve and the pump will
ride its pressure curve until bypass opens. Record the minimum flow across the heat
exchanger.
12. Verify the coil or heat exchangers controller calibration, and record the entering and
leaving water temperatures.
13. Record the coils design and actual flow (coils open for diversity) on a coil summary
sheet and verify total coil flow equals within 10% of total pump flow, total primary
heat exchanger flow, and total flow meter flow.
14. Show the actual gpm and head on the pump curve and establish and record the
brake horsepower. (Note: with VFD, discharge valve and VFD must be at l00%.)
The point at which the expansion tank connects to the system is called the point of no
pressure change. To avoid pumping problems, expansion
tanks are installed on the suction side of the pump.
Pressure-Relief Valves
Pressure-relief valves (Figure 1 1.12) are safety devices for protecting against system
damage and personal injury. The pressure-relief valve opens on a pre-set value so that
the system pressure cannot exceed this amount.
Air Control
Air is always present in hydronic heating and cooling systems. It gets into the system
when it is initially filled through make-up water and when the system is drained for
repairs and maintenance. Air is released from the water upon start-up, particularly when
the water is heated. Much of this air will find its way to the expansion tank through an air
separator. However, some of the air will find its way to other high points in the system.
This entrapped air must be vented or it will block flow through the terminals. In fact, air in
a system can restrict flow to the point of causing total shut-off. Air can also result in
noise in the system, pump cavitation, and seal failure. Air control devices such as air
vents and air separators are designed to remove air from the system.
Air Vents
Air vents should be located at each point in the piping at which the water
changes its direction to a downward flow, and at all high points in the system. Air vents
can be either automatic or manually operated. A manual air vent is simply a valve that is
opened to allow the entrained air to escape.
Because automatic air vents occasionally malfunction, manual valves should be
provided at each vent to permit servicing without shutting down and draining the system.
Air Separators
A boiler dip-tube air separator is a tube in the top or top side of the boiler. When water is
heated, air is released and collects at a high point in the boiler. The dip tube allows this
collected air to rise into the expansion tank. The air-separating tank is an in-line, lowvelocity, dip-tube air separator.
The centrifugal air separator works on the action of centrifugal force and
low-velocity separation. Water circulation through the air separator creates a vortex or
whirlpool in the center of the tank where entrained air collects and rises into the
expansion tank.
These devices are used at the point of lowest pressure and highest temperature in the
system, which suggests for hot water systems, it is located between the heat exchanger
and the pump inlet, and for chilled water systems it is located between the system and
pump inlets (the pump will pump through the heat exchanger).
Strainers
The purpose of strainers (Figure 11.14) is to catch sediment or other foreign material in
the water. A strainer contains a mesh screen formed into a sleeve that fits inside the
strainer body. This sleeve must be removed and cleaned. A strainer with a dirty sleeve or
a sleeve with a screen that is too fine means that there will be excessive pressure drop
across the strainer and lower water flow. Strainers placed in the suction side of the pump
must be properly sized and kept clean to avoid cavitation. Strainers should have
pressure taps installed at the inlet and outlet.
Strainers should only be used where necessary to protect the components in the system.
For example, in the case of cooling towers, strainers in the tower basin may provide
adequate protection. Individual fine mesh strainers may need to be installed before
automatic control valves or spray nozzles, which operate with small clearances and
require protection from materials that might pass through the pump strainer.
Valves
Valves are used in hydronic systems to:
x control water flow
x isolate part, or all of the system for servicing
Manual Valves
Manual valves fall into two major categories: manual service valves and check valves.
Manual service valves regulate flow rate. These include gate, globe, plug, ball, and
butterfly valves. Check valves limit the direction of flow. Another manual valve, the
combination valve, both regulates flow and limits direction of flow.
Gate Valves
Gate valves (Figure 11.15) regulate flow only in that they are either fully open or fully
closed. They should not be used for throttling purposes because they produce a highvelocity water stream when partly closed, resulting in erosion of the valve seat. This is
called wiredrawing, and will result in leakage when the valve is fully closed. Gate valves
should be used for tight shutoff, and for servicing equipment. Gate valves allow a
straight-through flow pattern, resulting in low-pressure drop.
Globe Valves
Globe valves (Figure 11.16) can be used in partially open positions and therefore can be
used for throttling fluid flow. However, globe valves have high-pressure drops, even
when fully open. Therefore, globe valves can unnecessarily increase the required pump
head, and should not be used for balancing. They can, however, be used in water
make-up lines. Note: If globe valves are ever tampered with, or used to shut off a
system, it is difficult to reset the system.
Plug Valves
Plug valves (Figure 11.17) are used for balancing water flow. Some plug valves have
adjustable memory stops that are set during the final balance so that if the valve is
closed, it can later be reopened to the original setting. Plug valves have a low-pressure
drop and therefore add little to the pumping head. They can also be used for tight
shutoff. Plug valves have good throttling characteristics (Figure 11.18). Throttling
characteristics refer to the relationship of the valve disc to the percentage of flow.
Valves have linear throttling characteristics when the disc-open percentage is the same
as the flow percentage. For example, a valve would be said to have linear or straight-line
throttling characteristic if closing it 50% reduced
flow by 50%. For adjusting purposes, the closer the valves are to linear flow the better.
Ball Valves
Ball valves (Figure 11.19) are similar to plug valves, and are often used for water
balancing. They have low-pressure drops and good flow characteristics. Set the memory
stop, if available.
Butterfly Valves
Butterfly valves (Figure 11.20) consist of a heavy ring enclosing a disc that
rotates on an axis and, in principle, is similar to a round single-blade damper. Butterfly
valves have low-pressure drops and are used as throttling valves, but do not have good
throttling characteristics.
Check Valves
Check valves allow water to flow in one direction and stops its flow in the other direction.
There are two types of check valves: swing and spring loaded. Check valves should be
used at the discharge of the pump. With swing check valves, when the system is off the
weight of the gate and gravity closes the valve. The valve is opened when the system is
turned on,
in addition, pressure from the fluid flowing in the proper direction causes the gate to
swing open. Spring-loaded check valves have springs that keep the valve closed. Water
pressure from the proper direction against the spring opens the valve.
Combination Valves
Combination valves (Figure 11.21) are sometimes referred to as a multipurpose or tripleduty valves. They are a combination of a check valve, a calibrated balancing valve, and a
shutoff valve. They are made in a straight or angle pattern.
Combination valves act as a check valve, preventing back flow when the
pump is off, and can be closed for tight shutoff, or can be partially closed for balancing.
These valves have pressure taps for connecting flow gauges and for reading pressure
drop across the valve. A calibration chart is provided with the valve for conversion of
pressure drop to gpm. The valves also have memory stops.
Series loop
The series loop is a simple and inexpensive piping arrangement generally limited to
residential and small commercial building applications. In series loops (Figure 11.32),
supply water is pumped through each terminal in series and then returned to the boiler.
Since all the water is circulated in succession through each terminal, there are several
disadvantages to the series loop arrangement. First, making repairs at any one terminal
requires shutting the whole system down. Second, it is not possible to provide capacity
controls on individual terminals, because valuing down one terminal would reduce flow
to all the terminals down the line. Instead, space heating must be controlled by
dampening the airflow.
These disadvantages can be partially remedied by designing the piping with two or more
circuits, and installing balancing valves in each circuit (Figure 11.33). This type of
arrangement is called a split series loop.
The series loop circuit length and pipe size are also very important in the design because
they directly influence the water flow rate, temperature, and pressure drop. For instance,
as the heating supply water flows through the terminals, its temperature drops
continuously as it gives up heat in each terminal. If there are too many terminals in
series, the water temperature in the last terminal may be too cool to be effective.
higher-pressure drop than the main, the water circulating in the main will tend to flow
through the straight run of the tee fittings, starving the terminal.
Pump Circuits
Primary-Secondary
Primary-secondary pump circuits reduce pumping horsepower requirements while
increasing system control quality. Primary-secondary
circuits are designed so that when two circuits are interconnected, flow in one circuit will
not cause flow in the other if the pressure drop is eliminated in the pipe common to both
circuits.
Figure 11.40 shows a primary-secondary pump circuit. The common pipe (A-H), which
may vary in length, has a negligible pressure drop and ensures the isolation of the
secondary circuit from the primary circuit. Therefore, in order to overcome the pressure
loss in the secondary circuit (A-B-C-D-E-F-G-H) and provide design flow, a secondary
pump (Figure 11.41) must be installed.
The primary pump and the secondary pump have no effect on each other. The function of
the primary pump is simply to circulate water around the primary circuit. The secondary
pump then supplies the terminals. The secondary flow may be (1) less than, (2) equal to,
or (3) greater than the primary flow (Figures 11.42, 11.43, and 11.44).
Basic Testing
Water Cooled Chiller
The water-cooled chiller consists of one or more of the following: compressors, liquid
coolers and water-cooled condensers. The basic test for a water-cooled chiller is shown
on the NTT Chillers report form. The basic procedure is to measure and/or report the
following:
x Chiller manufacturer nameplate data
x Rated capacity in tons
x Model and serial number
x Evaporator:
x the design and actual entering water temperature
x the design and actual leaving water temperature
x the design and actual pressure drop in feet (kpa)
x the design and actual GPM (Vs)
Example 10: Find the GPM of a GN, 070-chiller, entering water pressure of 42.45 psig
and a leaving pressure of 36.82 psig.
Solution
x Pressure drop X 2.31 = foot head
x Use chart for GN 070 chiller for GPM
x 42.45 pressure 36.82 pressure = 5.63 Pressure drop
x 5.63 Pressure drop X 2.31 = 13.00 foot head
x using chart for GN 070 chiller with a 13.0 foot head gave a 180 gpm
Example 11: Find the tons of the chiller in example 10 with an entering water temperature of 56.8
F and a leaving water temperature of 46.5 F of a GN 070 chiller.
Solution 1
x Tons = GPM X 60 X 8.337 X Temperature of the water / 12,000 btuh per ton
x 180 gallons X 60 minutes X 8.337 X 10.3 T = 927,407.8 btuh
x 927,407.8 btuh / 12,000 btuh per ton = 77.28 tons
Solution 2
x Tons = GPM X Temperature of the water X specific heat X specific gravity / 24
x 180 gallons X 10.3 T X 1 SH X 1 SG = 1854
x 1854 / 24 = 77.25 tons
Condenser
x the design and actual entering water temperature
x the design and actual leaving water temperature
x the design and actual pressure drop in feet (kpa)
x the design and actual GPM (Vs)
x Electrical (electrical measurements will only be taken on equipment rated under 600
volts)
x the design and actual voltage
x the design and actual amperages
Evaporator:
x the design and actual entering water
x the design and actual leaving water temperature
x the design and actual pressure drop in feet (kpa)
x the design and actual GPM (l/s)
Condenser
Electrical
x the design and actual voltage for the compressor( s)
x the design and actual amperage for the compressor( s)
x the design and actual voltage for the condenser fan( s)
x the design and actual amperage for the condenser fan( s)
The air-cooled chiller with remote condenser(s) consists of compressors and liquid
coolers or evaporators that connect to one or more air-cooled condensers.
The basic test for the air-cooled chiller with remote condenser is the same as Air Cooled
Chillers with the condenser data being not applicable.
The following tasks are the responsibility of contractors and/or manufacturers involved
and will be verified by the TAB Agency before the performance test is scheduled or
performed:
x Temperature taps or thermometer wells shall have been installed for measuring the
temperature of water entering and leaving the evaporator and condenser. All persons
involved in the test must agree on the method of temperature measuring
x The water circulating system shall have been thoroughly cleaned of all foreign matter.
Samples of the water shall be clear and indicate clear passage of water through the
pumps, piping, and evaporators
x The water circulating pump shall have been tested for correct operation, the strainers
cleaned, and placed in normal operation
x The liquid chilling package shall have been leak tested, dehydrated, evacuated, and
charged with the operating amount of refrigerant
x Water flow measuring devices shall be installed and functioning
General Procedures
The performance test shall be conducted by the NTT Agency and the manufacturer in the
presence of the purchaser, engineer, and final owner, should they desire to be present.
There should be sufficient notice of the test date so that all concerned parties can
arrange to be present. Additionally, if the manufacturer desires, he shall be given
sufficient time before the test to inspect and prepare the system being tested.
All test instrumentation shall be agreed upon by the purchaser, engineer, manufacturer,
and NTT Agency. All thermometers used in the test shall be tested before and after the
test. Any thermometer whose corrected reading (actual reading plus calibration) differs
from the average by more than k 0.5F (0.lC) shall not be used.
x Each reading of liquid temperatures shall not vary by more than 0.3F (0.1C)
x The liquid cooling temperature range shall not vary more than 0.5F (0.lC)
Range = Entering Liquid O F (C) - Leaving Liquid O F (C)
x Individual dry bulb temperature readings shall not vary by more than 2F ( 1C) from
the average value
x The arithmetic average of all required dry bulb air temperature readings shall not vary
from the specified values by more than 1F (0.5C)
x The chilled liquid flow rate shall not deviate more than 5% from the specified volume.
The NTT performance test is not dependent upon the tower manufacturers curves. A
graph generated by the NTT performance test illustrates the cooling tower operation
through a wide range of conditions.
Cooling tower performance test must be specified as per the NTT Cooling Tower
performance procedure or the CT1 test. Performance testing is over and above the basic
testing of towers.
Basic Test
The standard test for cooling towers is shown on the Associated Air Balance Councils
Cooling Tower Operation Test Report. The procedure is to measure and record:
x Design and actual flow of the water
Record the motor nameplate and heater element with actual amps, volts, calculated brake
horsepower. Record the design and actual rpms as well.
x
x
x
x
x
x
x
x
x
General Procedures
The performance test is conducted by the NTT TAB Agency in the presence of authorized
representatives of the manufacturer, the purchaser, and the owner, should they desire to
be present. The NTT Agency shall give sufficient advance notice of the test date so that
all concerned parties can arrange to be present. Additionally, the manufacturer shall be
given sufficient time before the test to inspect and prepare the tower, if desired.
The NTT TAB Agency uses a team of at least one TAB engineer and one technician to
perform this test. Representatives of the manufacturer and purchaser are allowed to
observe, but shall not participate in, reading and recording of test data.
All test instrumentation shall be furnished, or inspected and approved, by the NTT TAB
Agency. All thermometers used in the test are checked before and after the test by
immersing them in a common bath, the temperature of which is between 70F (32C) and
90F (63C). Any thermometer whose corrected reading (actual reading plus calibration)
differs from the average by more than +0.15"F (0.l"C) shall not be used.
The operating conditions during the test must conform to the following:
x Entering wet-bulb temperature shall be within 15F (1C) of design.
x Range shall be within 20% of design.
x Power input to fan (s) shall be within 10% of design.
x Average wind velocity shall be 10 mph or less, and shall not exceed 15 mph for longer
than one minute.
x Entering dry bulb, if applicable, shall not exceed 20% of design.
x Circulating water flow shall be within 10% of design.
x Barometric pressure shall be within 1 in. Hg. (3.4 kpa) of design.
For a valid test, the variations in the measured conditions over the one-hour test period
must conform to the following:
x Circulating water flow shall not vary by more than 2%.
x Range shall not vary by more than 5%.
x Total load shall not vary by more than 5%.
x Entering wet bulb temperature shall not exceed 2F (1C). Note: Air temperature
readings may fluctuate momentarily, but variations in the averages during the test period
should not exceed the indicated value.
x Btuh of a condenser are 15,000 btuh per ton.
x With a 10 T of the water the GPM is 3 gpm per ton, change the gpm changes the T
The duration of the test shall be for not less than one hour, starting after the system has
reached steady state conditions. During the test, readings shall be taken and recorded at
regular intervals. The frequency of test readings, the units of measure, and the number of
significant figures shall be as shown in Table 13.1.
Record test data on the NTT test data summary sheet (Appendix 13.1). Upon completion
of the test, the sheet is signed by the NTT TAB engineer and any representatives of the
manufacturer, purchaser, or owner who are present. Give one copy of each authenticated
test form to each person signing the test form.
Instrumentation
Temperature measurements shall be made with calibrated mercury-in-glass or resistance
thermometers. These thermometers must be accurate to O.1"F with indicators or
recorders graduated in increments of not more than 0.2F (0.lC).
When measuring wet bulb temperature, cover the temperature-sensitive element with a
wick continuously wetted with distilled water of a temperature approximately equal to the
wet bulb temperature being measured. The wick shall fit snugly over, and extend at least
3/4 inches (19 mm) past, the temperature-sensitive element. The air velocity over the
element shall be at least 950 (4.8 m/s) and no greater than 1050 (5.3 m/s) feet per minute.
Any of the following calibrated devices may be used to measure water flow rate:
x Venturi or flow nozzle
x Orifice plate
x Turbine meter (traverse)
x Pitot tube (traverse)
x Other mutually agreed upon flow measuring devices
For these devices, ensure that the proper upstream and downstream flow conditions
exist.
Report of Results
The report of test results must include:
x A description of the cooling tower, including the name of the manufacturer, the model
number, serial number, orientation, and principal dimensions.
x A sketch of the installation showing the location of instrumentation for measuring
water flow, water temperatures, air temperatures, etc. Note any buildings, walls,
obstructions, or other equipment in the immediate vicinity of the tower being tested. Give
particular attention to any equipment or facilities discharging heat or vapor near the
tower.
x A copy of all test data sheets, plus a single summary sheet tabulating all test data
averages used in calculating results and comparing them to the associated design
values for the same parameter (Appendix 13.1).
x A copy of all calculations made in determining the result.
x A brief summary stating the test result and mentioning any areas in which the test
deviated from the test parameters.
x The distribution of the report shood be limited to the parties directly involved in the
test.
industry for many years. They reasonably meet the need to obtain test data close to the
tower design conditions, while not imposing such stringent limits on the test conditions
as to severely limit the opportunities for obtaining a test.
Similarly, the instrumentation and procedures set forth in the test parameters are the
culmination of many years experience in testing cooling towers of all sizes and
configurations. They have been shown to give consistent and repeatable results.
Performance Test
The objective of this test is to determine a performance factor (P.F.) for the tower that is
constant at all heat load conditions and all entering (W) wet bulb conditions that may
occur. The performance factor (P.F.) will be used to determine the performance of the
tower at the design conditions.
Following is an outline of the analysis that establishes this test procedure, according to
applicable cooling tower factors and how they operate:
x Water flow GPM and airflow across the tower are constant.
x At constant heat load, the approach will decrease as the entering WB increases.
Approach is defined as the difference between the temperature of the water leaving the
tower and the wet bulb temperature of the air entering the tower.
x Evaporation takes place in a tower but has no effect on the cooling of the water. It is
simply a conversion of air sensible heat to latent heat.
x For standard cooling towers, the heat rejected per ton of refrigeration is 15,000 BTU/Hr.
(3 GPM with a 10T)
x At any point of test, the water, air, and fill arrangement combine to allow the air to
remove a given percentage of the theoretical heat available to it. This percentage, called
the Performance Factor (P.F.), will remain constant at any entering WB temperature and
heat load as long as the GPM (Vs), CFM (Vs), and fill do not change.
Test Procedure
During the test procedure, the following data is recorded with the same intervals and no
greater deviations than outlined in 13.3.3:
x Water temperature entering the tower.
x Water temperature leaving the tower.
x WB temperature of the air entering the tower (use table 11 to convert to enthalpy H2).
x WB temperature of the air leaving the tower (use table 11 to convert to enthalpy H3).
x Water flow rate GPM.
Example 12: Find the tons of a cooling tower with an entering water temperature of 90
and a leaving water temperature of 80 and a 145 gpm.
Solution 1
x GPM x 60 X 8.337 X T of the water = BTUH
x BTUH / 15,000 = Tons
x 145 gpm X 60 X 8.337 X 10 T = 725,319 btuh
x 725,319 btuh / 15,000 = 48.35 tons
Solution 2
x GPM X T of the water / 30 = tons
x (145 gpm X 10 T) / 30 = 48.33 tons
Example 13: Find the GPM of a cooling tower with an entering water temperature of 90
and a leaving water temperature of 80 and a entering air temperature of 95 dry bulb and
67 wet bulb, leaving air temperature of 92 dry bulb and 84 wet bulb and a 10,167 CFM.
Solution 1
x GPM = (Air Density X CFM X Enthalpy h1-h2) / (8.337 X Water T)
x Air density of 92 dry bulb and 84 wet bulb is 0.071
x Enthalpy of 92 dry bulb and 84 wet bulb is 48.13
x Enthalpy of 95 dry bulb and 67 wet bulb is 31.38
x Water T is 10
x (0.071 X 10,167 X 16.75) / (8.337 X 10) = 12,091.10 / 83.37 = 145.02 gpm
The enthalpy (total heat see table 11) of the air at the leaving WB temperature minus the
enthalpy of the air at the entering WB temperature determines the quantity of heat in
BTU/LB. that the air picks up while passing through the tower. If this heat gain (enthalpy
difference), is divided by the theoretical enthalpy difference that would result if the air left
the tower at a wet bulb temperature equal to the temperature of the water entering the
tower, the result is the Performance Factor. This theoretical enthalpy difference occurs at
zero approach and represents a tower performance of 100%:
If the water flow GPM and the airflow through the tower remain constant,
then the P.F. will remain the same as the heat load and WB temperature change.
With this as a basis, a cooling tower can be tested at a reasonable operating condition
and from the data of this test calculate the performance of the tower at the specified full
load conditions. It is possible to prepare a performance curve for the test tower at a given
P.F. It has been found that the most useful curve is to plot approach vs. heat rejection at
specified entering WB temperature, test water flow GPM and test P.F. From this curve,
the engineer can determine if the condenser water system will satisfy the requirements of
the operation of the tower at a wide range of operating conditions. See Example A in
Appendix 13.2.
Lam = lbs. of air per minute through tower = THR / (h.2 - h3)
CFM = Tower CFM = Lam / d (of leaving air)
Water Temperature
Water temperatures are to be measured using calibrated mercury-in-glass or resistance
thermometers, accurate to 0.1F (0.1"C) with indicators or recorders graduated in
increments no greater than 0.2"F (0.2"C). The temperature-sensitive element must be
carefully located so that the temperature being sensed is representative of the true
average temperature of the bulk fluid.
The hot water temperature entering the tower should be measured in the riser (s) leading
to the tower inlet (s), as close as practical to the tower, or at the discharge of the inlet
riser(s) into the flume or distribution box (es) on the tower (Figures 13.1 & 13.2).
The cold-water temperatures should be measured on the discharge side of the system
circulating pump (Figures 13.1 8z 13.2). If the temperature of the cold water leaving the
pump is being measured through a bleed test valve (as shown in Figure 13.3), the
average temperature must be corrected for the heat added by the pump and the valve.
The test valve must be sufficiently opened to provide adequate quantities to establish
accurate temperature measurements.
Cold-water temperatures should not be taken in the tower basin or by bleeding water
from the basin or outlet pipe since temperature gradients of several degrees may exist in
the basin and the suction piping extending from the tower to the pump. Only after the
water is well-mixed by the pump can one be assured the measured temperature is
representative of the true cold water temperature leaving the tower.
Many cooling tower systems have an automatic or manual bypass arrangement (Figure
13.4) used to control temperatures in the cooling loop by diverting hot water from the
cooling tower riser into the cold water line leaving the tower or into the tower basin.
Where such a bypass line exists, it is imperative it be shut
The cold-water temperatures should be measured on the discharge side of the system
circulating pump (Figures 13.1 8z 13.2). If the temperature of the cold water leaving the
pump is being measured through a bleed test valve (as shown in Figure 13.3), the
average temperature must be corrected for the heat added by the pump and the valve.
The test valve must be sufficiently opened to provide adequate quantities to establish
accurate temperature measurements. Cold-water temperatures should not be taken in the
tower basin or by bleeding water from the basin or outlet pipe since temperature
gradients of several degrees may exist in the basin and the suction piping extending
from the tower to the pump. Only after the water is well-mixed by the pump can one be
assured the measured temperature is representative of the true cold water temperature
leaving the tower.
Many cooling tower systems have an automatic or manual bypass arrangement (Figure
13.4) used to control temperatures in the cooling loop by diverting hot water from the
cooling tower riser into the cold water line leaving the tower or into the tower basin.
Where such a bypass line exists, it is imperative it be shut with a liquid of high thermal
conductivity (oil or water).
When dry bulb temperature measurement of the inlet air is made on forced draft (blow
through) type towers for the purpose of density determination, a measurement accuracy
of 2F to 5F (1C-2C) for the average inlet dry bulb temperature is usually satisfactory.
In most cases this can be achieved by means of a single psychrometer situated at a
representative location along an air inlet face.
can be used. If these become too expensive or unwieldy, measure the flow by Pitot tube
traverse.
Taps for Pitot tube traverses can be installed in either vertical or horizontal pipe runs. As
illustrated in Figure 13.7, the taps must be perpendicular to the pipe and at 90" from one
another. Adequate clearance [roughly the pipe diameter, plus three feet (1 m)] must be
available at each tap to install and position the Pitot tube.
If make-up enters or blow down leaves the tower or the system at a point where it will
affect any of the measured test values, they must either be shut off for the duration of the
test or the flow rates measured. Usually, these measurements lend themselves to a
volumetric or bulk measurement procedure. In many instances, a water meter will have
been installed in the make-up line and can be used for this purpose. In virtually all
instances, the blow down can be valved off during the test period.
Wind Velocity
When a cooling tower test is run under conditions of little or no wind, the parties to the
test often may agree to forego measurement of wind velocity. Strict compliance with the
test code, however, requires that wind velocity be measured with a meteorological
anemometer and wind vane. For towers with an overall height of less than 20 feet (6 m),
the point of measurement is 5 feet (1.5 m) above the basin curb at a distance 50 to 100
feet (15-30 m) upwind of the tower.
Example 14: Fine the tons of a condenser that has a 8 SCH 40 with a pressure of
23.347psig and a total pressure of 23.352 psig and a entering water of 85 and leaving
water of 93.
Solution
x Total pressure Pressure = VP
x FPM = 1040 X VP
x GPM = FPM X Gallons per foot
x Ton = GPM X 60 X 8.337 X Temperature of the water
x 23.352 psig 23.347 = 0.005 VP
x 1040 X 0.005 = 73.54 FPM
x 73.54 X 2.6 gallons per foot = 191.20 GPM
x 191.20 X 60 X 8.337 X 8 = 765,136.5 btuh
x 765,136.5 / 15,000 = 51.01 tons