The document is a bill of quantities for the construction of a new Bohol airport in the Philippines, outlining costs for 6 components - general requirements, civil works, utility works, building works, air navigation facilities, and aeronautical ground lighting works - with summaries of quantities, units, and pricing for each item needed for the various construction projects. It includes costs for infrastructure, buildings, utilities, equipment, and details project components like access roads, passenger terminals, control towers, lighting systems, and more.

Uploaded by

AntonioNicala
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
531 views

Boq

The document is a bill of quantities for the construction of a new Bohol airport in the Philippines, outlining costs for 6 components - general requirements, civil works, utility works, building works, air navigation facilities, and aeronautical ground lighting works - with summaries of quantities, units, and pricing for each item needed for the various construction projects. It includes costs for infrastructure, buildings, utilities, equipment, and details project components like access roads, passenger terminals, control towers, lighting systems, and more.

Uploaded by

AntonioNicala
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 336

NEW BOHOL AIRPORT CONSTRUCTION

AND
SUSTAINABLE ENVIRONMENT
PROTECTION PROJECT
(Loan No: PH-P256)

BID DOCUMENT IV
BILL OF QUANTITIES

August 2013
JICA Design Consultant Joint Venture

New Bohol Airport Construction Project and Sustainable Environment Protection Project

NEW BOHOL AIRPORT CONSTRUCTION


AND SUSTAINABLE ENVIRONMENT PROTECTION PROJECT
Bill of Quantities
Index
Summary
Summary of Component-1: (G) General Requirement
Summary of Component-2: (C) Civil Works
Summary of Component-3: (U) Utility Works
Summary of Component-4: (B) Building Works
Summary of Component-5: (N) Air Navigation Facilities
Summary of Component-6: (L) Aeronautical Ground Lighting Works
Price List of Japanese Origin Items

Bill of Quantities for Each Component


BOQ of Component-1: General Requirement
BOQ of Component-2: Civil Works
BOQ of Component-3: Utility Works
BOQ of Component-4: Building Work
BOQ of Component-5: Air Navigation Facilitie
BOQ of Component-6: Aeronautical Ground Lighting Work

New Bohol Airport Construction Project and Sustainable Environment Protection Project

New Bohol Airport Construction Project and Sustainable Environment Protection Project

SUMMARY OF THE WORKS


Item
No.

Amount

Item

LC(Php)

FC (Jp Yen)

Summary of the Works


Component-1:

(G) General requirements

Component-2:

(C) Civil Works

Component-3:

(U) Utility Works

Component-4:

(B) Building Works

Component-5:

(N) Air Navigation Facilities

Compoment-6:

(L) Aeronautical Ground Lighting


Subtotal of the Works

Provisional Sum

100,000,000.0
Total to Bid Form

Price of Japan Origin

Summary / Page -1

200,000,000

New Bohol Airport Construction Project and Sustainable Environment Protection Project

Component Summary
Item
No.

Amount
LC(Php)

Item

Component-1: General Requirements (G) - Summary


General Conditions of Contract
Section G-1115: Contractor's Facilities
Section G-1120 : Employer's and Engineer's Facilities
Section G-1130: Environment Management
Section G-1165: Contractor's Submission
Section G-1170: Daywork
Section G-1175: Soil Investigation
Section G-1210: Project Equipment
Section G-1230: Maintenance Equipment
Total to Summary of the Works
Component 2: (C) Civil Work Summary
Subcomponent 2-1: (C1) Access Road
Subcomponent 2-2: (C2) Airport Infrastructure
Total to Summary of the Works
Component-3: (U) Utility Works Summary
Subcomponent 3-1: (U1) Water Supply System
Subcomponent 3-2: (U2) Power Supply System
Subcomponent 3-3: (U3) Sewage Treatment System
Total to Summary of the Works
Component-4: (B) Building Works
Subcomponent 4-1: (B1) Passenger Terminal Building
Subcomponent 4-3: (B3) Control Tower, ATC Operation
& Administration Building (ATO)
Subcomponent 4-4: (B4) Fire Station and Airport

Summary / Page -2

FC (Jp Yen)

New Bohol Airport Construction Project and Sustainable Environment Protection Project
Item
No.

Amount
LC(Php)

Item

Subcomponent 4-5: Ancillary Buildings (ACB)


(B51) Driver's Lounge (DRL)
(B52) Car Parks Toilet (CPT)
(B53) Guard House (GDH)
(B54) Tollbooths (TLB)
Subcomponent 4-6: Utility Buildings (ULB)
(B61) Water Tank & Pump Houses
(B62) Power House (GDH)
(B63) STP Control Room (STP)
(B63) Material Recover Facility
Subcomponent 4-7: Navaids Buildings (NAV)
(B71) LLZ Building (LLZ)
(B72) GS Building (GSB)
(B73) VOR Building (VOR)
Total to Summary of the Works
Component-5: (N) Air Navigation Facilities
Subcomponent 5-1: (N0) General
Subcomponent 5-1: (N1) ILS
Subcomponent 5-2: (N2) VOR/DME
Subcomponent 5-3: (N3) ATS and Telecommunications
Subcomponent 5-4: (N4) Meteorological Observation
System
Total to Summary of the Works
Component-6: (L) Aeronautical Ground Lighting Works
Subcomponent 6-0: (L0) General
Subcomponent 6-1: (L1) Approach Lighting System

Summary / Page -3

FC (Jp Yen)

New Bohol Airport Construction Project and Sustainable Environment Protection Project
Item
No.

Amount
LC(Php)

Item

Subcomponent 6-2: (L2) Precision Approach Path


Subcomponent 6-3: (L3) Runway Lighting System
Subcomponent 6-4: (L4) Taxiway Lighting System
Subcomponent 6-5: (L5) Other Aeronautical Lighting
Subcomponent 6-6: (L6) Apron Floodlights
Subcomponent 6-7: (L7) Underground Cable Ducts
Subcomponent 6-8: (L8) Control and Monitoring System
Total to Summary of the Works

Summary / Page -4

FC (Jp Yen)

New Bohol Airport Construction Project and Sustainable Environment Protection Project

Form JPO: Price List of Japanese Origin Items


Name of Bidder:
Spec

Items

Manufactures

Materials /
Equipment

Contractor's
Equipment

Overhead (%)

Total (Yen)

d=a+b+c

Component-1: General Requirements


Insert the Japanese Origin Products
(If necessary, insert the lines)
Component-2: Civil works
Insert the Japanese Origin Products
(If necessary, insert the lines)
Component-3: Utility Works
Insert the Japanese Origin Products
(If necessary, insert the lines)
Component-4: Building Works
Insert the Japanese Origin Products
(If necessary, insert the lines)
Component-5: Air Navigation Facilities
Insert the Japanese's Origin Products
(If necessary, insert the lines)
Total
(%) of Japanese Origin Contents
Exchange Rate: as of Base Date under GCC 1.1.3.1

Php= Yen

Note to Bidders:
1) Additional lines may be inserted in each Component as necessary.
2) (%) of each item shall be proposed by the Bidder.
3) "Overhead" can include the salary and wage of Japanese personnel.

Summary / Page -5

BILL OF QUANTITIES
OF
COMPONENT-1:
G: GENERAL REQUIREMENTS

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Component-1 Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Component-1: General Requirements (G)


Component Summary
General Conditions of Contract
Section G-1115: Contractor's Facilities
Section G-1120 : Employer's and Engineer's Facilities
Section G-1130: Environment Management
Section G-1165: Contractor's Submission
Section G-1170: Daywork
Section G-1175: Soil Investigation
Section G-1210: Project Equipment
Section G-1230: Maintenance Equipment
Total to Summary of the Works

Component-1(G) / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Requirements under General Conditions of Contract
Item
No.

Rate
Description

Unit

Qty

sum

Local
Peso

(General Conditions of Contract)


1

Insurance for the Works, Third Party & Contractor's


Equipment under Clause 18 of GCC

Total to Component Summary

Component-1(G) / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1110: The Site
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section G-1115: Contractor's Facilities


Erection and Demolition of Barbed-wire Fence for 3
Barangay Roads
1

Both sides of Barangay Roads

3,200

Other parts, if necessary

500

mth

144

Provision of Security Guards


3

Provision of 2 persons each at 6 entrances of Barangay Road


for a period of 12 months

Total to Component Summary

Component-1(G) / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1120: Employer's & Engineer's Facilities
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section G-1120 : Employer's and Engineer's Facilities


Offices for Employer and Engineer
1

Project Sign Board

nos

Temporary Engineer's Office at Tagbilaran city

sum

Site Offices including utility works and all associated


equipment furnishing and facilities including removal cost

m2

410

Air-conditioning and ventilation (5 kw)

nos

17

Portable fire extinguishers (ABC 2kg)

nos

Bookshelves with glass doors and base skirt (width: 90cm;


height 2.0m, depth 40cm, 6 trays) for meeting room

nos

10

Bookshelves with base shirt (width: 90cm; height 2.0m, depth nos
40cm, 6 trays) for common use

20

Bookshelves with base shirt (wide: 90cm; height 1.0m, depth


40cm, 3 trays) for common use

nos

10

Metal Filling Cabinet with door and key lock for DOTC
representative and Consultant's Manager (width 1.2 m, height
1.2m, depth 40cm)

nos

nos

10

11 Kitchen set with cooking heater, refrigerator, hot water cattle, sum
microwave range, 30 sets of dishes, knives, spoons and folks,
60 sets of tea cups, tea spoon and glasses for the office and
laboratory

12 Meeting table (approx. 1.8m x 3 m) for meeting room

nos

13 Chairs with arm rests for meeting room

nos

20

14 Dinning table (approx. 1.8m x 2m)

nos

15 Chairs for dining tables

nos

16 Office desk for DOTC Representative and Consultant's


Manager, side drawers and chairs

nos

17 Guest chairs for DOTC Rep. & Consultant's Manager

nos

10

18 Office desks and chairs with arm rests

nos

42

19 Tables for drivers lounge

nos

20 Chairs for drivers lounge

nos

12

10 Filling Cabinet (width: 90cm, height: 2m, depth 60cm) with


door and key lock for Storage

21 Pavement around Engineer's office and car parks, side walk


m2
and landscaping and planting including removal cost (Asphalt
Surface Course = 5cm, Crushed aggregate base course = 23
cm)
22 Car Parks Roofing with posts, frame and lights including
removal cost

m2

1,730

350

Component-1(G) / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1120: Employer's & Engineer's Facilities
Rate

Item
No.

Description

Unit

Qty

23 Local Area Network System including rooters for WiFi &

sum

24 Computer for Office Use with accessories

no

25

25 Computer for AutoCAD with accessories

no

26 Lease: Multi-task Copy Machine with accessories

mth

72

27 Drawing Plotter

no

28 Network Laser Printer

no

29 PABX, telephone system and 50 handsets

sum

30 Seven (7) external line contract & telephone charge

mth

42

31 Projector and hanging roll type screen

no

32 Document Shredder

no

33 Potable Water Dispenser

no

34 Refrigerator

no

35 White board with markers (black, blue & red: 1 dozen each)

no

36 Time Recorder with 2000 punching cards

no

37 Construction Laboratory including utility works, airconditioning and removal cost

m2

220

38 Air-conditioning (3~5 kw)

nos

39 Bookshelves with glass doors and base skirt (width: 90cm;


height 2.0m, depth 40cm, 6 trays) for meeting room

nos

40 Metal rack for tools and equipment (width 90cm, height


1.8m, depth 60cm, 3~4 trays, open type)

nos

41 Office desk for Manager with side drawers and chair

nos

42 Office desk for laboratory and chair

nos

43 Workshop desk (width 1.5m, length 2.5 m) for laboratory

nos

44 Chairs for laboratory

nos

45 Laboratory Test Equipment

sum

mth

42

mth

90

Local
Peso

Office Equipment

Construction Laboratory

Utility and services for Office and laboratory Buildings


46 Maintenance of office and laboratory including water supply,
power supply, cleaning, waste garbage removal, grass cutting
and security services
Attendance upon the Engineer's Staff
During Construction Period
47 Survey Assistants (3 persons)

Component-1(G) / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1120: Employer's & Engineer's Facilities
Rate

Item
No.

Description

Unit

Qty

48 Laboratory Assistants (5 persons)

mth

150

49 Chainman (4 persons)

mth

120

50 Drivers including stand-by drivers (10 drivers)

mth

270

51 Survey Assistants (1 person)

mth

12

52 Laboratory Assistants (1person)

mth

12

53 Chainman (2 persons)

mth

24

54 Drivers (4 drivers)

mth

48

Local
Peso

Attendance upon the Engineer's Staff


During Defect Notification Period

Total to Component Summary

Component-1(G) / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1130: Environment Management
Rate

Item
No.

Description

Unit

Qty

Section G-1130: Environment Management


Monitoring and Reporting
1

Water Quality - Seawater

mth

42

Water Quality - Ground Water

mth

42

Air Quality

mth

42

Noise

mth

42

Solid Waste

mth

42

Removal of Temporarily Deposited Solid Waste


Removal of Solid Waste temporary deposited in the Site to
the designated disposal area

m3

2,000

Total to Component Summary

Componet-1(G) / Page - 7

Local
Peso

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1165: Contractor's Submission
Rate

Item
No.

Description

Unit

Qty

sum

Section G-1165: Contractor's Submission

As-Built Drawings
including binding
As-Built Drawings
Total to Component Summary

Componet-1(G) / Page - 8

Local
Peso

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

DAYWORK SCHEDULE
Section G-1170: Daywork
Rate

Item
No.

Item

Unit

Qty

Section G-1170: Daywork


Summary
Daywork - Labour
Daywork - Materials
Daywork -Plant & Equipment
Total to Component Summary
(Daywork - Labour)
1

Foreman

hour

500

Skilled labour

hour

1,000

Unskilled Labour

hour

2,000

Drivers of trucks

hour

200

Operators of equipment

hour

900

Net Price
Percentage to be entered by the Bidder %
Total to Work Summary

(Daywork - Materials)
1

Portland Cement

kg

500

Reinforcement bar

kg

200

Fine aggregate for concrete

m3

200

Coarse aggregate for concrete

m3

200

Asphalt Mixture for Surface Course

m3

200

Portland Concrete Mixture (240 kg/cm2)

m3

200

300mm dia RCPC

100

Net Price
Percentage to be entered by the Bidder %
Total to Work Summary

(Daywork - Plant & Equipment)

Wheel Loader (1.8 m3)

hour

100

Bulldozer (D9 Class)

hour

100

Bulldozer (D7 Class)

hour

100

Dump Tuck

hour

100

Water Truck

hour

100

Componet-1(G) / Page - 9

Local
Peso

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

DAYWORK SCHEDULE
Section G-1170: Daywork
Rate

Item
No.

Item

Unit

Qty

Hydraulic Breaker

hour

100

Motor Grader (200 HP)

hour

100

Tire Roller (25T)

hour

100

Vibratory Roller (10T)

hour

100

10

Tandem Roller (15.5T)

hour

100

11

Asphalt Finisher

hour

50

12

Asphalt Milling Machine

hour

50

Local
Peso

Net Price
Percentage to be entered by the Bidder %
Total to Work Summary

Componet-1(G) / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1175: Soil Investigation for Cavity Detection
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section G-1175: Soil Investigation for Cavity Detection)

Boring with SPT including laboratory tests and reporting

2-m deep Boreholes at airside (runway and taxiway)

No.

124

5-m boreholes at PTB

No.

100

5-m boreholes at Control Tower/ Administration Building

No.

31

Total to Component Summary

Componet-1(G) / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1210: Project Equipment
Rate

Item
No.

Description

Unit

Qty

vm

10

Local
Peso

Section G-1210 : Project Equipment


Provide temporary hired vehicles;
(Vehicle Month - vm)
1

Rough Terrain Vehicles (3 vehicles)


Provide, register and insure the following Vehicles:

Type-I: Sedan

no

Type- II: Rough Terrain

no

Type-III: Micro Bus

no

Type-IV: Motorcycle

no

Maintain, repair, provide fuel lubricants replacement tires


and other parts - (per month of Vehicle use -vm):
6

Type-I: Sedan (monthly average mileage: 3000 km)

vm

39

Type- II: Rough Terrain (monthly average mileage: 3500km)

vm

273

Type-III: Micro Bus (monthly average mileage: 3600km)

vm

39

Type-IV: Motorcycle (monthly average mileage: 3600km)

vm

351

Refurbish and repair vehicles and hand over to Employer:

10

Type-I: Sedan

no

11

Type- II: Rough Terrain

no

12

Type-III: Micro Bus

no

13

Type-IV: Motorcycle

no

sum

Provide Survey Equipment, including repair and regular


recalibration:
14

Survey Equipment

Total to Component Summary

Componet-1(G) / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-1: General Requirements

Component-1: General Requirements


Section G-1230: Maintenance Equipment
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section G-1230: Maintenance Equipment


1

Shovel Tractor with Backhoe (0.25 m3)

No.

Road Sweeper

No.

Dump Truck (2 t)

No.

Rotary Mower

No.

Water Sprinkler Truck (4 m3)

No

Hand Type Mower

No.

Aerial work platform, battery operated, to reach vertically


12m and horizontally 6 m

No.

Aerial work platform battery operated, to reach vertically 8 m No.

Pressure Washer

No.

Total to Component Summary

Component-1(G) / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
COMPONENT-2:
C: CIVIL WORKS

BILL OF QUANTITIES
OF
SUBCOMPONENT-2-C1:
ACCESS ROAD

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Subcomponent-2-1 Summary

Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-2-1: (C1) Access Road Summary


Subcomponent Summary
Section C1-2100 Series : Earthworks
Section C1-2200 Series : Pavement Works
Section C1-2300 Series : Drainage System
Section C1-2400 Series : Miscellaneous
Section C1-2500 Series : Landscaping
Section C1-3110 : Water Supply Pipe Line
Section C1-3290 : Road and Car Park Lighting
Total to Component-2: Civil Work Summary

Subcomponent-C1-Access Road / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Section 2100 Series: Earthworks
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section C1-2100 Series :Earthworks

Section C1-2110 : Clearing and Grubbing


Clearing and grubbing

m2

4,640

Tree Removal

No.

110

Section C1-2120 : Topsoil Removal


Topsoil removal and storage

m3

5,000

Section C1-2130 : Excavation


Common Excavation

m3

38,750

Rock Excavation

m3

5,000

Section C1-2140 : Embankment


Embankment with excavated materials

m3

15,810

Section C1-2150 : Subgrade Preparation


Grading and compaction of the top 150-mm thick subgrade to m2
95% of Maximum Dry Density

51,700

Total to Subcomponent 2-1 Summary

Subcomponent-C1-Access Road / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Section 2200 Series: Pavement Works

Item
No.

Unit

Qty

Local
Peso

Section C1-2200 Series: Pavement Works


42,380 m 2

7-m wide Access Road (2 Lanes in each direction)


Section C1-2210: Granular Subbase Course
Delivery and stockpile of locally-available coarse materials
for mixing with excavated materials; assumed at 20% of
subbbase work volume, subject to laboratory test

m3

1,950

m3

9,750

Section C1-2220: Graded Crushed Aggregate Base Course


150mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

6,360

Section C1-2240: Asphalt Concrete Surface and Binder Course


50mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

4,240

230mm Thick (using materials crashed and blended with


excavated material on site)

Section C1-2250: Prime Coat


Prime Coat

m2

42,370

Section C1-2260: Tack Coat


Tack Coat

m2

42,370

Section C1-2290: Pavement Marking


Thermoplastic reflective paint (white)

m2

160
9,090 m2

1.5-m wide Access Road Shoulder

Amount

Rate
Description

Section C1-2220: Graded Crushed Aggregate Base Course


100mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)
Section C1-2250: Prime Coat
Prime Coat

m2

909

9,090

Total to Subcomponent 2-1 Summary

Subcomponent-C1-Access Road / Page - 3

Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Section 2300 Series: Drainage System
Rate

Item
No.

Description

Unit

Qty

U-drain of 400-mm high CHB wall on 500-mm wide/200-mm


thick RC base, complete with reinforcement, with 100-mm
high topping concrete, jointing, expansion joint at 30-m
intervals, backfilling.

5,970

RCP 750 mm diameter

175

Inlet Manhole (IMH) 1000 mm x1000 mm

pc

10

Local
Peso

Section C1-2300 Series: Drainage System


CHB-walled U drain
1

Total to Subcomponent 2-1 Summary

Subcomponent-C1-Access Road / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Section 2400 Series: Miscellaneous Works
Rate

Item
No.

Description

Unit

Qty

6,080

Local
Peso

Section C1-2400 Series: Miscellaneous Works


1

Concrete curbstone (Type-B)


Road Signs

RS-2

No.

RS-3

No.

RS-4

No.

RS-5

No.

RS-12

No.

RS-13

No.

RS-15

No.

RS-16

No.

RS-19

No.

One Sign Two Post


10

GS-10

No.

11

GS-11

No.

12

GS-12

No.

Total to Subcomponent 2-1 Summary

Subcomponent-C1-Access Road / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Section 2500 Series: Landscaping
Rate

Item
No.

Description

Unit

Qty

m3

1,405

Local
Peso

Section C1-2500 Series: Landscaping


Section C1-2510 : Topsoiling
1

Topsoil 200mm thick


Section C1-2520 : Planting and Sodding
Trees

COCOS NUCIFERA - Coconut


Trunk Ht. 3.0-3.5m

pcs.

80

DELONIX REGIA, Fire Tree


125mm-150mm Cal./Total Ht. 4.5-6.0m

pcs.

122

pcs.

158,865

Shrubs & Ground Cover


4

ARACHIS PINTOI
Yellow Peanut, Spaced @ 0.15m O.C.
Total to Subcomponent 2-1 Summary

Subcomponent-C1-Access Road / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Section 3100 Series: Water Supply
Rate

Item
No.

Description

Unit

Qty

3,027

Local
Peso

Section C1-3110: Water Supply Pipeline


TRANSMISSION PIPELINES
Installation of 150-mm diameter High-density Polyethelene
(HDPE) Pipe; complete with excavation, backfilling, valves,
assemblies, connection with airport reservoir tank
1

150 mm dia, HDPE-PE100 SDR 13.6(PN 12.5)

VALVES
100 mm Gate Valves on Proposed Lines

No.

ASSEMBLIES
25 mm dia. Air Vacuum/ Air Release Valve

No.

75 mm dia. Blow-off Assemblies

No.

100 mm dia. Main Water Meter

No.

PIPE CROSSING
Canal Pipe Crossing

Sum

Total to Subcomponent 2-1 Summary

Subcomponent-C1-Access Road / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-1: (C1) Access Road


Section 3290: Road and Car Park Lighting
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section C1-3290: Access Road Lighting


1

Hot Dip Galvanized, Double Arm Lighting Pole, 12m

No.

59

120W LED Type Light, Complete with Lighting Fixture, etc. No.

118

Panelboard
ARLP1 & 2, Outdoor Type, Stainless Steel with Photo cell,
NEMA4X

No.

Power Accessories
Pole Mounted Transformer 3 or 3-1, 15kVA,
13.2kV/230V, 60Hz

Sum

Pole Accessories includes; 15kV ACSR Cable, Load Break


Switch, Power Fuse, Lightning Arrester, Connections, Pole
Line Hardware, etc.

Sum

KWH Meter

No.

Wires and Cables


7

60 mm2 THHN

6,800

50 mm2 THHN

4,300

30 mm2 THHN

2,500

10

8 mm2 THHN

2,000

11

5.5 mm2 THHN

1,500

12

6 mm2 XLPE

200

13

5.5 mm2 TW

1,200

14

Grounding System

Sum

15

Civil Works
Pedestal with 3-50 mmPVC

No.

16

Pedestal for Panelboard

No.

17

Fence, Gate, Lock and Gravel bed

Sum

18

Handholes for Lights

No.

59

19

Handholes for Pole Mounted Transformer

No.

20

Foundation/Pedestal for 12m double arm Pole

No.

59

21

2-50 mm PVC

1,900

22

3-50 mm PVC

70

23 4-50 mm PVC

900

Total to Subcomponent 2-1 Summary

Subcomponent-C1-Access Road / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
SUBCOMPONENT-2-C2:
AIRPORT INFRASTRUCTURE

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Subcomponent-2-2 Summary

Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-2-2: (C2) Airport Infrastructure Summary


Subcomponent Summary
Section C2-2100 Series : Earthworks
Section C2-2200 Series : Pavement Works
Section C2-2300 Series : Drainage System
Section C2-2400 Series : Miscellaneous
Section C2-2500 Series : Landscaping
Total to Component-2: Civil Work Summary

Subcomponent-C2-Airport Infrastructure / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2- 2100 Series: Earthworks

Item
No.

Rate
Description

Unit

Qty

m2

10,000

No.

50

m3

20,000

Local
Peso

Section C2-2100 Series :Earthworks

Section C2-2110 : Clearing and Grubbing


Clearing and grubbing of the areas for Project Affected
Family (PAF) who may occupy the construction site until
after the Commencement Date.
Removal of trees in the areas for Project Affected Family
(PAF) who may occupy the construction site until after the
Commencement Date.
Section C2-2120 : Topsoil Removal

Removal of top humus soils of variable thickness scattered


over the entire construction site, and storage thereof for the
later use for topsoiling (C2-2510-1)

Section C2-2130 : Excavation


Common Excavation by means of hydraulic excavators,
m3
scrapers, bulldozers (D7 to D9 type with or without rippers or
similar attachments) of the areas in cut to the depth of design
elevation of the finished grade or pavement subgrade or
bottome of open drains as the case may be, or the areas in fill
to the depth where the natural compaction degree is tested to
be not less than 90 % of Maximum Dry Density and
unsuitable materials is eliminated prior to subsequent
structural embankment

Rock Excavation by means of pneumatic drills or jack


hammer when exixtence of rock was observed and consented
by the Engineer through the course of Common Excavation.
Section C2-2140 : Embankment
Embankment of the areas in fill with the excavated materials
to the design elevation of the finished grade or pavement
subgrade with the compaction degree of not less than 90% of
Maximum Dry Density (MDD).
Delivery of Imported humus soils for the later use for
topsoiling (C2-2510-1)
Section C2-2150 : Subgrade Preparation
Grading and compaction of at least the top 150-mm thick
subgrade with the compaction degree of not less than 95% of
Maximum Dry Density

427,800

m3

50,000

m3

289,300

m3

5,000

m2

317,000

Total to Subcomponent 2-2 Summary

Subcomponent-C2-Airport Infrastructure / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2- 2200 Series: Pavement Works

Description

Unit

Qty

Local
Peso

Section C2-2200 Series: Pavement Works


Division Summary
Division 1: Runway
Division 2: Taxiway
Division 3: Overrun and Shoulder
Division 4: Apron
Division 5: GSE Road
Division 6: Perimeter Road
Division 7: Car Park
Division 8: Circulation Road
Total to Subcomponent 2-2 Summary
82,190 m 2

Division 1: Runway
Section C2-2210: Granular Subbase Course
Delivery and stockpile of locally-available coarse materials
for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test

m3

7,400

m3

37,000

Section C2-2220: Graded Crushed Aggregate Base Course


150mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

12,330

Section C2-2230: Asphalt Treated Aggregate Base Course


130mm Thick (using materials crashed and blended with
basalt, granite or riverstone imported from other islands)

10,700

Amount

Rate

Item
No.

450mm Thick (using materials crashed and blended with


excavated material on site)

m3

Section C2-2240: Asphalt Concrete Surface and Binder Course


150mm Thick; in 3 layers (using materials crashed and
m3
blended with basalt, granite or riverstone imported from other
islands)

12,330

Section C2-2250: Prime Coat


Prime Coat

m2

82,200

Section C2-2260: Tack Coat


Tack Coat

m2

247,000

Section C2-2290: Pavement Marking


Thermoplastic reflective paint (white)

m2

14,670

Cold applied reflective paint (white)

m2

3,870

Total to Division Summary

Subcomponent-C2-Airport Infrastructure / Page - 3

Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2- 2200 Series: Pavement Works
Rate

Item
No.

Description

Unit

m3

2,680

m3

13,400

Section C2-2220: Graded Crushed Aggregate Base Course


150mm Thick (using materials crashed and blended with
m3
basalt, granite or river stone imported from other islands)

4,790

Section C2-2270: Cement Treated Aggregate Base Course


150mm Thick (using materials crashed and blended with
basalt, granite or river stone imported from other islands)

4,790

420mm Thick (using materials crashed and blended with


excavated material on site)

Local
Peso

31,870 m 2

Division 2 : Taxiway and Runway Turn Pad


Section C2-2210: Granular Subbase Course
Delivery and stockpile of locally-available coarse materials
for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test

Qty

m3

Section C2-2240: Asphalt Concrete Surface and Binder Course


150mm Thick; in 3 layers (using materials crashed and
m3
blended with basalt, granite or riverstone imported from other
islands)

4,790

Section C2-2250: Prime Coat


Prime Coat

m2

31,870

Section C2-2260: Tack Coat


Tack Coat

m2

63,740

Section 22-2290: Pavement Marking


Thermoplastic reflective paint (yellow)

m2

760

Total to Division Summary


50,020 m 2

Division 3 : Overrun and Shoulder


Section C2-2210: Granular Subbase Course
Delivery and stockpile of locally-available coarse materials
for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test

m3

3,002

m3

15,010

Section C2-2220: Graded Crushed Aggregate Base Course


150mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

7,510

Section C2-2240: Asphalt Concrete Surface and Binder Course


50mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

2,510

300mm Thick (using materials crashed and blended with


excavated material on site)

Section C2-2250: Prime Coat


Prime Coat

m2

50,020

Section C2-2290: Pavement Marking


Thermoplastic reflective paint (yellow)

m2

350

Total to Division Summary


55,585 m 2

Division 4 : Apron
Section C2-2210: Granular Subbase Course

Subcomponent-C2-Airport Infrastructure / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2- 2200 Series: Pavement Works
Rate

Item
No.

Description

Unit

Qty

Delivery and stockpile of locally-available coarse materials


for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test

m3

3,892

350mm Thick (using materials crashed and blended with


excavated material on site)

m3

19,460

Section C2-2270: Cement Treated Aggregate Base Course


150mm Thick (using materials crashed and blended with
basalt, granite or riverstone imported from other islands)

m3

8,350

Section C2-2280: Portland Cement Concrete Pavement


400mm Thick (using materials crashed and blended with
basalt, granite or riverstone imported from other islands)

m3

22,400

Jointing Steel

pcs

28,714

Isolation Joint

202

Cutting and Sealing of Joint

21,338

Dowelled Connection with Flexible Pavement


3-m wide 250mm Thick concrete slab with wire-mesh
enbedded under taxiway

210

330

Section 22-2250: Prime Coat


10 Prime Coat

m2

55,600

Section 22-2290: Pavement Marking


11 Thermoplastic reflective paint (yellow, white)

m2

138

12 Cold applied reflective paint (black)

m2

120

13 Cold applied reflective paint (yellow)

m2

206

2-m wide 300mm Thick concrete slab with wire-mesh


embedded under GSE road

Local
Peso

Total to Division Summary


11,170 m 2

Division 5 : GSE Road

Section C2-2210: Granular Subbase Course


Delivery and stockpile of locally-available coarse materials
for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test
250mm Thick (using materials crashed and blended with
excavated material on site)
Section C2-2270: Cement Treated Aggregate Base Course
150mm Thick (using materials crashed and blended with
basalt, granite or riverstone imported from other islands)

m3

560

m3

2,800

m3

1,680

Section C2-2240: Asphalt Concrete Surface and Binder Course


100mm Thick; in 2 layers (using materials crashed and
m3
blended with basalt, granite or riverstone imported from other
islands)

1,120

Section C2-2250: Prime Coat


Prime Coat

m2

11,170

Section C2-2260: Tack Coat


Tack Coat

m2

11,170

Section C2-2290: Pavement Marking


Thermoplastic reflective paint (white)

m2

90

Subcomponent-C2-Airport Infrastructure / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2- 2200 Series: Pavement Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Total to Division Summary


48,610 m 2

Division 6 : Perimeter Road


Section C2-2210: Granular Subbase Course
Delivery and stockpile of locally-available coarse materials
for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test

m3

1,460

m3

7,300

Section C2-2220: Graded Crushed Aggregate Base Course


100mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

4,870

Section C2-2240: Asphalt Concrete Surface and Binder Course


50mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

2,430

150mm Thick (using materials crashed and blended with


excavated material on site)

Section C2-2250: Prime Coat


Prime Coat

m2

48,610

Section C2-2290: Pavement Marking


Thermoplastic reflective paint (white)

m2

573

Total to Division Summary


7,780 m2

Division 7 : Car Park


Section C2-2210: Granular Subbase Course
Delivery and stockpile of locally-available coarse materials
for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test

m3

360

m3

1,790

Section C2-2220: Graded Crushed Aggregate Base Course


150mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

1,170

Section C2-2240: Asphalt Concrete Surface and Binder Course


50mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)

390

230mm Thick (using materials crashed and blended with


excavated material on site)

Section C2-2250: Prime Coat


Prime Coat

m2

7,780

Section C2-2290: Pavement Marking


Thermoplastic reflective paint (white)

m2

120

Total to Division Summary


27,540 m 2

Division 8 : Circulation Road


Section C2-2210: Granular Subbase Course
1

Delivery and stockpile of locally-available coarse materials


for mixing with excavated materials; assumed at 20% of
subbase work volume, subject to laboratory test

m3

1,268

230mm Thick (using materials crashed and blended with


excavated material on site)

m3

6,340

Subcomponent-C2-Airport Infrastructure / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2- 2200 Series: Pavement Works

Item
No.

Rate
Description

Unit

Section C2-2220: Graded Crushed Aggregate Base Course


150mm Thick (using materials crashed and blended with
m3
basalt, granite or riverstone imported from other islands)
Section C2-2240: Asphalt Concrete Surface and Binder Course
100mm Thick; in 2 layers (using materials crashed and
m3
blended with basalt, granite or riverstone imported from other
islands)

Qty

Local
Peso

4,140

2,754

Section C2-2250: Prime Coat


Prime Coat

m2

2,754

Section C2-2260: Tack Coat


Tack Coat

m2

2,754

Section C2-2290: Pavement Marking


Thermoplastic reflective paint (white)

m2

575

Total to Division Summary

Subcomponent-C2-Airport Infrastructure / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2-2300 Series: Drainage System
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section C2-2300 Series: Drainage System


Division Summary
Division 1 :Airfield and Perimeter Drainage
Division 2: Landside Drainage
Division 3: Soaking Yard
Total to Subcomponent 2-2 Summary
Division 1 :Airfield and Perimeter Drainage
Riprapped-wall Open Ditch with varied width; complete
with two (2) opposed rows of 250-mm thick boulder wall at
vertically 16.7-degree inclined, rest on 50-mm thick mortar
beneath and 50-mm thick aggregate behind, excavation,
backfilling, expansion joint at 20-m intervals. Provided that
the bottom of the drain between the 2 rows of riprapped walls
should be evenly leveled without excessive compaction so
that natural permeability is maintained.
1

Type 1: 1.25-m high

8,156

Type 2: 1.75-m high

1,824

Tunnel Section crossing under Taxiway/ Road


1 - RCP 750 mm with 180 RC casing

20

2 - RCP 750 mm with 180 RC casing

46

3 - RCP 750 mm with 180 RC casing

76

3 - RCP 750 mm with360 RC casing / under pavement

30

4 - RCP 750 mm with 180 RC casing

44

4 - RCP 750 mm with 360 RC casing / under pavement

5 - RCP 750 mm with 180 RC casing

226

5 - RCP 750 mm with 360 RC casing / under pavement

80

120

11 2 - RCP 600 mm with 180 RC casing

150

12 3 - RCP 600 mm with 180 RC casing

150

13 4 - RCP 600 mm with 180 RC casing

100

Inlet Manhole (IMH) at ILS/GS signal reflection area


14 IMH Type 2-1 (1000mm x 2000mm)

No.

15 IMH Type 2-2 (1000mm x 2700mm)

No.

16 IMH Type 2-3 (1000mm x 3600mm)

No.

Head Wall
10 0.5-m high 200-mm thick Concrete Headwall on the end of
RCP 750 with 360concrete casing to enclose Type-2 RC
wall
RC Pipe culvert at ILS/GS signal reflection area

Subcomponent-C2-Airport Infrastructure / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2-2300 Series: Drainage System
Rate

Item
No.

Description

Filtration Bank with gabion and Giotextile


17 (8) nos of 5-m wide 0.5-m high Filtration bank
(1) no of 3-m wide 0.5-m high Filtration bank
Total to Division Summary

Unit

Qty

43

Local
Peso

Division 2: Landside Drainage

RC Pipe
RCP 300 mm diameter with 180 RC casing

357

RCP 375 mm diameter with 180 RC casing

183

RCP 450 mm diameter with 180 RC casing

956

RCP 600 mm diameter with 180 RC casing

444

RCP 750 mm diameter with 180 RC casing

315

RCP 900 mm diameter with 180 RC casing

396

RCP 1050 mm diameter with 180 RC casing

413

PVC Pipe
PVC 150 mm diameter with 360 Sand casing

Inlet Manhole (IMH)


IMH Type 1 (600mm x600mm)

No.

52

10 IMH Type 2 (1350mm x 1350mm)

No.

23

11 IMH Type 3 (1850mm x 1850mm)

No.

12 Street Inlet including inlet and outlet


150-200mm dia. PVC pipe Type 1

No.

28

No.

Fuel Separator
13 Fuel Separator
Total to Division Summary
Division 3: Soaking Yard
1

Filtration bank (in the Soaking yard)

280

Geotextile

m2

30,000

Total to Division Summary

Subcomponent-C2-Airport Infrastructure / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section 2400 Series: Miscellaneous Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section 22-2400 Series: Miscellaneous Works


Series Summary
Section 22-2410 : Curbstone, Gutter and Walkway
Section 22-2420 : Fence and Gates
Section 22-2430 : Road Signs and Guide Signs
Section 22-2440 : Flagpoles
Total to Subcomponent 2-2 Summary
Section 22-2410 : Curbstone, Gutter and Walkway
Concrete curb
1

Type-A

740

Type-B

1,130

Type-C

720

Concrete gutter

740

Concrete walkway

m2

1,330

Total to Section Summary


Section 22-2420 : Fence and Gates
1

Fence; Type 1 (2120 mm high)

9,970

Fence; Type 2 (1500 mm high)

620

Double swing gate Type 1

No.

Double swing gate Type II

No.

Total to Section Summary


Section 22-2430 : Road Signs and Guide Signs

One Sign on One Post


RS-1

No.

RS-2

No.

RS-3

No.

RS-4

No.

RS-5

No.

RS-7

No.

RS-8

No.

RS-11

No.

RS-13

No.

Subcomponent-C2-Airport Infrastructure / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section 2400 Series: Miscellaneous Works
Rate

Item
No.

Description

Unit

Qty

10 RS-17

No.

11 RS-18

No.

Two Signs on One Post


12 RS-6, RS-12

No.

13 RS-9, RS-10

No.

14 RS-14

No.

15 GS-6

No.

16 GS-7

No.

Overhead
17 GS-1

No.

18 GS-2

No.

19 GS-3

No.

20 GS-4

No.

21 GS-5

No.

Local
Peso

One Sign on Two Post

Total to Section Summary


Section 22-2440 : Flagpoles

Complete with foundation and accessories


9 m High mast

No.

6 m High mast

No.

Total to Section Summary

Subcomponent-C2-Airport Infrastructure / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2-2500 Series: Landscaping
Rate

Item
No.

Description

Unit

Qty

m3

27,000

pcs.

34

Local
Peso

Section C2-2500 Series: Landscaping


Series Summary
Section C2-2510: Topsoiling
Section C2-2520: Planting and Sodding
Division 1: Main Entrance/ Car Park
Division 2: PTB Courtyard
Division 3 : ATC Car Park
Division 4: Airfield
Section C2-2530: Irrigation System
Section C2-2540: Maintenance during DNP
Total to Subcomponent 2-2 Summary
Section C2-2510 : Topsoiling
1

Topsoil 150mm thick


Total to Series Summary
Section C2-2520 : Planting and Sodding
Division 1: Main Entrance/ Car Park

Trees
PELTHOPHORUM INERME, Yellow Copper pod
100mm-125mm cal., Total Ht. 3.0-3.5m

CASSIA BIFLORA - Yellow Cassia


Total Ht. 1.8-2.0m

pcs.

1,129

CASSIA FISTULA - Golden Shower


100mm-125mm cal., Total Ht. 3.0-3.5m

pcs.

12

COCOS NUCIFERA - Coconut


Trunk Ht. 3.0-3.5m

pcs.

120

FICUS MACLELLANDII - Ficus Maclelland


Total Ht. 2.5-3.0m

pcs.

55

BISMARCKIA NOBILIS - Bismarck Palm


Trunk Ht. 0.30-0.50m, Total Ht. 1.2-1.5m

pcs.

PHOENIX DACTYLIFERA - Dates Palm


Trunk Ht. 0.60m
Trunk Ht. 3.0-3.5m

pcs.

PLUMERIA RUBRA - Red Calachuchi


100mm-125mm Cal., Total Ht. 2.7-3.2m

pcs.

25

ROYSTONEA REGIA - Royal palm


Trunk Ht. 3.0-3.5m

pcs.

34

10

SPATHODEA CAMPANULATA - African Tulip


100mm-150mm Cal.. Total Ht. 5-6m

pcs.

24

Subcomponent-C2-Airport Infrastructure / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2-2500 Series: Landscaping

Item
No.

Rate
Description

Unit

Qty

11

TABEBUIA HETEROPHYLLA - Pink Tabebuia


75mm-100mm Cal., Total Ht. 3.5-4.0m

pcs.

14

12

TRIPLARIS SURINAMENSIS - Palo Santo


100mm-125mm Cal., Total Ht. 5.0-6.0m

pcs.

16

13

WODYETIA BIFURCATA - Foxtail Palm


Trunk Ht. 2.0-2.5m

pcs.

28

pcs.

160

14

Shrubs & Ground Cover


ALPINIA PURPURATA
Red Ginger, Spaced @ 0.50m O.C.

15

ARACHIS PINTOI
Yellow Peanut, Spaced @ 0.15m O.C.

pcs.

3,575

16

BOUGAINVILLEA SP. "Mary Palmer"


Bougainvillea, Spaced @ 0.40m O.C.

pcs.

957

17

CALLIANDRA HEAEMATOCEPHALA
Powder Puff, Spaced @ 0.50m O.C.

pcs.

1,376

18

EUGENIA SP.
Eugenia, Spaced @ 0.40m O.C.

pcs.

9,957

19

HELICONIA PSITTACORUM
False Birds of Paradise, Spaced @ 0.40m O.C.

pcs.

2,213

20

HIBISCUS SP.
Gumamela, Spaced @ 0.40m O.C.

pcs.

6,150

21

HYMINOCALIS LITORALIS
Green Lily, Spaced @ 0.25m O.C.

pcs.

6,032

22

IRIS PSEUDACARPUS
Yellow Iris, Spaced @ 0.20m O.C.

pcs.

7,800

23

MURAYA PANICULATA
Kamuning, Spaced @ 0.40m O.C.

pcs.

8,350

24

OSMOXYLON LINEARE
Miagos, Spaced @ 0.30m O.C.

pcs.

9,312

25

CYNODON SP.
LaPrima Bermuda Grass (Sprigging)

m2

5,728

26

SANSEVIERIA TRIFASCIATA
Yellow Sanseviera, Spaced @ 0.20m o.c.

pcs.

4,550

27

TABERNAEMONTANA PANDACAQUI
Dwarf Pandakaki, Spaced @ 0.30m O.C.

pcs.

12,445

28

NERIUM OLEANDER
Adelfa, Spaced @ 1.20m O.C.

pcs.

696

29

CONC. STEPPING PADS 0.60 X 0.60M

pcs.

337

Local
Peso

Total to Series Summary

Subcomponent-C2-Airport Infrastructure / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2-2500 Series: Landscaping
Rate

Item
No.

Description

Unit

Qty

pcs.

14

Local
Peso

Division 2: PTB Courtyard

30

Trees
PRITCHARDIA PACIFICA - Pritchardia Palm
Trunk Ht. 1.5-1.8m

31

BISMARCKIA NOBILIS - Bismarck Palm


Trunk Ht. 0.30-0.50m, Total Ht. 1.2-1.5m

pcs.

36

32

PHOENIX DACTYLIFERA - Dates Palm


Trunk Ht. 2.1-2.4m

pcs.

11

33

ROYSTONEA REGIA - Royal Palm


Trunk Ht. 3.0-3.5m

pcs.

65

34

1.2m X 1.2M X 1.2M Fiberglass Reinforced Planter Box

pcs.

14

35

Shrubs & Ground Cover


CYNODON SP.
LaPrima Bermuda Grass (Sprigging)

713

36

FLAT BULIK STONES

16

37

CORALLINE LIME STONES

38

pcs.

15

pcs.

12

pcs.

8,811

pcs.

497

42 CYNODON SP. " La Prima Blend" (Seeds/kg. - Approx.


2,2000,000), Seeding Rate - 30-35kg./Hectare

m2

65,455

43

m2

42,930

pcs.

10

Total to Series Summary


Division 3 : ATC Car Park

38

39

40

41

Trees
DELONIX REGIA, Fire Tree
125mm-150mm Cal./Total Ht. 4.5-6.0m
CASSIA FISTULA, Golden Shower
100mm-125mm cal., Total Ht. 3.0-3.5m
Shrubs & Ground Cover
ARACHIS PINTOI
Yellow Peanut, Spaced @ 0.15m O.C.
BOUGAINVILLEA SP. "Mary Palmer"
Bougainvillea, Spaced @ 0.40m O.C.
Total to Series Summary
Division 4 : Airfield & Other Areas

Other Area
La Prima Seeded Bermuda Blend
Total to Series Summary
Section C2-2530: Irrigation System

SPRINKLERS & ACCESSORIES


MP300090-210
MP Rotator - 40PSI, 9.1M Radius, 3.64GPM

Subcomponent-C2-Airport Infrastructure / Page - 14

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2-2500 Series: Landscaping
Rate

Item
No.

Description

Unit

Qty

MP3000360
MP Rotator - 40PSI, 9.1M Radius, 1.82GPM

pcs.

49

PROS-04-PRS40 POP-UP BODY


4" Pop-up Ht. Body

pcs.

59

ICV-151G SOLENOID VALVE


24VAC, 20-135GPM, 20-220PSI

pcs.

IC-601-PL (+1 ICM-600) 12 STA. CONTROLLER


220VAC, 1AMP, 12 Stations

unit

SJ-512 SWING JOINT


1/2" x 12" Swing Joint

pcs.

59

HSJ-1 SWING JOINT


1" x 12" Swing Joint

pcs.

122

HQ-44RC QUICL COUPLING VALVE


1" Inlet x 3/4" Outlet Quick Coupling Valve

pcs.

122

HK-44 QUICK COUPLING KEY


3/4" QCV Key

pcs.

10 HS-1 QUICK COUPLING SWEVEL


3/4" QCV Swevel Elbow

pcs.

11 160700 SPOTSHOT HOSE-END NOZZLE


3/4" Hose-End Nozzle

pcs.

12 6" ROUND VALVE BOX

pcs.

122

13 12" RECT. VALVE BOX

pcs.

27

PIPES & FITTINGS


14 6" PVC PIPE CL150 X 6m, SCH80, ASTM D1784

pcs.

25

15 1" PVC PIPE CL150 X 3m, SCH80, ASTM D1784

pcs.

65

16 1" PVC PIPE CL150 X 3m, SCH80, ASTM D1784

pcs.

25

17 1" PVC PIPE CL150 X 3m, SCH80, ASTM D1784

pcs.

1,167

18 " PVC PIPE CL150 X 3m, SCH80, ASTM D1784

pcs.

43

19 " PVC PIPE CL150 X 3m, SCH80, ASTM D1784

pcs.

118

20 1" PVC Tee

pcs.

40

21 1" PVC Tee

pcs.

35

22 1" PVC Tee

pcs.

135

23 " PVC Tee

pcs.

30

24 " PVC Tee

pcs.

20

25 1" x 90 PVC Elbow

pcs.

26

26 1" x 90 PVC Elbow

pcs.

28

Local
Peso

Subcomponent-C2-Airport Infrastructure / Page - 15

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-2: Civil Works

Subcomponent-2-2: (C2) Airport Infrastructure


Section C2-2500 Series: Landscaping
Rate

Item
No.

Description

Unit

Qty

27 1" x 90 PVC Elbow

pcs.

165

28 " x 90 PVC Elbow

pcs.

21

29 " x 90 PVC Elbow

pcs.

58

30 2" X 1" PVC Bushing Reducer

pcs.

34

31 1" X 1" PVC Bushing Reducer

pcs.

42

32 1" X 1" PVC Bushing Reducer

pcs.

50

33 1" X " PVC Bushing Reducer

pcs.

60

34 " X " PVC Bushing Reducer

pcs.

75

35 6" X 2" C.I. Saddle Clamp

pcs.

27

36 1" Brass Gate Valve

pcs.

37 1" Brass Gate Valve

pcs.

20

38 2" Male Adaptor

pcs.

27

39 1" Male Adaptor

pcs.

28

40 1" Male Adaptor

pcs.

40

41 1" Female Adaptor

pcs.

122

42 " Female Adaptor

pcs.

59

43 DBY Connector

pcs.

30

44 #12 U.F. Wire (Black)

pcs.

475

45 #14 U.F. Wire (Red)

pcs.

2,240

46 3/4" Garden Hose x 25m

rolls

47 Electrical Tape

rolls

15

48 Teflon Tape

rolls

75

49 721 PVC Blue Cement

sum

mth

12

Local
Peso

Total to Series Summary


Section C2-2540: Maintenance during Defect Notification
Period

Maintenance of Plants and Irrigation System during Defect


Notification Period
Total to Series Summary

Subcomponent-C2-Airport Infrastructure / Page - 16

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
COMPONENT-3:
U: UTILITY WORKS

BILL OF QUANTITIES
OF
COMPONENT-3:
U1: WATRER SUPPLY SYSTEM

Subcomponent-3-U: Utility Works


Component Summary

Item
No.

Rate
Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Component-3-U: Utility Works


Component Summary
U1: Water Supply System
U2: Power Supply System
U3: Sewage Treatment System

Total to Work Summary

Subcomponent-3-U1: Water Supply System / Page - 1

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-1: (U1): Water Supply System


Subcomponent Summary

Item
No.

Rate
Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Subcomponent-3-1: (U1): Water Supply System


Subcomponent Summary
Section U1-3110: Water Supply System

Price shall be quoted in BOQ of Component-2: Civil Works; C1: Access Road

Section U1-3130: Water Storage


Section U1-3150: Water Distribution System

Total to Component Summary

Subcomponent-3-U1: Water Supply System / Page - 2

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-1: (U1): Water Supply System


Section UI-3110: Water Supply Pipe Line
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Section U1-3110: Water Supply

TRANSMISSION PIPELINES
150 mm dia, HDPE-PE100 SDR 13.6(PN 12.5)

VALVES
100 mm Gate Valves on Proposed Lines

ASSEMBLIES
25 mm dia. Air Vacuum/ Air Release Valve

75 mm dia. Blow-off Assemblies

100 mm dia. Main Water Meter

PIPE CROSSING
Canal Pipe Crossing

(Note: Quotation for Section 3110 of Compoment-31: Water Supply System shall be included in
Component-2-1: C1: Access road).Access Road
Therefore, Rate and Amount in this Section 3110
shall be blank.

Total to Subcomponent 3-1 Summary

Subcomponent-3-U1: Water Supply System / Page - 3

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-1: (U1): Water Supply System


Section UI-3130: Water Storage
Rate

Item
No.

Description

Unit

Qty

sum

Local
Peso

Amount
Foreign
Yen

Section U1-3130: Water Storage

Reservoirs
Two (2) units of 255 m Capacity Ground Water Reservoirs
Underground Fire and Rescue Water

Excavation
CommonExcavation

m3

177

Rock Excavation

m3

146

Filling
Backfilling to subgrade

m3

238

Filling/Compaction
Gravel bed; 200mm thick

m2

27

Concrete Works
In-situ Concrete

Concrete: Class B3 in:


Lean concrete; 50mm thick

m3

Reinforced Concrete: Class B1 in:


Slab

m3

Wall

m3

16

Stair

m3

10

Reinforced Concrete: Class B2 in:


Ground Slab

m3

Formwork

11

Class F1 Formwork in:


Slab

m2

21

12

Ground Slab

m2

13

Wall

m2

119

15

Reinforcement
Reinforcement bar - (Grade 40, = 276 N/mm2)
10 mm ~ 12 mm

kg

1,900

Miscellaneous
18

Manhole Cover (Circular type Dia 0.6m)

unit

19

Ladder Rung

unit

Total to Subcomponent 3-1 Summary

Subcomponent-3-U1: Water Supply System / Page - 4

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-1: (U1): Water Supply System


Section U1-3150: Water Distribution
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Section U1-3150: Water Distribution


1

Booster Pump Unit (incl. Pump, Motor, Control Panel,


pressure tank and Accessories)

sum

Electric Drive Fire Pump (incl, pump, motor, Control Panel

sum

Engine Drive Fire Pump (incl, pump, engine, Control Panel,

sum

Jockey Pump (incl, pump, motor, Control Panel and

sum

PVC Pipes & Fittings for Outdoor Fire Protection, Class 150

Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back


filling, Sand bedding and Accessories
5

250 mm

634

200 mm

68

150 mm

1,209

Valves
Alarm Check Valve 150 mm

nos

Butterfly Valve 150 mm

nos

10 Gate Valve 150 mm

nos

11 Flexible Joint 150 mm

nos

12 Relief Valve

nos

13 Fire Pump Test Connection, 65 mm x 4-Way

nos

14 Fire Department Connection, 65 mm x 2-Way

nos

15 Fire Hydrants

nos

16 Wet Pilot Type Deluge Valve

nos

Pipework, Polyvinyl chloride pipe (High Density VP)


Incl, Fittings Hangers, Supports, Sleeves, Inserts, Excavation,
Back filling, Sand bedding and Accessories
17

150 mm

426

18

100 mm

449

19

80 mm

15

20

50 mm

912

21

40 mm

73

22

32 mm

240

23

25 mm

70

24

20 mm

26

Gate Valves for Water Distribution (JIS 10 Kg/cm2)

Subcomponent-3-U1: Water Supply System / Page - 5

Local
Peso

Foreign
Yen

New Bohol Airport Construction Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-1: (U1): Water Supply System


Section U1-3150: Water Distribution
Rate

Item
No.

Description

Unit

Qty

25 150 mm

nos

26 100 mm

nos

10

27 80 mm

nos

28

50 mm

nos

29

32 mm

nos

30

25 mm

nos

31

20 mm

nos

nos

33 150 mm

nos

34

nos

35 100 mm

nos

36 80 mm

nos

nos

Local
Peso

Amount
Foreign
Yen

Y-Strainer (10 Kg/cm2)


32 100 mm
Flexible Joint (10 Kg/cm2)

25 mm
Water Level Control Valve (10 Kg/cm2)

Pilot Valve
37 25 mm
Total to Subcomponent 3-1 Summary

Subcomponent-3-U1: Water Supply System / Page - 6

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
COMPONENT-3:
U2: POWER SUPPLY SYSTEM

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Subcomponent-3-2: U2: Power Supply System
Subcomponent Summary

Item
No.

Rate
Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-3-2: (U2) Power Supply System


Subcomponent Summary
Section U2-3210 : Electrical Power Supply
Section U2-3230 : Standby Generator
Section U2-3250 : Photovoltaic Power Generation System
Section U2-3270 : Power Distribution
Section U2-3290 : Road and Car park Lighting
Total to Component Summary

Subcomponent-3-U2: Power Supply System / Page - 1

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Subcomponent-3-2: U2: Power Supply System
Section U2-3210 : Electrical Power Supply

Description

Unit

Qty

Local
Peso

Section U2-3210 : Electrical Power Supply


1

Main VCB 15kV

No

ATS 2VCB 7.2kV

No

Take-off Panel (VT.ZPD) (1)

No

3VCB Panel (2)

No

3VCB Panel (3)

No.

3VCB Panel (4)

No.

1VCB Panel (5)

No.

2000kVA, Transformer, Cast Resin, 3, 13.2kV/4.16kV


Indoor Type

No.

Capacitor Bank, 5KV, 1000KVAR, with complete


accessories

No.

10 700kVA, Transformer, Cast Resin, 3, 4.16kV/230V Indoor


Type (PTB)

No.

11 500kVA, Transformer, Cast Resin, 3, 4.16kV/230V Indoor


Type (CTO)

No.

12 200kVA, Transformer, Cast Resin, 3, 4.16kV/230V Indoor


Type (AGL)

No.

13 175kVA, Transformer, Cast Resin, 3, 4.16kV/230V Indoor


Type (WPH)

No.

14 100kVA, Transformer, Cast Resin, 4.16kV/230V, 3, Indoor No.


Type (PWH)

15 100kVA, Transformer, Cast Resin, 4.16kV/230V, 3,


Outdoor Type (STP)

No.

16 50kVA, Transformer, Cast Resin, 4.16kV/230V, 3, Indoor


Type (ANS)

No.

17

VCB Panel for PTB Indoor Type, 7.2kV

No.

18

VCB Panel for Pump House Indoor Type, 7.2kV

No.

19

LBS, Power Fuse MVSG, 7.2kV. Outdoor Type (STP)

No.

20 LBS, Power Fuse, MVSG, 7.2kV with Extended Buss Bar.


Indoor Type (VOR)

No.

No.

21

Amount

Rate

Item
No.

LBS, Power Fuse, MVSG, 7.2kV with Cast Resin


Low Voltage Switch Gear

22

LVSG - PTB, 230V

No.

23

LVSG - PWH, 230V

No.

24

LVSG - AGL, 230V

No.

Subcomponent-3-U: Power Supply System / Page - 2

Foreign
Yen

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Subcomponent-3-2: U2: Power Supply System
Section U2-3210 : Electrical Power Supply
Rate

Item
No.

Description

Unit

Qty

25

LVSG - CTO, 230V

No.

26

LVSG - WPH, 230V

No.

27

LVSG - STP, 230V

No.

28

LVSG - LLZ, GS and VOR, 230V

No.

Local
Peso

Cables
29

240 mm2 XLPE, 600V

550

30

120 mm2 XLPE, 600V

75

31

95 mm2 XLPE, 600V

175

32

35 mm2 XLPE, 600V

50

33

25 mm2 XLPE, 600V

200

34

6 mm2 XLPE, 600V (VOR/GS/LLZ)

50

35

UPS
100 kVA, UPS, 230V, 3 (AGL)

No.

36

Other
Grounding System

Sum

Provisional sum of ten million peso for the Bohol Electric


Sum
Company 1 (BOHECO 1) overhead HV line from the
proposal 10MVA substation and also for all required deposits
payable to Bohol Electric Company 1 (BOHECO 1)

37

Total to Subcomponent Summary

Subcomponent-3-U: Power Supply System / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project

Subcomponent-3-2: U2: Power Supply System


Section 3230: Stand-by Generator

Item
No.

Rate
Description

Unit

Qty

Local
Peso

SECTION 3230: Stand-by Generator


1

400 kVA, Diesel Engine Generator, 4.16kV, 1800 rpm, PF80%, including Fuel/Exhaust Piping, Generator Control
Panels, cabling, wiring. Outgoing VCB switchgear, auxiliary
equipment, grounding equipment and other equipment
necessary to complete the works including ancillary
transformer, 50kVA, 4.16kV/230V

No.

Main Fuel Tank (18 kl) and Daily Fuel Tank (900 l)
No.
including supporting structure, pipes and concrete foundation.

Total to Subcomponent Summary

Subcomponent-3-U: Power Supply System / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Subcomponent-3-2: U2: Power Supply System
Section 3280: Photovoltaic Power Generation System
Rate

Item
No.

Unit

Qty

Section 3250: Photovoltaic Power Generation System


Photovoltaic Module
480 kW or above, 210 W, Crystalline Type

nos

2304

Mount on Metal Roof


Mount Parts Photovoltaic Module

nos

9056

Rail (Straight)

1890

Fixing Clasp (for Edge on Straight Rail, Angle Adjustable


Type)

nos

1652

Fixing Clasp (for Middle on Straight Rail, Angle Adjustable


Type)

nos

2310

Rail (Curve on Roof)

2430

Fixing Clasp (for Edge on Curve Rail, Angle Adjustable


Type)

nos

2124

Fixing Clasp (for Middle on Curve Rail, Angle Adjustable


Type)

nos

2970

sum

Junction Box
10 Connection Box (5 Input Circuits)

nos

11 Connection Box (4 Input Circuits)

nos

Power Conditoner
12 500 kVA Type, 5 Input Circuits

sum

Board for Power Conditoner


13 500 kVA 200/230V

lot

Meteorological Monitoring System


14 Meteorological Monitoring and Data Collecting System

set

Display Monitor
15 Display Monitor with Cable and Fixture

set

Power Cable
16 Power Cable

sum

Control/Communication Cable
17 Control/Communication Cable

sum

Electrical Conduit (for DC Cable)


18 PFD 28 mm (for 600V CVD 8 sqmm)

170

19

FEP 150 mm (for 600V CVD 150 sqmm)

520

Cable Tray (to Elec. Room in PTB )


20 Stright Cable Tray, W=400 mm, L=3,000 mm

nos

21 Bend Cable Tray, W=400 mm

nos

22 Connecting Clasp

nos

nos

Description

Connection Box
Connection Box

Local
Peso

Test Equipment
23 Clamp Meter

Subcomponent-3-U: Power Supply System / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Subcomponent-3-2: U2: Power Supply System
Section 3280: Photovoltaic Power Generation System

Item
No.

Rate
Description

24 Spare Parts

Unit

Qty

Sum

Local
Peso

Total to Subcomponent Summary

Subcomponent-3-U: Power Supply System / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Component-3-2: U2: Power Supply System
Section U2-3270 : Power Distribution
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section U2-3270 : Power Distribution


1

Concrete Pedestal with 8-110 mm PVC for 13.2kV Overhead No.


line entrance

1C-50 mm2 XLPE, 15kV

600

1C-25 mm2 XLPE, 5kV

8,710

1C-35 mm2 XLPE, 5kV

5,460

1C-50 mm2 XLPE, 5kV

705

1C-95 mm2 XLPE, 5kV

75

1C-120 mm2 XLPE, 5kV

180

15kV Splicing Kit


8

For 50 mm2 XLPE, 15kV (1C)

No.

For 25 mm2 XLPE, 5kV (1C)

No.

16

10

For 35 mm XLPE, 5kV (1C)

No.

22

11

For 50 mm XLPE, 5kV (1C)

No.

12

For 95 mm XLPE, 5kV (1C)

No.

13

For 120 mm2 XLPE, 5kV (1C)

No.

Cable Duct Bank


14

12-100 mm PVC

25

15

10-100 mm PVC

205

16

6-100 mm PVC

175

17

5-100 mm PVC

50

18

4-100 mm PVC

380

19

2-50 mm PVC

270

20

2-100 mm PVC & 2-50 mm PVC

120

21

1-100 mm PVC & 2-50 mm PVC

200

22

Manhole

No.

25

Total to Subcomponent Summary

Subcomponent-3-U: Power Supply System / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Subcomponent-3-2: U2: Power Supply System
Section U2-3290 : Road and Car park Lighting
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section U2-3290 : Road and Car park Lighting


1

Hot Dip Galvanized Double Arm Lighting Pole, 12m

No.

10

Hot Dip Galvanized Single Arm Lighting Pole, 12m

No.

29

120W LED Type Light, Complete with Lighting Fixture, etc. No.

65

Hot Dip Galvanized 15m Car park Lighting Pole

No.

Panelboard
5

RCPN (BMS Interface)

No.

RCPNE (BMS Interface)

No.

Wires and Cables


7

38 mm2 THHN

1320

30 mm2 THHN

2400

22 mm2 THHN

2000

10

14 mm2 THHN

900

11

8.0 mm2 THHN

200

12

5.5 mm2 THHN

1500

13

1C-6 mm2 XLPE

100

14

1C-4 mm2 XLPE

2500

Civil Works
15

Lighting Pole Pedestal/Foundation, 12m

No.

39

16

Car park Lighting Pole Pedestal/Foundation, 15m

No.

17

Handholes

No.

43

Concrete Duct Bank


18

1-50mm PVC

1710

19

2-50mm PVC

400

20

3-50mm PVC

150

21

4-50mm PVC

100

22

8-50mm PVC

70

23

Grounding System

Sum

Access Road
24

Hot Dip Galvanized, Double Arm Lighting Pole


12m

No.

59

25

120W LED Type Light, Complete with Lighting Fixture, etc. No.

118

Subcomponent-3-U: Power Supply System / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-3: Utility Works

New Bohol Airport Construction Sustainable Environmental Protection Project


Subcomponent-3-2: U2: Power Supply System
Section U2-3290 : Road and Car park Lighting
Rate

Item
No.

Description

Unit

Qty

No.

27 Pole Mounted Transformer 3 or 3-1, 15kVA,


13.2kV/230V, 60Hz

Sum

28 Pole Accessories includes; 15kV ACSR Cable, Load Break


Switch, Power Fuse, Lightning Arrester, Connections, Pole
Line Hardware, etc.

Sum

No.

Local
Peso

Panelboard
26 ARLP1 & 2, Outdoor Type, Stainless Steel with Photo cell,
NEMA4X
Power Accessories

29

KWH Meter
Wires and Cables

30

60 mm2 THHN

6800

31

50 mm2 THHN

4300

32

30 mm2 THHN

2500

33

8 mm2 THHN

2000

34

5.5 mm2 THHN

1500

35

6 mm2 XLPE

200

36

5.5 mm2 TW

1200

37

Grounding System

Sum

Civil Works
38

Pedestal with 3-50 mm PVC

No.

39

Pedestal for Panelboard

No.

40

Fence, Gate, Lock and Gravel bed

Sum

41

Handholes for Lights

No.

59

42

Handholes for Pole Mounted Transformer

No.

43

Foundation/Pedestal for 12m double arm Pole

No.

59

44

2-50 mm PVC

1900

45

3-50 mm PVC

70

46

4-50 mm PVC

900

Total to Subcomponent Summary

Subcomponent-3-U: Power Supply System / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
COMPONENT-3:
U3: SEWAGE TREATMENT SYSTEM

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Summary

Item
No.

Rate
Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

SUBCOMPONENT 3-3: SEWAGE TREATMENT SYSTEM


Subcomponent Summary
Section 3305: General Requirement

Section U3-3310: CIVIL WORKS

Section U3-3350: MECHANICAL EQUIPMENT

Section U3-3370: ELECTRICAL EQUIPMENT

Total to Component Summary

Subcomponent-3-U3: Sewage Treatment System / Page - 1

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3305: Maintenance and Repair Services during the Defect Notification Period

Item
No.

Rate
Description

Unit

Qty

mth

12

Local
Peso

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Section U3-3305: GENERAL REQUIREMENTS


1

Maintenance and Repair Services during the Defect


Notification Period
Total to Subcomponent Summary

Subcomponent-3-U3: Sewage Treatment System / Page - 2

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Section U3-3310: CIVIL WORKS


Division-1: GRIT CHAMBER/ PUMP STATION
Division-2: DISTRIBUTION CHAMBER
Division-3: OXIDATION DITCH
Division-4: FINAL CLARIFIER
Division-5: DISINFECTION TANK
Division-6: SLUDGE THICKENER
Division-7: SLUDGE DRYING BED
Division-8: YARD PIPE
Division-9: SEWER LINE WORK
Total to Subcomponent Summary

Division-1: GRIT CHAMBER/ PUMP STATION


Excavation
1

CommonExcavation

m3

814

Rock Excavation

m3

668

m3

739

m2

23

Filling
3

Backfilling to subgrade
Filling/Compaction

Gravel bed; 200mm thick


Concrete Works
In-situ Concrete

Concrete: Class B3 in:


Lean concrete; 50mm thick

m3

Reinforced Concrete: Class B1 in:


Slab

m3

18

Wall

m3

146

Stair

m3

Reinforced Concrete: Class B2 in:


Ground Slab

m3

61

Formwork

10

Class F1 Formwork in:


Slab

m2

144

11

Ground Slab

m2

26

12

Wall

m2

617

Subcomponent-3-U3: Sewage Treatment System / Page - 3

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.
13

Description

Stair

Unit

Qty

m2

Local
Peso

Amount
Foreign
Yen

Reinforcement
14

Reinforcement bar - (Grade 40, = 276 N/mm2)


10 mm ~ 12 mm

kg

1844

15

Reinforcement bar - (Grade 60, = 415 N/mm2)


16mm ~ 25mm

kg.

34569

Miscellaneous
16

Plain Concrete

m3

17

Manhole Cover (Circular type Dia 0.6m)

unit

18

Manhole cover (FRP 1.4x0.6m)

unit

19

Manhole cover (FRP 1.0x0.5m)

unit

20

Manhole cover (FRP 0.6x0.5m)

unit

21

Manhole cover (FRP 0.4x0.5m)

unit

22

Manhole cover (FRP 1.2x0.6m)

unit

23

Manhole cover (FRP 1.5x0.6m)

unit

24

Ladder Rung

unit

37

25

Handrail

50

26

Corrosion Protection Paint (Type D1)

m2

164

27

SS304 Pipe 100mm

23

28

SS304 Pipe 200mm

29

FRPROOFMechanical Pit)

unit

Total to Division Summary


Division-2: DISTRIBUTION CHAMBER
Excavation
1

CommonExcavation

m3

21

Rock Excavation

m3

m3

11

m2

m3

Filling
3

Backfilling to subgrade
Filling/Compaction

Gravel bed; 200mm thick


Concrete Works
In-situ Concrete

Concrete: Class B3 in:


Lean concrete; 50mm thick

Subcomponent-3-U3: Sewage Treatment System / Page - 4

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Reinforced Concrete: Class B1 in:


6

Slab

m3

Wall

m3

Stair

m3

Reinforced Concrete: Class B2 in:


9

Ground Slab

m3

Formwork
Class F1 Formwork in:
10

Slab

m2

11

Ground Slab

m2

12

Wall

m2

71

Reinforcement
13

Reinforcement bar - (Grade 40, = 276 N/mm2)


10 mm ~ 12 mm

kg

50

14

Reinforcement bar - (Grade 60, = 415 N/mm2)


16mm ~ 25mm

kg.

2,730

Miscellaneous
15

Plain Concrete

m3

16

Manhole Cover (Circular type Dia 0.6m)

unit

17

Manhole Cover (Dome type 0.4x 0.8m)

unit

18

Ladder Rung

unit

30

19

Handrail

12

20

Stop Log (W=0.8m x H=0.5m x 3pc.)

unit

21

Corrosion Protection Paint (Type D1)

m2

15

22

SS304 Pipe 100mm

23

PVCPipe 100mm

P.C.

Total to Division Summary


Division-3: OXIDATION DITCH
Excavation
1

CommonExcavation

m3

672

Rock Excavation

m3

40

m3

240

Filling
3

Backfilling to subgrade

Subcomponent-3-U3: Sewage Treatment System / Page - 5

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

m2

39

m3

10

Local
Peso

Amount
Foreign
Yen

Filling/Compaction
4

Gravel bed; 200mm thick


Concrete Works
In-situ Concrete
Concrete: Class B3 in:

Lean concrete; 50mm thick


Reinforced Concrete: Class B1 in:

Slab

m3

12

Wall

m3

168

Stair

m3

m3

84

Reinforced Concrete: Class B2 in:


9

Ground Slab
Formwork
Class F1 Formwork in:

10

Slab

m2

78

11

Ground Slab

m2

27

12

Wall

m2

1,069

13

Stair

m2

Reinforcement
14

Reinforcement bar - (Grade 40, = 276 N/mm2)


10 mm ~ 12 mm

kg

4,006

15

Reinforcement bar - (Grade 60, = 415 N/mm2)


16mm ~ 25mm

kg.

33,337

Miscellaneous
16

Plain Concrete

m3

17

Manhole Cover (Circular type Dia 0.6m)

unit

18

Manhole cover (FRP 2.0x2.0m)

unit

19

Ladder Rung

unit

40

20

Handrail

138

21

Water proof Lining

m2

550

22

SS304 Pipe 100mm

Total to Division Summary

Subcomponent-3-U3: Sewage Treatment System / Page - 6

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Division-4: FINAL CLARIFIER


Excavation
1

CommonExcavation

m3

430

Rock Excavation

m3

92

m3

155

m2

21

m3

Filling
3

Backfilling to subgrade
Filling/Compaction

Gravel bed; 200mm thick


Concrete Works
In-situ Concrete
Concrete: Class B3 in:

Lean concrete; 50mm thick


Reinforced Concrete: Class B1 in:

Slab

m3

Wall

m3

97

Stair

m3

m3

45

Reinforced Concrete: Class B2 in:


9

Ground Slab
Formwork
Class F1 Formwork in:

10

Slab

m2

26

11

Ground Slab

m2

46

12

Wall

m2

522

13

Stair

m2

23

Reinforcement
14

Reinforcement bar - (Grade 40, = 276 N/mm2)


10 mm ~ 12 mm

kg

1,586

15

Reinforcement bar - (Grade 60, = 415 N/mm2)


16mm ~ 25mm

kg.

14,296

Miscellaneous
18

Plain Concrete

m3

30

19

Manhole Cover (Circular type Dia 0.6m)

unit

20

Pump Pit hole cover (0.5x0.6m)

unit

Subcomponent-3-U3: Sewage Treatment System / Page - 7

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

21

Scum Pit Grating (1.1x0.6m)

unit

22

Ladder Rung

unit

53

23

Handrail

42

24

Corrosion Protection Paint (Type D1)

m2

121

25

SS304 Pipe 150mm

17

26

SS304 Pipe 100mm

14

27

SS304 Pipe 125mm

28

Water proof Lining

m2

273

Local
Peso

Amount
Foreign
Yen

Total to Division Summary


Division-5: DISINFECTION TANK
Excavation
1

CommonExcavation

m3

181

Rock Excavation

m3

10

m3

111

m2

m3

Filling
3

Backfilling to subgrade
Filling/Compaction

Gravel bed; 200mm thick


Concrete Works
In-situ Concrete
Concrete: Class B3 in:

Lean concrete; 50mm thick


Reinforced Concrete: Class B1 in:

Slab

m3

Wall

m3

18

Stair

m3

m3

10

Reinforced Concrete: Class B2 in:


9

Ground Slab
Formwork
Class F1 Formwork in:

10

Slab

m2

64

11

Ground Slab

m2

11

12

Wall

m2

73

Subcomponent-3-U3: Sewage Treatment System / Page - 8

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.
13

Description

Unit

Qty

m2

10

Stair

Local
Peso

Amount
Foreign
Yen

Reinforcement
14

Reinforcement bar - (Grade 40, = 276 N/mm2)


10 mm ~ 12 mm

kg

1489

15

Reinforcement bar - (Grade 60, = 415 N/mm2)


16mm ~ 25mm

kg.

4152

m3

Miscellaneous
16

Plain Concrete

17

Manhole Cover (Circular type Dia 0.8m)

unit

18

Manhole cover (FRP 0.8 x0.8m)

unit

19

Manhole cover (FRP 0.5x1.0m)

unit

unit

22

20

Ladder Rung

21

Handrail (H=1.1m)

22

Water proof Lining

m2

95

23

SS304 Pipe 100mm

18

m2

12

Architecture Works
24

Chemical House
Total to Subcomponent Summary
Division-6: SLUDGE THICKENER
Excavation

CommonExcavation

m3

78

Rock Excavation

m3

m3

68

m2

m3

Filling
3

Backfilling to subgrade
Filling/Compaction

Gravel bed; 200mm thick


Concrete Works
In-situ Concrete
Concrete: Class B3 in:

Lean concrete; 50mm thick


Reinforced Concrete: Class B1 in:

Slab

m3

Wall

m3

15

Stair

m3

Subcomponent-3-U3: Sewage Treatment System / Page - 9

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

m3

Local
Peso

Amount
Foreign
Yen

Reinforced Concrete: Class B2 in:


9

Ground Slab
Formwork
Class F1 Formwork in:

10

Slab

m2

11

Ground Slab

m2

12

Wall

m2

93

13

Stair

m2

10

Reinforcement
14

Reinforcement bar - (Grade 40, = 276 N/mm2)


10 mm ~ 12 mm

kg

204

15

Reinforcement bar - (Grade 60, = 415 N/mm2)


16mm ~ 25mm

kg.

3837

Miscellaneous
16

Plain Concrete

m3

17

Manhole Cover (Circular type Dia 0.6m)

unit

18

Pump Hole Cover (0.5x0.6m)

unit

19

Ladder Rung

unit

16

20

Handrail

10

21

Corrosion Protection Paint (Type D1)

m2

14

22

SS304 Pipe 100mm

23

SS304 Pipe 150mm

Total to Division Summary


Division-7: SLUDGE DRYING BED
Excavation
1

CommonExcavation

m3

1161

Rock Excavation

m3

121

m3

424

m2

129

Filling
3

Backfilling to subgrade
Filling/Compaction

Gravel bed; 200mm thick


Concrete Works
In-situ Concrete

Subcomponent-3-U3: Sewage Treatment System / Page - 10

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

m3

32

Local
Peso

Amount
Foreign
Yen

Concrete: Class B3 in:


5

Lean concrete; 50mm thick


Reinforced Concrete: Class B1 in:

Wall

m3

113

Stair

m3

m3

151

Reinforced Concrete: Class B2 in:


8

Ground Slab
Formwork
Class F1 Formwork in:

Ground Slab

m2

59

10

Wall

m2

1,061

11

Stair

m2

Reinforcement
12

Reinforcement bar - (Grade 40, = 276 N/mm2)


10 mm ~ 12 mm

kg

6454

13

Reinforcement bar - (Grade 60, = 415 N/mm2)


16mm ~ 25mm

kg.

31,734

Miscellaneous
16

Plain Concrete

m3

83

17

Ladder Rung

unit

600

18

Sludge bed gravel

m3

101

19

Sludge bed sand

m3

96

20

Grating 900x850 mm

unit

20

21

Drain PVC Pipe Dia 100mm

121

22

Drain PVC PorousPipe Dia 100mm

154

23

Protect Plate

unit

20

24

Corrosion Protection Paint (Type D1)

m2

102

25

Stop Log

unit

20

26

FRP Roof (390 m2 / unit)

unit

107

Total to Division Summary


Division-8: YARD PIPE
Yard Pipe
1

80mm uPVC, average excavation depth=0.84m)

Subcomponent-3-U3: Sewage Treatment System / Page - 11

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3310: Civil Work
Rate

Item
No.

Description

Unit

Qty

80mm uPVC, average excavation depth=1.44m

106

100mm PVC, average excavation depth=1.60m

219

100mm PVC, average excavation depth=2.25m

26

125mm PVC, average excavation depth=0.89m

60mm uPVC

50

Manhole 900 mm, average depth=1.62m

nos

Manhole 900mm, average depth=2.25m

nos

Local
Peso

Amount
Foreign
Yen

Total to Division Summary


Division-9: SEWER LINE WORK
Sewer Line
1

200mm PVC, average excavation depth=2.15m

270

200mm PVC, average excavation depth=2.95m

169

200mm PVC, average excavation depth=3.97m

205

Manhole 900mm, average depth=2.77m

P.C.

11

Service Connection

P.C.

15

Drainage & Irrigation Pipe


6

100mm uPVC Pipe & sprinkler

488

50mm uPVC Pipe & sprinkler

620

Total to Division Summary

Subcomponent-3-U3: Sewage Treatment System / Page - 12

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3350: Mechanical Work
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Section U3-3350:MECHANICAL EQUIPMENT


GRIT CHAMBER / PUMP STATION
1

MV-101.main inlet valve

No.

SC-102. Screen Removal System

No.

MG-103. Inlet Gate

No.

SC-104A. Fine Screen A

No.

SC-104B. Fine Screen B

No.

MG-105. Outlet Gate

No.

PU-201. Row water pump

No.

MX-202. Mixer for Equalization tank

No.

MG-203. Pumping well Connecting Gate

No.

No.

DISTRIBUTION CHAMBER
10

NW-204. Manual Operated Adjustable


OXIDATION DITCH

11

AE-301. Aerator

No.

12

HO-302. Hoist for Aerator

No.

13

MW-303. Inlet Distribution weir

No.

14

NW-304. Outlet Distribution weir

No.

FINAL CLARIFIER
15

SC-401. Clarifier

No.

16

PU-402. Return Sludge Pump

No.

17

PU-403.Waste Sludge Pump

No.

18

MV-404. Sludge Outlet Valve

No.

19

MG-405. Isolate Gate for Sludge Pumping Well

No.

DISINFECTION TANK
20

UU-501 Utility Water Supply Unit (1)

No.

21

UU-501 Utility Water Supply Unit (2)

No.

22

IS-502. Treated Water Inlet Screen

No.

23

CL-601. Chlorine Solution Tank/Pump/Mixer

No.

24

MV-602. Disinfection Tank Inlet Valve and By-pass Valve

No.

No.

SLUDGE THICKENER
25

SC-701. Thickener

Subcomponent-3-U3: Sewage Treatment System / Page - 13

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3350: Mechanical Work
Rate

Item
No.

Description

Unit

Qty

26

MV-702. Thickened Sludge Outlet Valve

No.

27

PU-703.Thickened Sludge Pump

No.

28

HO-801.Hoist for Pump and Scum Container

No.

No.

Local
Peso

Amount
Foreign
Yen

PIPING MATERIAL
29

PM-901. PIPING MATERIAL


Total to Subcomponent Summary

Subcomponent-3-U3: Sewage Treatment System / Page - 14

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-3: Utility Works

Subcomponent-3-3: Sewage Treatment System


Section 3370: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Section U3-3370: ELECTRICAL EQUIPMENT


1

Motor Control Center (MCC)

No.

UPS

No.

Instrumentation Panel

No.

Equalization Tank Level

No.

Inlet Flow

No.

Return Sludge Flow

No.

Excess Sludge Flow

No.

Effluent Flow

No.

Thickened Sludge Flow

No.

10

Level Switch

No.

11

Pressure Switch

No.

12

Materials

Set

Total to Subcomponent Summary

Subcomponent-3-U3: Sewage Treatment System / Page - 15

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
COMPONENT-4:
B: BUILDING WORKS

BILL OF QUANTITIES
OF
SUBCOMPONENT-4-B1:
Passenger Terminal Building

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Subcomponent-4-B1 Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent 4- 1: (B1) Passenger Terminal Building (PTB)


Subcomponent Summary
Section B1-4000 Series: Architectural Works
Section B1-5000 Series : Mechanical Works
Section B1-6000 Series : Electrical Works
Section B1-7000 Series : Special Equipment

Total to Component Summary

Component-4-B1: PTB / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

Local
Peso

Section B1-4000 series : Architectural


Series Summary
Section B1-4110 : Earthwork
Section B1-4120 : Termite Control
Section B1-4130: Soil Improvement
Section B1-4220 : Concrete Works
Section B1-4230 : Structural Steelworks
Section B1-4315 : Blockworks
Section B1-4320 : Waterproofing
Section B1-4330 : Roofing Cladding and Facades
Section B1-4340 : Windows/Doors
Section B1-4350 : Metalworks
Section B1-4360 : Woodworks and Partitions
Section B1-4370 : Finishes
Section B1-4380 : Miscellaneous Fittings and Furniture
Section B1-4390 : Signage
Total to Subcomponent Summary
Section B1-4110 : Earthwork

Normal Excavation
Pits

m3

2,783

Trenches

m3

349

Excavation in Rock
Pits

m3

557

Trenches

m3

70

Filling
Backfilling to excavations

m3

3,151

Filling/Compaction
Gravel bed; 100mm thick

8,686

Gravel bed; 50mm think to external sidewalk (32/)MD

2,955

Polyethylene waterproof membrane

8,686

m2

23,112

Total to Series Summary


Section B1-4120 : Termite Control
1

Soil treatment; to pits, trenches ; surface of backfill


and gravel beds
Total to Series Summary
Section B1-4130: Soil Improvement

Subcomponent-4-B1 / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

kg

4,000

In-situ Concrete
Plain Concrete Class B3 (180) in :
Blinding layer; 50 mm thick

m3

478

Blinding layer; 50 mm thick to external sidewalk (32/MD)

m3

148

Reinforced Concrete Class B1 (280) in :Column foundations

m3

414

Ground beams

m3

93

Columns

m3

515

Beams

m3

607

Suspended slabs

m3

464

Reinforced Concrete Class B2 (210) in :


Ground floor slab

m3

1,312

Base slab to external sidewalk (32/MD)

m3

443

Class F1 Formwork in:


10 Column foundations

m2

1,711

11

Ground beams

m2

717

12

Columns

m2

3,691

13

Beams

m2

4,494

14

Class F3 Formwork in:


Suspended slabs

m2

3,703

Reinforcement bars - (Grade 60 = 415 N/mm2)


15 10 mm ~ 12mm

kg

166,522

16

kg

299,894

731

Grout Injection including all required equipment, materials,


labor and testing
Total to Series Summary

Local
Peso

Section B1-4220: Concrete Works

Formwork

Reinforcement

16 mm ~ 28mm

17 Polystyrene Isolation Joint with sealant


Network Equipment and peripheral
Total to Series Summary
Section B1-4230: Structural Steelwork
Material, fabrication, anti-corrosive shop primer paint, erection,
touch-up primer paint and all necessary associated works.

Main Roof
Built-up Section (Rolled Shape Section)

kg

247,239

Angle Section

kg

97,174

Hollow Section

kg

20,103

Channel Section

kg

96,660

Round Bar

kg

10,441

Connection Plate

kg

47,412

Subcomponent-4-B1 / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

Service Stair
Rolled W-Section

kg

32

Angle Section

kg

47

Channel Section

kg

1,123

10 Circular Hollow Section

kg

48

11 Plates

kg

63

12 Steel grating treads and risers; galvanized

kg

618

Steel Suncreen
13 Built-Up Section

kg

52,013

14 Connection Plates

kg

2,675

Covered Walkway
15 Square Hollow Section

kg

819

16 B. I. Pipe Schedule 80

kg

117

17 Connection Plates

kg

268

External Miscellaneous Structure


18 Square Hollow Section

kg

118

19 Plates

kg

45

20 Steel gratings, galvanized

kg

299

Local
Peso

Total to Series Summary


Section B1-4315: Blockwork

Hollow Concrete Block


Wall; 150mm thick

4,059

Back wall for toilet coping; 100mm thick (7B/MD)

102

Reinforced Concrete Class B2 in Lintels and


Stiffeners
3

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

262

Stiffener beam; 150 x 300mm including


formwork and reinforcement

1,895

Stiffener column; 150 x 300mm including


formwork and reinforcement

840

Total to Series Summary


Section B1-4320: Waterproofing
Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
1

Waterproofing System with insulation


applied to surface (1/RD)

m2

3,398

Waterproofing System applied to parapet


wall (1/RD)

m2

183

50mm Thick protection concrete with 4mm


diameter at 100mm welded wire mesh steel trowel

m2

3,398

Subcomponent-4-B1 / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

954

Local
Peso

finish (1/RD)
4

25mm Wide contraction gap w/ sealant in protection


concrete ( 1/RD )

Urethane Waterproofing Coating; WP-3 to :


Toilets, Shower room, Pantry; horizontal

m2

635

Toilets, Shower room, Pantry; vertical

m2

125

Underground External Waterproofing; WP-5 to :


Trench and dropped slab

m2

106

m2

8,738

Total to Series Summary


Section B1-4330 : Roofing Cladding and Facades

Main Roof
0.8mm Thick double skin steel plate pre-painted
galvalume fluorine resin coated; curved including
foil faced insulation ; 100mm thick

0.8mm Thick steel roof gutter ; 1403 mm girth

261

0.8mm Thick steel roof gutter; 719mm girth

670

0.8mm Thick roof closure to curved roof; 488mm girth

104

0.8mm Thick end Flashing; 314mm girth

104

Basket strainer roof drain outlet 200 mm diameter (10/RD)

No.

20

Basket strainer roof drain outlet 150 mm diameter (10/RD)

No.

10

Basket strainer roof drain outlet 100 mm diameter (10/RD)

No.

Total to Series Summary


Section B1-4340: Windows/Doors
CURTAIN WALLING SYSTEMS; as shown on the
Drawings, including aluminum framing and supports, with
with all related fixing and components, finishings,
glass, antishatter film, gaskets, ironmongery, sealants
1

1/AW 3450 x 8360 mm

No.

2/AW 3450 x 3975 mm including double door 1930 x 2256


mm

No.

3/AW 3450 x 8750 mm including double door 1950 x 2247


mm

No.

12

4A/AW 2250(1150) x 8750 mm

No.

5/AW 3450(2329) x 8750 mm

No.

6/AW 2329(3450) x 8750 mm

No.

7/AW 2252(1150) x 8750 mm

No.

8/AW 2392 x 8750 mm

No.

11/AW 1550 x13090 mm

No.

10

12/AW 7997 x 2100 mm

No.

11

14/AW 2252(1150) x 8750 mm

No.

Subcomponent-4-B1 / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

12

15/AW 3450(2329) x 8750 mm

No.

13

16/AW 2329(3450) x 8750 mm

No.

14

17/ AW 2252(1150) x 8360 mm

No.

15

18/ AW 3450 x1663 mm

No.

16

19/AW 3450 x 6297 mm

No.

17

20/AW 1150 x 8360 mm

No.

18

ALUMINIUM GLAZED SCREENS; as shown on


Drawings, including frames, all related fixing components,
components, glass, beads and gaskets, ironmongery,
thresholds, frame set and fixing lugs, mortar bedding,
filling and sealants
1/AS 3450 x 8360 mm

No.

19

2/AS 3450 x 8500 mm

No.

20

3/AS 3450 x 5625

No.

21

4AS 3450 x 8360 mm

No.

22

5/AS 3450 x 26360 mm

No.

23

6/AS 2700 x 8360 mm

No.

24

7/AS 2392 x 8750 mm

No.

25

8/AS 3450 x 8360 mm

No.

Local
Peso

WOOD DOOR SETS: flush type ; as shown on door &


window schedule drawing; including all ironmongery,
louvers, openings, wood frames and beads and all fixing
lugs, mortar bedding/filling and sealants
26

1/WD 900 x 2100 mm

No.

13

27

2/WD 600 x 2100 mm

No.

28

3/WD 2015 x 2100 mm w/ fixed glass

No.

17

29

4/WD 2015 x 2100 mm w/ fixed glass

No.

30

5/WD 1890 x 2700 mm

No.

STEEL DOOR SETS; flush type as shown on door &


window schedule drawing: including ironmongery, louvers,
openings, glazing, thresholds, frame set and fixing lug,
mortar bedding/ filling
31

1/SD 900 x 2100 mm

No

32

2/SD 900 x 2100 mm

No

33

3/SD 600 x 2100 mm w/ louver 400 x 400

No

12

34

4/SD 520 x 2100 mm

No

35

5/SD 900 x 2100 mm

No

36 6/SD 600 x 2100 mm

No

37 7/SD 1600 x 2100 mm

No

38 8/SD 1600 x 2100 mm

No

Subcomponent-4-B1 / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

39 9/SD 1300 x 2255 mm

No

40 10/SD 1600 x 2100 mm

No

41 11/SD 900 x 1730 mm

No

42 12/SD 625 x 1440 mm

No

No.

44 9/AW 2000 x 1200 mm

No.

45 10/AW 3420 x 1000 mm

No.

46 1/LV 2252(1150) x 8750mm

No.

20

47 2/LV 3450(2252) x 8750 mm

No.

16

48 3/LV 3450 (2252)x 8750 mm

No.

16

49 4/LV 2252(1150) x 8750 mm

No.

20

50 5/LV 2392 x 8750 mm

No.

51 6/LV 1150 x 8750 mm

No.

60

52 1/ML 1102 x 900 mm

No.

53 2/ML 977 x 1862 mm

No.

54 3/ML 1863x 1102 mm

No.

55 4/ML 500 x 602 mm

No.

56 5/ML 980 x 1102 mm

No.

57 6/ML 1862 x 2318 mm

No.

58 7/ML 1000 x 2000 mm

No.

59 8/ML 500 x 500 mm

No.

60 9/ML 800 x 1400 mm

No.

61 10/ML 800 x 850 mm

No.

62 11/ML 1000 x 1500 mm

No.

63 12/ML 1900 x 2000 mm

No.

Local
Peso

ALUMINIUM DOORS; as shown on Drawings, including


glazing, beads, gaskets, ironmongery, thresholds, frame set
and fixing lug, mortar bedding/filling and sealants
43 1/AD 1880 x2700mm
ALUMINIUM WINDOWS; as shown on Drawings,
including glazing, beads, gaskets, ironmongery, thresholds,
frame set and fixing lug, mortar bedding/filling and sealants

WOODEN LOUVERS : fixed type ; including frames,


frame set and fixing lug, sub-frames, stainless steel brackets,
stainless steel flat bar mid supports, stainless steel rod,
related fixings

ALUMINIUM LOUVERS : fixed type ; effective rate


40%; including frames, frame set and fixing lug, mortar
bedding/filling and sealants and complete with insect screens
and sub-frames

Subcomponent-4-B1 / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

64 1/MS 2252(1150) x 8750 mm

No.

65 2/MS 3450(2250) x 8750 mm

No.

66 3/MS 3450(2250) x 8750 mm

No.

67 4/MS 2252(1150) x 8750 mm

No.

68 5/MS 2392 x 8750 mm

No.

Local
Peso

INSECT SCREENS: fixed type including aluminum frames


and support systems with all related fixing, components and
finishings, frame set and fixing lug, mortar bedding/filling
and sealants

SECURITY ROLLER SHUTTER : as shown on Drawings;


including motors, pulleys, chains, locks and ironmongery,
frames, fixing lugs, mortar bedding and sealants, electrical
connection and control interface with the BHS system
69 RS/

1100 x 1200 mm

No

70 RS/

1400 x 1500mm

No

71 RS/

1400 x 2160 mm

No

72 RS/

1600 x 2160 mm

No

Total to Series Summary


Section B1-4350: Metalwork

Expansion Joint Assemblies


2A/EJD at Column/Beam (int/ext)

19

2B/EJD at Ceiling

2C/EJD at Wall

28

4/B1-4300-14 Expansion joint at Roof deck, incl st. steel


flashing, foam filling and expansion joint in rc soffit

18

Roof Drain Outlet (10/RD)


200mm Diameter

No.

20

150mm Diameter

No.

10

100mm Diameter

No.

Stainless Steel Handrails, Guard Rails and


Railings
8

Floor mounted handrail (11B/MD)

74

Floor mounted handrail incl. wicket gate (B1-4300-64)

22

10 Wall and glazing protection rail (4/B1-4300-61)

123

11 Trolley corral Type A (B1-4300-63)

32

12 Trolley corral Type B (B1-4300-63)

19

13 Handrail for Handicapped Toilet Type A (Fixed)

No.

14 Handrail for Handicapped Toilet Type B (Hinged)

No.

15 Handrail for Urinal (1 set = 2 handrails)

No.

16 Column protector; 80x80x3 mm, h=1000 mm (B1-4300-63)

No.

138

Subcomponent-4-B1 / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Unit

Qty

17 15mm stainless steel strip separator

15

18 Stainless steel U channel recessed beads 20x20x2mm


to external walls, curved to suit incl. setting profiles
and all related fixings

776

19 Stainless Steel maintenance pipe including fixings


and accessories, diameter 90 mm, t=3mm.

756

Galvanized Iron Handrails, Guard Rails and


Railings
20 Floor mounted handrails (Elevation A B1-4300-31)

16

21 Handrailing to void at room 169 (detail same as 19 above)

22 Hand railing to service stairs B1-4300-31 Stair details 1/2

55

23 Guard post around columns (25/MD)

No.

23

24 Galvanized steel maintenance ladder (B1-4300-14) ;


3,432mm high

No.

10

25 Raised floor system

m2

137

26 Trench pit cover support 6mm steel plate to ceramic tiles;


w=276mm

42

27 Trench pit cover seat (32mmx32mm x 3mm Angle Bar)


w/ primer paint finish including dowel Support
(10mm diameter bar) w/ primer paint finish

42

28 Trench pit cover seat (50mmx50mm x 4mm Angle Bar)


w/ primer paint finish including Trench pit cover Support
(38mmx38mm x 3mm Angle Bar) w/ primer paint finish

35

29 Trench pit cover (W<600 ; Mild Steel Grating)

35

30 Catch Basin cover support (32mmx 32mm x 3 mm Angle bar) wi No


primer paint including dowel support

31 Flex beam to BHS area wall protection

33

874

209

Rate

Other Miscellaneous Metal


32 Aluminum channel recessed beads 20x20x2mm deep
to internal walls, curved to suit incl. setting profiles
and related fixings
33 Aluminum shadow gaps, between drywall bulkheads
and structure 35x20x2 mm, incl all related fixings

Local
Peso

Total to Series Summary


Section B1-4360: Woodwork and Partition

Miscellaneous Wood Works


Wooden Trellis ; w=4800mm

93

ditto, but; w = 4000mm

75

ditto, but; w= 3900mm

20

Blind boxes (B1-4300-58 )

49

Dry Partitioning; 12mm Thick Gypsum Board


double layer faced partition with insulation on
light gauge steel framing (W-7, 1/MD)
Drywall partitions faced both sides (3A/MD)

m2

371

Subcomponent-4-B1 / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

Ceiling perimeter enclosures, faced both sides

m2

62

Ceiling closures above aluminum screens, faced both sides

m2

139

Bulkhead enclosures, (single face, no insulation)

m2

397

Roof Enclosure: 15 mm calcium silicate board with light gauge


steel framing with insulation, sealed to prevent airflow,
nominal height 225 mm

720

Cubicles; including folding doors, partitions and all


necessary fittings and ironmongery (4/B1-4300-40)
10 One unit Cubicle

No.

11

Two unit Cubicle

No.

12 Four unit Cubicle

No.

13 Five unit Cubicle

No.

11

14 Floor mounted: 3040x600x850 high

No.

15 Ditto: 2920x600x850mm high

No.

16 Wall mounted: 3040x300x800 high

No.

17 Ditto: 2920x600x800mm high

No.

18 Ticketing and cashier counters as shown on the


drawings:19 mm. thick MDF panel with high
pressured laminate, including concrete slab,
complete with lockable drawerblocks, all
necessary framing, fixings, fittings and
ironmongery
19 2189x600x720 high

No.

20 1710x600x720mm high

No.

Local
Peso

Kitchen, pantry, counters and cabinets as shown on the


drawings: 19 mm. thick MDF panel with high pressured
laminate, including concrete slab, all necessary framing,
fixings, fittings and ironmongery

Total to Series Summary


Section B1-4370: Finishes
Provisional Sum
1

Include the Provisional Sum of two million five hundred


thousand Peso for office furniture

sum

Include for the use of Contractor's resources, indirect cost,


overheads and profit for expenditures under the
Provisional Sum (rate to be inserted by the Contractor rate shall not exceed 5%)

sum

m2

1,390

In-situ Finishes
Internal Finishes
Cement render to floor; 42mm thick, to receive
ceramic tiles

Cement render to floor; 50mm thick, to receive


damp proof paint (P-6)

m2

137

Cement render to floor; 50mm thick, including


surface hardener (F-11)

m2

1,422

Subcomponent-4-B1 / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

Cement render to wall; 14mm thick, to receive


ceramic tiles

m2

1,105

Cement render; 20 mm thick, to walls; over


waterproofing, reinforced with metal lath

m2

483

Cement render to wall; 20mm thick, to receive


glasswool board insulation

m2

126

Cement render to wall, column and beams; 20mm thick,


to receive paint (P-1/partially P-4)

m2

5,061

10

External Finishes
Cement render to walls, beams, parapets and columns,
20mm thick, to receive paint (P-4)

m2

1,677

11

Cement render to sidewalk 30mm thick (29/MD)

m2

2,955

85

Granite stone to fixed counters 20mm thick, including


facia, cement render bedding
13 2190 x 400mm

No

14 1710x400mm

No

Granite stone to kitchen and pantry counters, 20 mm thick,


including facia, splashboards, cement render bedding 20mm
with cutout to receive stainless steel sink.
15 3040x600mm

No

16 2920x600mm

No

Ceramic Tile Covering


17 Ceramic tiles to floor 600 x 600 x 8mm (F14), including
cement render bedding

m2

6,688

18 Ceramic tiles to skirting; 300mm high x 6 mm thick(S-1)


including cement render bedding

638

19

Ceramic tiles to floors; 300 x 300 x 8mm thick (F-3),


including cement render bedding

m2

1,390

20

Ceramic tiles to skirting; 100mm high x 6mm thick


including cement render bedding

745

21

Ceramic tiles to walls; 300 x 300 x 6mm thick


(W-2) (Co-2)

m2

1,105

Flexible Tile/Sheet
22 Anti-static vinyl tiles to raised floor; 500 x 500 x 2mm
thick

m2

137

23

Polyvinyl soft tile to skirting; 100mm high x


2mm thick (S-4)

36

24 Precovered glass wool board; to walls (W-8)

m2

126

m2

732

Local
Peso

Rigid Tile/Slab/Block
Granite
12 Granite stone to toilet wall coping; 150mm x 20mm thick (F27/MD) including cement render bedding; 30mm thick

Suspended Ceilings; including supports and


suspension system
25 600 x 600 x 15mm Thick acoustic rockwool
ceiling system (C-1)

Subcomponent-4-B1 / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

26 Double ceiling system: t=12 colored acoustic rockwool


ceiling board on t=9 water-resistant gypsum board with paint
perimeter wall trims (C-2)

m2

57

27 Aluminum linear ceiling system;150mm wide (C-7),


incl all fixings and fixtures.

m2

760

28 Wood battens varnish finish; 200mm wide, 25mm thick to


curved ceiling ( C-12)

m2

7,797

29 Aluminum Baffle ceiling; w = 13; h = 122 (C14) incl all fixings


and fixtures, suspensions system and black painted substrate,
slab, beams, ducts, piping, cable trays and other visible
elements.

m2

1,719

Synthetic resin emulsion paint (P-1) to:


30 Cement rendered Wall (W3 (Co-3)

m2

4,398

31 Fair face concrete ceiling incl. beams (C-15)

m2

1,352

32

Fair face concrete columns

m2

1,681

33

Gypsum board wall (W7) (Co-7)

m2

667

34

Synthetic resin mixed Paint (P-2) type A to:


Wood doors ( type-1)

m2

124

35

Synthetic resin mixed Paint (P-3) to:


Steel doors

m2

192

36

Steel column guard post (150mm diameter x 1,000mm high)

m2

17

37

Synthetic resin multi layer coating (P-4) to:


Beams ( BMC )

m2

737

38

Columns ( CNC )

m2

623

39

Walls( WLC ), incl walls behind louvers

m2

1,066

40 Water resistant gypsum board ceiling

57

Clear Lacquer (P-5/P-5A)


41 Wood Battens ceiling (C12)

m2

7,797

42 Wooden Trellis

m2

1,624

43 Wooden Louvers

m2

3,228

Epoxy-resin Floor Paint (P-6) to :


44 Concrete roof deck

m2

3,398

45 Concrete trenches

m2

113

46 Concrete floor

m2

163

Concrete Dustproofer (P-6A) to:


Concrete floors (Concessions and Roof voids)

m2

1,664

47

Fluorine-resin Enamel Coating (P-8) to :


Steel Sunscreen

m2

1,210

48

Structural steel surface (curved rafter)

m2

2,869

49

Exposed steel roof beam

m2

3,290

50

Exposed square hollow steel column

m2

331

Local
Peso

Total to Section Summary

Subcomponent-4-B1 / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

Local
Peso

Section B1-4380:Miscellaneous Fixtures and Furniture


Miscellaneous Items
1

Venetian Blinds

m2

60

Clear mirror

m2

59

Laminated Glass to external canopies and airside walkways


8mm+1.52mm PVB+8mm+1.52 mm PVB+8mm

m2

729

Granite stone to countertop lavatories 20 mm. thick


(Polished) including its facia, splashboard and steel
support structure
Six unit countersunk lavatory
6550x 600 mm Deep

No.

5000 x 600 mm Deep

No.

4800 x 600 mm Deep

No.

Four unit countersunk lavatory


4560 x 600 mm Deep

No.

3400 x 600 mm Deep

No.

Two unit countersunk lavatory


2400 x 600 mm Deep

No.

10

One unit countersunk lavatory


1230 x 600 mm Deep

No.

Granite stone to urinal portions, 20 mm thick (Polished)


including stainless steel brackets and all necessary
accessories
400x800x20 mm

No.

25

11 Glass Screens Protection Markings (Self Adhesive Film)

202

12 Tactile Paving

144

No.

Public Furniture
PF-01 Gate Lounge Seats
14 A- 3 Seater ( External )

No.

18

15 B-5 Seater ( Internal )

No.

74

16 C-3 Seater ( Internal )

No.

28

17 PF-02 Workstation

No.

18 PF-03 Writing Shelf

No.

19 PF-04 Trolley

No.

300

20 PF-05 Waste Bins

No.

25

21 PF-06 Baggage inspection Counter w/ stainles steel bench

No.

22 PF-07 Information Counter

No.

13

Building Marker ; 1,650mm high x 1,800mm wide x 300mm


(400) deep, surface mounted with black marble and brass
plaque fixed to concrete wall (18/MD)
Furniture

PF-08 Check-in Counter

Subcomponent-4-B1 / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

23 Curved Counter (Left )

No.

24 Curved Counter ( Right )

No.

25 Straight Counter

No.

26 Special Assistance Counter

No.

27 PF-09 Arrival Counter w/stainless steel bench

No.

28 PF-10 Passport Control Counter

No.

29 PF-11 Custom Check Counter w/stainless steel bench

No.

30 PF-12 Gate Counter (curved left)

No.

31 PF-13 Gate Counter (curved right)

No.

32 PF-14 Staff chair , mid back w/ Armrest

No.

58

221

No.

No.

Pavement
33 Concrete curbs (28A/MD)

Local
Peso

Total to Series Summary


Section B1-4390: Signage
Building Sign
Supply and install LED signs complete with all necessary
support frame, fixings ,fittings and finishing, all electrical
works including tubes, finishing, all electrical works
1

1200mm high x 10465mm wide (BOHOL AIRPORT)


Visual Sign
Supply and install building signage as shown on signage
schedule drawing ; complete with necessary fixings and fittings
1-01a Single face; individual cut-out mount type;
600mm H x 4,010mm L All DEPARTURES

1-01b Single face; individual cut - out mount type


;468mm H x 5190mm L INTERNATIONAL ARRIVAL

No.

1-01c Single face; individual cut - out mount type;


468mm H x 4470mm L DOMESTIC ARRIVAL

No.

1-02a Single face; individual cut-out mount type;


468mm H x 2,105mm L CHECK-IN

No.

1-02b Single face; individual cut-out mount type;


468mm H x2,830mm L ALL GATES

No.

1-03 Single face; individual cut-out mount type;


468mm H x 6340mm L 4 GATE 4 (5, 6, 7)

No.

1-04 Single face; individual cut-out mount type;


468mm H x 1266mm L BELT 1

No.

1-04a Single face; individual cut-out mount type;


468mm H x 1340mm L BELT 2

No.

10 1-05 Double face; bracket type; 600mm H x 2240mm L


INTERNATIONAL ARRIVAL 4; illuminated type

No.

11 1-05a Double face; bracket type; 600mm H x 2240mm L


DOMESTIC ARRIVAL 4; illuminated type

No.

Subcomponent-4-B1 / Page - 14

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

12 1-05b Double face; bracket type; 600mm H x 2240mm L


All Departures 4; illuminated type

No.

13 1-06 Single face; pipe mounted type; 400mm H x 1310mm L


BELT 1; illuminated type

No.

14 1-06a Single face; pipe mounted type; 400mm H x 1355mm L


BELT 2; illuminated type

No.

15 1-07 Double face; bracket type; 500mm H x 2255mm L


ALL GATES; illuminated type

No.

16 1-07a Single face; wall mount type; 300mm H x 1870mm L


BAGGAGE CLAIM; illuminated type

No.

17 1-08 Single face; pipe mount type; 450mm H x 1780mm L


ALL GATES; illuminated type

No.

18 1-08a Single face; pipe mount type; 300mm H x 1845mm L


SECURITY CHECK; illuminated type

No.

19 1-09 Single face; pipe mount type; 300mm H x 1815mm L


CUSTOM CHECK; illuminated type

No.

20 1-10 Single face; pipe mount type; 300mm H x 740mm L


EXIT ; illuminated type

No.

21 1-11 Single face; pipe mount type; 300mm H x 1142mm L


NO EXIT ; illuminated type

No.

22 1-12 Double face; bracket type; 300mm H x 1138mm L


TOILETS; illuminated type

No.

23 1-12a Single face; pipe mount type; 300mm H x 1398mm L


TOILETS; illuminated type

No.

24 1-13 Single face; bracket type; 500mm H x 1300mm L


OVERSIZED BAGGAGE; illuminated type

No.

25 1-14 Double face; bracket type; 300mm H x 1075mm L


BAGGAGE RECONCILIATION; illuminated type

No.

26 1-15 Double face; bracket type; 300mm H x 695mm L


LOST&FOUND; illuminated type

No.

27 1-16 Double face; bracket type; 300mm H x 740mm L


HEALTH CONTROL; illuminated type

No.

28 1-17 Single face; stick on mount type; 150mm H x 250mm L

No.

81

29 1-18 Single face; stick on mount type; 200mm H x 400mm L

No.

30 1-19 Single face; stick on mount type; 200mm H x 400mm L

No.

31 1-20 Single face; stick on mount type; 200mm H x 400mm L

No.

32 1-21 Single face; stick on mount type; 200mm H x 200mm L

No.

10

33 1-22 Single face; stick on mount type; 200mm H x 200mm L

No.

34 1-23 Single face; stick on mount type; 200mm H x 200mm L

No.

14

35 1-24 Single face; pipe mount type; 500mm H x 500mm L


NO.1 TO 18; illuminated type

No.

18

36 1-25 Single face; individual cut-out mount type;


468mm H x 1465mm L GATE 4 (5, 6, 7)

No.

Local
Peso

Subcomponent-4-B1 / Page - 15

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1) Passenger Terminal Building


Section 4000 Series: Architectural Works
Item
No.
Description

Rate
Unit

Qty

37 1-26 Single face; stick on mount type; 400mm H x 1600mm L


TEXT+LOGO TO BE DETERMINED; illuminated type

No.

38 1-27 Single face; bracket type; 300mm H x 1000mm L


variable message sign to counter (LED)

No.

39 1-28 Single face; pipe mount type; 300mm H x 1000mm L


variable message sign over counter (LED)

No.

40 1-29 Single face; pipe mount type; 300mm H x 1200mm L


TEXT + LOGO TO BE DETERMINED ; illuminated type

No.

41 1-30 Double face; bracket type; 300mm H x 1500mm L


TEXT + LOGO TO BE DETERMINED; illuminated type

No.

Local
Peso

Total to Series Summary

Subcomponent-4-B1 / Page - 16

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

Local
Peso

Section 5000 series : Mechanical Works


Series Summary
Section 5100 : Sanitary and Plumbing
Section 5200 : Ventilation and Air Conditioning
Section 5300 : Fire Protection
Total to Subcomponent Summary
Section 5100 : Sanitary and Plumbing

Sanitary Fixtures
WC-1 Water closet (FV)

No.

59

WC-2 Water closet for handicapped

No.

Water closet handrail for handicapped

No.

WC-3 Water closet (FV)

No.

UR-1 Urinal

No.

25

UR-2 Urinal

No.

UR-3 Urinal

No.

LAV-1 Under counter type lavatory

No.

59

LAV-2 Lavatory for handicapped

No.

10 Laboratory handrail for handicapped

No.

11 LAV-3 Under counter type lavatory

No.

12 LAV-4 Wall Hanged type lavatory

No.

13 SS-1 Service sink (Slop Sink)

No.

14 Faucet for pantry sink

No.

15 SHW-1Shower Set

No.

16 Hand Dryer

No.

12

17 TPH-1Toilet paper holder Double Type

No.

65

18 TPH-2Toilet paper holder Single Type

No.

19 Paper Towel Dispenser

No.

12

20 Sop Holder

No.

21 Baby Sheet

No.

Above Ground
22 20 mm diameter

223

23 25 mm diameter

203

24 32 mm diameter

296

Water Distribution System


Piping Works
Pipeworks, Polyvinyl chloride pipe (High Density)
Incl, Fittings, Hangers, Supports, Sleeves, Inserts,
Excavation, Back Filling and Accessories.

Component-4-B1: PTB / Page - 17

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

25 40 mm diameter

88

26 50 mm diameter

174

27 75 mm diameter

65

28 100 mm diameter

84

29 10 mm diameter

114

Under Ground
Incl, Fittings, Hangers, Supports, Sleeves, Inserts,
Excavation, Back Filling, Sand Bedding and Accessories.
30 32 mm diameter

29

31 50 mm diameter

33

32 10 mm diameter

38

Gate Valve (JIS 10kg/cm)


33 32 mm diameter

No.

25

34 50 mm diameter

No.

15

35 100 mm diameter

No.

36 10 mm diameter

No.

Water Hammer Arrester


37 20 mm diameter

No.

41

Flexible Joint, SUS x 10 kg


38 150mm

No.

40 100mm

No.

41 32mm

No.

Hose Bibb
42 20 mm

No.

Hot Water Distribution


Network Equipment and peripheral
Equipment
Incl, Hangers, Supports, Sleeves, Inserts and Accessories
42 Electric Water Heater Single Type

No.

No.

Pipeworks, Polyvinyl chloride Pipe (High density)


Incl, Hangers, Suports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories.
45 150 mm diameter

33

46 100 mm diameter

774

47 75 mm diameter

22

48 50 mm diameter

300

Local
Peso

Hot Water Piping Works


Cooper Pipe, Type L
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories
43 15mm
Gate Valve JIS 10Kg/cm2
44 15 mm
Sewer Piping System
Pipeworks/Accessories

Component-4-B1: PTB / Page - 18

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

Fittings
Wye & 1/8 bend combination
49 150 x 100 mm diameter

No.

50 100 x 100 mm diameter

No.

149

51 100 x 75 mm diameter

No.

52 100 x 50 mm diameter

No.

256

1/4 Bend
53 100 mm diameter

No.

127

54 75 mm diameter

No.

16

55 50 mm diameter

No.

160

1/8 Bend
56 100 mm diameter

No.

34

P-Trap
57 50 mm diameter

No.

70

Reducer
58 150 x 100 mm

No.

Floor / Ground Clean Out


59 100 mm diameter

No.

58

Floor Drains
60 50 mm diameter

No.

70

61

No.

Pipeworks, Polyvinyl coride pipe (VU)


Incl, Hangers, Suports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories.
62 100 mm diameter

170

63 75 mm diameter

126

64 50 mm diameter

674

Fittings
90 Bend
65 100 mm diameter

No.

48

66 75 mm diameter

No.

16

67 50 mm diameter

No.

88

90 TEE
68 100 x 100 mm diameter

No.

69 100 x 75 mm diameter

No.

70 100 x 50 mm diameter

No.

16

71 75 x 75 mm diameter

No.

16

72 75 x 50 mm diameter

No.

24

73 50 x 50 mm diameter

No.

176

Reducer
74 100 x 75 mm diameter

No.

16

75 75 x 50 mm diameter

No.

16

Grease trap @ pantry

Local
Peso

Vent Pipes

Component-4-B1: PTB / Page - 19

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

Above Ground
76 250 mm diameter

178

77 200 mm diameter

235

78 100 mm diameter

25

Under Ground
Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories.
79 250 mm diameter

279

80 200 mm diameter

103

81 100 mm diameter

44

Fittings (GI)
90 Bend
82 100 mm diameter

No.

45 Bend
83 250 mm diameter

No.

44

84 200 mm diameter

No.

Wye
85 250 x 250 mm diameter

No.

86 250 x 200 mm diameter

No.

87 200 x 200 mm diameter

No.

88

No.

17

Roof Drain
89 200 mm

No.

30

90 100 mm

No.

Clean Out
91 200 mm

No.

92

No.

17

Fan Coil Unit (VRF Indoor Unit)


Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
FCU - 01A to 01B
Ceiling Cassette 4-way Cooling Capacity 2.0 Kw

No.

FCU - 02A to 02D


Ceiling Cassette 4-way Cooling Capacity 2.38 Kw

No.

FCU - 03A to 03B


Ceiling Cassette 4-way Cooling Capacity 2.0 Kw

No.

Local
Peso

Storm Drain
Galvanized carbon steel pipe ASTM Sch 40
Incl, Hangers, Suports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories.

Catch Basin

Catch Basin Cover

Total to Series Summary


Section 5200 : Ventilation and Air Conditioning
Air Conditioning System
Equipment

Component-4-B1: PTB / Page - 20

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Item
No.

Rate
Unit

Quantity

FCU - 04
OA Processing Duct Type Cooling Capacity 19.5 Kw

No.

FCU - 05A to 05B


Ceiling Cassette 4-way Cooling Capacity 4.35 Kw

No.

FCU - 06
Ceiling Cassette 4-way Cooling Capacity 6.7 Kw

No.

FCU - 07
Ceiling Cassette 4-way Cooling Capacity 6.7 Kw

No.

FCU - 08
Ceiling Cassette 4-way Cooling Capacity 6.7 Kw

No.

FCU - 09
Ceiling Cassette4-way Cooling Capacity 6.7 Kw

No.

10 FCU - 10
Ceiling Cassette4-way Cooling Capacity 4.7 Kw

No.

11 FCU - 11
Ceiling Cassette 4-way Cooling Capacity 4.7 Kw

No.

12 FCU - 12
Ceiling Cassette 4-way Cooling Capacity 4.7 Kw

No.

13 FCU - 13A to 13B


Ceiling Cassette 4-way Cooling Capacity 4.6 Kw

No.

14 FCU - 14
Ceiling Cassette 4-way Cooling Capacity 6.7 Kw

No.

15 FCU - 15
Ceiling Cassette 4-way Cooling Capacity 5.1 Kw

No.

16 FCU - 16A to 16D


Ceiling Cassette 4-way Cooling Capacity 2.7 Kw

No.

17 FCU - 17B
Ceiling Mount Duct Type Cooling Capacity 24.3 Kw

No.

18 FCU - 17D
Ceiling Mount Duct Type Cooling Capacity 22.34 Kw

No.

19 FCU - 18D
OA Processing Duct Type Cooling Capacity 24.5 Kw

No.

20 FCU - 19
Ceiling Cassette 4-way Cooling Capacity 2.5 Kw

No.

21 FCU - 20
Ceiling Cassette 4-way Cooling Capacity 2.3 Kw

No.

22 FCU - 21
Ceiling Cassette 4-way Cooling Capacity 2.3 Kw

No.

23 FCU - 22A to 22D


Ceiling Cassette 4-way Cooling Capacity 1.98 Kw

No.

24 FCU - 23A to 23D


Ceiling Cassette 4-way Cooling Capacity 4.0 Kw

No.

25 FCU - 24A to 24B


Ceiling Cassette 4-way Cooling Capacity 2.45 Kw

No.

26 FCU - 17F to 17H


Ceiling Mount Duct Type Cooling Capacity 22.34 Kw

No.

27 FCU - 18H
OA Processing Duct Type Cooling Capacity 24.5 Kw

No.

Description

Local
Peso

Component-4-B1: PTB / Page - 21

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Item
No.

Rate
Description

Unit

Quantity

28 FCU - 19A,19C,19E
Ceiling Cassette 4-way Cooling Capacity 10.8 Kw

No.

29 FCU - 20E,20F
Ceiling Cassette 4-way Cooling Capacity 3.3 Kw

No.

30 FCU - 17J
Ceiling Mount Duct Type Cooling Capacity 22.34 Kw

No.

31 FCU - 18K
OA Processing Duct Type Cooling Capacity 24.5 Kw

No.

32 FCU - 19G,19I,19K
Ceiling Cassette 4-way Cooling Capacity 10.8 Kw

No.

33 FCU - 25
Ceiling Cassette 4-way Cooling Capacity 3.9 Kw

No.

34 FCU - 26A to 26B


Ceiling Cassette 4-way Cooling Capacity 2.45 Kw

No.

35 FCU - 27
Ceiling Cassette 4-way Cooling Capacity 4.6 Kw

No.

36 FCU - 28A to 28D


Ceiling Cassette 4-way Cooling Capacity 5.3 Kw

No.

37 FCU - 29A to 29B


Ceiling Cassette 4-way Cooling Capacity 2.7 Kw

No.

38 FCU - 30
Ceiling Cassette 4-way Cooling Capacity 3.4 Kw

No.

39 FCU - 31
Ceiling Cassette 4-way Cooling Capacity 2.5 Kw

No.

40 FCU - 32
Wall Mount Type Cooling Capacity 0.9 Kw

No.

41 FCU - 33
Ceiling Cassette 4-way Cooling Capacity 2.3 Kw

No.

42 FCU - 34
Wall Mount Type Cooling Capacity 1.2 Kw

No.

43 FCU - 35A to 35D


Ceiling Cassette 4-way Cooling Capacity 5.95 Kw

No.

44 FCU - 18A,18I,18J
OA Processing Duct Type Cooling Capacity 24.5 Kw

No.

45 FCU - 17A to 17C


Ceiling Mount Duct Type Cooling Capacity 24.3 Kw

No.

46 FCU - 36A to 36D


Ceiling Cassette 4-way Cooling Capacity 2.6 Kw

No.

47 FCU - 18B to 18C


OA Processing Duct Type Cooling Capacity 24.5 Kw

No.

48 FCU - 37
Ceiling Suspended Type Cooling Capacity 5.2 Kw

No.

49 FCU - 38A to 38B


Ceiling Cassette 4-way Cooling Capacity 3.95 Kw

No.

50 FCU - 17E,17G,17I
Ceiling Mount Duct Type Cooling Capacity 22.34 Kw

No.

51 FCU - 18E
OA Processing Duct Type Cooling Capacity 24.5 Kw

No.

Local
Peso

Component-4-B1: PTB / Page - 22

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

52 FCU - 19B
Ceiling Mount Duct Type Cooling Capacity 22.34 Kw

No.

53 FCU - 39A
Wall Mount Type Cooling Capacity 1.2 Kw

No.

54 FCU - 39B
Wall Mount Type Cooling Capacity 1.2 Kw

No.

55 FCU - 39C
Wall Mount Type Cooling Capacity 1.2 Kw

No.

56 FCU - 39D
Wall Mount Type Cooling Capacity 1.2 Kw

No.

57 FCU - 39E
Wall Mount Type Cooling Capacity 1.2 Kw

No.

58 FCU - 39F
Wall Mount Type Cooling Capacity 1.2 Kw

No.

59 FCU - 20A to 20D


Ceiling Cassette 4-way Cooling Capacity 3.3 Kw

No.

60 FCU - 17K,17L
Ceiling Mount Duct Type Cooling Capacity 22.34 Kw

No.

61 FCU - 43A to 43B


Ceiling Cassette 4-way Cooling Capacity 3.65 Kw

No.

62 FCU - 18G
OA Processing Duct Type Cooling Capacity 24.5 Kw

No.

63 FCU - 19D,19F,19H,19J
Ceiling Cassette 4-way Cooling Capacity 10.8 Kw

No.

64 FCU - 44
Ceiling Suspended Type Cooling Capacity 5.2 Kw

No.

65 FCU - 45
Wall Mount Type Cooling Capacity 1.8 Kw

No.

66 FCU - 26A to 46C


Ceiling Cassette 4-way Cooling Capacity 12.2 Kw

No.

Aluminum Cladding for FCU


67 Aluminum Sheet (Ga. # 28)

m2

80

No.

No.

No.

No.

181

VRF Outdoor Unit


Incl, Common Base,Hangers,Vibration Isolator, Supports,
Inserts and Accessories.
68 VRF - 01 to 08
Cooling Capacity 121 KW
69 VRF - 09
Cooling Capacity 58 KW
Fan Filter Unit
Incl, Common Base, Vibration Isolator, Hangers, Supports,
Inserts and Accessories.
70 OAF - 01
11,990 l/s x 300 Pa x 18.5 kw x 3 x 230V x 60 Hz
71 OAF - 02
9,620 l/s x 300 Pa x 15 kw x 3 x 230V x 60 Hz

Local
Peso

Refrigerant pipes, copper pipes type "L" Incl, Fittings,


Hangers, Suports,Sleeves, Inserts and Accessories.
72 6.4 mm diameter

Component-4-B1: PTB / Page - 23

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

73 9.5 mm diameter

647

74 12.7 mm diameter

258

75 15.9 mm diameter

389

76 19.1 mm diameter

163

77 22.2 mm diameter

319

78 28.6 mm diameter

171

79 34.9 mm diameter

62

80 41.3 mm diameter

85

81 Outdoor Multi Connection Piping Kit

set

82 Refrigerant Joint Kit

No.

129

Thermal Insulation, pre-molded rubber pipe


83 6.4 mm diameter, t = 30mm

181

84 9.5 mm diameter, t = 30mm

647

85 12.7 mm diameter, t = 30mm

258

86 15.9 mm diameter, t = 30 mm

389

87 19.1 mm diameter, t = 30mm

163

88 22.2 mm diameter, t = 30mm

319

89 28.6 mm diameter, t = 30mm

171

90 34.9 mm diameter, t = 30mm

62

91 41.3 mm diameter, t = 30mm

85

Aluminum Cladding for Pipe


92 Aluminum Sheet (Ga. # 26)

m2

60

Filter drier
93 34,.9 mm diameter

No.

94 41.3 mm diameter

No.

Moisture Indicator
95 34,.9 mm diameter

No.

96 41.3 mm diameter

No.

G.I sheets
Incl, Hangers, Supports, Sleeves, Inserts and Accessories.
97 0.5 mm (Ga. # 26)

409

98 0.6 mm

(Ga. # 24)

325

99 0.8 mm (Ga. # 22)

287

100 1.0 mm (Ga. # 20)

473

101 1.2 mm (Ga. # 18)

245

Spiral Duct
Incl, Fittings, Hangers, Suports ,Sleeves, Inserts and
Accessories.
102 100 mm

31

Local
Peso

Fittings and accessories

Duct Works

Component-4-B1: PTB / Page - 24

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

103 250 mm

37

104 350 mm

19

105 400 mm

106 500 mm

245

107 Thermal insulation, glasswool 50 mm thick


x 40 Kg/ m2 with single face foil barrier.

796

m2

796

NozzleNeck Size)
109 225mm

No.

168

110 350mm

No.

18

111 450mm

No.

12

Fresh Air Grille (FA)


112 250 x 250 mm

No.

49

113 300 x 300 mm

No.

114 350 x 350 mm

No.

115 450 x 450 mm

No.

Volume Damper
116 400 x 250 mm

No.

117 450 x 250 mm

No.

118 500 x 250 mm

No.

119 900 x 500 mm

No.

120 1,000 x 450 mm

No.

121 2,000 x 550 mm

No.

122 2,000 x 600 mm

No.

Fire Damper w/ Fusible Link


123 2,000 x 550 mm

No.

124 2,000 x 600 mm

No.

Elbow
Acoustical lining Type
125 2000 x 600 mm

No.

126 2000 x 550 mm

No.

Aluminum Cladding for Duct


108 Aluminum Sheet (Ga. # 26)

Local
Peso

Air Grilles

Condensate Drain Piping; PVC Pipes(VP), above


Ground Incl, Fittings, Hangers, Supports, Sleeves, Inserts
127 25 mm diameter

(PVC-VP)

303

128 32 mm diameter

(PVC-VP)

232

129 40 mm diameter

(PVC-VP)

43

130 50 mm diameter

(PVC-VP)

116

131 65 mm diameter

(PVC-VP)

23

Component-4-B1: PTB / Page - 25

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

Condensate Drain Piping; PVC Pipes(VP), under


Incl, Fittings, Hangers, Supports, Sleeves, Inserts,
Excavation, Back filling, Sand Bedding and Accessories.
132 25 mm diameter (PVC-VP)

54

133 50 mm diameter

(PVC-VP)

43

134 65 mm diameter

(PVC-VP)

116

Condensate Drain Insulation; close cell elastomeric


135 25 mm diameter , t = 20mm

303

136 32 mm diameter, t = 20mm

232

137 40 mm diameter, t = 20mm

43

138 50 mm diameter , t = 20mm

116

139 65 mm diameter , t = 20mm

23

Aluminum Cladding for Pipe


140 Aluminum Sheet (Ga. # 26)

m2

141 FFU Control System


Including, Accessories & wire

set

142 VRF Control system


Including, ITM & Accessories

set

143 BAC Net

No.

144 FCU Control system


Including, wiring

No.

129

145 Wired Remote Controller

No.

50

146 Fan Control system


Including, Thermostat & wire

set

No.

151 EF - 02 In-line Axial Fan


7,420 l/s x 170 Pa x 1.6 kw x 3x230V x 60Hz

No.

152 EF - 03 In-line Axial Fan


3,103 l/s x 130 Pa x 0.45 kw x 3x230V x 60Hz

No.

153 EF - 04 In-line Axial Fan


8,519 l/s x 150 Pa x 2.4 kw x 3x230V x 60Hz

No.

154 EF - 05 In-line Axial Fan


2,742 l/s x 180 Pa x 0.45 kw x 3x230V x 60Hz

No.

155 EF - 06 In-line Axial Fan


2,779 l/s x 180 Pa x 0.45 kw x 3x230V x 60Hz

No.

156 EF - 07 In-line Axial Fan


2,647 l/s x 200 Pa x 0.45 kw x 3x230V x 60Hz

No.

157 EF - 08 In-line Axial Fan


2,230 l/s x 160 Pa x 0.3 kw x 3x230V x 60Hz

No.

Local
Peso

Automatic Control System

Mechanical Ventilation System


Equipment
Exhaust Fans
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
150 EF - 01 In-line Axial Fan
1,875 l/s x 150 Pa x 0.3 kw x 3x230V x 60Hz

Component-4-B1: PTB / Page - 26

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

158 EF - 09 In-line Axial Fan


2,660 l/s x 200 Pa x 0.45 kw x 3x230V x 60Hz

No.

159 EF - 10 In-line Axial Fan


2,647 l/s x 260 Pa x 0.45 kw x 3x230V x 60Hz

No.

160 EF - 11 In-line Axial Fan


382 l/s x 150 Pa x 0.15 kw x 3x230V x 60Hz

No.

161 EF - 12 In-line Axial Fan


1,079 l/s x 130 Pa x 0.15 kw x 3x230V x 60Hz

No.

162 EF - 13 In-line Axial Fan


103 l/s x 150 Pa x 0.15 kw x 3x230V x 60Hz

No.

163 EF - 14 In-line Axial Fan


112 l/s x 150 Pa x 0.15 kw x 3x230V x 60Hz

No.

164 EF - 15 In-line Axial Fan


360 l/s x 60 Pa x 0.045 kw x 1x230V x 60Hz

No.

165 EF - 16 In-line Axial Fan


1,460 l/s x 240 Pa x 0.28 kw x 3x230V x 60Hz

No.

No.

167 SF - 02 In-line Axial Fan


7,420 l/s x 170 Pa x 1.6 kw x 3x230V x 60Hz

No.

168 SF - 03 In-line Axial Fan


3,103 l/s x 130 Pa x 0.45 kw x 3x230V x 60Hz

No.

G.I sheets
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories.
169 0.5 mm (Ga. # 26)

268

170 0.6 mm (Ga. # 24)

340

171 0.8 mm (Ga. # 22)

17

Spiral Duct
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories.
172 200 mm

Exhaust Air Grilles (EA)


173 250 x 250 mm

No.

17

174 300 x 300 mm

No.

39

175 450 x 450 mm

No.

176 800 x 800 mm

No.

177 850 x 850 mm

No.

Supply Air Grilles (SA)


178 800 x 800 mm

No.

179 850 x 850 mm

No.

Volume Damper
180 150 x 150 mm

No.

Fresh Air Fan


Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
166 SF - 01 In-line Axial Fan
1,875 l/s x 150 Pa x 0.3 kw x 3x230V x 60Hz

Local
Peso

Duct Works

Component-4-B1: PTB / Page - 27

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

181 250 x 150 mm

No.

182 300 x 250 mm

No.

183 400 x 250 mm

No.

184 500 x 250 mm

No.

185 500 x 300 mm

No.

186 550 x 250 mm

No.

187 550 x 300 mm

No.

188 600 x 500 mm

No.

189 800 x 400 mm

No.

Backdraft Damper
190 150 x 150 mm

No.

191 250 x 150 mm

No.

192 300 x 250 mm

No.

193 400 x 250 mm

No.

194 500 x 250 mm

No.

195 500 x 300 mm

No.

196 550 x 250 mm

No.

197 550 x 300 mm

No.

198 600 x 500 mm

No.

199 800 x 400 mm

No.

Incl, Fittings, Hangers, Supports, Sleeves, Inserts and


Accessories.
B.I. Pipe Schedule 40
25 mm diameter

1,064

32 mm diameter

506

40 mm diameter

392

50 mm diameter

41

65 mm diameter

60

150 mm diameter

853

Gate Valve
25 mm diameter

No.

40 mm diameter

No.

50 mm diameter

No.

Gate Valve
10 150 mm diameter

No.

OS & Y Valves
11 150 mm diameter

No.

Local
Peso

Total to Series Summary


Section 5300 : Fire Protection
Piping

Component-4-B1: PTB / Page - 28

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 5000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Quantity

12

Supervisory switch for OS & Y valves

No.

13

Water flow detector switch

No.

14

Sight glass; 25 mm diameter

No.

15

Auxiliary drain valve; 25 mm diameter

No.

16

Fire Department connection w/ cap & chain;


Diameter = 65 mm (4 - Way)

No.

17 Stand Pipe Fire Hose valve c/w cap and chain


Diameter = 65 mm

No.

18

Pressure gauge

No.

19

Fire hose cabinet c/w valve, 40mm diameter x 30m fire hose No.
w/ fog nozzle, hose rack and 4.5kg ABC type fire

10

Portable Fire Extinguisher


20 ABC Type, 4.5 kg

No.

31

21 CO2 Type, 23.0 Kg

No.

22

No.

31

Sprinkler Heads
23 Pendant type

No.

539

24 Upright type

No.

317

Fire extinguisher bracket

25

Alarm Check Valve


Alarm check valve assembly complete with vertical closed
drain trims, accessories, motor alarm gong and retard

No.

26

Total Flooding System (FM200)


FM - 200 Automatic Fire Suppression System c/w FM - 200 sum
gas cylinder, piping and detection system.

Local
Peso

Total to Series Summary

Component-4-B1: PTB / Page - 29

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-1: (B1) Electrical Works


Series Summary
Section B1-6100: Power Feeder System
Section B1-6200: Lighting And Receptacle
Section B1-6300: Telephone And Data System
Section B1-6400: Cable TV System
Section B1-6500: Public Address System
Section B1-6600: Master Clock System
Section B1-6700: Closed Circuit Television
Section B1-6800: Fire Detection And Alarm
Section B1-6900: Lightning Protection and Grounding System

Total to Section Summary


Section B1-6100: Power Feeder System
1

30 KVA UPS, 3 Phase, 230 V

No.

Panel boards
Normal Power
2

MDPL

No.

LPN1

No.

LPN2

No.

LPN3

No.

LPN4

No.

LPN5

No.

PN1

No.

PN2

No.

10 PNC1

No.

11 PNC2

No.

12 PVN

No.

13 PACN

No.

14 LPNE1

No.

15 LPNE2

No.

16 PNE1

No.

Normal / Emergency Power

Component-4-B1: PTB / Page - 30

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

17 PNE2

No.

18 PACNE

No.

19 PCFNE

No.

20 MDUPS

No.

21 UPSE1

No.

22 UPSE2

No.

23 Concession Panel Board

No.

14

24 150AT, 150AF, 3P ECB

No.

25 100AT, 100AF, 3P ECB

No.

26 50AT, 100AF, 3P ECB

No.

10

27 30AT, 100AF, 2P ECB

No.

20

28 20AT, 100AF, 2P ECB

No.

30

29 Digital Kilowatt Meter for Concession

No.

14

30 240 mm XLPE

1,300

31 150 mm XLPE

900

32 120 mm XLPE

270

33 95 mm XLPE

450

34 70 mm XLPE

850

35 50 mm XLPE

450

36 35 mm XLPE

50

37 16 mm XLPE

500

38 10 mm XLPE

50

39 4 mm XLPE

350

40 Network Equipment and peripheral

3,500

41 14 mm THHN

200

42 5.5 mm THHN

4,200

43 3.5 mm THHN

10,800

44 14 mm TW

400

45 8.0 mm TW

800

46 5.5 mm TW

1,500

Local
Peso

UPS

Wires & Cables

Conduits/Cable Tray

Component-4-B1: PTB / Page - 31

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

47 IMC 100 mm

30

48 IMC 50 mm

10

49 IMC 40 mm

200

50 IMC 32 mm

275

51 IMC 25 mm

125

52 IMC 20 mm

475

53 IMC 15 mm

1,300

54 Flexible IMC 20 mm

200

55 Flexible IMC 15 mm

500

56 500 mm (W) cable tray

300

57 300 mm (W) cable tray

400

58 200 mm (W) wireway

100

Local
Peso

Total to Series Summary


Section B1-6200: Lighting And Receptacle
Lighting Fixtures
1

31W LED Recessed Lighting

No.

85

28W LED Recessed Lighting

No.

65

24W LED Recessed Lighting

No.

240

8W LED Recessed Lighting

No.

8W LED Recessed Lighting with Motion sensor

No.

151

120W LED Wall mounted Lighting

No.

165

50W LED Wall mounted Lighting

No.

115

28W LED Ceiling Surface or Wall mounted

No.

50

10W Exit Signage

No.

15

10 Duplex convenience outlet

No.

165

11 Duplex convenience outlet, floor mtd. pop-out type

No.

38

12 Single convenience outlet

No.

13 Single convenience outlet (FIDS)

No.

46

14 Special purpose outlet (Hand dryer)

No.

15

15 Special purpose outlet (APD)

No.

16 Special purpose outlet, floor mounted


(Baggage X-ray, PWTM,WTMD)

No.

10

17 Special purpose outlet (Air Curtain)

No.

Wiring Devices & Receptacle

Component-4-B1: PTB / Page - 32

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

18 Duplex convenience outlet, weatherproof

No.

19 Duplex maintenance outlet, weatherproof

No.

20 Outlet for Urinal sensor

No.

30

21 One - gang switch

No.

20

22 Two - gang switch

No.

35

23 Three - gang switch

No.

24 3.5 mm THHN

55,000

25 5.5 mm THHN

4,800

26 3.5 mm Fire Rated Cable

3,500

27 20 mm Diameter IMC

21,000

28 20 mm Diameter flexible metallic conduit

2,100

Sum

Local
Peso

Wires & Cables for Light & Receptacle

Conduit

29 Power Supply for Neon Light


Total to Series Summary
Section B1-6300: Telephone And Data System
Telephone System
Equipment & Devices
1

Main distribution Frame (MDF)

No.

Basic Shelf

No.

Expansion shelf

No.

Bus-master card of basic shelf for connecting shelf

No.

L type PSU

No.

16 ports analogue trunk card

No.

8 ports Caller ID card

No.

16 Circuit digital proprietary line card

No.

24 ports single line card with Caller ID function

No.

10

No.

60

11

Digital Tel.6 lines LCD,24 CO, Optional USB/12CO/BT &


Speaker phone
DSS Console with 60 CO Key

No.

12

Voice Processing System

No.

13

2 ports Hybrid Expansion Card

No.

14

Mounting Kit

No.

15

Installation fee extension socket for SLT

Sum

Component-4-B1: PTB / Page - 33

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

16

Installation fee extension socket for VPS

Sum

17

Config Design (Telephone and VPS

Sum

18

Config Installation Telephone

Sum

19

Config Installation VPS

Sum

20 Telephone Terminal Cabinet

No.

21 Telephone outlet w/ RJ11, wall mtd.

No.

95

22 Telephone outlet w/ RJ11, floor mtd.

No.

23 4P CAT. 5e UTP CABLE (interconnection)

6,100

24 12P CAT. 5e UTP CABLE (To Other Buildings)

1,187

25 24P CAT. 5e UTP CABLE (To Other Buildings)

1,010

26 48P CAT. 5e UTP CABLE (To Other Buildings)

920

27 15 mm dia IMC

220

28 20 mm dia IMC

550

29 25 mm dia IMC

660

30 Data Terminal Cabinet

No.

31 Computer outlet w/ RJ45, wall mtd.

No.

83

32 15 mm dia IMC

220

33 20 mm dia IMC

550

34 25 mm dia IMC

660

35 4P CAT6 UTP CABLE (interconnection)

3,950

36 12P CAT6 UTP CABLE (To Other Buildings)

420

37 24P CAT6 UTP CABLE (To Other Buildings)

1,390

No.

Local
Peso

Wires & Cables

Conduits

Data System
Equipment & Devices

Conduits

Wires & Cables

Total to Series Summary


Section B1-6400: Cable TV System
Equipment / Devices
1

MCATV including amplifier, ILSE, test tuner, etc.


(complete set)

Component-4-B1: PTB / Page - 34

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

CATV Equalizers

No.

Voltage down adapter

No.

4 - Way splitter

No.

Wall Outlet (For in out)

No.

Wall Outlet (For inns)

No.

Terminator

No.

F type connector

No.

35

14-inch Monitor

No.

No.

550

12 RG6 Coaxial cable (To Other Buildings)

660

13 RG6 Coaxial cable (interconnection)

90

14 250mm(SQ) x 100mm(D) GA. 16 NEMA-1

No.

15 200mm(SQ) x 100mm(D) GA. 16 NEMA-1

No.

10 DVD Player

Local
Peso

Conduit
11 20 mm diameter IMC
Wires & Cables

Pull Box

Total to Series Summary


Section B1-6500: Public Address System
Equipment / Devices
1

System Manager

No.

Audio Input Unit

No.

Stereo Select Input Module

No.

Remote MIC Interface Module

No.

Audio Output Unit

No.

Remote Microphone

No.

Stereo Select Input Module

No.

Power Amplifier ( 1x120W)

No.

Power Amplifier ( 1x240W)

No.

Power Amplifier ( 1x420W)

No.

10 Power Amplifier Input Module

No.

11 Power Supply Frame

No.

12 Power Supply Unit

No.

Component-4-B1: PTB / Page - 35

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

13 Emergency Power Supply Unit

No.

14 Record/Playback Announcer

No.

15 Memory Card

No.

16 MIC/Line Input Module

No.

17 Ceiling Speaker

No.

30

18 Line Array Speaker

No.

55

19 Line Projection Speaker

No.

20

20 Horn Speaker

No.

21 Matching Transformer

No.

51

22 Perforated Panel

No.

23 Blank Panel

No.

24 CD/USB/SD/MMC Card Player with FM Radio

No.

25 Cabinet Rack

No.

26 Battery

No.

27 TB-PA-PTB

No.

28 15 mm Diameter IMC

2,500

29 20 mm Diameter IMC

200

30 20 mm Diameter flexible metallic conduit

100

7,000

Local
Peso

Conduit

Wires & Cables


31 1.25mm TF WIRE
Total to Series Summary
Section B1-6600: Master Clock System
Equipment / Devices
1

Slave digital clock

(Included in N1-8300)

Slave analog clock

(Included in N1-8300)

TB-CLK-PTB

No.

550

Conduit
4

15 mm dia IMC
Wires & Cables

1.25 mm TF wires (To Other Buildings)

1,100

1.25 mm TF wires (interconnection)

780

Pull Box

Component-4-B1: PTB / Page - 36

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Description

Unit

Qty

250mm(SQ) x 100mm(D) GA. 16 NEMA-1

No.

100mm(SQ) x 100mm(D) GA. 16 NEMA-1

No.

Local
Peso

Total to Series Summary


Section B1-6700: Closed Circuit Television
Equipment / Devices
1

TV & control desk, including cameras, controller,


multiplexer, TV monitors and time lapse VCR, Computer /
Station, Internet equipment & newwork switch

Sum

PTZ DOME TYPE CAMERA (INDOOR TYPE)

No.

PTZ CAMERA (INDOOR TYPE)

No.

PTZ CAMERA (OUTDOOR TYPE)

No.

TB-CCTV-PTB

No.

Conduit
6

20 mm Diameter IMC

600

25 mm Diameter IMC

110

32 mm Diameter IMC

130

920

10 RG59 Coaxial cable (To Other Buildings)

460

11 1.25 mm TF wires (interconnection)

1,400

12 RG59 Coaxial cable (interconnection)

700

No.

Wires & Cables


9

1.25 mm TF wires (To Other Buildings)

Pull Box
13 400mm(SQ) x 200mm(D) GA. 16 NEMA-1
Total to Series Summary
Section B1-6800: Fire Detection And Alarm
Equipment / Devices
1

Fire Alarm Control Panel

No.

Remote Annunciator Panel

No.

Short Circuit Isolator

No.

16

Workstation

No.

Telephone Handset

No

Addressable Smoke Detector

No.

175

Addressable Rate of Rise Heat Detector

No.

Addressable Fixed Type Heat Detector

No.

25

Component-4-B1: PTB / Page - 37

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 6000 Series: Electrical Works
Rate

Item
No.

Unit

Qty

No.

24

10 Address Module for Manual Push Station

No.

24

11 Address Module for Fire Alarm Bell

No.

24

12 Control Module for PABGM

No

13 Monitor Module for Fire Pump/Jockey Pump

No.

14 Monitor Module for FM200

No.

3,300

16 1.25 mm TF Wires (interconnection)

3,500

17 Fiber optic cable (To Other Buildings)

5,585

18 250mm(SQ) x 100mm(D) GA. 16 NEMA-1

No.

19 100mm(SQ) x 100mm(D) GA. 16 NEMA-1

No.

Sum

Description
Local Combination Box

Local
Peso

Conduit
15 15 mm Diameter IMC
Wires & Cables

Pull Box

Total to Series Summary


Section B1-6900: Grounding System

Grounding System
Total to Series Summary

Component-4-B1: PTB / Page - 38

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 7000 series: Special Equipment Works
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Section 7000 series: Special Equipment Works


Series Summary
Section B1-7300: Baggage Handling System
Section B1-7400: Airport Security System
Section B1-7500: Flight Information Display
Section B1-7600: Building Management System
Section B1-7800: Access Control System
Total to Subcomponent Summary
Section B1-7300: Baggage Handling System
1

Sum
Check-in BHS (Sum of C1 to C6 inclusive)
C1: Weighing Conveyor ; width 785 mm x length 1.2m., 16 units

C2: Dispatch Conveyor ; width 785mm x length 1.5m, 16 units


C3: Collecting Conveyor ; width 1.0m x length 35m
C4: Up-sloped Conveyor ; width 1.0m x length 1.5m
C5: Queuing Conveyor ; width 1.0m x length 1.5m
C6: Induction Conveyor ; width 1.2m x length 2.5m
2

Weigh Scale (Pressure sensor)

No.

16

Inline Screening BHS (Sum of S1 to S10 inclusive)


S1: Up-sloped Conveyor ; width 1.2m x length 2.4m

Sum

Sum

S2: EDS Pre-entry Conveyor ; width 1.2m x length 3.4m


S3: EDS Entry Conveyor ; width 1.0m x length 1.5m
S4: EDS Exit Conveyor ; width 1.0m x length 1.5m
S5: Curved Conveyor ; 90 degrees, radius 1.5m: 2 nos
S6: Screening Judgment Conveyor ; width 1.0m x length 8.8m
S7: Queuing Conveyor ; width 1.0m x length 1.5m
S8: Bi-direction Conveyor ; width 1.0m x length 1.5m
S9: EDT Holding Roller ; width 1.0m x length 1.5m
S10: Cleared Baggage Conveyor ; width 1.0m x length 5.9m
4

Departure Make-up BHS (Sum of D1 to D8 inclusive)


D1: Induction Conveyor ;width 1.0m x length 4.8m
D2: Up-sloped Conveyor ; width 1.0m x length 5.7m
D3: Transition Conveyor ; width 1.0m x length 1.5m
D4: Curved Conveyor ; 90 degrees, radius 1.5m: 2 nos.
D5: Straight Conveyor ; width 1.0m x length 7.8m

Component-4-B1: PTB / Page - 39

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 7000 series: Special Equipment Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

D6: Down-sloped Conveyor ; width 1.0m x length 5.3m


D7: Final Induction Conveyor ; width 1.0m x length 3.5m
D8: Make-Up Carousel ; width 1.5m x length 51m

Arrival BHS
A1: Claiming Carousel ; width 1.0m x length 61m

No.

Ancillary Component
Motor Control Panel

Sum

Catwalk

44

Draught Curtain

No.

Data Communication between BHS and CCO

Sum

Total to Series Summary


Section B1-7400: Airport Security System

Baggage inspection system


Hold - Baggage Inspection System

No.

Hold - Baggage Inspection System (Odd sizes)

No.

Hand - Baggage System

No.

Metal detection system


Walkthrough Metal Detector

No.

In-Line Screening Machine


Explosive Detection System (EDS)

No.

Workstation for EDS

No.

Electronic Trace Detector (ETD) with table

No

Total to Series Summary

Section B1-7500 : Flight Information Display


FIDS Server with Redundant Server with 17" LCD Monitor,
necessary accessories and Software

No.

Workstation for Operation with 21.5" LCD Monitor

No.

Workstation for Airline with 21.5" LCD Monitor

No.

FIDS Displays - 17" LCD Monitor with controller

No.

FIDS Displays - 21.5" LCD Monitor with controller

No.

10

FIDS Displays - 40" LCD Monitor with controller

No.

29

FIDS Displays - 46" LCD Monitor with controller

No.

Installation Brackets for all FIDS Displays

Sum

Network Equipment and peripheral

Sum

Component-4-B1: PTB / Page - 40

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-1: (B1)Passenger Terminal Building


Section 7000 series: Special Equipment Works
Rate

Item
No.
10

Description
Installation Work includes the installation of Server, LCD
Monitor, Bracket and Terminal.

Unit

Qty

Sum

Local
Peso

Total to Series Summary


Section B1-7600: Building Management System

Hardware
Management integration Server (MIS)

No.

System Core server (SCS)

No.

Operator workstation with PC and printer

Sum

Control panel for MIS and SCS

No.

Remote station panel

Sum

Software
Software

Sum

PC Engineer Tool
PC Engineer Tool

Sum

Energy Management System


Energy Management System

Sum

DDC Controllers
Multipurpose Controller, I/O Module DI, DO, AI and TTD

Sum

10

Cable
Fiber optical cable

500

11

Installation Works
Installation Works excluding field devices

Sum

Total to Series Summary


Section B1-7800: Access Control System

Access Control System at PTB


Main Control Unit comprising host computer

Sum

Door Control Unit

Sum

Software development

Sum

Interface with Fire Alarm and Detection System

Sum

Emergency Exits Control System

Sum

Power Cables 20mm dia. IMC

500

Signal Cables, 4P CAT5e UTP Cable

2,000

Other signal cables

sum

Total to Series Summary

Component-4-B1: PTB / Page - 41

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
SUBCOMPONENT-4-B3:
Control Tower, ATC Operation &
Administration Building

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Subcomponent-4-3: (B3) Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-3: B3 Control tower, ATC Operation and Administration Building


Subcomponent Summary
Section B3-4000 Series : Architectural Works
Section B3-5000 Series : Mechanical Works
Section B3-6000 Series : Electrical Works
Section B3-7000 Series : Special Equipment

Total to Component Summary

Component-4-B3: ATO / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B3-4000 series : Architectural


Series Summary
Section B3-4110 : Earthwork
Section B3-4120 : Termite Control
Section B3-4220 : Concrete Works
Section B3-4230 : Structural Steelworks
Section B3-4310 : Blockworks
Section B3-4320 : Waterproofing
Section B3-4340 : Windows/Doors
Section B3-4350 : Metalworks
Section B3-4360 : Woodworks and Partitions
Section B3-4370 : Finishes
Section B3-4380 : Miscellaneous Fittings and Furnitures
Total to Subcomponent Summary
Section B3-4110 : Earthwork

Normal Excavation
Column foundation and Pits

m3

1,034

Trenches

m3

54

Excavation in Rock
Column foundation and Pits

m3

258

Trenches

m3

13

m3

541

Filling
5

Backfilling to foundations
Filling/Compaction

Gravel bed; 100mm thick

m2

1,290

Gravel bed; 50mm think to external sidewalk (29/MD)

549

Polyethylene waterproof membrane

m2

801

m2

2,199

Total to Series Summary


Section B3-4120 : Termite Control
1

Soil treatment
Total to Series Summary

Component-4-B3: ATO / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B3-4220: Concrete Works


In-situ Concrete
Plain Concrete; Class B3, in :
1

Blinding layer; 50mm thick

m3

95

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

Reinforced Concrete; Class B0 in Control Tower:


3

Beams

m3

41

Colums

m3

Staircase

m3

49

Walls

m3

304

Suspended slab

m3

47

m3

578

Reinforced Concrete; Class B1 in Control Tower:


8

Foundations
Reinforced Concrete; Class B2 in Control Tower:

Ground floor slab

m3

10

Base slab to external sidewalk (29/MD)

m3

Reinforced Concrete; Class B1 in Operations &


Administration Building:
11

Column foundations

m3

85

12

Ground beams

m3

61

13

Columns

m3

92

14

Beams

m3

189

15

Suspended slabs

m3

179

16

Parapet

m3

30

17

Staircases

m3

23

Reinforced Concrete; Clas B2, in:


18

Ground floor slab

m3

115

19

Base slab to external sidewalk (29/MD)

m3

46

Formwork

Component-4-B3: ATO / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Class F1 Formwork in: Control Tower:


20

Column Foundations

136

21

Beams

345

22

Column/Encasement to column

62

23

Wall

304

24

Staircase

162

25

Ground slab

336

Class F3 Formwork in: Control Tower:


26

Suspended slab
Class F1 Formwork in Operations & Administration
Building:

27

Column Foundations

134

28

Footing tie beams

490

29

Columns

642

30

Beams

1,915

31

Staircases

225

32

Suspended slab

1,533

33

Walls

2,700

41

35

Reinforcement bars - (grade 40 = 276 N/mm2)


10 mm ~ 12mm

kg

19,278

36

Reinforcement bars - (grade 60 = 415 N/mm2)


16 mm ~ 25mm

kg

99,418

37

Reinforcement bars - (grade 40 = 276 N/mm2)


10 mm ~ 12mm

kg

47,506

38

Reinforcement bars - (grade 60 = 415 N/mm2)


16 mm ~ 25mm

kg

64,407

Class F3 Formwork in Operations & Administration


Building:
34

Suspended slab
Reinforcement
Control Tower:

Operations & Administration Building:

Total to Series Summary

Component-4-B3: ATO / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B3-4230 : Structural Steelwork


Control Tower Roof Deck
1

Rolled H-Section

kg

5,618

Angle section

kg

1,198

Plate

kg

870

Connection plate

kg

267

Floor deck; galvanized 1.2mm thick, 51mm high

kg

1,691

Frabicated square section

kg

6,732

Total to Section Summary


Section B3-4310: Blockwork
Hollow Concrete Block
1

Wall; 150mm thick in Control Tower

155

Wall; 150mm thick in Operations & Administration Building:

1,833

Wall; 100mm thick

Reinforced Concrete Class B2 in Lintels and Stiffeners


4

Lintel beam above opening; 150 x 200mm including formwork


and reinforcement

Stiffener beam; 150 x 300mm including formwork and


reinforcement

221

Stiffener column; 150 x 400mm including formwork and


reinforcement

253

Total to Series Summary


Section B3-4320 : Waterproofing
Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
1

Waterproofing System with insulation applied to surface

m2

980

Waterproofing System applied to parapet wall

m2

149

50mm Thick protection concrete with 4mm diameter at 100mm m2


welded wire mesh steel trowel finish (1/RD)

980

25mm Wide contraction gap w/ sealant in protection concrete

382

200mm Wide steel trowel finish roof ditch with metal lath
(10/RD)

130

Component-4-B3: ATO / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Urethane Water Proofing Coating WP-3


6

Waterproofing applied to floor (2F and 8F)

m2

80

Waterproofing applied to wall;300mmhigh

m2

48

Underground External Waterproofing Coating


WP-5
8

WP for Elev. Pit to Floor

m2

WP for Elev. Pit wall, trench and machine foundation

m2

46

No.

Total to Series Summary


Section B3-4340: Windows/Doors
CURTAIN WALLING SYSTEMS; as shown on the
Drawings, including steel mullions and supporting systems,
steel and aluminium framing and supports, with all related
fixing and support components, finishings, glass, gaskets,
ironmongery, sealants

6/AD 5240 x 6450(2100)


WOOD DOOR SETS: flush type ; as shown on door &
window schedule drawing; including all ironmongery,
louvers, openings, wood frames and beads and all fixing
lugs, mortar bedding/filling and sealants

1/WD 700 x 2100 mm w/ louver

No.

2/WD 900 x 2100 mm

No.

16

3/WD 900 x 2100 mm w/ louver

No.

4/WD 900 x 2100 mm w/ louver

No.

12

5/WD 900 x 2100 mm w/ louver

No.

6/WD 600 x 1800 mm

No.

8/WD 600 x 2100 mm w/ louver

No.

9/WD 1800 x 2100 mm

No.

STEEL DOOR SETS ; flush type as shown on door &


window schedule drawing : including ironmongery, louvers,
openings, glazing, thresholds, frame set and fixing lug,
mortar bedding/filling

10

1/SD 900 x 2100 mm

No.

11

2/SD 900 x 2100 mm w/ louver

No.

12

3/SD 1400 x 2100 mm w/ louver

No.

13

4/SD 1800 x 2100 mm

No.

Component-4-B3: ATO / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

14

5/SD 1800 x 2100 mm

No.

15

6/SD 1800 x 2100 mm w/ louver

No.

16

7/SD 600 x 2100 mm w/ louver

No.

17

8/SD 800 x 2100 mm

No.

10

18

9/SD 600 x 600 mm

No.

19

12/SD 1400 x 2100 mm

No.

20

13/SD 900 x 2100 mm

No.

21

14/SD 900 x 2100 mm

No.

22

15/SD 1400 x 2100 mm

No.

Local
Peso

ALUMINIUM DOORS; as shown on Drawings, including


glazing, beads, gaskets, ironmongery, thresholds, frame set
and fixing lug, mortar bedding/filling and sealants

23

1/AD 1800 x 2100

No

24

3/AD 6980(1800) x 2100

No

25

5/AD 1200(900) x 2100

No

ALUMINIUM WINDOWS WITH INSECT SCREENS; as


shown on Drawings, including glazing, beads, gaskets,
louvers, ironmongery, thresholds, frame set and fixing lug,
mortar bedding/filling and sealants

26

1/AW 1750 x 1200 mm w/ louver

No.

12

27

2/AW 2640 x 1200 mm w/ louver

No.

28

3/AW 4400 x 1200 mm w/ louver

No.

29

4/AW 5280 x 1200 mm w/ louver

No.

30

5/AW 830 x 450 mm w/ louver

No.

31

6/AW 3105(1440 x 2100 mm w/ louver

No.

32

7/AW 1750 x 1200 mm

No.

33

8/AW 600 x 500 mm

No.

STAINLESS STEEL WINDOWS; as shown on door &


window schedule drawing including sills, glass, ironmongery
and sealants, sealant, sash drain and etc.

34

1/SSW 1100 w/louver

No.

35

2/SSW 3192(2810) X 2046 mm

No.

Component-4-B3: ATO / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

ALUMINIUM LOUVERS : fixed type ; effective rate


40% ; including frames, frame set and fixing lug, mortar
bedding /filling and sealants and complete with insect
screens and sub-frames
36

1/AL 4400 x 500 mm

No.

37

2/AL 1200 x 500 mm

No.

38

3/AL 600 x 250 mm

No.

39

4/AL 400 x 400 mm

No.

40

5/AL 1500 x 400 mm

No.

41

6/AL 750 x 450 mm

No.

42

7/AL 400 x 300 mm

No.

43

8/AL 350 x 300 mm

No.

44

9/AL 500 x 300 mm

No.

Total to Series Summary


Section B3-4350: Metalworks
Expansion Joint Assemblies
1

(4/EJD) At floor

(1/EJD) At parapet

(2C/EJD) At interior wall

30

(4B/EJD) At wall/ floor

(2B/EJD) At ceiling

No.

13

Roof Drain Outlet (10/RD)


6

100 mm Diameter (9/RD)


Miscellaneous Metal Works

Stainless steel nosing to stair treads (15A/MD)

165

Aluminum cased vinyl nosing to stair treads (15B/MD)

16

Stainless steel escape ladder 400mm wide w/ 25mm diameter.


vertical member and 22mm diameter rungs at 350 o.c. fix to
concrete wall w/ and including all necessary fixations.
(22B/MD)

37

10

Ditto ( 22B/MD )

150

11

Raised floor system

m2

41

12

Window sill, 2.5mm thick x 645mm girth steel plate bent twice
with and including all supporting frames and fixations to
structure

23

Component-4-B3: ATO / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

13 Pipe enclosure, 1.5mm Thick x 880 girth x2,046 high SUS 304 No.
stainless steel plate in hairline finish bent twice with and
including all necessary supports and fixations to structure Ditto
but 460mm girth x 2,046 mm high bent five times column
cladding (at VFR room)

Qty

Local
Peso

14 Aluminum blind box overall size 120mm wide x 100mm high


fix to structure with hanger bolts (5E/MD)

193

15

Aluminum wall trim at ceiling (5/MD); 20 x 15 x 10 x 20mm,


double L section

222

16

Aluminum Louver type A (11/RD)

m2

73

17

Aluminum Louver type B (34/MD)

m2

98

18

Trench pit cover seat ( L 50 x 50 x 4 mm) w/ primer paint finish m


including dowel support (10mm diameter bar ) w/ primer
paint finish (31/MD )

11

19

Trench pit cover ( W< 1000 mm ; Mild steel grating )

11

Stainless Steel Handrails, Guard rails and Railings


20

Floor mounted stair & ramp handrail (11A/MD)

110

21

Floor mounted guardrail (11B/MD)

22

22

Wall mounted handrail (13/MD)

37

23

Tower balcony guardrail

33

24

Tower roof guardrail

27

Access Ladders and Hatches


25

Stainless steel fixed ladder assembly, 400mm wide, 3,800mm


long

No.

26

Aluminium drop-down telescopic ladder (17/MD)

No.

27

600mm x 600mm floor hatch ( level 9)

No.

28

700mm x 700mm Roof access hatch ( level 9 )

No.

29

1000mm x 1000mm roof access (roof tower )

No.

30

Stainless Steel Maintenance Rings

No.

32

Total to Series Summary


Section B3-4360: Woodworks and Partitions
Miscellaneous Wood Works
1

Timber skirting 25 mm thick x 50 mm high (S-3)

457

Timber infill between aluminum window and blockwall with


and including aluminum channel and sealant (3B/MD)

14

Component-4-B3: ATO / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

1.2

Ditto but between aluminum window and drywall (3A/MD)

Local
Peso

Kitchen counters and cabinetas shown on the drawings : 19 mm


thick MDF panel w/ high pressured laminate, including concrete
slab, all necessary framing, fixing, fittings and ironmongery
4

Floor mounted : 3380 x 600 x 850mm high

No.

Wall Mounted : 3380 x 300 x 800 mm high

No.

12mm Thick Gypsum Board double layer faced partition on


6

Partition faced one side

m2

19

Partition faced both sides

m2

404

Cubicles (8/MD); including all necessary ironmongery


8

Two unit Cubicle

No.

Urinal partition

No.

11

m2

262

Total to Series Summary


Section B3-4370: Finishes
In-situ Finishes

Internal Finishes
Cement render to floor; 50mm thick, to receive damp proof
paint P-6 (F8)

Cement render to floor; 38mm thick, to receive vinyl tiles (F6)

m2

674

Cement render to floor; 42mm thick, to receive ceramic tiles


(F-4)

m2

710

Cement render to stairs; 42mm thick, to receive ceramic tiles 300 mm wide tread (15A/MD)

165

Cement render to stairs; 22mm thick, to receive ceramic tiles 158.3 mm high riser (15A/MD)

175

Cement render to stairs; 38mm thick, to receive vinyl tiles 240 mm wide tread (15B/MD)

16

Cement render to stairs; 38mm thick, to receive vinyl tiles 190 mm high riser (15B/MD)

17

Cement render to walls; 20mm thick,to receive paint (W3 &


W4)

m2

1,976

Cement render to walls; 22mm thick, to receive ceramic tiles


(W2)

m2

407

10

Cement render to wall; 25mm thick, to receive glasswool board m2


insulation

75

Component-4-B3: ATO / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

11 Cement render to floors; 42mm thick, to receive ceramic tiles


to floors

m2

23

Cement render to staircase landings; 50mm thick with surface

m2

15

106

m2

565

15 Cement render to stairs; 42mm thick, to receive ceramic tiles 300mm wide tread (15A/MD)

16 Cement render to stairs; 22mm thick, to receive ceramic tiles 150mm high riser (15A/MD)

17 Cement render to walls; 20mm thick receive paint; to Control


Tower

m2

766

18 Cement render to walls; 20mm thick to receive paint; to


Operations & Administration Building

m2

837

19 Cement render to concrete trellis; 20mm thick to receive paint;


to Operations & Administration Building

m2

237

Local
Peso

External Finishes

12

13 Cement render to treads and risers; 50mm thick with surface


hardener
14

Cement render to sidewalk 30mm thick (32/MD)

Rigid Tile/Slab/Block

20

Ceramic Tile Covering


Ceramic tiles to floors; 300 x 300 x 8mm thick (F4)

m2

710

21

Ceramic tiles to walls; 300 x 300 x 8mm thick (W2)

m2

407

22 Ceramic tile to stairways; 8mm thick; 275mm wide tread


(15A/MD)

165

23

Ceramic tile to stairways; 8mm thick; 151mm high riser


(15A/MD)

175

24

Ceramic tile to toilet wall coping; 300 x200mm x 8mm thick,


including cement render backing; 30mm thick (7/MD)

10

m2

472

26 Anti-static vinyl tiles to floors; 300 x 300 x 2mm thick (F-6B)

m2

202

27

Anti-static carpet tiles to floors; 500 x 500 x 7mm thick (F-9)

m2

41

28

Vinyl tile to stair treads; 2mm thick; 240mm

16

29

Vinyl tile to stair risers; 2mm thick; 190mm

17

30

Polyvinyl soft tile to skirtings; 100mm high 2mm thick (S-4)

460

31

Precovered glass wool board; to walls (W-8)

m2

75

32

Precovered glass wool board; to ceilings (W-5)

m2

62

Flexible Tile/Sheet
25

Vinyl tiles to floors; 300 x 300 x 2mm thick (F-6A)

Component-4-B3: ATO / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Suspended Ceilings and Bulkheads; Including Supports and


Suspension System:
33

600 x 600 x 15mm Thick acoustic rockwool ceiling system (C1)

m2

779

34

600 x 300 x 12mm Thick acoustic rockwool ceiling system


including 9.5mm thick gypsum board (C-2)

m2

368

35

8mm Thick calcium silicate board (C-3)

m2

14

m2

213

36 Suspended Double Ceiling: t=12.5 on t=9.5 Sheating gypsums


(C-6)
Painting/Clear Finishing
Synthetic resin emulsion paint (P-1) to:
37

Cement rendered wall (W-3); internal

m2

933

38

Gypsum board wall(W-7)

m2

807

39

Gypsum board ceiling

213

Synthetic resin mixed paint type A (P-2) to:


40

Wood skirting 50mm high (S-3)

430

41

Wood doors

m2

262

Synthetic resin mixed paint type B (P-3) to:


42

Steel doors

m2

272

43

Structural Steel

m2

213

Synthetic resin emulsion multi-layer coating (P-4) to:


44

Cement rendered wall (W-4)

m2

2,040

45

Cement rendered wall (W-3); external to Control Tower

m2

766

46

Cement rendered wall (W-3); external to ops and admin bldg

m2

837

47

Cement rendered concrete trellis

m2

237

m2

262

m2

14

Epoxy resin floor paint (P-6) to:


48

Cement rendered floors (F-8)


Acrylic resin emulsion paint (P-7) to:

49

Calcium silicate board ceiling (C-3)


Total to Series Summary
Section B3-4380: Miscellaneous Fittings and Furnitures
Miscellaneous Item

Component-4-B3: ATO / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Clear mirror

m2

11

Venetian blinds

m2

232

Roll-up film screen-3,192/2,810 x 2,046mm high

No.

Local
Peso

Lavatory Counter Top; in Granite polish finish, 20mm thick;


with opening for lavatory basins including supporting frame
and all necessary fixations (7/MD)

2320 x 600 mm Deep

No.

1245 x 600 mm Deep

No.

No

Stainless steel kitchen counter w/ double bowl sink(21/MD)


6

3380mm x 600mm deep


Total to Series Summary

Component-4-B3: ATO / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B3-5000 Series: Mechanical Work Summary


Series Summary
Section B3-5100 : Sanitary and Plumbing
Section B3-5200 : Ventilation and Air Condition
Section B3-5300 : Fire Protection

Total to Subcomponent Summary


Section B53-5100 : Sanitary and Plumbing
Sanitary Fixtures
1

WC-3 Water closet (FV)

No.

16

WC-4 Water closet for handicapped

No.

Water closet handrail for handicapped

No.

UR-3 Urinal

No.

11

LAV-3 Under counter type lavatory

No.

21

LAV-4 Waii Hang Lavatory

No.

LAV-5 Lavatory for handicapped

No.

Lavatory handrail for handicapped

No.

SS-1 Service sink (Slop Sink)

No.

10

SHW-1 Shower set

No.

11

Faucet for kitchen sink

No.

12

Sop Holder

No.

13

PH-2 Toilet paper holder

No.

17

14

Hose Bib

No.

Kitchen Equipment
15

SS Work Table, 1200 mm x 600 mm x 800 mm H

No.

16

SS Double Sink, 1200 mm x 600 mm x 800 mm H

No.

17

SS Utility Rack,4 Layers, 800 mm x 600 mm x 1800 mm H

No.

18

SS Ceiling Suspended Cabinet, 1200mm x 350 mm x 600


mm H

No.

19

SS Work Table, 600 mm x 600 mm x 800 mm H

No.

Component-4-B3: ATO / Page - 14

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

20

SS Work Table, 900 mm x 600 mm x 800 mm H

No.

21

SS Garbage Can

No.

22

SS Electric Cooking Table 2.5 Kw

No.

23

Rice Cooker, 40 cups

No.

24

Refrigerator, 19 cuft

No.

No.

Local
Peso

Water Distribution System


Equipment
Incl, Hangers,Vibration Isolator, Supports, Inserts and
Accsessories.
25

BP - 1 Booster Pump Unit


Capacity 32mm diameter x 80 l/minx 37m x 2 unit
Control panel w/ noise filter
double type back flow preventer, strainer
and standard accessories
Piping Works
Pipework, Polyvinyl chloride pipe (Hight Dencity VP)
Incl, Fittings,Hangers, Supports, Sleeves, Inserts and
Accessories

26

20 mm diameter

84

27

25 mm diameter

46

28

32 mm diameter

134

29

40 mm diameter

30

50 mm diameter

25

31

65 mm diameter

40

32

80 mm diameter

15

33

Gate Valve, JIS 10 Kg/cm2


20 mm diameter

No.

34

25 mm diameter

No.

35

32 mm diameter

No.

36

40 mm diameter

No.

37

50 mm diameter

No.

38

65 mm diameter

No.

39

80 mm diameter

No.

40

Water Hammer Arrester

No.

19

Hot Water Distribution

Component-4-B3: ATO / Page - 15

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Equipment
Incl, Hangers,Vibration Isolator, Supports, Inserts and
Accsessories.
41

EWH - 1 Electric Water Heater - Single point


(Instantaneous)

No.

42

Solar Water Heater


Natural circulation Type , Storage Capacity 200 L
Solar Panel 3.22 m2, Steel Base

No.

43

Hot Water Storage Tank


Storage Capacity 370 L w/ Electric Heater 5 kw, Insutation

No.

44 Water Softner
40 l/min x 300 w x 3 x 230v x 60Hz

No.

45 Booster Pump Unit


40 l/min x 10m TDH x 0.4Kw x 3 x 230v x 60Hz

No.

46 Hot Water Cerculation Pump


5 l/min x 3m TDH x 0.1Kw x 1 x 230v x 60Hz

No.

47 15mm

100

48

20mm

17

49

25mm

22

50

32mm

47

51

Thermal insulation
Closed cell elastomeric thermal insulation
15mm x 20 mm

100

52

20mm x 20mm

17

53

25mm x 20mm

22

54

32mm x 20mm

47

55

Gate Valve, JIS 10 Kg/cm2


15mm

No.

17

56

20mm

No.

57

25mm

No.

58

32mm

No.

12

59

Check Valve, JIS 10 Kg/cm2


15mm

No.

60

32mm

No.

Hot Water Piping Works


Cooper Pipe,Type L
Incl,Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories

Component-4-B3: ATO / Page - 16

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

61

Y-Strainer, JIS 10 Kg/cm2


15mm

No.

62

32mm

No.

63

Flexible Joint, JIS 10 Kg/cm2


15mm

No.

64

25mm

No.

65

32mm

No.

66

Air Vent, JIS 10 Kg/cm2


15mm

No.

67

Constant Flow Valve, JIS 10 Kg/cm2


15mm

No.

68

Wax Type 3-Way Valve, JIS 10 Kg/cm2


32mm

No.

Local
Peso

Sewer Piping System


Pipework/Accessories
Pipework, Polyvinyl chloride pipe (Hight Dencity VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand bedding and Accessories
69

100 mm diameter

246

70

75 mm diameter

71

50 mm diameter

102

72

Fittings
Wye & 1/8 bend combination
100 mm diameter

No.

73

100 x 75 mm diameter

No.

74

100 x 50 mm diameter

No.

32

75

50 x 50 mm diameter

No.

76

Wye
100 mm diameter
100 x 50 mm diameter

No.
No.

20
32

77

1/8 Bend
100 mm diameter

No.

16

78

50 mm diameter

No.

56

79

1/4 Bend
100 mm diameter

No.

21

80

50 mm diameter

No.

38

81

Floor / Ground Clean Out


100 mm diameter

No.

38

Component-4-B3: ATO / Page - 17

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

82

P - Trap
50 mm diameter

No.

28

83

Floor Drains
50 mm diameter

No.

26

Local
Peso

Shower Drains
84

Grease trap @ kitchen

No.

85

Oil Interceptor (for mechanical room)

No.

86

Pipework, PVC (VU)


Incl, Hangers, Supports, Sleeves, Inserts and Accessories
100 mm diameter

576.00

87

75 mm diameter

130.00

88

50 mm diameter

478.00

89 100 mm diameter

No.

18

90

75 mm diameter

No.

91

50 mm diameter

No.

55

90 TEE
92 100 mm diameter

No.

93

75 mm diameter

No.

94

50 mm diameter

No.

45

95

Reducer
75 x 50 mm diameter

No.

96

Storm Drain
Pipework
Abave Ground
Galvanized carbon steel pipe ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accessories
100 mm diameter

173.00

97

75 mm diameter

18.00

Vent Pipes

Fittings
90 Bend

Under Ground
Pipework, Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand bedding and Accessories
98

150 mm diameter

98.00

99

100 mm diameter

41.00

Component-4-B3: ATO / Page - 18

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

100 100 mm diameter

No.

11

101 75 mm diameter

No.

11

45 Bend
102 100 mm diameter

No.

29

103 75 mm diameter

No.

Wye
104 100 mm diameter

No.

105 75 mm diameter

No.

Roof Drains
106 100 mm diameter

No.

11

107 75 mm diameter

No.

108

Catch Basin

No.

13

109

Catch Basin Cover

No.

13

No.

No.

No.

No.

No.

No.

No.

Local
Peso

Fittings ( GI )
90 Bend

Total to Section Summary


Section B53-5200 : Ventilation and Air Conditioning
Air Conditioning System
Operation and Administration Building
Equipment
Fan Coil Unit (VRF Indoor Unit)

Incl, Hangers, Suppoets, Sleeves, Inserts, Vibration Isolators


and Accessories.
FCU-01A to 01D
Ceiling casset 4-Way Cooling Capacity 2.8 Kw

FCU-02
Ceiling casset 4-Way Cooling Capacity 2.3 Kw

FCU-03
Ceiling casset 4-Way Cooling Capacity 1.5 Kw

FCU-04A to 04B
Ceiling casset 4-Way Cooling Capacity 6.2 Kw

FCU-05
Ceiling Suspended Cooling Capacity 3.0 Kw

FCU-06
Ceiling casset 4-Way Cooling Capacity 1.5 Kw

FCU-07
Ceiling casset 4-Way Cooling Capacity 1.7 Kw

Component-4-B3: ATO / Page - 19

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Unit

Qty

No.

No.

10 FCU-10A to 10B
Ceiling casset 4-Way Cooling Capacity 1.9 Kw

No.

11 FCU-11A to 11B
Ceiling casset 4-Way Cooling Capacity 1.55 Kw

No.

12 FCU-12
Wall Mounted Cooling Capacity 1.0 Kw

No.

13 FCU-13A to 13B
Ceiling casset 4-Way Cooling Capacity 3.95 Kw

No.

14 FCU-14A to 14C
Ceiling casset 4-Way Cooling Capacity 4.07 Kw

No.

15 FCU-15A to 15B
Ceiling casset 4-Way Cooling Capacity 1.8 Kw

No.

16 FCU-16A to 16B
Ceiling casset 4-Way Cooling Capacity 2.8 Kw

No.

17 FCU-17
Ceiling casset 4-Way Cooling Capacity 0.1 Kw

No.

18 FCU-18
Ceiling Mounted Duct Type Cooling Capacity 19.5 Kw

No.

19 FCU-19A to 19C
Ceiling Suspended Cooling Capacity 6.83 Kw

No.

20 FCU-20A to 20C
Ceiling casset 4-Way Cooling Capacity 3.0 Kw

No.

21 FCU-21A to 21B
Ceiling casset 4-Way Cooling Capacity 3.2 Kw

No.

22 FCU-22A to 22B
Ceiling casset 4-Way Cooling Capacity 2.7 Kw

No.

23 FCU-23A to 23B
Ceiling casset 4-Way Cooling Capacity 2.9 Kw

No.

24 FCU-24
Ceiling casset 4-Way Cooling Capacity 2.9 Kw

No.

25 FCU-25
Ceiling Mounted Duct Type Cooling Capacity 19.5 Kw

No.

26 FCU-26A to 26B
Ceiling casset 4-Way Cooling Capacity 2.6 Kw

No.

27 FCU-27A to 27B
Ceiling casset 4-Way Cooling Capacity 2.7 Kw

No.

Description
FCU-08

Local
Peso

Ceiling casset 4-Way Cooling Capacity 0.8 Kw


9

FCU-09
Ceiling Mount Duct Type Cooling Capacity 24.5 Kw

Component-4-B3: ATO / Page - 20

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Item
No.

Rate
Description

Unit

Qty

28 FCU-28A to 28B
Ceiling casset 4-Way Cooling Capacity 2.35 Kw

No.

29 FCU-29A to 29B
Ceiling casset 4-Way Cooling Capacity 6.15 Kw

No.

30 FCU-30A to 30B
Ceiling casset 4-Way Cooling Capacity 4.4 Kw

No.

31 FCU-31A to 31B
Ceiling casset 4-Way Cooling Capacity 5.1 Kw

No.

32 FCU-32A to 32B
Ceiling casset 4-Way Cooling Capacity 3.1 Kw

No.

33 FCU-33
Ceiling casset 4-Way Cooling Capacity 2.1 Kw

No.

34 FCU-34
Ceiling Mounted Duct Type Cooling Capacity 24.5 Kw

No.

35 FCU-35A to 35B
Ceiling casset 4-Way Cooling Capacity 8.4 Kw

No.

36 FCU-36A to 36B
Ceiling casset 4-Way Cooling Capacity 1.6 Kw

No.

37 FCU-37A to 37B
Ceiling casset 4-Way Cooling Capacity 5.9 Kw

No.

38 FCU-38
Ceiling casset 4-Way Cooling Capacity 5.0 Kw

No.

39 FCU-39A to 39B
Ceiling casset 4-Way Cooling Capacity 9.0 Kw

No.

40 FCU-40
Ceiling casset 4-Way Cooling Capacity 5.3 Kw

No.

41 FCU-41
Ceiling casset 4-Way Cooling Capacity 8.0 Kw

No.

42 FCU-42A to 42C
Ceiling Suspended Cooling Capacity 8.4 Kw

No.

43 FCU-43A to 43B
Ceiling casset 4-Way Cooling Capacity 6.2 Kw

No.

44 FCU-44
Ceiling casset 4-Way Cooling Capacity 8.9 Kw

No.

45 FCU-45
Ceiling casset 4-Way Cooling Capacity 7.8 Kw

No.

46 FCU-46A to 465B
Ceiling casset 4-Way Cooling Capacity 5.7 Kw

No.

47 FCU-47A to 47B
Ceiling casset 4-Way Cooling Capacity 6.3 Kw

No.

Local
Peso

Component-4-B3: ATO / Page - 21

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

48 FCU-48A to 48B
Ceiling casset 4-Way Cooling Capacity 7.5 Kw

No.

49 FCU-49
Ceiling casset 4-Way Cooling Capacity 8.6 Kw

No.

50 VRF - 01
Coolimg capacity 68.1 Kw

No.

51 VRF - 02
Coolimg capacity 68.1 Kw

No.

52 VRF - 03
Coolimg capacity 82.6 Kw

No.

53 VRF - 04
Coolimg capacity 77.8 Kw

No.

54 VRF - 05
Coolimg capacity 77.8 Kw

No.

55 VRF - 06
Coolimg capacity 63.3 Kw

No.

56 VRF - 07
Coolimg capacity 58.45 Kw

No.

No.

58 6.4 mm diameter

152.0

59 9.5 mm diameter

366.0

60 12.9 mm diameter

212.0

61 15.9 mm diameter

249.0

62 19.1 mm diameter

124.0

63 22.2 mm diameter

95.0

64 28.6 mm diameter

72.0

65 34.9 mm diameter

69.0

66 Outdoor Multi Conection Piping Kit Kit

set

67 Refrigerant Joint Kit

No.

84

Local
Peso

VRF Outdoor Unit


Incl, Common Base, Hangers, Suppoets, Sleeves, Inserts,
Vibration Isolators and Accessories.

Fan Filter Unit


Incl, Hangers, Suppoets, Sleeves, Inserts, Vibration Isolators
and Accessories.
57 OAF - 1
1910 l/s x 200 Pa x 2.2 Kw x 3 x 230V x 60Hz
Refrigerant pipes, copper pipes type "L"
(Incl, Fittings, Hangers, Suppoets, Sleeves, Inserts, and
Accessories)

Component-4-B3: ATO / Page - 22

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Thermal insulation
Closed cell elastomeric thermal insulation
68 6.4 mm diameter, t = 30mm

152.0

69 9.5 mm diameter, t = 30mm

366.0

70 12.9 mm diameter, t = 30mm

212.0

71 15.9 mm diameter, t =30mm

249.0

72 19.1 mm diameter, t = 30mm

124.0

73 22.2 mm diameter, t = 30mm

95.0

74 28.6 mm diameter, t = 30mm

72.0

75 34.9 mm diameter, t = 30mm

69.0

Pipe Fittings
76 Filter Drier, 34.9 diameter

No.

77 Filter Drier, 28.6 diameter

No.

78 Moisture Indicator, 34.9 diameter

No.

79 Moisture Indicator, 28.6 diameter

No.

Aluminum Cladding for Pipe


80 Aluminum Sheet (Ga. # 26)

38

Local
Peso

Duct Works
G.I sheets
(Incl, Hangers, Suppoets, Sleeves, Inserts, and Accessories)
81 0.5 mm

(Ga. # 26)

295

82 0.6 mm

(Ga. # 24)

89

221

Supply Air register (SA)


84 150 x 150 mm

No.

15

85 200 x 200 mm

No.

17

Volume Damper
86 400 x 200 mm

No.

87 400 x 250 mm

No.

88 400 x 300 mm

No.

89 450 x 250 mm

No.

90 700 x 400 mm

No.

83 Thermal insulation, glasswool 50 mm thick


x 40 Kg/ m2 with single face foil barrier.
Air Grilles

Component-4-B3: ATO / Page - 23

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Fire Damper w/ Fusible Link


91 150 x 150 mm

No.

92 200 x 150 mm

No.

93 700 x 400 mm

No.

Acoustical lining Elbow


94 700 x 400 mm

No.

95 25 mm diameter

191

96 32 mm diameter

121

97 40 mm diameter

40

98 65 mm diameter

29

99 25 mm diameter

30

100 65 mm diameter

33

Condensate Drain Insulation;


Closed cell elastomeric thermal insulation
101 25 mm diameter t = 20mm

191

102 32 mm diameter t = 20mm

121

103 40 mm diameter t = 20mm

40

104 65 mm diameter t = 20mm

29

105 FFU Control System


Including, Accessories & wire

set

106 VRF Control system


Including, ITM & Acssessories

set

107 BAC Net

No.

108 FCU Control system including wiring

No.

84

109 Wired Remote Controller

No.

30

110 Fan Control system


Including, Thermostat & wire

set

Local
Peso

Condensate Drain Piping; PVC Pipes(VP) Above Ground


Incl, Fittings, Hangers, Suppoets, Sleeves, Inserts, and
Accessories

Condensate Drain Piping; PVC Pipes(VP) Under Ground


Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand bedding and Accessories

Automatic Control System

Mechanical Ventilation System


Equipment

Component-4-B3: ATO / Page - 24

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

No.

112 EF - 2 - GF In-line Axial Fan


3,871 l/s x 150Pa x 0.7Kw x 3 x 230V x 60Hz

No.

113 EF - 3 - GF Ceiling casset Fan


201 l/s x 100Pa x 0.045Kw x 1 x 230V x 60Hz

No.

114 EF - 4 - GF In-line Axial Fan


718 l/s x 200Pa x 0.15Kw x 3 x 230V x 60Hz

No.

115 EF - 5 - GF In-line Axial Fan


408 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

116 EF - 6 - GF In-line Axial Fan


447 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

117 EF - 7 - GF In-line Axial Fan


393 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

118 EF - 8 - GF In-line Axial Fan


393 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

119 EF - 9 - GF In-line Axial Fan


374 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

120 EF - 10 - GF In-line Axial Fan


133 l/s x 80Pa x 0.045Kw x 1 x 230V x 60Hz

No.

121 EF - 11 - 2F Ceiling casset Fan


407 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

122 EF - 12 - 2F In-line Axial Fan


318 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

123 EF - 13 - 2F In-line Axial Fan


452 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

124 EF - 14 - 2F In-line Axial Fan


380 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

125 EF - 15 - 2F In-line Axial Fan


380 l/s x 130Pa x 0.15Kw x 3 x 230V x 60Hz

No.

126 EF - 16 - 2F Ceiling casset Fan


288 l/s x 80Pa x 0.045Kw x 1 x 230V x 60Hz

No.

127 EF - 17 - 2F Ceiling casset Fan


267 l/s x 80Pa x 0.045Kw x 1 x 230V x 60Hz

No.

128 EF - 18 - 2F Ceiling casset Fan


133 l/s x 80Pa x 0.045Kw x 1 x 230V x 60Hz

No.

129 SF- 1- GF In-line Axial Fan


624 l/s x 150Pa x 0.15Kw x 3 x 230V x 60Hz

No.

Local
Peso

Exhaust Fans
(Incl, Hangers, Suppoets, Sleeves, Inserts, Vibration Isolators
and Accessories)
111 EF - 1 - GF In-line Axial Fan
624 l/s x 150Pa x 0.15Kw x 3 x 230V x 60Hz

Component-4-B3: ATO / Page - 25

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

No.

131 0.5 mm (Ga. # 26)

69

132 0.6 mm (Ga. # 24)

33

133 0.8 mm (Ga. # 22)

134 1.2 mm (Ga. # 18)

Exhaust Air Grilles (EA)


135 150 x 150 mm

No.

15

136 200 x 200 mm

No.

17

Volume Damper
137 250 x 200 mm

No.

138 300 x 200 mm

No.

139 350 x 200 mm

No.

140 750 x 350 mm

No.

Back Draft Damper


141 250 x 200 mm

No.

142 300 x 200 mm

No.

143 350 x 200 mm

No.

144 750 x 350 mm

No.

145 Ceiling cassette split type AC unit


Cooling Capacity 10.25 KW

No.

146 Wall mounted split type AC unit


Cooling Capacity 5.3 KW

No.

147 6.35 mm diameter

15.00

148 9.53 mm diameter

55.00

149 15.88 mm diameter

40.00

130 SF- 2- GF In-line Axial Fan


3,871 l/s x 150Pa x 0.7Kw x 3 x 230V x 60Hz

Local
Peso

Duct Works
G.I sheets
(Incl, Hangers, Suppoets, Sleeves, Inserts, and Accessories)

Control Tower
Equipment
Air Cooled Packaged Air Conditioner
(Incl, Hangers, Suppoets, Sleeves, Inserts, Vibration Isolators
and Accessories)

Refrigerant pipes, copper pipes type "L"


(Incl, Fittings, Hangers, Suppoets, Sleeves, Inserts, and
Accessories)

Component-4-B3: ATO / Page - 26

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Closed cell elastomeric thermal insulation


150 6.35 mm diameter (30 mm thick)

15.00

151 9.53 mm diameter (30 mm thick)

55.00

152 15.88 mm diameter (30 mm thick)

40.00

153 25 mm diameter

24.00

154 50 mm diameter

10.00

Condensate Drain Insulation;


Closed cell elastomeric thermal insulation
155 50 mm diameter, t = 20mm

10.00

156 25 mm diameter, t = 20mm

24.00

Aluminum Cladding
157 Aluminum Sheet (Ga. # 26)

m2

24.00

158 EF - 1- 7F In-line Axial Fan


519 l/s x 175Pa x 0.37Kw x 1 x 230V x 60Hz

No.

159 EF - 2 - 7F In-line Axial Fan


356 l/s x 0.047Kw x 1 x 230V x 60Hz

No.

160 EF - 3- 8F In-line Axial Fan


728 l/s x 170Pa x 0.37Kw x 1 x 230V x 60Hz

No.

161 EF -4A- 8F Ceiling Casset Fan


15 l/s x 48Pa x 0.03Kw x 1 x 230V x 60Hz

No.

162 EF -4B- 8F Ceiling Casset Fan


15 l/s x 48Pa x 0.03Kw x 1 x 230V x 60Hz

No.

No.

No.

Local
Peso

Condensate Drain Piping; PVC Pipes(VP)


(Incl, Fittings, Hangers, Suppoets, Sleeves, Inserts, and
Accessories)

Mechanical Ventilation System


Equipment
Exhaust Fans
(Incl, Hangers, Suppoets, Sleeves, Inserts, Vibration Isolators
and Accessories)

Fresh Air Fans


(Incl, Hangers, Suppoets, Sleeves, Inserts, Vibration Isolators
and Accessories)
163 SPF - 1 - 7F In-line Axial Fan
1056 l/s x 200Pa x 0.75Kw x 3 x 230V x 60Hz
164 FAF - 1-7F In-line Axial Fan
1364 l/s x 105Pa x 0.55Kw x 3 x 230V x 60Hz
Duct Works
G.I sheets
(Incl, Hangers, Suppoets, Sleeves, Inserts, and Accessories)

Component-4-B3: ATO / Page - 27

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

165 0.6 mm (Ga. # 24)

200.00

166 0.8 mm (Ga. # 22)

300.00

Exhaust Air Grilles (EA)


167 250 x 250 mm

No.

168 350 x 350 mm

No.

Fresh and Pressurization Air Grilles (FA)


169 250 x 250 mm

No.

170 300 x 300 mm

No.

171 500 x 400 mm

No.

172 900 x 850 mm

No.

Volume Damper
173 400 x 300 mm

No.

16

174 300 x 300 mm

No.

Backdraft Damper
175 800 x 500 mm

No.

176 700 x 400 mm

No.

177 500 x 300 mm

No.

No.

Local
Peso

Total to Section Summary


Section B53-5300 : Fire Protection
Operation and Administration Building
1

Fire hose cabinet c/w valve, 40mm diameter


x 30m fire hose w/ fog nozzle, hose rack and
4.5kg ABC type fire extinguisher

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

CO2 Type, 4.5 Kg

No.

CO2 Type, 23.0 Kg

No.

Fire extinguisher bracket W/housing

No.

No.

Control Tower
6

Fire hose cabinet c/w valve, 40mm diameter


x 30m fire hose w/ fog nozzle, hose rack and
4.5kg ABC type fire extinguisher

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

CO2 Type, 9.0 Kg

No.

Component-4-B3: ATO / Page - 28

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-5000: Mechanical Works
Item
No.
9

Rate
Description

Unit

Qty

Fire extinguisher bracket W/ housing

No.

17

Local
Peso

Total to Section Summary

Component-4-B3: ATO / Page - 29

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-6000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B3-6700: Closed Circuit Television


Equipment / Devices
1

19 inch Monitor, Power Supply Unit & Control desk (VFR)

Sum

Camera with motorized zoom lens (indoor type)

No.

Terminal Board (TB-CCTV-CTO)

No.

130

Wires & Cables


4

RG59 Coaxial cable (interconnection)


Conduits

IMC 20 mm dia

50

IMC 25 mm dia

45

IMC 32 mm dia

30

Total to Series Summary


Section B3-6800: Fire Detection And Alarm
Equipment / Devices
1

Fire Alarm Control Panel (FACP-2)

No.

Smoke detector (addressable)

No.

81

Heat Detector (addressable)

No.

Fire alarm bell

No.

11

Manual Fire Alarm Station

No.

11

Fire Zone Locator

No.

Fireman's Telephone Jack

No.

10

1,100

Wires & Cables


8

1.25 mm TF Wires (interconnection)


Conduits

IEC 15 mm dia

1,100

10

IEC 20 mm dia

50

11

IEC 25 mm dia

160

Total to Series Summary

Component-4-B3: ATO / Page - 31

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-6000 Series: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B3-6900 Lightning Protection and Grounding System


Lightning Protection
1

Early Emission Type Air Terminal (Coverage 120m)

No.

Earthing Grounding for Early Emission, Air Terminal


(complete)

No.

Counter Meter

No.

Down Conductor (complete) , 263 KV withstand Voltage

110

Conventional Type Air Terminal (complete)

No.

3000mm x 20mm Copper Clad Ground Rod

No.

Cadweld/ Bolted Ground Connector

No.

100 mm BCW (For Conventional Type)

80

Sum

Grounding System
9

Grounding System
Total to Series Summary

Component-4-B3: ATO / Page - 32

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-4: Building Works

Subcomponent-4-3: (B3) Control tower, ATC Operation and Administration Building


Section B3-7000 Series: Special Equipment Works
Item
No.

Rate
Description

Unit

Qty

No.

sum

Local
Peso

Section B3-7000 series: Special Equipment Works


Series Summary
Section B3-7200: Elevator
Section B3-7800: Access Control System (ACS)
Total to Subcomponent Summary
Section B3-7200: Elevator
1

CEV-1 Elevator (3Stop / 8Floor)


Total to Series Summary
Section B3-7800: Access Control System (ACS)

Access Control Key Pad including Finger reader, LCD


Display, Finger Reader, UPS, cabling of signal and power
supply

Total to Series Summary

Component-4-B3: ATO / Page - 33

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
SUBCOMPONENT-4-B4:
Fire Station & Airport Maintenance
Building (FSM)

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Subcomponent-4-B4 Summary

Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Subcomponent Summary
Section B4-4000 Series: Architectural Works
Section B4-5000 Series: Mechanical Works
Section B4-6000 Series: Electrical Works
Total to Component Summary

Component-4-B4: FSM / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B4-4000 Series: Architectural Work


Series Summary
Section B4-4110 : Earthwork
Section B4-4120 : Termite Control
Section B4-4220 : Concrete Works
Section B4-4310 : Blockworks
Section B4-4320 : Waterproofing
Section B4-4340 : Windows/Doors
Section B4-4350 : Metalworks
Section B4-4360 : Woodwork and Partitions
Section B4-4370 : Finishes
Section B4-4380 : Miscellaneous Fittings and Furniture
Total to Subcomponent Summary
Section B4-4110 : Earthwork

Normal Excavation
Column foundation and Pits

m3

172

Ground beams

m3

74

Excavation in Rock
Column foundation and Pits

m3

43

Ground beams

m3

18

Filling
Backfilling to foundations

m3

173

Filling/Compaction
6

Gravel bed; 50mm thick

m2

92

Gravel bed; 100mm thick

m2

977

Gravel bed; 50mm think to external sidewalk (29/MD)

456

Polyethylene waterproof membrane

m2

864

m2

1,966

Total to Series Summary


Section B4-4120 : Termite Control
1

Soil treatment
Total to Series Summary
Section B4-4220: Concrete Works
In-situ Concrete
Plain Concrete Class B3 in:

Component-4-B4: FSM / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Blinding layer; 50mm thick

m3

54

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

23

Reinforced Concrete; Class B1 in:


Column foundations

m3

60

Ground beams

m3

55

Columns

m3

59

Beams

m3

106

Suspended slabs

m3

86

Parapet

m3

30

Reinforced Concrete; Class B2 in:


Ground floor slab

m3

130

10

Base slab to external sidewalk (29/MD)

m3

46

Class F1 Formwork in:


11 Column foundations

115

12 Ground beams

459

13 Columns

370

14 Beams

950

15 Ground slabs

21

16 Suspended slabs

443

17 Parapet

345

Class F3 Formwork in:


18 Suspended slabs

421

Reinforcement bars - (grade 40 = 276 N/mm2)


19 10 mm ~ 12mm

kg

21,877

Reinforcement bars - (grade 60 = 415 N/mm2)


20 16 mm ~ 25mm

kg

28,304

584

31

Local
Peso

Formwork

Reinforcement

Total to Series Summary


Section B4-4310: Blockwork

Hollow Concrete Block


Wall; 150mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

Component-4-B4: FSM / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Stiffener beam; 150 x 300mm including


formwork and reinforcement

245

Stiffener column; 150 x 300mm including


formwork and reinforcement

121

m2

864

Local
Peso

Total to Series Summary


Section B4-4320: Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing System with insulation
applied to surface (1/RD)

Waterproofing System applied to parapet


wall (1/RD)

m2

158

50mm Thick protection concrete with 4mm diameter


at 100mm welded wire mesh steel trowel finish, (1/RD)

m2

837

25mm Wide contraction gap w/ sealant in


protection concrete (3/RD)

800

350mm Wide steel trowel finish roof ditch with


metal lath

104

Urethane Waterproofing Coating WP-3


Waterproofing applied to toilet & kitchen floor (F4)

m2

32

Waterproofing applied to wall at 300mm high(W4)

m2

21

Total to Section Summary


Section B4-4340: Windows/Doors
WOOD DOOR SETS: flush type ; as shown on door &
window schedule drawing; including all ironmongery,
louvers, openings, wood frames and beads and all fixing
lugs, mortar bedding/filling and sealants
1

1/WD 600 x 2100 mm w/ louver

No.

2/WD 900 x 2100 mm

No.

3/WD 900 x 2100 mm w/ louver

No.

4/WD 900 x 2100 mm w/ louver

No.

5/WD 900 x 2100 mm w/ louver

No.

6/WD 1800 x 2100 mm

No.

7/WD 900 x 2100 mm w/ louver

No.

8/WD 600 x 1800 mm

No.

No.

STEEL DOOR SETS ; flush type as shown on door &


window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
9

2/SD 900 x 2100 mm w/ louver

Component-4-B4: FSM / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

10 3/SD 900 x 2100 mm w/ louver

No.

11 4/SD 1400 x 2100 mm w/ louver

No.

12 5/SD 1800 x 2100 mm w/ louver

No.

13 1/AW 2580(900) x 2635 mm w/ louver

No.

14 2/AW 1900 x 1735 (1175) mm w/ louver

No.

20

15 3/AW 2900 x 1735 (1175) mm w/ louver

No.

16 4/AW 4900 x 1735 (1175) mm w/ louver

No.

17 5/AW 1900 x 535 mm

No.

18 6/AW 950 x 535 mm

No.

19 7/AW 1900 x 535 mm w/ louver

No.

20 1/AL 450 x 300 mm

No.

21 2/AL 300 x 300 mm

No.

22 3/AL 850 x 550 mm

No.

23 4/AL 1250 x 500 mm

No.

No.

Local
Peso

ALUMINIUM WINDOWS WITH INSECT SCREENS; as


shown on Drawings, including glazing, beads, gaskets,
ironmongery, thresholds, frame set and fixing lug, mortar
bedding/filling and sealants

ALUMINIUM LOUVERS : fixed type ; effective rate


40%; including frames, frame set and fixing lug, mortar
bedding/filling and sealants and complete with insect
screens and sub-frames

24 7/LV 1800 x 400 (type A 11/RD )


Total to Section Summary
Section B4-4350: Metalworks
Miscellaneous Metal Works
1

Roof drain outlet 100 mm diameter (7/RD)

No.

16

Stainless steel counter top (14/MD)


Overall size 450 x 2,000 x 40mm thick

No.

Aluminum blind box, overall size 120mm wide x


100mm high fix to structure with hanger bolts
(5E/MD)

77

Aluminum wall trim at ceiling (5/MD);


20 x 15 x 10 x 20mm, double L section

115

Protection pipe galvanized steel pipe w/paint P-3; H =1000 mmNo.

37

Total to Series Summary

Component-4-B4: FSM / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

115

Local
Peso

Section B4-4360: Woodworks and Partition

Miscellaneous Wood Works


Timber skirting 25 mm thick 50 mm high (S-3)
Dry Partitioning
12mm Thick Gypsum Board double layer faced partition on
light gauge steel framing (W-7, 1/MD)

Partition faced both sides

m2

69

Cubicles (8/MD)
Two unit cubicle

No.

Urinal partition

No.

Kitchen counter cabinets,as shown on the drawings; 19 mm


thick MDF panel w/ high pressure laminate, including concrete
slab, all necessary framing, fixing, fittings and ironmongery
No.
Floormounted; 1925 x 500 x 850 high

Wall mounted; 1925 x 450 x 1050 mm

No.

m2

136

Total to Series Summary


Section B4-4370: Finishes
In-situ Finishes

Internal Finishes
Cement render to floor; 50mm thick; to receive damp
proof paint (P-6)

Cement render to floor; 50mm thick; including


surface hardener ( F11 )

m2

382

Cement render to floor; 42mm thick; to receive


ceramic tiles (F4)

m2

346

Cement render to walls; 20mm thick;


to receive paint (W3 and W4)

m2

713

Cement render to walls; 22mm thick;


to receive ceramic tiles (W2)

m2

240

External Finishes
Cement render to floor; 42mm thick; to receive
ceramic tiles

m2

11

Cement render to sidewalk; 30mm thick (29/MD)

m2

502

Cement render to wall; 20mm thick to receive paint

m2

701

Cement render to concrete trellis; 20mm thick to receive


paint

m2

112

Homogeneous Tile Covering


10 Ceramic tiles to floors; 300 x 300 x 8 mm thick (F4)

m2

346

11 Ceramic tiles to wall; 300 x 300 x 8 mm thick (W2)

m2

240

Rigid Tile/Slab/Block

Component-4-B4: FSM / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

m2

276

14 8mm Thick calcium silicate board (C-3)

m2

18

15 Suspended Double Ceiling: t=12.5 on t=9.5


Sheeting gypsums w/ P-1 (C6)

m2

126

Synthetic resin emulsion paint (P-1) to:


16 Cement rendered wall (W-3)

m2

682

17 Gypsum board ceiling

m2

126

Synthetic resin mixed paint type A (P-2) to:


18 Wood skirting 50mm high (S-3)

115

19 Wood doors

m2

71

Synthetic resin mixed paint type B (P-3) to:


20 Steel doors

m2

25

21 Steel Protection pipe 150mm diameter

m2

65

22 Cement rendered wall (W-4)

m2

544

23 Formed face concrete beams and ceiling at garage

m2

469

24 Cement rendered concrete trellis

m2

112

Epoxy resin floor paint (P-6) to:


25 Cement rendered floors (F-8)

m2

136

Acrylic resin emulsion paint (P-7) to:


26 Calcium silicate board ceiling (C-3)

m2

18

12 Ceramic tile to toilet coping;300x 200mm x 8mm thick;


including cement render backing; 30mm thick (7/MD)
Suspended Ceilings and Bulkheads; including
supports and suspension systems:
13 600 x 600 x 15mm Thick acoustic rockwool
ceiling system (C-1)

Local
Peso

Painting/Clear Finishing

Synthetic resin emulsion multi-layer


coating (P-4) to:

Total to Series Summary


Section B4-4380: Miscellaneous Fittings and
Furniture

Miscellaneous Item
Clear mirror

m2

Venetian blinds

m2

108

Shower curtain

m2

Lavatory Counter Top; in Granite polish finish,


20mm thick; with opening for lavatory basins
including supporting frame and all necessary
fixations (7/MD)
Three Unit Countersunk lavatory

Component-4-B4: FSM / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-4000: Architectural Works
Rate

Item
No.

Description

2500 x 600 mm Deep

Unit

Qty

No.

No.

No.

Local
Peso

Two Unit Lavatory Counter


5

1900 x 600 mm Deep


One Unit Lavatory Counter

2300 x 600 mm Deep


Total to Series Summary

Component-4-B4: FSM / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B4-5000 Series: Mechanical


Series Summary
Section B4-5100 : Sanitary and Plumbing
Section B4-5200 : Ventilation and Air Condition
Section B4-5300 : Fire Protection
Total to Subcomponent Summary
Section B4- 5100 : Sanitary and Plumbing
1

WC-3 Water closet (FT)

No.

UR-3 Urinal

No.

LAV-3 Under counter type lavatory

No.

SS-1 Service sink (Slop Sink)

No.

SHW-1 Shower set

No.

Faucet for kitchen sink

No.

PH-2 Toilet paper holder

No.

Sop Holder

No.

No.

10

Incl, Fittings, Hangers, Supports, Sleeves, Inserts and


Accessories
20 mm diameter

80

11

25 mm diameter

21

12

32 mm diameter

21

13

40 mm diameter

20

14

50 mm diameter

48

15

Gate Valve JIS 10 Kg/cm2


40 mm diameter

No.

16

50 mm diameter

No.

17

Water Hammer Arrester


25 mm diameter

No.

18

40 mm diameter

No.

Kitchen Equipment
9

Electric Cooking Stove


Water Distribution System
Piping Works
Pipeworks, Polyvinyl chloride pipe (High Density VP)

Hot Water Distribution

Component-4-B4: FSM / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-5000: Mechanical Works
Rate

Item
No.

19

20

Description
Incl, Hangers, Supports, Inserts and Accessories.
EWH - 1 Electric Water Heater - Single point
(Instantaneous)
EWH - 2 Electric Water Heater - Multi point
(Instantaneous)

Unit

Qty

No.

No.

11

No.

Local
Peso

Hot Water Piping Works


Cooper Pipe, Type L
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories
21

20 mm diameter

22

Gate Valve JIS 10 Kg/cm2


20 mm diameter
Sewer Piping System
Pipeworks, Polyvinyl chloride pipe (High Density VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories

23

100 mm diameter

69

24

75 mm diameter

39

25

50 mm diameter

78

26

Fittings
1/8 bend
100 mm diameter

27

75 mm diameter

28

50 mm diameter

10

29

Wye
50 mm diameter

No.

30

75 x 50 mm diameter

No.

31

100 x 50 mm diameter

No.

21

32

1/4 Bend
100 mm diameter

No.

33

75 mm diameter

No.

34

50 mm diameter

No.

10

35

Floor / Ground Clean Out


100 mm diameter

No.

36

75 mm diameter

No.

37

50 mm diameter

No.

38

P - Trap
50 mm diameter

No.

12

Floor Drains
50 mm diameter

No.

22

39

40

Reducer
100 x 75 mm diameter

No.

Component-4-B4: FSM / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

41

Tapped Tee
50 mm diameter

No.

10

42

Grease trap @ kitchen

No.

43

Oil Interceptor (for garage)

No.

44

Pipeworks, Polyvinyl chloride pipe (VU)


Incl, Hangers, Supports, Sleeves, Inserts and Accessories
100 mm diameter

18

45

75 mm diameter

34

46

50 mm diameter

62

47

Fittings
90bend
75 mm diameter

No.

20

48

50 mm diameter

No.

51

49

90 TEE
75 mm diameter

No.

20

50

50 mm diameter

No.

51

51

100 x 75 mm diameter

No.

20

52

100 x 50 mm diameter

No.

51

53

75 x 50 mm diameter

No.

51

54

Reducer
100 x 75 mm diameter

No.

55

100 x 50 mm diameter

No.

56

75 x 50 mm diameter

No.

48

Local
Peso

Vent Pipes

Storm Drain

57

Pipe works
Above Ground
Galvanized carbon steel pipe ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accessories
100 mm diameter
Under Ground
Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories

58

200 mm diameter

33

59

150 mm diameter

68

60

100 mm diameter

45

61

50 mm diameter

33

62

Fittings GI )
90bend
100 mm diameter

No.

44

Component-4-B4: FSM / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

63

45bend
100 mm diameter

No.

38

64

Wye
100 mm diameter

No.

65

Roof Drains
100 mm diameter

No.

14

66

Garter Drains
50 mm diameter

No.

12

67

Catch Basin

No.

10

68

Catch Basin Cover

No.

10

Local
Peso

Total to Series Summary


Section B4-5200 : Ventilation and Air Condition
Equipment
Incl, Hangers, Vibration Isolator, Supports, Inserts and
Accessories.
1

Ceiling suspended split AC Unit


Cooling Capacity 12.3 kW

No.

Ceiling suspended split AC Unit


Cooling Capacity 10.2 kW

No.

Ceiling suspended split AC Unit


Cooling Capacity 8.78 kW

No.

Wall mounted split AC Unit


Cooling Capacity 7 kW

No.

Wall mounted split AC Unit


Cooling Capacity 5.3 kW

No.

Wall mounted split AC Unit


Cooling Capacity 3.5 kW

No.

Refrigerant pipes copper pipes type "L"


Incl, Fittings, Hangers, Supports, Sleeves, Inserts, and
Accessories
7

6.35mm diameter

24

9.53mm diameter

64

15.88m diameter

24

10

19.05mm diameter

64

11

Thermal Insulation
Closed cell elastomeric thermal insulation
6.35mm diameter t = 30mm

24

12

9.53mm diameter t = 30mm

64

13

15.88m diameter t = 30mm

24

14

19.05mm diameter t = 30mm

64

Filter Drier

Component-4-B4: FSM / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

15

6.35mm diameter

No.

16

9.53mm diameter

No.

17

Moisture Indicator
6.35mm diameter

No.

18

9.53mm diameter

No.

Local
Peso

Condensate Drain Piping; PVC Pipes(VP)


Incl, Fittings, Hangers, Supports, Sleeves, Inserts, and
Accessories
19

25mm diameter

150

20

50mm diameter

24

21

Condensate Drain Insulation;


Closed cell elastomeric thermal insulation
50mm diameter, t = 20mm

24

22

25mm diameter, t = 20mm

150

23

Aluminum Cladding
Aluminum sheet (Ga #26)

m2

72

No.

Mechanical ventilation System


Equipment
Incl, Hangers, Vibration Isolator, Supports, Inserts and
Accessories.
24

Exhaust Fans
In-line Axial Fan Direct Driven
Q=802 lps

25

In-line Axial Fan Direct Driven


Q=849 lps

No.

26

In-line Axial Fan Direct Driven


Q=714 lps

No.

27

In-line Axial Fan Direct Driven


Q=481 lps

No.

28

In-line Axial Fan Direct Driven


Q=360 lps

No.

29

In-line Axial Fan Direct Driven


Q=604 lps

No.

30

In-line Axial Fan Direct Driven


Q=340 lps

No.

31

In-line Axial Fan Direct Driven


Q=226 lps

No.

Duct Works
(Incl, Hangers, Supports, Sleeves, Inserts, and Accessories)

32

G.I sheets
0.6mm (Ga. #24)

m2

150

33

0.8mm (Ga. #22)

m2

240

Exhaust Air Grilles (EA)

Component-4-B4: FSM / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

34

300x300mm

No.

35

400x400mm

No.

36

800x500mm

No.

37

Exhaust Air Louvers (EA)


400x300mm

No.

38

500x400mm

No.

39

1000x500mm

No.

40

Volume Damper
150x150mm

No.

16

41

200x200mm

No.

42

Backdraft Damper
200x200mm

No.

43

300x200mm

No.

No.

Local
Peso

Total to Series Summary


Section B4- 5300 : Fire Protection
1

Fire hose cabinet c/w valve, 40mm diameter x 30m fire


hose w/ fog nozzle, hose rack and 4.5kg ABC type
fire extinguisher

Portable Fire Extinguisher


ABC Type, 4.5kg

No.

CO2 Type, 9.0kg

No.

CO2 Type, 23.0kg

No.

Fire extinguisher bracket W/housing

No.

Total to Series Summary

Component-4-B4: FSM / Page - 14

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-4: (B4) Electrical Works


Series Summary
Section B4-6100: Power Feeder System
Section B4-6200: Lighting And Receptacle
Section B4-6300: Telephone And Data System
Section B4-6400: Cable TV System
Section B4-6600: Master Clock System
Section B4-6800: Fire Detection And Alarm
Section B4-6900: Lightning Protection and Grounding System

Total to Subcomponent Summary


Section B4-6100: Power Feeder System
1

MDPN

No.

LPPN

No.

VACN

No.

MDPNE

No.

LPPNE

No.

FTCNE

No.

1C-35mm XLPE

20

1C-10mm XLPE

35

1C-4mm XLPE

20

10

14mm TW

10

11

8mm TW

15

12

5.5mm TW

10

13

500mm (W) cable ladder

10

14

150mm (W) wireway

55

Total to Series Summary


Section B4-6200: Lighting And Receptacle
Lighting Fixtures
1

2 x 36W Fluorescent Fixture, industrial type

No.

16

1 x 36W Fluorescent Fixture, batten type

No.

4 x 18W Fluorescent Fixture, louver type

No.

51

Component-4-B4: FSM / Page - 15

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-6000: Electrical Works
Rate

Item
No.
4

Description
18W PLC

Unit

Qty

No.

34

Local
Peso

Wiring Devices & Receptacle


5

Duplex Convenience outlet, wall mounted

No.

26

Hand Dryer outlet

No.

1 - gang single throw switch

No.

38

2 - gang single throw switch

No.

30AT, 100AF, 2P ECB

No.

10

40AT, 100AF, 2P ECB

No.

Wires & Cables


11

3.5mm THHN

5300

12

5.5mm THHN

1250

13

8mm THHN

180

Conduits
14

15mm dia

1600

15

20mm dia

40

Total to Series Summary


Section B4-6300: Telephone and Data System
Equipment & Devices
1

Telephone outlet w/ RJ11

No.

Single Line Telephone

No.

Terminal Board (TB-FSM)

No.

411

Wires & Cables


4

4P CAT 5e UTP CABLE (interconnection)


Conduits

15 mm dia

22

20 mm dia

42

25 mm dia

71

Total to Series Summary


Section B4-6400: Cable TV System
Equipment / Devices
1

Voltage down adapter

No.

4 - Way splitter

No.

Component-4-B4: FSM / Page - 16

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-4: (B4) Fire Station and Airport Maintenance & Administration Building
Section B4-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Wall Outlet (For in out)

No.

Wall Outlet (For inns)

No.

Terminator

No.

75

90

Local
Peso

Wires & Cables


6

RG6 Coaxial cable (interconnection)


Conduits

20 mm dia
Total to Series Summary
Section B5-6600: Master Clock System
Equipment / Devices

Single Faced Analog Slaved Clock

(Included in N1-8300)

Wires & Cables


2

1.25 mm TF wires (interconnection)

104

100

Conduits
3

15 mm dia
Total to Series Summary
Section B5-6800: Fire Detection And Alarm
Equipment / Devices

Smoke detector

No.

16

Heat Detector

No.

Fire alarm bell

No.

Manual Fire Alarm Station

No.

Remote Annunciator Panel

No

Fireman's Telephone Jack w/ Handset

No

Fire Alarm Terminal Cabinet (FATC-FSM)

No

124

175

Sum

Wires & Cables


8

1.25 mm TF Wires (interconnection)


Conduits

15 mm dia
Total to Series Summary

Section B4-6900: Grounding System


Grounding System
Total to Series Summary

Component-4-B4: FSM / Page - 17

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
SUBCOMPONENT-4-B5:

Ancillary Buildings
B51: Drivers Lounge
B52: Car Park Toilet
B53: Guard Houses
B54: Toll Booths

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


Subcomponent 4-B5 Summary
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-5:(B5)Ancillary Buildings Summary


Subcomponent Summary
4-51: Drivers Lounge
4-52: Car Park Toilet
4-53: Guard Houses
4-54: Toll Booths

Total to Component Summary

Component-4-B5: Ancillary Buildings / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge Summary
Section B51-4000 Series: Architectural Works
Section B51-5000 Series : Mechanical Works
Section B51-6000 Series : Electrical Works
Total to Subcomponent Summary

Component-4-B5: Ancillary Buildings / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge
Section B51-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B51-4000 Series : Architectural


Series Summary
Section B51-4110 : Earthwork
Section B51-4120 : Termite Control
Section B51-4220 : Concrete Works
Section B51-4320 : Waterproofing
Section B51-4350 : Metalworks
Section B51-4370 : Finishes
Section B51-4380 : Miscellaneous Fittings and Furniture
Total to B51 Drivers Lounge Summary
Section 4110 : Earthwork
Normal Excavation
1

Column foundations

m3

Ground beams

m3

Excavation in Rock
3

Column foundations

m3

Ground beams

m3

Filling
5

Backfilling to foundations

m3

13

Filling/Compaction
Gravel bed; 50mm thick

180

Gravel bed; 50mm think to external sidewalk (29/MD)

108

Polythylene waterproof membrane

161

323

Total to Series Summary

Section 4120 : Termite Control


Soil treatment
Total to Series Summary
Section 4220 : Concrete Works

Plain Concrete Class B3 in:


Blinding concrete;50mm thk

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

Reinforced Concrete Class B1 in:


Column foundations

Component-4-B5: Ancillary Buildings / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge
Section B51-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Ground beams

Columns

Beams

Parapet

11

Suspended slabs

17

24

m3

11

Formwork
Class F1 Formwork in:
11 Column foundations

17

12

Ground beams

50

13

Columns

90

14

Beams

15

Fascia wall

148

16

Suspended slabs

45

17

Ground slabs

Class F1 Formwork in:


18 Suspended slabs

47

19 Parapet

58

Reinforcement
Reinforcement bars - (grade 40, = 276 N/mm)
20 10 mm ~ 12mm

kg

4,160

Reinforcement bars - (grade 60, = 415 N/mm)


21 16 mm ~ 25 mm

kg

3,381

92

12

92

9
10

Reinforced Concrete Class B2 in:


Ground floor slab
Base slab to external sidewalk (29/MD)

Local
Peso

Total to Series Summary


Section 4320 : Waterproofing

2
3

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing system with insulation applied to roof
surface (1/RD)
Waterproofing system applied to parapet wall (1/RD)
50mm Thick protection concrete with 4mm dia at 100mm
welded wire mesh in steel trowel finish (1/RD)

25mm Wide contraction gap w/ sealant in protection


concrete (1/RD)

63

350mm Wide steel trowel finish roof ditch with


metal lathe

12

Component-4-B5: Ancillary Buildings / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge
Section B51-4000: Architectural Works
Item
No.

Rate
Description

Unit

Qty

No.

m2

96

Local
Peso

Total to Series Summary

Section 4350 : Metalworks


Roof drain outlet 100mm diameter
Total to Series Summary

Section B51-4370 : Finishes


In-situ Finishes
Cement render to floors; 20mm thick, to receive
granite tiles

Cement render to walls; 20mm thick to receive paint (W3)

32

Cement render to sidewalk 30mm thick (32/MD)

m2

222

Rigid Tile/Slab/Block
Ceramic Tile Covering
Ceramic tiles to floors; 300 x 300 x 8mm thick (F-3)

m2

96

32

72

Soffit of roof slab, beams and parapet


m
Total to Series Summary

73

Suspended Ceilings; including


supports and suspension system
600 x 600 x 15mm Thick acoustic rockwool ceiling
system (C-1)
Painting/Clear Finishing

6
7

Synthetic Resin Emulsion Multi-layer Coating (P-4) to:


Cement rendered external walls

Component-4-B5: Ancillary Buildings / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge
Section B51-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B51-5000 Series: Mechanical


Series Summary
Section B51-5100 : Sanitary and Plumbing
Section B51-5300 : Fire Protection
Total to B51: Drivers Lounge Summary
Section 5100 : Sanitary and Plumbing
Water Distribution System
Pipework, Polyvinyl chloride pipe (High Density VP)
Incl, Fittings, Hangers, Supports, Sleeves, Inserts, Excavation,
Back filling, Sand Bedding and Accessories
1

20mm diameter

Faucet

No.

Drain Trap

No.

Gate valve

No.

Water meter; 20 mm dia.

No.

Meter Box, 20 mm diameter

No.

Water Hammer Arrester

No.

10

No.

Sewer Piping System


Pipeworks/Accessories
Pipework, Polyvinyl chloride pipe (High Density VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories
8

75mm diameter

Floor Clean Out


75mm diameter

10

Storm Drain
Above Ground
Galvanized carbon steel pipe ASTM Sch-40
100 mm diameter
Under Ground
Pipework, Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories

11

100 mm diameter

14

12

Roof Drain
100 mm diameter

No.

13

Catch Basin w/Cover

No.

Total to Section Summary

Component-4-B5: Ancillary Buildings / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge
Section B51-5000: Mechanical Works
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Section 5300 : Fire Protection

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

Fire extinguisher bracket W/housing

No.

Total to Section Summary

Component-4-B5: Ancillary Buildings / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B51: Drivers Lounge
Section B51-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B51-6000 Series: Electrical Works


Series Summary
Section B51-6100: Power Feeder System
Total to B51 Drivers Lounge Summary
Section B51-6100: Power Feeder System
Lighting Fixtures
1

1 x 18W PLC

No.

12

1 x 18W PLC (Outdoor type)

No.

Wiring Devices & Receptacle


1

Duplex Convenience Outlet, Weather Proof

No.

One - gang switch

No.

Two-gang switch

No.

500.00

200.00

Wires & Cables


1

3.5mm THHN
Conduits

15mm dia

Total to Series Summary

Component-4-B5: Ancillary Buildings / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B52: Car Park Toilet
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-5: (B5) Ancillary Buildings


B52: Car Park Toilet Summary
Section B52-4000 Series : Architectural Works
Section B52-5000 Series : Mechanical Works
Section B52-6000 Series : Electrical Works
Total to Subcomponent Summary

Component-4-B5: Ancillary Buildings / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B52: Car Park Toilet
Section B52-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B52-4000 Series: Architectural Works


Series Summary
SectionB52-4110 : Earthwork
Section B52-4120 : Termite Control
Section B52-4220 : Concrete Works
Section B52-4310 : Blockworks
Section B52-4320 : Waterproofing
Section B52-4340 : Windows/Doors
Section B52-4350 : Metalworks
Section B52-4360 : Woodwork and Partitions
Section B52-4370 : Finishes
Section B52-4380 : Miscellaneous Fittings and Furniture
Total to B52 Car Park Toilet Summary
Section B52-4110 : Earthwork
Normal Excavation
1

Column foundation

m3

16

Ground beams

m3

Excavation in Rock
3

Column foundation

m3

Ground beams

m3

Filling
Backfilling to excavations

21

Filling/Compaction
Gravel bed; 50mm thick

38

Gravel bed; 50mm think to external sidewalk (29/MD)

106

Polythylene waterproof membrane

21

156

Total to Series Summary

Section 52-4120 : Termite Control


Soil treatment
Total to Series Summary

1
2

Section 52-4220 : Concrete Works


Plain Concrete Class B3 in:
Blinding concrete; 50mm thick
Blinding concrete; 50mm thick external sidewalk (29/MD)

Component-4-B5: Ancillary Buildings / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B52: Car Park Toilet
Section B52-4000: Architectural Works
Rate

Item
No.

Description

Reinforced Concrete Class B1 in:


Column foundations

Unit

Qty

Ground beams

Columns

Beams

Parapet

Suspended slabs

Reinforced Concrete Class B2 in:


Ground floor slab

10 Base slab to external sidewalk (29/MD)

11

Formwork
Class F1 Formwork in:
11 Column foundations

12

Ground beams

26

13

Columns

32

14

Beams

63

15

Parapet

32

16 Ground slab

17

18 Suspended slab

16

19 Parapet

32

Reinforcement
Reinforcement bars - (grade 40, = 276 N/mm)
20 10 mm ~ 12 mm

kg

1,484

Reinforcement bars - (grade 40, = 414 N/mm)


16 mm ~ 25 mm

kg

1,088

84

Suspended slab

Local
Peso

Class F3 Formwork in:

21

Total to Series Summary


Section B52-4310 : Blockworks

1
2

Hollow Concrete Block


Wall; 150 mm thick
Wall; 100 mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

Stiffener beam; 150 x 300mm including

20

Component-4-B5: Ancillary Buildings / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B52: Car Park Toilet
Section B52-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

35

Local
Peso

formwork and reinforcement


5

Stiffener column; 150 x 300mm including


formwork and reinforcement
Total to Series Summary
Section B52-4320 : Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing system with insulation applied to roof surface
(1/RD)

Waterproofing system applied to parapet wall (1/RD)

30

50mm Thick protection concrete with 4mm dia. At 100mm


welded wire mesh in steel trowel finish (1/RD)

35

25mm Wide contraction gap w/ sealant in protection concrete


(1/RD)

350mm Wide steel trowel finish roof ditch with metal lath

No.

Total to Series Summary


Section 52-4340 : Windows/Doors
STEEL DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
1

1/SD 900 x 2100 mm w/ louver


ALUMINIUM WINDOWS WITH INSECT SCREENS;
as shown on Drawings, including glazing, beads, gaskets,
ironmongery, thresholds, frame set and fixing lug,
mortar bedding/filling and sealants

1/AW 1800 x 700 mm

No.

2/AW 1200 x 700 mm

No.

No.

Total to Series Summary

Section B52-4350 : Metalworks


1

Roof drain outlet 75 mm diameter (11/RD)


Total to Section Summary
Section 52-4360 : Woodwork and Partitions
Cubicles (8/MD)

Two unit cubicle

No.

Urinal partition

No.

Total to Series Summary


Section B52-4370 : Finishes

Component-4-B5: Ancillary Buildings / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B52: Car Park Toilet
Section B52-4000: Architectural Works
Rate

Item
No.

Description
In-situ Internal Finishes
Cement render to floor; 42 mm thick to receive
ceramic tiles (F3)
Cement render to walls; 22mm thick
to receive ceramic tiles (W1)
In-situ External Finishes
Cement render to walls; 20mm thick to receive
paint (W4)

Unit

Qty

23

63

66

Ceramic Tile Covering


Ceramic tiles to floors; 300 x 300 x 8 mm thick

23

Ceramic tiles to wall; 300 x 300 x 8 mm thick

63

200mm Wide x 8mm thick toilet coping in


polish finish (7/MD)

21

66

8
9

Suspended Ceilings and Bulkheads; including


supports and suspension system
Suspended double ceiling; t=12.5 mm on t=9.5
sheeting gypsum with P1 (C-11)
Painting/Clear Finishing
Synthetic Resin Mixed Paint Type B (P-7) to:
100m uPVC downspout pipe
Steel doors

Local
Peso

Synthetic Resin Emulsion Multi-layer Coating (P-4) to:


10 Blockwork walls
Total to Series Summary
Section B52-4380 : Miscellaneous Fittings and Furniture
1

Clear mirror

Total to Series Summary

Component-4-B5: Ancillary Buildings / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B52: Car Park Toilet
Section B52-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B52-5000 Series: Mechanical


Series Summary
Section B52-5100 : Sanitary and Plumbing
Section B52-5200 : Ventilation and Air Condition
Total to B52 Car Park Toilet Summary
Section 5100 : Sanitary and Plumbing

Sanitary Fixtures
WC-3 Water closet (FT)

No.

UR-3 Urinal

No.

LAV-3 Under counter type lavatory

No.

Hose Bib

No.

PH-2 Toilet paper holder

No.

Water Distribution System


Piping Works
Pipework, Polyvinyl chloride pipe (High Density VP)
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories
6

20 mm diameter

25 mm diameter

32 mm diameter

13

40 mm diameter

10 50 mm diameter

11

Gate Valve JIS 10 Kg/cm2


12 20 mm diameter

No.

13 25 mm diameter

No.

14 32 mm diameter

No.

15 40 mm diameter

No.

16 50 mm diameter

No.

17 65 mm diameter

No.

18 Water Hammer Arrester

No.

65 mm diameter

Sewer Piping System


Pipeworks/Accessories
Pipework, Polyvinyl chloride pipe (High Density VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories

Component-4-B5: Ancillary Buildings / Page - 14

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B52: Car Park Toilet
Section B52-5000: Mechanical Works
Item
No.

Rate
Description

Unit

Qty

19 100 mm diameter

16

20 75 mm diameter

21 50 mm diameter

Fittings ( GI )
1/8 bend
22 100 mm diameter

No.

23 100 x 75 mm diameter

No.

24 100 x 50 mm diameter

No.

Wye
25 100 mm diameter

No.

26 100 x 75 mm diameter

No.

27 100 x 50 mm diameter

No.

1/4 Bend
28 100 mm diameter

No.

29 50 mm diameter

No.

Floor / Ground Clean Out


30 100 mm diameter

No.

P - Trap
31 50 mm diameter

No.

Floor Drains
32 50 mm diameter

No.

Vent Pipes
Pipework, Polyvinyl chloride pipe (VU)
Incl, Hangers, Supports, Sleeves, Inserts and Accessories
33 100 mm diameter

57

34 75 mm diameter

13

35 50 mm diameter

47

Fittings
90 Bend
36 100 mm diameter

No.

37 75 mm diameter

No.

38 50 mm diameter

No.

90 TEE
39 100 mm diameter

No.

40 75 mm diameter

No.

41 50 mm diameter

No.

Reducer
42 75 x 50 mm diameter

No.

43 100 x 75 mm diameter

No.

Local
Peso

Component-4-B5: Ancillary Buildings / Page - 15

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B52: Car Park Toilet
Section B52-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

18

45 100 mm diameter

25

Fittings
90 Bend
46 100 mm diameter

No.

47 75 mm diameter

No.

45 Bend
48 100 mm diameter

No.

49 75 mm diameter

No.

Wye
50 100 mm diameter

No.

51 75 mm diameter

No.

Roof Drains
52 100 mm diameter

No.

53

Catch Basin

No.

54

Catch Basin Cover

No.

No.

Storm Drain
Above Ground
Galvanized carbon steel pipe ,ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accessories
44 100 mm diameter

Local
Peso

Under Ground
Pipework, Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories

Total to Section Summary


Section 5200 : Ventilation and Air Condition
Equipment
Exhaust Fans
Incl, Hangers, Vibration Isolator, Supports, Inserts and
Accessories.
1

Ceiling Cassette Exhaust Fans, Q = 150 lps


w/ Integral Backdraft Damper
Duct Works
G.I sheets
(Incl, Hangers, Supports, Sleeves, Inserts, and Accessories)

0.8 mm (Ga. # 22)

12

Exhaust Air Louvers (EA)


300 Aluminum Vent Cap
ventilation and air-conditioning system

No.

Total to Section Summary

Component-4-B5: Ancillary Buildings / Page - 16

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B52: Car Park Toilet
Section B52-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

No.

Local
Peso

Section B52-6000 Series: Electrical Works


Series Summary
Section B52-6100: Power Feeder System
Section B52-6200: Lighting And Receptacle
Total to B52 Car Park Toilet Summary
Section B52-6100: Power Feeder System
1

DRLN
Total to Series Summary
Section B52-6200: Lighting And Receptacle
Lighting Fixtures

1 x 18W PLC

No.

1 x 18W PLC (Outdoor type)

No.

Hand Dryer Outlet

No.

One - gang switch

No.

Two-gang switch

No.

Three-Gang Switch

No.

300

100

Wires & Cables


7

3.5mm THHN
Conduits

15mm dia
Total to Series Summary

Component-4-B5: Ancillary Buildings / Page - 17

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B53: Guard Houses
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-5: (B5) Ancillary Buildings


B53: Guard Houses Summary
Section 4000 Series : Architectural Works
Section 5000 Series : Mechanical Works
Section 6000 Series : Electrical Works
Total to Subcomponent Summary

Component-4-B5: Ancillary Buildings / Page - 18

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B53-4000 Series: Architectural Works


Series Summary
Section B53-4110 : Earthwork
Section B53-4120 : Termite Control
Section B53-4220 : Concrete Works
Section B53-4310 : Blockworks
Section B53-4320 : Waterproofing
Section B53-4340 : Windows/Doors
Section B53-4350 : Metalworks
Section B53-4370 : Finishes
Section B53-4380 : Miscellaneous Fittings and
Furniture
Total to B53 Guard Houses Summary
Guardhouses Type 1 (3 Units) and Type 2 (5Units)
Section B53-4110 : Earthwork

Normal Excavation
Column foundations

m3

54

Excavation in Rock
Column foundations

m3

14

Filling
Backfilling to excavations

55

Filling/Compaction
Gravel bed; 50mm thick

114

Gravel bed; 50mm thick to external sidewalk (29/MD)

513

41

592

26

22

11

Polythylene waterproof membrane


Total to Series Summary

Section B53-4120 : Termite Control


Soil treatment
Total to Series Summary
Section B53-4220 : Concrete Works

1
2

3
4

Plain Concrete Class B3 in:


Blinding concrete; 50mm thick
Blinding concrete; 50mm thick to external sidewalk
(29/MD)
Reinforced Concrete Class B1 in:
Column foundations
Columns

Component-4-B5: Ancillary Buildings / Page - 19

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Beams

Suspended slabs

Parapet and canopy

10

Reinforced Concrete Class B2 in:


Ground floor slab

Base slab to external sidewalk (29/MD)

51

Formwork
Class F1 Formwork in:
10 Column foundation

29

11

Columns

152

12

Beams

62

13 Ground slab

Class F3 Formwork in:


14 Parapet and canopy

127

Reinforcement
Reinforcement bars - (grade 40, = 276 N/mm)
15 10 mm ~ 12 mm

kg

3,169

Reinforcement bars - (grade 60, = 415 N/mm)


16 16 mm ~ 25 mm

kg

841

181

18

Local
Peso

Total to Series Summary


Section B53-4310 : Blockworks

Hollow Concrete Block


Wall; 150mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners
Lintel beam above opening; 150 x 200mm
including formwork and reinforcement

Stiffener beam; 150 x 300mm including


formwork and reinforcement

13

Stiffener column; 150 x 300mm including


formwork and reinforcement

56

60

Total to Series Summary


Section B53-4320 : Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing system with insulation applied to roof surface
(1/RD)

Waterproofing system applied to parapet wall (1/RD)

49

50mm Thick protection concrete with 4mm dia.


100mm welded wire mesh in steel trowel finish

60

Component-4-B5: Ancillary Buildings / Page - 20

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-4000: Architectural Works
Rate

Item
No.

Description

350mm Wide steel trowel finish roof ditch with metal lath
metal lathe

Unit

Qty

14

No.

No.

Local
Peso

Total to Series Summary


Section B53-4340 : Windows/Doors
WOOD DOOR SETS: flush type ; as shown on door &
window schedule drawing; including all ironmongery,
louvers, openings, wood frames and beads and all fixing
lugs, mortar bedding/filling and sealants
1

1/WD 600 x 2100 mm w/ louver


STEEL DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling

1/SD 900 x 2100 mm


ALUMINIUM WINDOWS WITH INSECT SCREENS;
as shown on Drawings, including glazing, beads, gaskets,
ironmongery, thresholds, frame set and fixing lug, mortar
bedding/filling and sealants

1/AW 2192(865) x 1200 mm w/ insect screen

No.

2/AW 520 x 400 mm w/ insect screen

No.

3/AW 600 x 1200 mm

No.

No.

33

Total to Series Summary


Section B53-4350 : Metalworks
1

Roof drain outlet 100mm diameter (11/RD)


Total to Series Summary
Section B53-4370 : Finishes

In-situ Internal Finishes


Cement render to floor; 50mm thick to receive damp
proof paint P=6 (F8)

Cement render to floor; 42mm thick to receive


ceramic tiles (F4)

Cement render to walls; 22mm thick to


receive ceramic tiles (W2)

44

Cement render to walls; 20mm thick to


receive paint (W3)

129

129

In-situ External Finishes


Cement render to walls; 20mm thick to receive paint (W4)
receive paint (W4)
Ceramic Tiles Covering
Ceramic tile to floors; 300 x 300 x 8mm thick

Component-4-B5: Ancillary Buildings / Page - 21

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-4000: Architectural Works
Item
No.

Rate
Description

Ceramic tile to wall; 300 x 300 x 8mm thick


Suspended Ceilings and Bulkheads; including
supports and suspension system
Suspended Double Ceiling: t=12.5
on t=9.5 Sheathing gypsums w/ P-1 (C11)

Unit

Qty

44

40

Local
Peso

Painting/Clear Finishing

Synthetic Resin Emulsion Paint (P-1) to:


Cement rendered wall (W3)

129

10

Synthetic Resin Mixed Paint Type A (P-2) to:


Wood doors

20

11

Synthetic Resin Mixed Paint Type B (P-3) to:


Steel doors

20

12

Synthetic Resin Emulsion Multi-layer Coating (P-4) to:


Cement rendered walls

129

33

No.

No.

13

Epoxy Resin Floor Paint (P-6) to:


Cement rendered floors (F8)
Total to Series Summary

Section B53-4380 : Miscellaneous Fittings and


Furniture
Wood counter, overall size 400 x 2350 x 40mm thick
in melamine finish
Built-in wooden locker, 695 x 2100 mm x 450mm
Total to Series Summary

Component-4-B5: Ancillary Buildings / Page - 22

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B53-5000 Series: Mechanical Works


Series Summary
Section B53-5100 : Sanitary and Plumbing
Section B53-5200 : Ventilation and Air Condition
Section B53-5300 : Fire Protection
Total to B53 Guard Houses Summary
Section 5100 : Sanitary and Plumbing
Sanitary Fixtures
1

WC-3 Water closet

No.

LAV-3 Under counter type lavatory

No.

PH-2 Toilet paper holder

No.

Water Distribution System


Piping Works
Pipework, Polyvinyl chloride pipe (High Density VP)
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories
4

20 mm diameter

12

25 mm diameter

32 mm diameter

40 mm diameter

40

Gate Valve JIS 10 Kg/cm2


40 mm diameter

No.

Water Hammer Arrester

No.

Sewer Piping System


Pipeworks/Accessories
Pipework, Polyvinyl chloride pipe (High Density VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories
10

100 mm diameter

100

11

50 mm diameter

24

12

Fittings
1/8 bend
100 mm diameter

No.

12

13

50 mm diameter

No.

16

14

Wye
100 mm diameter

No.

Component-4-B5: Ancillary Buildings / Page - 23

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

15

100 x 50mm diameter

No.

16

1/4 Bend
100 mm diameter

No.

17

50 mm diameter

No.

18

Floor / Ground Clean Out


100 mm diameter

No.

19

P - Trap
50 mm diameter

No.

20

Floor Drains
50 mm diameter

No.

21

Pipework, Polyvinyl chloride pipe (VU)


Incl, Hangers, Supports, Sleeves, Inserts and Accessories
100 mm diameter

12

22

75 mm diameter

16

23

50 mm diameter

20

24

Fittings
90 Bend
100 mm diameter

No.

25

75 mm diameter

No.

26

50 mm diameter

No.

27

90 TEE
100 mm diameter

No.

28

75 mm diameter

No.

29

50 mm diameter

No.

30

Reducer
75 x 50 mm diameter

No.

31

100 x 75 mm diameter

No.

24

Fittings ( GI )
90 Bend
33 50 mm diameter

No.

45 Bend
34 50 mm diameter

No.

No.

No.

No.

Local
Peso

Vent Pipes

Storm Drain
Galvanized carbon steel pipe, ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accessories
32 50 mm diameter

Wye
35 50 mm diameter
Roof Drains
36 50 mm diameter
37

Catch Basin

Component-4-B5: Ancillary Buildings / Page - 24

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-5000: Mechanical Works
Rate

Item
No.

38

Description

Catch Basin Cover

Unit

Qty

No.

No.

12

Local
Peso

Total to Section Summary


Section 5200 : Ventilation and Air Conditioning
Mechanical Ventilation System
Equipment

Exhaust Fans
Wall Mounted Propeller Fan
Q=80 lps
Total to Section Summary
Section 5300 : Fire Protection

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

Fire extinguisher bracket W/housing

No.

Total to Section Summary

Component-4-B5: Ancillary Buildings / Page - 25

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

No.

Local
Peso

Section B53-6000 Series: Electrical Works


Series Summary
Section B53-6100: Power Feeder System
Guard house-1
Guard house-2
Section B53-6200: Lighting And Receptacle
Guard house-1
Guard house-2
Section B53-6300: Telephone and Data System
Guard house-1
Guard house-2
Total to B53 Guard Houses Summary

Guard House - 1 (TYPICAL 4)


Section B53-6100: Power Feeder System
1

20AT CB-GH1
Total to Series Summary
Section B53-6200: Lighting And Receptacle

1 x 18W PLC

No.

1 x 18W PLC (Outdoor type)

No.

Duplex convenience outlet

No.

Two-gang switch

No.

3.5 mm THHN

280

15mm dia

92

Total to Series Summary


Section B53-6300: Telephone System
1

Telephone outlet w/ RJ11

No.

Single Line Telephone

No.

4P-CAT5e UTP CABLE (interconnection)

24

15mm dia

20

No.

Total to Section Summary


Guard House - 2 (TYPICAL 4)
Section B53-6100: Power Feeder System
1

20AT CB-GH2
Total to Series Summary
Section B53-6200: Lighting And Receptacle

Component-4-B5: Ancillary Buildings / Page - 26

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B53: Guard Houses
Section B53-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

1 x 18W PLC

No.

1 x 18W PLC (Outdoor type)

No.

Duplex convenience outlet

No.

Two-gang switch

No.

3.5 mm THHN

400

15mm dia

132

No.

Local
Peso

Total to Series Summary


Section B53-6300: Telephone System
1

Telephone outlet w/ RJ11

4P-CAT5e UTP CABLE (interconnection)

24

15mm dia

20

Total to Series Summary

Component-4-B5: Ancillary Buildings / Page - 27

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B54: Toll Booths
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-5: (B5) Ancillary Buildings


B54: Toll Booths Summary
Section B54-4000 Series : Architectural Works
Section B54-5000 Series : Mechanical Works
Section B54-6000 Series : Electrical Works
Total to Subcomponent Summary

Component-4-B5: Ancillary Buildings / Page - 28

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B54: Toll Booths
Section B54-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B54-4000 Series : Architectural Works


Series Summary
Section B54-4110 : Earthwork
Section B54-4220 : Concrete Works
Section B54-4000 : Architectural works
Total to B54 Toll Booths Summary
Section B54-4110 : Earthwork
1

Column foundations

16

Filling
Backfilling to excavations

Filling/Compaction
Gravel bed; 50mm Thick

12

Total to Series Summary


Section B54-4220 : Concrete Works

Plain Concrete Class B3 in:


Blinding concrete; 50mm Thick

Reinforced Concrete Class B1 in:


Column foundations

Columns

Beams

Ground Beam

Formwork
Class F1 Formwork in:
Column foundation

Columns

28

Beams

Ground Beam

kg

312

kg

621

Reinforcement
10 Reinforcement bars - Grade40, =276N/mm
10mm - 12mm
11 Reinforcement bars - Grade60, =415N/mm
16mm - 25mm
Total to Series Summary
Section B54-4000 : Architectural works
1

Toll booth assembly

No.

Roof shelter over Toll booth

No.

Component-4-B5: Ancillary Buildings / Page - 29

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B54: Toll Booths
Section B54-4000: Architectural Works
Rate

Item
No.
3

Description
Barrier assembly

Unit

Qty

No.

10

Local
Peso

Storm Drain
4

Pipeworks PVC pipe, 100 mm diameter


Total to Section Summary

Component-4-B5: Ancillary Buildings / Page - 30

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-5: (B5) Ancillary Buildings
B54: Toll Booths
Section B54-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B54-5000 Series: Mechanical Works


Series Summary
Section B54-5100: Sanitary and Plumbing
Section B54-5200 : Ventilation and Air Condition
Total to B54 Toll Booths Summary
Section 5100 : Sanitary and Plumbing

Storm Drain
Galvanized carbon steel pipe, ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accessories
50 mm diameter

16.00

Fittings ( GI )
90 Bend
100 mm diameter

No.

4.00

Roof Drains
50 mm diameter

No.

Catch Basin

No.

Catch Basin Cover

No.

No.

Total to Section Summary

Section 5200 : Ventilation and Air Condition


Equipment
Fan
1

Wall Mounted Propeller Fan


Total to Section Summary

Component-4-B5: Ancillary Buildings / Page - 31

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-5: (B5) Ancillary Buildings


B54: Toll Booths
Section B54-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B54-600 Series: Electrical Works


Series Summary
Section B54-6100: Power Feeder System
Section B54-6200: Lighting And Receptacle
Section B54-6300 Telephone and Data System

Total to B54 Toll Booths Summary


Section B54-6100: Power Feeder System
1

20AT CB-TB1

No.

20AT CB-TB2

No.

Total to Series Summary


Section B54-6200: Lighting And Receptacle
1

1 x 36w Fluorescent fixtures recessed mounted

No.

1 x 36w Fluorescent fixtures, diffuser type

No.

Duplex convenience outlet

No.

One-gang switch

No.

3.5 mm THHN

250

15mm dia

100

20 mm dia

15

Total to Series Summary


Section B54-6300: Telephone System
1

Telephone outlet w/ RJ11

No.

Single Line Telephone

No.

4P-CAT5e UTP CABLE (interconnection)

35

15mm dia

10

20 mm dia

20

Total to Series Summary

Component-4-B5: Ancillary Buildings / Page - 32

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
SUBCOMPONENT-4-B6:

Utility Buildings
B61: Water Tank & Pump House
B62: Power House
B63: STP Control Room
B64: Material Recovery Facility

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


Sucomponent-4-6: (B6) Utility Buildings
Summary
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B6) Utility Buildings Summary


Subcomponent Summary
4-61: Water Tank & Pump House
4-62: Power House
4-63: STP Control Room
4-64: Material Recovery Facility

Total to Component Summary

Component-4-B6: Utility Buildings / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B6) UtilityBUildings


B61: Water Tank & Pump House Summary
Section B61-4000 Series : Architectural Works
Section B61-5000 Series : Mechanical Works
Section B61-6000 Series: Electrical Works

Total to Subcomponent Summary

Component-4-B6: Utility Buildings / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-4000: Architectrual Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Section B61-4000 Series : Architectural Works


Series Summary
Section B61-4110 : Earthwork
Section B61-4120 : Termite Control
Section B61-4220 : Concrete Works
Section B61-4310 : Blockworks
Section B61-4320 : Waterproofing
Section B61-4340 : Windows/Doors
Section B61-4350 : Metalworks
Section B61-4370 : Finishes
Section B61-4380 : Miscellaneous Fittings and

Total to B61 Water Tank & Pump House Summary


Section B61-4110 : Earthwork
Normal Excavation
1

Column foundation and pits

m3

100

Ground beams

m3

46

Excavation in Rock
3

Column foundation and pits

m3

25

Ground beams

m3

11

Filling
Backfilling to foundations

m3

104

Filling/Compaction
Gravel bed; 50mm thick

m2

30

Gravel bed; 100mm thick

m2

573

Gravel bed; 50mm think to external sidewalk (29/)MD

312

m2

480

m2

1,299

10 Polyethylene waterproof membrane


Total to Series Summary
Section B61-4120 : Termite Control

Soil treatment
Total to Series Summary
Section B61-4220: Concrete Works
In-situ Concrete

Component-4-B6: Utility Buildings / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-4000: Architectrual Works
Rate

Item
Description
No.

Unit

Qty

Plain Concrete Class B3 in :


Blinding layer; 50mm thick

m3

30

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

16

Reinforced Concrete; Class B1 in:


Column foundations

m3

30

Ground beams

m3

34

Columns

m3

36

Beams

m3

59

Suspended slabs

m3

48

Parapet

m3

34

Reinforced Concrete; Class B2 in:


Ground floor slab

m3

72

10

Base slab to external sidewalk (29/MD)

m3

31

Class F1 Formwork in:


11 Column foundations

m2

63

12 Ground beams

m2

279

13 Columns

m2

232

14 Beams

m2

524

15 Ground slab

m2

14

16 Parapet

m2

351

m2

480

Reinforcement bars - (grade 40, = 276 N/mm2)


18 10 mm ~ 12mm

kg

14,675

Reinforcement bars - (grade 60, = 415 N/mm2)


19 16 mm ~ 25mm

kg

24,471

183

Local
Peso

Formwork

Class F3 Formwork in:


17 Suspended slabs
Reinforcement

Total to Series Summary


Section B61-4310: Blockwork

Hollow Concrete Block


Wall; 150mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

Component-4-B6: Utility Buildings / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-4000: Architectrual Works
Rate

Item
Description
No.

Unit

Qty

Stiffener beam; 150 x 300mm including


formwork and reinforcement

44

Stiffener column; 150 x 300mm including


formwork and reinforcement

18

m2

498

Local
Peso

Total to Series Summary


Section B61-4320: Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing System with insulation
applied to surface (10/RD)

Waterproofing System applied to parapet


wall (10/RD)

m2

83

50mm Thick protection concrete with 4mm diameter


at 100mm welded wire mesh in steel trowel
finish (10/RD)

m2

498

25mm Wide contraction gap w/ sealant in


protection concrete (10/RD)

310

350mm Wide steel trowel finish roof ditch with


metal lath

60

Total to Series Summary


Section B61-4340: Windows/Doors
STEEL DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
1

1/SD 1800 x 2100 mm

No.

ALUMINIUM LOUVERS : fixed type ; effective rate


40%; including frames, frame set and fixing lug, mortar
bedding/filling and sealants and complete with insect
screens and sub-frames
1/AL 1200 x 800 mm

No.

3/AL 2100 x 800 mm

No.

no.

no.

No.

Total to Series Summary


Section B61-4350: Metalworks

Chain link Panels


Galvanised chain link wire on galvanized steel
framing to opening size 6000 W x 2730 mm H
including 2 access doors as shown in the Drawing (1/CD)
Galvanised chain link wire on galvanized steel
framing to opening size 8000 W x 2730 mm H
Miscellaneous Metal Works
Roof drain outlet 100 mm diameter (10/RD)
Total to Series Summary

Component-4-B6: Utility Buildings / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-4000: Architectrual Works
Rate

Item
Description
No.

Section B61-4370: Finishes


In-situ Finishes
lnternal Finishes
Cement render to floor; 50mm thick;
to receive damp proof paint P-6 (F8 & F11)
Cement render to walls; 20mm thick to
receive paint (W3 & W4)

Unit

Qty

m2

401

m2

653

External Finishes
Cement render to walls; 20mm thick, to receive paint

m2

483

Cement render to concrete trellis ; 20mm thick to receive paint m2

73

Cement render to sidewalk 30mm thick (32/MD)

m2

312

Local
Peso

Painting/Clear Finishing

Synthetic resin emulsion paint (P-1) to:


Cement rendered wall (W-3)

m2

300

Synthetic resin mixed paint type B (P-3) to:


Steel doors

m2

23

Synthetic resin emulsion multi-layer


coating (P-4) to:
Cement rendered wall (W-4)

m2

483

Cement rendered concrete trellis

m2

73

10 formed face concrete to water tank room ceiling

m2

470

Epoxy resin floor paint (P-6) to:


11 Cement rendered floors (F-8)

m2

401

Total to Series Summary

Component-4-B6: Utility Buildings / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-5000: Mechanical Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Section B61-5000 Series: Mechanical


Series Summary
Section B61-5100 : Sanitary and Plumbing
Section B61-5200 : Ventilation and Air Condition
Section B61-5300 : Fire Protection

Total to B61 Water Tank & Pump House Summary


Section B61-5100 : Sanitary and Plumbing
Sewer Piping System
Pipeworks, Polyvinyl chloride pipe (Hight Dencity VP)
Incl, Fittings,Hangers, Supports, Sleeves, Inserts,Excavation,
Back Filling,Sand Bedding and Accessories.
1

75 mm diameter

22

Fittings
1/8 bend
75 mm diameter

No.

No.

75 mm diameter for Wye


Floor / Ground Clean Out
75 mm diameter

No.

Floor Drains
50 mm diameter

No.

Oil Interceptor (for mechanical room)

No.

44

Storm Drain

Above Ground
Galvanized carbon steel pipe, ASTM Sch-40
Incl, Hangers, Supports,Sleeves, Inserts and Accsessories.
100 mm diameter
Under Ground
Polyvinyl cloride pipe (VP)
Incl, Hangers, Supports,Sleeves, Inserts,Excavation, Back
filling, Sand Bedding and Accsessories.

150 mm diameter

66

100 mm diameter

35

Fittings (GI )
90 Bend
10 100 mm diameter

No.

24

45 Bend
11 100 mm diameter

No.

16

Roof Drains
12 100 mm diameter

No.

13

Catch Basin

No.

14

Catch Basin Cover

No.

Component-4-B6: Utility Buildings / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-5000: Mechanical Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Total to Section Summary


Section B61-5200 : Ventilation and Air Conditioning
Mechanical Ventilation System
Equipment
Exhaust Fans
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.
1

In-Line Axial Fan


c/w Direct Driven Motor, Q= 820 lps

No.

In-Line Axial Fan


c/w Direct Driven Motor, Q= 750 lps

No.

Fresh Air Fans


Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
3

In-Line Axial Fan


c/w Direct Driven Motor, Q= 820 lps

No.

In-Line Axial Fan


c/w Direct Driven Motor, Q= 750 lps

No.

G.I sheets
Incl, Hangers, Supports,Sleeves, Inserts and Accsessories.
0.6 mm (Ga. # 24)

24

0.8 mm (Ga. # 22)

36

Exhaust Air Grilles (EA)


1500 x 600 mm

No.

1200 x 600 mm

No.

Exhaust Air Louvers (EA)


2000 x 600 mm

No.

10 1800 x 600 mm

No.

Fresh Air Grilles (FA)


11 1300 x 600 mm

No.

12 1100 x 600 mm

No.

Fresh Air Louvers (FA)


13 1800 x 600 mm

No.

14 1500 x 600 mm

No.

No.

Duct Works

Total to Section Summary


Section B61-5300 : Fire Protection
1

Fire hose cabinet c/w valve, 40mm diameter


x 30m fire hose w/ fog nozzle, hose rack and
4.5kg ABC type fire extinguisher
Portable Fire Extinguisher

Component-4-B6: Utility Buildings / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-5000: Mechanical Works
Rate

Item
Description
No.

Unit

Qty

ABC Type, 4.5 kg

No.

CO2 Type, 23.0 Kg

No.

Fire extinguisher bracket W/housing

No.

Local
Peso

Total to Section Summary

Component-4-B6: Utility Buildings / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B61) Electrical Works


Series Summary
Section B61-6100: Power Feeder System
Section B61-6200 : Lighting And Receptacle
Section B61-6300 : Telephone and Data System
Section B61-6800 : Fire Detection And Alarm
Section B61-6900 : Lightning Protection and Grounding System

Total to Section Summary


Section B61-6100: Power Feeder System
1

LPPNE

500mm (W) cable tray

No.

45

Total to Series Summary


Section B61-6200: Lighting And Receptacle
Lighting Fixtures
1

1 x 18W PLC

No.

1 x 18w CFL, wall mounted

No.

10

2 x 36w Fluorescent fixture, industrial type

No.

10

1 x 36W Fluorescent Fixture (wall mounted)

No.

12

Wiring Devices & Receptacle


5

Duplex Convenience Outlet

No.

Duplex Weatherproof outlet

No.

One - gang switch

No.

Two - gang switch

No.

1,800

600

Wires & Cables


9

3.5 mm THHN
Conduits

10

15 mm dia
Total to Series Summary

Component-4-B6: Utility Buildings / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B61: Water Tank & Pump House Building
Section B61-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B61-6300: Telephone and Data System


Equipment & Devices
1

Telephone outlet w/ RJ11

No.

Single Line Telephone

No.

Terminal Board (TB-WPH)

No.

25

20

Wires & Cables


4

4P-CAT5e UTP CABLE (interconnection)


Conduits

15 mm dia
Total to Series Summary
Section B61-6800: Fire Detection And Alarm
Equipment & Devices

Smoke detector

No.

Fire alarm bell

No.

Manual Fire Alarm Station

No.

Remote Annunciator Panel

No

Fireman's Telephone Jack

No.

Fire Alarm Terminal Cabinet (FATC-WPH)

No

41

Sum

Wires & Cables


7

1.25 mm TF Wires (interconnection)


Conduits

15 mm dia
Total to Series Summary
Section B61-6900: Grounding System

Grounding System

Total to Series Summary

Component-4-B6: Utility Buildings / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B6) UtilityBUildings


B62: Power House Summary
Section B62-4000 : Architectural Works
Section B62-5000 : Mechanical Works
Section B62-6000 : Electrical Works

Total to Subcomponent Summary

Component-4-B6: Utility Buildings / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B62: Power House
Section B62-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Section B62-4000 series : Architectural Works


Series Summary
Section B62-4110 : Earthwork
Section B62-4120 : Termite Control
Section B62-4220 : Concrete Works
Section B62-4310 : Blockworks
Section B62-4320 : Waterproofing
Section B62-4340 : Windows/Doors
Section B62-4350 : Metalworks
Section B62-4360 : Woodwork and Partitions
Section B62-4370 : Finishes
Section B62-4380 : Miscellaneous Fittings & Furniture
Total to B62 Power House Summary
Section B62-4110 : Earthwork
Normal Excavation
1

Column foundations and pits

m3

230

Ground beams

m3

77

Excavation in Rock
3

Column foundation and pits

m3

58

Ground beams

m3

19

Filling
Backfilling to foundations

m3

258

Filling/Compaction
Gravel bed; 50mm thick

m2

396

Gravel bed; 100mm thick

m2

982

Gravel bed; 50mm think to external sidewalk (29/MD)

396

m2

864

m2

1,919

10 Polyethylene waterproof membrane


Total to Series Summary
Section B62-4120 : Termite Control
1

Soil treatment
Total to Series Summary
Section B62-4220: Concrete Works
In-situ Concrete

Component-4-B6: Utility Buildings / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B62: Power House
Section B62-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

Reinforced Concrete; Class B3 in:


Blinding layer; 50mm thick

m3

55

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

20

Reinforced Concrete; Class B1 in:


Column foundations

m3

63

Ground beams

m3

56

Columns

m3

77

Beams

m3

139

Suspended slabs

m3

58

parapet

m3

16

Reinforced Concrete; Class B2 in:


Ground floor slab

m3

130

10

Base slab to external sidewalk (29/MD)

m3

40

Class F1 Formwork in:


11 Column foundations

108

12 Ground beams

468

13 Columns

530

14 Beams

1,148

15 Suspended slabs

275

16 Parapet

213

Class F3 Formwork in :
17 Suspended slabs

301

Reinforcement bars - (grade 40, = 276 N/mm2)


18 10 mm ~ 12mm

kg

35,076

Reinforcement bars - (grade 60, = 415 N/mm2)


19 16 mm ~ 25mm

kg

43,521

Local
Peso

Formwork

Reinforcement

Total to Series Summary


Section B62-4310: Blockwork

Hollow Concrete Block


Wall; 150mm thick

1,269

Wall (100 mm thk)

112

Reinforced Concrete Class B2 in Lintels and


Stiffeners
3

Lintel beam above opening; 150 x 200mm

Component-4-B6: Utility Buildings / Page - 14

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B62: Power House
Section B62-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

including formwork and reinforcement


4

Stiffener beam; 150 x 300mm including


formwork and reinforcement

134

Stiffener column; 150 x 300mm including


formwork and reinforcement

209

m2

900

Total to Series Summary


Section B62-4320: Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing System with insulation
applied to surface (1/RD)

Waterproofing System applied to parapet


wall (3/RD)

m2

110

50mm Thick protection concrete with 4mm


diameter at 100mm welded wire mesh in steel
trowel finish (3/RD)

m2

900

25mm Wide contraction gap w/ sealant in


protection concrete (3/RD)

447

350mm Wide steel trowel finish roof ditch with


metal lath

72

m2

182

Underground External Water Proofing WP-5


6

Trench wall and floor


Total to Series Summary
Section B62-4340: Windows/Doors
WOOD DOOR SETS: flush type ; as shown on door &
window schedule drawing; including all ironmongery,
louvers, openings, wood frames and beads and all fixing
lugs, mortar bedding/filling and sealants

1/WD 700 x 2100 mm w/ louver

No.

2/WD 900 x 2100 mm

No.

3/WD 900 x 2100 mm w/ louver

No.

4/WD 900 x 2100 mm w/ louver

No.

5/WD 900 x 2100 mm w/ louver

No.

6/WD 600 x 1800 mm

No.

STEEL DOOR SETS ; flush type as shown on door &


window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
7

1/SD 900 x 2100 mm

No.

2/SD 1400 x 2100 mm

No.

Component-4-B6: Utility Buildings / Page - 15

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B62: Power House
Section B62-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

No.

10 4/SD 1400 x 2100 mm w/ louver

No.

11 5/SD 1800 x 2100 mm

No.

12 1/AD 1800 X 2625 (2100) mm w/ louver

No.

13 2/AD 900 x 2100 mm

No.

14 1/AW 1900 X 1175 mm w/ louver

No.

10

15 2/AW 2000 x 1200 mm

No.

16 3/AW 1900 x 535 mm w/ louver

No.

17 1/AL 950 x 400 mm

No.

18 2/AL 2000 x 1200 mm

No.

19 3/AL 1530 x 1600 mm

No.

20 4/AL 5250 x 1735 mm

No.

21 5/AL 500 x 300 mm

No.

22 6/AL 1900 x 850 mm

No.

23

7/AL 1900 x 600 mm

No.

24

8/AL 1910 x 500 mm

No.

No.

87

No.

33

3/SD 1400 x 2100 mm

Local
Peso

ALUMINIUM DOORS; as shown on Drawings, including


glazing, beads, gaskets, ironmongery, thresholds, frame
set and fixing lug, mortar bedding/filling and sealants

ALUMINIUM WINDOWS WITH INSECT SCREENS; as


shown on Drawings, including glazing, beads, gaskets,
ironmongery, thresholds, frame set and fixing lug, mortar
bedding/filling and sealants

Total to Series Summary


Section B62-4350: Metalworks

Miscellaneous Metal Works


Roof drain outlet 100 mm diameter (3/RD)

Aluminum wall trim at ceiling (5/MD);


20 x 15 x 10 x 20mm, double L section

Stainless steel kitchen counter w/ integrated sink


Over all size 600 x 5260 mm L-Shape type,

Aluminum blind box overall size 120mm wide x 100mm high


100 mm high fix to structure with hanger bolts
(5A/MD)

Component-4-B6: Utility Buildings / Page - 16

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B62: Power House
Section B62-4000: Architectural Works
Rate

Item
Description
No.

Trolley Hoist and Beam Rail


Trolley hoist/beam rail assembly, 12,000mm long,capacity
=1.5 tons with and including all necessary brackets, bolts,
anchors, plates, and angles (18/MD)

Unit

Qty

No.

Local
Peso

Total to Series Summary


Section B62-4360: Woodworks and Partition

Cubicles (8/MD)
One-unit cubicle

No.

Two-unit cubicle

No.

Urinal partition

No.

Kitchen counter and cabinetsas shown on the Drawings,


19mm thick MDF panel w/ high pressured laminate,
including concrete slab, all necessary framing, fixing,
fittings and ironmongery
Floor mounted ; 5260 x 600 x 1000mm high (L-shape )

No.

Wall mounted; 5260 x 300 x 815mm high (L-shape )

No.

m2

639

Total to Series Summary


Section B62-4370: Finishers

In-situ Finishes
lnternal Finishes
Cement render to floor; 50mm thick; to receive
damp proof paint P-6 (F8)

Cement render to floor; 38mm thick; to receive


vinyl tiles (F6)

m2

127

Cement render to floor; 42mm thick; to receive


ceramic tiles (F4)

m2

86

Cement render to walls; 20mm thick;


to receive paint (W3 and W4)

m2

995

Cement render to walls; 22mm thick;


to receive ceramic tiles (W2)

m2

142

Cement render to wall; 25mm thick, to receive


glasswool board insulation (W8)

m2

546

External Finishes
7

Cement render to walls; 20mm thick; to receive


paint

m2

558

Cement render to concrete trellis; 20mm thick to receive


paint

m2

110

Cement render to sidewalk 30mm thick (29/MD)

m2

436

m2

86

Rigid Tile/Slab/Block
Ceramic Tile Covering
10 Ceramic tiles to floors; 300 x 300 x 8mm
thick (F4)

Component-4-B6: Utility Buildings / Page - 17

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B62: Power House
Section B62-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

11 Ceramic tiles to wall; 300 x 300 x 8mm thick (W2)

m2

142

12 Ceramic tiles to toilet coping; 300 x 200mm x


8 mm thick including cement render backing;
30 mm thick (7/MD)

m2

101

14 Anti-static vinyl tiles to raised floors; 300 x 200 x 2mm


thick

m2

26

15 Polyvinyl soft tile to skirting 100mm high x


2 mm thick (S4)

100

16 Precovered glass wool board; to walls (W8)

m2

546

17 Precovered glass wool board; to ceilings (W-5)

m2

252

m2

250

52

Synthetic resin emulsion paint (P-1) to:


20 Cement rendered wall (W-3)

m2

939

Synthetic resin mixed paint type A (P-2) to:


21 Wood doors

m2

28

Synthetic resin mixed paint type B (P-3) to:


22 Steel doors

m2

33

Synthetic resin emulsion multi-layer


coating (P-4) to:
23 Cement rendered external walls

m2

614

24 Cement rendered concrete trellis

m2

110

Epoxy resin floor paint (P-6) to:


25 Cement rendered floors (F-8)

m2

639

m2

Flexible Tile/Sheet
13 Vinyl tiles to floors; 300 x 300 x 2mm thick (F6A)

Suspended Ceilings and Bulkheads; including


supports and suspension systems:
18 600 x 600 x 15mm Thick acoustic rockwool
ceiling system (C-1)
19 Suspended Double Ceiling: t=12 on t=9
sheeting gypsums with P-1 (C6)

Local
Peso

Painting/Clear Finishing

Total to Series Summary


Section B62-4380: Miscellaneous Fittings and
Furniture

Miscellaneous Item
Clear mirror
Lavatory Counter Top, in Granite polish finish, 20 mm
thick; w/opening for lavatory basins including supporting
frame and all necessary fixations (7/MD)

2897 x 600 mm Deep

No.

1402 x 600 mm Deep

No.

Venetian blinds

m2

48

Component-4-B6: Utility Buildings / Page - 18

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B62: Power House
Section B62-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Total to Series Summary

Component-4-B6: Utility Buildings / Page - 19

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B62-5000 Series: Mechanical Works


Series Summary
Section B62-5100 : Sanitary and Plumbing
Section B62-5200 : Ventilation and Air Condition
Section B62-5300 : Fire Protection

Total to B62 Power House Summary


Section B62-5100 : Sanitary and Plumbing
Sanitary Fixtures
1

WC-3 Water closet (FV)

No.

UR-3 Urinal

No.

LAV-3 Under counter type lavatory

No.

LAV-4 Wall Hang

No.

SS-2 Service sink (Slop Sink)

No.

SHW-1 Shower set

No.

Faucet for kitchen sink

No.

PH-2Toilet paper holder (Duble)

No.

Sop Dispenser

No.

No.

Pipeworks, Polyvinyl chloride pipe (High Density VP)


Incl, Fittings,Hangers, Supports, Sleeves, Inserts and
Accsessories.
11 20 mm diameter

25

12

25 mm diameter

14

13

32 mm diameter

40

14

50 mm diameter

Gate Valve JIS 10 Kg/cm2


15 40 mm diameter

No.

16

50 mm diameter

No.

17

Water Hammer Arrester

No.

Kitchen Equipment
10

Electric Cooking Stove


Water Distribution System
Piping Works

Hot Water Distribution


Equipment

Component-4-B6: Utility Buildings / Page - 20

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

18

EWH - 1 Electric Water Heater - Single point


(Instanteneous)

No.

19

EWH - 2 Electric Water Heater - Multi point


(Instanteneous)

No.

12

No.

22 100 mm diameter

50

23

75 mm diameter

24

50 mm diameter

18

25

Fittings
Wye & 1/8 bend combination
100 mm diameter

No.

26

75 mm diameter

No.

27

50 mm diameter

No.

19

28

Wye
100 mm diameter

No.

29

100 x 75mm diameter

No.

30

100 x 50mm diameter

No.

10

31

1/4 Bend
100 mm diameter

No.

32

50 mm diameter

No.

33

Floor / Ground Clean Out


100 mm diameter

No.

12

34

P - Trap
50 mm diameter

No.

35

Floor Drains
50 mm diameter

No.

Shower Drains
36 50 mm diameter

No.

37

Grease trap @ kitchen

No.

38

Oil Interceptor (for genset room)

No.

Local
Peso

Hot Water Piping Works


Incl, Fittings,Hangers, Supports, Sleeves, Inserts and
Accsessories.
20

Copper Pipe Type L; 20 mm diameter

Gate Valve JIS 10 Kg/cm2


21 20 mm diameter
Sewer Piping System
Pipeworks, Polyvinyl chloride pipe (Hight Dencity VP)
Incl, Fittings,Hangers, Supports, Sleeves, Inserts,Excavation,
Back Filling,Sand Bedding and Accsessories.

Component-4-B6: Utility Buildings / Page - 21

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Vent Pipes
Pipeworks, Polyvinyl chloride pipe (VU)
Incl, Hangers, Supports, Sleeves, Inserts and Accsessories.
39

100 mm diameter

173

40

75 mm diameter

39

41

50 mm diameter

144

42

Fittings
90 Bend
100 mm diameter

No.

43

75 mm diameter

No.

44

50 mm diameter

No.

17

90 TEE
45 100 mm diameter

No.

10

46 75 mm diameter

No.

47 50 mm diameter

No.

14

Reducer
48 75 x 50 mm diameter

No.

49 100 x 75 mm diameter

No.

53

51 100 mm diameter

120

Fittings ( GI )
90 Bend
52 100 mm diameter

No.

53 75 mm diameter

No.

45 Bend
54 100 mm diameter

No.

55 75 mm diameter

No.

Wye
56 100 mm diameter

No.

57 75 mm diameter

No.

Roof Drains
58 100 mm diameter

No.

Storm Drain
Abave Ground
Galvanized carbon steel pipe, ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accsessories.
50 100 mm diameter
Under Ground
Pipeworks, Polyvinyl chloride pipe (VP)
Incl, Fittings,Hangers, Supports, Sleeves, Inserts,Excavation,
Back Filling,Sand Bedding and Accsessories.

Component-4-B6: Utility Buildings / Page - 22

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

59 75 mm diameter

No.

60

Catch Basin

No.

61

Catch Basin Cover

No.

Local
Peso

Total to Section Summary


Section B62-5200 : Ventilation and Air Conditioning
Air Conditioning System
Equipment
Air Cooled Packaged Air Conditioner
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.
1

Ceiling Suspended Split AC Unit


Cooling Capacity 8.78 kw

No.

Wall Mounted AC Unit


Cooling Capacity 7 kw

No.

Ceiling Cassette Split AC Unit


Cooling Capacity 7 kw

No.

Ceiling Cassette Split AC Unit


Cooling Capacity 5.27 kw

No.

Window Type AC Unit


Cooling Capacity 6.66 KW

No.

Refrigerant pipes, copper pipes type "L"


Incl, Fittings,Hangers, Supports, Sleeves, Inserts and
Accsessories.
6

6.35 mm diameter

16

9.53 mm diameter

48

15.88 mm diameter

16

19.05 mm diameter

48

Thermal Insulation
Closed cell elastomeric thermai insulation
10 6.35 mm diameter (30 mm thick)

16

11 9.53 mm diameter (30 mm thick)

48

12 15.88 mm diameter (30 mm thick)

16

13 19.05 mm diameter (30 mm thick)

48

Pipe Fittings
Filter Drier
14 6.35 mm diameter

No.

15 9.53 mm diameter

No.

Moisture Indicator
16 6.35 mm diameter

No.

17 9.53 mm diameter

No.

Component-4-B6: Utility Buildings / Page - 23

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Condensate Drain Piping; PVC (VP)Pipes


Incl, Fittings,Hangers, Supports, Sleeves, Inserts and
Accsessories.
18 25 mm diameter

(PVC-VP)

150

19 50 mm diameter

(PVC-VP)

24

Condensate Drain Insulation


Thermal Insulation
Closed cell elastomeric thermai insulation
20 50 mm diameter (20 mm thick)

24

21 25 mm diameter (20 mm thick)

150

Aluminum Cladding
22 Aluminum Sheet (Ga. # 26)

m2

72

23 Centrifugal In-Line Duct Fan


c/w Direct Driven Motor, Q= 133 lps

No.

24 Centrifugal In-Line Duct Fan


c/w Direct Driven Motor, Q= 375 lps

No.

25 In-Line Axial Fan


c/w Belt Driven Motor, Q= 69 lps

No.

26 Propeller Wall Mounted Fan,


c/w Direct Driven Motor and Shutter, Q= 356 lps

No.

27 Centrifugal In-Line Duct Fan


c/w Direct Driven Motor, Q= 1125 lps

No.

28 In-Line Axial Fan


c/w Belt Driven Motor, Q= 2837 lps

No.

29 In-Line Axial Fan


c/w Belt Driven Motor, Q= 3665 lps

No.

30 In-Line Axial Fan


c/w Belt Driven Motor, Q= 139 lps

No.

No.

32 0.6 mm (Ga. # 24)

60

33 0.8 mm (Ga. # 22)

90

Mechanical Ventilation System


Equipment
Exhaust Fans
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.

Fresh Air Fans


Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.
31 In-Line Axial Fan
c/w Belt Driven Motor, Q= 2123 lps
Duct Works
G.I sheets
Incl, Hangers, Supports, Sleeves, Inserts and Accsessories.

Component-4-B6: Utility Buildings / Page - 24

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Exhaust Air Grilles (EA)


34 300 x 300 mm

No.

11

35 400 x 400 mm

No.

36 800 x 500 mm

No.

37 1000 x 500 mm

No.

Exhaust Air Louvers (EA)


38 400 x 300 mm

No.

39 500 x 400 mm

No.

40 1000 x 500 mm

No.

41 1200 x 800 mm

No.

Fresh Air Grilles (FA)


42 800 x 400 mm

No.

Fresh Air Louvers (FA)


43 900 x 500 mm

No.

Volume Damper
44 150 x 150 mm

No.

16

45 200 x 200 mm

No.

Backdraft Damper
46 200 x 200 mm

No.

47 300 x 200 mm

No.

No.

Local
Peso

Total to Section Summary


Section B62-5300 : Fire Protection
1

Fire hose cabinet c/w valve, 40mm diameter


x 30m fire hose w/ fog nozzle, hose rack and
4.5kg ABC type fire extinguisher

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

CO2 Type, 9.0 Kg

No.

CO2 Type, 23.0 Kg

No.

Fire extinguisher bracket W/housing

No.

Total to Section Summary

Component-4-B6: Utility Buildings / Page - 25

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

No.

Local
Peso

Subcomponent-4-6: (B62) Electrical Works


Series Summary
Section B62-6100: Power Feeder System
Section B62-6200 : Lighting And Receptacle
Section B62-6300 : Telephone and Data System
Section B62-6800 : Fire Detection And Alarm
Section B62-6900 : Lightning Protection and Grounding
System
Total to Section Summary
Section B62-6100: Power Feeder System
1

10 KVA UPS, 1 Phase, 230 V


Panel boards ( Normal Power )

VACN

No.

LPPN

No.

LPN

No.

PPGA

No.

RCPN

No.

Panelboards (Normal and Emergency Power)


7

VACNE

No.

LPPNE

No.

RCPNE

No.

10

UPSE

No.

Wires & Cables


11

1C-95mm XLPE

1,150

12

1C-10mm XLPE

75

13

1C-6mm XLPE

75

14

14mm TW

330

15

8mm TW

10

16

5.5mm TW

20

17

3.5mm TW

15

Total to Series Summary

Component-4-B6: Utility Buildings / Page - 26

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B62-6200: Lighting And Receptacle System


Lighting Fixtures
1

4 x 18W Fluorescent fixture w/ metal louver

No.

34

2 x 36w Fluorescent fixture, industrial type

No.

48

1 x 18w PLC downlight

No.

39

Wiring Devices & Receptacle

Duplex convenience outlet

No.

23

Special Purpose Outlet (ACU)

No.

Hand dryer outlet

No.

One - gang switch

No.

Two - gang switch

No.

10

10

30A, 3P, 230V, ECB

No.

11

40A, 3P, 230V, ECB

No.

12

30A, 2P, 230V, ECB

No.

13

40A, 2P, 230V, ECB

No.

Wires & Cables


14

3.5 mm THHN

3,200

15

5.5 mm THHN

700

16

8.0 mm THHN

80

17

3.5mm Fire Rated Cable

1,000

Conduits
18

15 mm dia

1,200

19

20 mm dia

40

20

20 mm Diameter flexible metallic conduit

100

Total to Series Summary


Section B62-6300: Telephone and Data System
Equipment / Devices
1

Telephone outlet w/ RJ11

No.

Single Line Telephone

No.

Computer outlet w/ RJ45

No.

Component-4-B6: Utility Buildings / Page - 27

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B62: Power House
Section B62-6000: Electrical Works
Rate

Item
No.
4

Description
Terminal Board (TB-WPH)

Unit

Qty

No.

Local
Peso

Wires and Cables


5

4P-CAT5e UTP CABLE (interconnection)

60

4P-CAT6 UTP CABLE (interconnection)

60

Conduits
7

15 mm dia

45

20 mm dia

35

Total to Series Summary


Section B62-6800: Fire Detection And Alarm
Equipment / Devices
1

Smoke detector (addressable)

No.

14

Heat Detector (addressable)

No.

Fire alarm bell

No.

Manual Fire Alarm Station

No.

Remote Annunciator Panel

No

Fireman's Telephone Jack

No.

Fire Alarm Terminal Cabinet (FATC-PWH)

No

50

200

Sum

Wires & Cables


8

1.25 mm TF Wires (interconnection)


Conduits

15 mm dia
Total to Series Summary
Section B62-6900: Grounding System

Grounding System

Total to Series Summary

Component-4-B6: Utility Buildings / Page - 28

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B6) UtilityBUildings


B63: STP Control Room Summary
Section B63-4000 : Architectural Works
Section B63-5000 : Mechanical Works
Section B63-6000 : Electrical Works

Total to Subcomponent Summary

Component-4-B6: Utility Buildings / Page - 29

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B63: STP Control Room
Section B63-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B63-4000 series : Architectural Works Summary


Series Summary
Section B63-4110 : Earthwork
Section B63-4120 : Termite Control
Section B63-4220 : Concrete Works
Section B63-4310 : Blockworks
Section B63-4320 : Waterproofing
Section B63-4340 : Windows/Doors
Section B63-4350 : Metalworks
Section B63-4370 : Finishes
Section B63-4380 : Miscellaneous Fittings & Furniture

Total to B63 STP Control Room Summary


Section B63-4110 : Earthwork

Excavation
Columns foundations and pits

m3

64

Excavation in Rock
Columns foundations and pits

m3

16

Filling
Backfilling to excavations

m3

68

Filling/Compaction
Gravel bed; 50mm thick

m2

106

Gravel bed; 50mm think to external sidewalk (29/MD)

150

m2

60

m2

298

m3

Polyethylene waterproof membrane


Total to Series Summary
Section B63-4120 : Termite Control

Soil treatment
Total to Series Summary
Section B63-4220 : Concrete Works
In - situ Concrete
Reinforced concrete : Class B3 in:

Blinding concrete; 50mm thick

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

Reinforced Concrete Class B1 in:


Column foundations

m3

10

Component-4-B6: Utility Buildings / Page - 30

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B63: STP Control Room
Section B63-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Ground beams

m3

Columns

m3

Beams

m3

Suspended slabs

m3

15

Parapet

m3

Reinforced Concrete Class B2 in:


Ground floor slab

m3

10

Base slab to external sidewalk (29/MD)

m3

15

Local
Peso

Formwork

11

Class F1 Formwork in:


Column foundations

19

12

Ground beams

49

13

Columns

90

14

Beams

61

15

Ground slab

16

Suspended slabs

121

17

Parapet

110

18

Class F3 Formwork in:


Suspended slabs

Kg

2,698

Kg

2,863

117

27

Reinforcement
19

20

Reinforcement bars - (grade 40 = 276 N/m)


10mm ~ 12mm
Reinforcement bars - (grade 60 = 415 N/m)
16mm ~ 25mm
Total to Series Summary
Section B63-4310 : Blockworks

Hollow Concrete Block


Walls; 150mm thick

Reinforced Concrete Class B2 in Lintels and


Stiffeners
Lintel beam above opening; 150 x 200mm
including formwork and reinforcement

Stiffener beam; 150 x 300mm including


formwork and reinforcement

20

Stiffener column; 150 x 300mm including


formwork and reinforcement

69

Total to Series Summary

Component-4-B6: Utility Buildings / Page - 31

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B63: STP Control Room
Section B63-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

m2

108

Local
Peso

Section B63-4320 : Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing system with insulation
applied to surface (1/RD)

Waterproofing system applied to parapet


wall (3/RD)

m2

24

50mm Thick protection concrete with 4mm


diameter at 100mm welded wire mesh in steel
trowel finish (3/RD)

m2

108

25mm Wide contraction gap w/ sealant in


protection concrete (3/RD)

49

350mm Wide steel trowel finish roof ditch with


metal lath

18

Urethane Waterproofing Coating WP -3


6

To floor ; toilet, shower, pantry and laboratory

m2

24

To wall; toilet, shower, pantry and laboratory

m2

m2

20

Underground External Waterproofing Coating WP -5


8

Waterproofing applied to cable trench; pit and dropped slab

Total to Series Summary


Section B63-4340 : Windows/Doors
WOOD DOOR SETS: flush type ; as shown on door &
window schedule drawing; including all ironmongery,
louvers, openings, wood frames and beads and all fixing
lugs, mortar bedding/filling and sealants
1

1/WD 800 x 2100 mm w/ louver

No.

2/WD 700 x 2100 mm w/ louver

No.

3/WD 800 x 2100 mm w/ louver

No.

No.

STEEL DOOR SETS ; flush type as shown on door &


window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
4

1/SD 1800 x 2100 mm w/ louver


ALUMINIUM WINDOWS WITH INSECT SCREENS;
as shown on Drawings, including glazing, beads, gaskets,
ironmongery, thresholds, frame set and fixing lug, mortar
bedding/filling and sealants

1/AW 2370 x 700 mm

No.

2/AW 1570(900) x 1500(2100) mm

No.

3/AW 1570(1350) x 1500(2100) mm

No.

Component-4-B6: Utility Buildings / Page - 32

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B63: STP Control Room
Section B63-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

4/AW 805 x 700 mm

No.

5/AW 780 x 700 mm

No.

No.

Local
Peso

Total to Series Summary


Section B63-4350 : Metalworks

Miscellaneous Metal Works


Roof drain outlet 100 mm diameter (3/RD)

Cable trench cover, W<600 ; Mild steel grating w/ primer paint m

22

Cable trench cover seat 50 x 50 x 4mm thick Angle bar w/


10mm diameter dowel bar w/ primer paint ( 31/MD )

22

m2

36

m2

24

m2

68

m2

30

m2

82

m2

24

m2

82

m2

36

m2

m2

18

11

Painting/Clear Finishing
Synthetic resin emulsion paint (P-1) to:
Cement rendered wall (W-3)

m2

68

12

Synthetic resin mixed paint type A (P-2) to:


Wood doors

m2

17

Total to Series Summary


Section B63-4370 : Finishes

In-situ lnternal Finishes


Cement render to floor; 50mm thick; to receive
damp proof paint P-6 (F8)
Cement render to floor; 42mm thick; to receive
ceramic tiles (F4)
Cement render to walls; 20mm thick;
to receive paint (W3 and W4)
Cement render to floor; 42mm thick to receive
vinyl tiles
Cement render to walls; 22mm thick;
to receive ceramic tiles (W2)
Ceramic Tile Covering
Ceramic tiles to floors; 300 x 300 x 8mm thick
(F-4)
Ceramic tiles to wall; 300 x 300 x 8mm thick
(W-2)

Suspended Ceilings and Bulkheads;


including supports and suspension system
600 x 600 x 15mm Thick acoustic rockwool
ceiling system (C-1)
8mm Thick calcium board (C-3) w/ P-4

10 Suspended Double Ceiling t=12.5 on t=9.5 Sheeting gypsums


(C6)

Component-4-B6: Utility Buildings / Page - 33

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-6: Utility Buildings
B63: STP Control Room
Section B63-4000: Architectural Works
Rate

Item
No.

Unit

Qty

m2

Synthetic resin emulsion multi-layer coating (P-4) to


14 Cement rendered external wall

m2

191

15 Calcium Silicate board

m2

13

Description
Synthetic resin mixed paint type B (P-3) to:
Steel doors

16

Epoxy resin floor paint (P-6) to:


Cement rendered floors (F-8)

m2

24

17

Skirting to Control room

24

m2

No.

Local
Peso

Total to Series Summary

1
2

Section B63-4380 : Miscellaneous Fittings


and Furniture
Miscellaneous Fitting
Clear mirror
Counter with Stainless steel sink
incuding supporting frames and necessary fixations
Over all size 600 x 3100mm
Total to Series Summary

Component-4-B6: Utility Buildings / Page - 34

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Section B63-5000: Mechanical Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Section B63-5000 : Mechanical Work Summary


Series Summary
Section B63-5100 : Sanitary and Plumbing
Section B63-5200 : Ventilation and Air Condition
Section B63-5300 : Fire Protection
Total to B63 STP Control Room Summary
Section B63-5100 : Sanitary and Plumbing
Sanitary Fixtures
1

WC-4 Water ClosetFV)

No.

LAV-3 Lavatory

No.

SHW-1 Shower set

No.

Faucet for pantry sink

No.

PH-2 Toilet paper holder

No.

SopHolder

No.

Water Distribution System


Piping Works
Pipeworks, Polyvinyl chloride pipe (Hight Dencity VP)
Incl, Fittings,Hangers, Supports, Sleeves, Inserts and
Accsessories.
7

20 mm diameter

17

25 mm diameter

15

Gate Valves JIS 10 Kg/cm2


20 mm diameter

No.

10

25 mm diameter

No.

11

Flexible joint; 20 mm diameter

No.

12

Valve box

No.

No.

No.

12

13 Water Hammer Arrester


Hot Water Distribution
Equipment
Incl,Hangers, Supports, Sleeves, Inserts and Accessories
14 Electric Water Heater Single Type
Hot Water Piping Works
Cooper Pipe,Type L
Incl,Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories
15 15mm

Component-4-B6: Utility Buildings / Page - 35

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Section B63-5000: Mechanical Works
Rate

Item
Description
No.

Gate Valve JIS 10Kg/cm2


16 15 mm

Unit

Qty

No.

Local
Peso

Sewer Piping System


Pipeworks, Polyvinyl chloride pipe (VP)
Incl, Fittings,Hangers, Supports, Sleeves, Inserts,Excavation,
Back Filling,Sand Bedding and Accsessories.
17

50 mm diameter

26

18

100 mm diameter

36

Clean-out
19

50 mm diameter

No.

20

100 mm diameter

No.

Floor Drains
21

50 mm diameter

No.

22

Shower Drain
50 mm diameter

No.

23

Vent Cap, SUS


50 mm diameter

No.

18

25 100 mm diameter

25

Roof Drain
26 100 mm diameter

No.

27

No.

No.

Storm Drain
Pipeworks
Abave Ground
Galvanized carbon steel pipe, ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accsessories.
24 100 mm diameter
Under Ground
Pipeworks, Polyvinyl chloride pipe (VP)
Incl, Fittings,Hangers, Supports, Sleeves, Inserts,Excavation,
Back Filling,Sand Bedding and Accsessories.

Storm drain pit


Total to Section Summary
Section B63-5200 : Ventilation and Air Condition
Ceiling Suspended split air-conditioning Type
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.

Cooling capacity 7.0KW


Wall mounted split air-conditioning type
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.

Component-4-B6: Utility Buildings / Page - 36

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Section B63-5000: Mechanical Works
Rate

Item
Description
No.

Cooling capacity 3.51KW

Unit

Qty

No.

Local
Peso

Refrigerant pipes, copper pipes type "L"


Incl, Fittings,Hangers, Supports, Sleeves, Inserts and
Accsessories.
3

6.35 mm diameter

9.53 mm diameter

19

15.88 mm diameter

11

Thermal Insulation
Closed cell elastomeric thermai insulation
6.35 mm diameter (30 mm thick)

9.53 mm diameter (30 mm thick)

19

15.9 mm diameter (30 mm thick)

11

Condensate Drain Piping


PVC(VP) Pipes
Incl, Fittings, Hangers, Supports,Sleeves, Inserts,Excavation,
Back filling, Sand Bedding and Accsessories.
9

50 mm diameter (PVC-VP)

14

10

25 mm diameter (PVC-VP)

14

Thermal Insulation
Closed cell elastomeric thermai insulation
11 50 mm diameter (20 mm thick)

14

12

14

sq m

36

14 Ceiling cassette exhaust fans Q=171 lps

No.

15 Ceiling cassette exhaust fans Q=109 lps

No.

16 Ceiling cassette exhaust fans Q=30 lps

No.

Condensate Drain Insulation

25 mm diameter (20 mm thick)


Aluminum cladding

13 Aluminum sheet(Ga#26)
Mechanical Ventilation System
Equipment
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.

Duct Works
Incl, Hangers, Supports, Sleeves, Inserts and Accsessories.

17

Spiral Duct
150 mm diameter

12

18

200 mm diameter

19

Vent Cap, SUS


200 mm diameter

No.

Component-4-B6: Utility Buildings / Page - 37

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Section B63-5000: Mechanical Works
Rate

Item
Description
No.

20

300 mm diameter

Unit

Qty

No.

Local
Peso

Total to Section Summary


Section B63-5300 : Fire Protection
Portable Fire Extinguisher
1

ABC Type, 4.5 Kg

No.

CO2 Type, 4.5 Kg

No.

No.

Fire extinguisher bracket W/ housing


Total to Section Summary

Component-4-B6: Utility Buildings / Page - 38

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Section B63-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B63) Electrical Works


Series Summary
Section B63-6100: Power Feeder System
Section B63-6200 : Lighting And Receptacle
Section B63-6300 : Telephone and Data System
Section B63-6800 : Fire Detection And Alarm
Section B63-6900 : Lightning Protection and Grounding System

Total to Section Summary


Section B63-6100 : Power Feeder System
1

LPPN

No.

1C-6mm XLPE

60

8mm TW

20

300mm (W) cable tray

18

Total to Series Summary


Section B63-6200 : Lighting And Receptacle System
Lighting Fixture
1

4 x18w Fluorescent fixture, louver type

No.

10

2 x 36w Fluorescent fixture, industrial type

No.

1x18w PLC

No.

Wiring Devices / Receptacle and Boxes


4

Convenience outlet duplex

No.

Convenience outlet duplex, Weather pfroof

No.

One - gang switch

No.

Two-gang switch

No.

Three-gang switch

No.

Wires and Cables


9

3.5mm THHN

650

10

5.5mm THHN

70

200

Conduit
11

20mm dia
External Lighting

Component-4-B6: Utility Buildings / Page - 39

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Section B63-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Lighting Fixture
12

Hot Dip Galvanized, Double Arm Lighting Pole, 12m

No.

13

120W LED Type Light, Complete with Lighting Fixture, etc. No.

14

Lighting Pole Pedestal/Foundation, 12m

No.

15

Handholes

No.

150

Wires and Cables for External Lighting


16

5.5mm THHN
Conduit for STP Facilities Site

17

3-75mm PVC

60

18

2-75mm PVC

35

19

6-50mm PVC

60

20

4-50mm PVC

95

21

2-50mm PVC

105

22

1-100mm PVC

70

23

1-75mm PVC

140

24

1-32mm PVC

390

Total to Series Summary


Section B63-6300 : Telephone and Data System
Equipment / Devices
1

Telephone outlet w/ RJ11

No.

Single Line Telephone

No.

Terminal Board (TB-STP)

No.

36

15

Wires and Cables


4

4P-CAT5e UTP CABLE (interconnection)


Conduits

20 mm dia
Total to Series Summary
Section B63-6800 : Fire Detection And Alarm
Equipment / Devices

Smoke detector

No.

Fire alarm bell

No.

Manual Fire Alarm Station

No.

Component-4-B6: Utility Buildings / Page - 40

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B63: STP Control Room
Section B63-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Remote Annunciator Panel

No

Fireman's Telephone Jack

No.

Fire Alarm Terminal Cabinet (FATC-STP)

No

10

30

Sum

Local
Peso

Wires & Cables


7

1.25 mm TF Wires (interconnection)


Conduits

15 mm dia
Total to Series Summary
Section B63-6900 : Grounding System

Grounding System
Total to Series Summary

Component-4-B6: Utility Buildings / Page - 41

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B64: Material Recover Facility
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B6) UtilityBUildings


B64: Material Recovery Facility Summary
Section B64-4000 : Architectural Works
Section B64-5000 : Mechanical Works
Section B64-6000 : Electrical Works

Total to Subcomponent Summary

Component-4-B6: Utility Buildings / Page - 42

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B64: Material Recover Facility
Section B64-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Section B64-4000 series : Architectural Works


Series Summary
Section B64-4110 : Earthwork
Section B64-4220 : Concrete Works
Section B64-4310 : Blockworks
Section B64-4230 : Structural Steelworks
Section B64-4330 : Roofing Cladding and Facades
Section B64-4370 : Finishes

Total to B64 Material Recoverly Facility Summary


Section B64-4110 : Earthwork

Excavation
Column foundations

m3

15

Ground beams

m3

Excavation in Rock
3

Column foundation and pits

m3

Ground beams

m3

m3

18

Filling
5

Backfilling to foundations
Filling/Compaction

Gravel bed; 50mm thick

118

Gravel bed; 50mm thick to external sidewalk (29/MD)

72

Total to Series Summary


Section B64-4220: Concrete Works
In-situ Concrete

Reinforced Concrete; Class B3 in:


Blinding layer; 50mm thick
Reinforced Concrete; Class B1 in:

Column Foundation

Ground beams

Column

Beam

Canopy

Component-4-B6: Utility Buildings / Page - 43

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B64: Material Recover Facility
Section B64-4000: Architectural Works
Rate

Item
Description
No.

Unit

Qty

Reinforced Concrete; Class B2 in:


Ground floor Slab

14

Base slab to external sidewalk (29/MD)

12

10 Ground beams

60

11 Beam

70

12 Column

73

13 Canopy

24

14 Ground slab

15 Reinforcement bars - (grade 40, = 276 N/mm2)


10 mm ~ 12mm

kg

1,540

16 Reinforcement bars - (grade 60, = 415 N/mm2)


16 mm ~ 25mm

kg

1,541

121

Local
Peso

Formwork

Class F1 Formwork in:


Column Foundation

Reinforcement

Total to Series Summary


Section B64-4310: Blockwork

Hollow Concrete Block


Wall; 150mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

28

Stiffener beam; 150 x 300mm including


formwork and reinforcement

34

Stiffener column; 150 x 300mm including


formwork and reinforcement

22

Total to Series Summary


Section B64-4230 : Structural Steelworks
1

Supply, fabricate and deliver structural steel work

kg

537

Supply pre-painted C channel purlins

kg

572

m2

96

Total to Series Summary

Section B64-4330 : Roofing Cladding and Facades


1

0.6mm Thick single folded steel plate pre-painted Galvalume


fluorine resin coated; curved

Component-4-B6: Utility Buildings / Page - 44

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B64: Material Recover Facility
Section B64-4000: Architectural Works
Rate

Item
Description
No.

0.8mm Thick steel roof gutter ; 915 girth

Steel roof drain outlet 100 mm diameter (3/RD)

Unit

Qty

12

No.

m2

96

m2

132

m2

107

Local
Peso

Total to Series Summary


Section B64-4370: Finishes
In-situ Finishes

lnternal Finishes
Cement render to floor; 50mm thick; including
surface hardener (F11)
Cement render to walls, columns, and beams; 20mm thick;
to receive paint (W4)
External Finishes

Cement render to walls, columns, and beams; 20mm thick;


to receive paint (W4)
Painting/Clear Finishing

Synthetic resin emulsion paint (P-1) to:


Cement rendered wall (W-4)

m2

239

Synthetic resin mixed paint type B (P-8) to:


Steel Structures

m2

80

Total to Series Summary

Component-4-B6: Utility Buildings / Page - 45

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B64: Material Recover Facility
Section B64-5000: Mechanical Works
Rate

Item
Description
No.

Unit

Qty

Local
Peso

Section B64-5000 Series: Mechanical Works


Series Summary
Section B64-5100 : Sanitary and Plumbing
Section B64-5200 : Ventilation and Air Conditioning
Section B64-5300 : Fire Protection

Total to B64 Material Recovery Facility Summary


Section B64-5100 : Sanitary and Plumbing
1

Water Hose Bibb WHB-1

20mm dia. 20 m long hose

No.

Water Hose Bibb WHB-2

20mm dia. 5 m long hose

No.

Gate Valves

No.

Valve box, C.I (25mm)

No.

Water Distribution System


Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories.
5

Pipeworks, PVC(VP) 25 mm diameter

22

Pipeworks, PVC(VP) 20 mm diameter

30

Water Hammer Arrester

No.

No.

Total to Section Summary


Section B64-5200 : Ventilation and Air Conditioning
Mechanical Ventilation System
Equipment
Exhaust Fans
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
1

Roof Ventilator Direct Driven, Q = 600 lps


Total to Section Summary
Section 5300 : Fire Protection

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

Fire extinguisher bracket W/housing

No.

Total to Section Summary

Component-4-B6: Utility Buildings / Page - 46

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environmental Protection Project

Component-4: Building Works

Subcomponent-4-6: Utility Buildings


B64: Material Recover Facility
Section B64-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-6: (B64) Electrical Works


Series Summary
Section B64-6200 : Lighting And Receptacle
Section B64-6900 : Lightning Protection and Grounding System

Total to Section Summary


Section B64-6200 : Lighting And Receptacle System
1

1 x 36W Fluorescent fixture, industrial type

No.

Duplex Convenience Outlet, Weatherproof

No.

Two-gang switch

No.

3.5mm THHN

110

15mm dia

33

Sum

Total to Series Summary


Section B64-6900 : Grounding system
1

Grounding system
Total to Series Summary

Component-4-B6: Utility Buildings / Page - 47

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
SUBCOMPONENT-4-B7:
Navaids Buildings
B71: LLZ Building
B72: GS Building
B73: VOR Building

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
Subcomponent-4-B7: Navaids Buildings Summary
Summary
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-4-7: (B7) Navaids Buildings


Subcomponent Summary
4-B71: LLZ Building
4-B72: GS Building
4-B73: VOR Building

Total to Component Summary

Component-4-B7: Navaids Building / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-7: (B7) Navaids Buildings


B71: LLZ Building Summary
Section B71-4000 Series: Architectural Works
Section B71-5000 Series: Mechanical Works
Section B71-6000 Series: Electrical Works

Total to Subcomponent Summary

Component-4-B7: Navaids Building / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-4000: Architectrual Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B71-4000 Series: Architectural Works


Series Summary
Section B71-4110 : Earthwork
Section B71-4120 : Termite Control
Section B71-4220 : Concrete Works
Section B71-4310 : Blockwork
Section B71-4320 : Waterproofing
Section B71-4340 : Windows/Doors
Section B71-4350 : Metalworks
Section B71-4370 : Finishes
Section B71-4380 : Miscellaneous Fittings and Furniture

Total to B71 LLZ Building Summary


Section B71-4110 : Earthwork

Excavation
Normal Excavation

m3

Excavation in Rock

m3

Filling
Backfilling to excavations

m3

Filling/Compaction
Gravel bed; 50mm thick

m2

33

Gravel bed; 50mm think to external sidewalk (29/MD)

106

Polyethylene waterproofing membrane

m2

28

m2

135

Total to Series Summary


Section B71-4120 : Termite Control
1

Soil treatment
Total to Series Summary
Section 4220 : Concrete Works
In-situ Concrete

Reinforced Concrete: Class B3 in:


Blinding concrete; 50mm thick

m3

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

Reinforced Concrete Class B1 in:


Column foundations

m3

Component-4-B7: Navaids Building / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-4000: Architectrual Works
Rate

Item
No.

Description

Unit

Qty

Columns

m3

Beams

m3

Suspended slabs

m3

Parapet

m3

m3

m3

11

8
9

Reinforced Concrete Class B2 in:


Ground floor slab
Base slab to external sidewalk (29/MD)

Local
Peso

Formwork

10

Class F1 Formwork in:


Column foundations

11

Columns

29

12

Beams

30

13

Suspended slabs

14

14

Walls

27

15

Ground slab

16

Class F3 Formwork in:


Suspended slab

16

17

Reinforcement bars - (grade 40 = 276 N/m)


10mm ~ 12mm

Kg

842

18

Reinforcement bars - (grade 60 = 415 N/m)


10mm ~ 12mm

Kg

512

67

Total to Series Summary

Section B71-4310 : Blockwork


Hollow concrete block
Wall; 150mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

Stiffener beam; 150 x 300mm including


formwork and reinforcement

18

Stiffener column; 150 x 300mm including


formwork and reinforcement

14

m2

28

Total to Series Summary


Section B71-4320 : Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing System with insulation
applied to surface (1/RD)

Component-4-B7: Navaids Building / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-4000: Architectrual Works
Rate

Item
No.

Description

Unit

Qty

Waterproofing System applied to parapet


wall (1/RD)

m2

50mm Thick protection concrete with 4mm

m2

28

Local
Peso

diameter at 100mm welded wire mesh in steel


trowel finish (1/RD)
4

25mm Wide contraction gap w/ sealant in


protection concrete (1/RD)

32

350mm wide steel trowel finish roof ditch with


metal lath

No.

Total to Series Summary


Section B71-4340 : Windows/Doors
WOOD DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
1

1/WD 900 x 2100 mm w/ louver


STEEL DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling

1/SD 1400 x 2400 mm w/ louver

No.

2/SD 900 x 2100 mm

No.

3/SD 900 x 2400 mm w/ louver

No.

Total to Series Summary


Section B71-4350 : Metalworks
1

Roof drain outlet 100 mm diameter. (1/RD)

No.

Trench cover seat, 4.5mm thick checkered steel


plate w/ 40 x 40 x 4.5mm thick steel angle frame
(31/MD)

m2

Trench cover seat, 50 x 50 x 4mm thick steel


angle w/ 10mm diameter dowel bar at 500mm c.c,
including edging frame,25 x 6mm thick
SUS 304 flat bar. (31/MD)

12

m2

13

Total to Series Summary


Section B71-4370 : Finishes

In-situ lnternal Finishes


Cement render to floor; 50mm thick to receive damp, proof
paint

Cement render to floor; 38mm thick, to receive


vinyl tiles

m2

15

Cement render to wall; 20mm thick to receive paint

m2

110

Component-4-B7: Navaids Building / Page - 5

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-4000: Architectrual Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

External Finishes
4

Cement render to external wall; 20mm thick to receive paint

m2

102

Cement render to sidewalk 30mm thick (29/MD)

m2

59

Flexible Tile/Sheet
300 x 300 x 2mm Thick anti-static vinyl tiles

m2

15

17

m2

18

Painting/Clear Finishing
Synthetic resin emulsion paint (P-1) to:
Cement rendered wall (W-3); 30mm thick

m2

110

10

Formed face concrete ceiling

m2

16

11

Synthetic resin mixed paint type B (P-2) to:


Wood doors

m2

to floors (F-6)
7

12

Polyvinyl soft tile to skirting 100mm high x 2mm


thick (S-4)
Suspended Ceilings and Bulkheads including
supports and suspension system
600 x 600 x 15mm Thick acoustic rockwool
ceiling system (C-1)

Acrylic resin enamel paint (P-7) to;


Galvanized SGP downspout pipe; 100mm
100mm Diameter uPvc downspout pipe

13

Synthetic resin mixed paint type B (P-3) to;


Steel doors

m2

15

14

Trench cover

m2

15

Synthetic resin emulsion multi-layer coating (P-4) to:


Concrete external walls

m2

102

16

Epoxy resin floor paint (P-6) to:


Cement rendered floors (F-8)

m2

13

Total to Series Summary

Component-4-B7: Navaids Building / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Storm Drain
Above Ground
Galvanized carbon steel pipe, ASTM Sch-40
Incl, Hangers, Supports,Sleeves, Inserts and Accsessories.
100mm diameter

Under Ground
Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories.
100mm diameter

10

Roof Drain
100mm diameter

No.

Catch Basin

No.

Catch Basin Cover

No.

No.

Refrigerant pipes, copper pipes type "L"


Incl, Fittings, Hangers, Supports,Sleeves, Inserts and
Accsessories.
6.35 mm diameter

16

15.88 mm diameter

16

Thermal Insulation
Closed cell elastomeric thermai insulation
6.35 mm diameter (30 mm thick)

16

15.88 mm diameter (30 mm thick)

16

Local
Peso

Section B71-5000 Series : Mechanical Works Summary


Section B71-5100 : Sanitary and Plumbing
Section B71-5200 : Ventilation and Air Condition
Section B71-5300 : Fire Protection

Total to B71 LLZ Building Summary


Section B71-5100 : Sanitary and Plumbing
Plumbing and Sanitary

Total to Section Summary


Section 5200 : Ventilation and Air Conditioning
Air Conditioning System
Equipment

Air Cooled Packaged Air Conditioner


Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.
Wall Mounted AC Unit
Cooling Capacity 7 kw

Pipe Fittings
Filter Drier

Component-4-B7: Navaids Building / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

6.35 mm diameter

No.

Moisture Indicator
6.35 mm diameter

No.

Condensate Drain Piping; PVC Pipes


Incl, Fittings, Hangers, Supports,Sleeves, Inserts and
Accsessories.
25 mm diameter (PVC-VP)

10

Condensate Drain Insulation


Thermal Insulation
Closed cell elastomeric thermai insulation
25 mm diameter (20 mm thick)

10

10

Aluminum Cladding
Aluminum Sheet (Ga. # 28)

m2

16

No.

No.

13

G.I sheets
Incl, Hangers, Supports,Sleeves, Inserts and Accsessories.
0.6 mm (Ga. # 24)

14

0.8 mm (Ga. # 22)

16

15

Exhaust Air Grilles (EA)


300 x 300 mm

No.

16

Exhaust Air Louvers (EA)


500 x 400 mm

No.

17

Volume Damper
200 x 200 mm

No.

18

Backdraft Damper
300 x 200 mm

No.

Local
Peso

Mechanical Ventilation System


Equipment

11

12

Exhaust Fans
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accsessories.
In-Line Axial Fan Direct Driven
c/w Direct Driven Motor, Q= 170 lps
Wall Mounted Exhaust Fan, Q = 150 lps
Duct Works

Total to Section Summary


Section B71-5300 : Fire Protection
Portable Fire Extinguisher
1

ABC Type, 4.5 kg

No.

CO2 Type, 9.0 Kg

No.

CO2 Type, 23.0 Kg

No.

Total to Section Summary

Component-4-B7: Navaids Building / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B71-6000 Series : Electrical Works


Series Summary
Section B71-6100 : Power Feeder System
Section B71-6200 : Lighting And Receptacle
Section B71-6300 : Telephone and Data System
Section B71-6800 : Fire Detection And Alarm
Section B71-6900 : Lightning Protection and Grounding System

Total to B71 LLZ Building Summary


Section B71-6100: Power Feeder System
Power Feeder System
1

LPPNE-LLZ

No.

1C-4mm XLPE

40

5.5mm TW

20

200mm (W) cable ladder

10

Total to Series Summary


Section B71-6200: Lighting And Receptacle System
Lighting Fixtures
1

1 x 36W Fluorescent fixture, industrial type

No.

1 x 36W Fluorescent fixture, batten type

No.

4 x 18W Fluorescent fixture, louver type

No.

1 x 18W PLC

No.

Wiring Devices & Receptacle


5

Duplex convenience outlet

No.

Two-gang switch

No.

Three-gang switch

No.

30AT, 100AF, 2P ECB

No.

380

110

Wires & Cables


9

3.5mm THHN
Conduits

10

15mm dia
Total to Series Summary

Component-4-B7: Navaids Building / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B71: LLZ Building
Section B71-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B71-6300: Telephone and Data System


Equipment / Devices
1

Telephone outlet with RJ11 Device

No

Single Line Telephone

No.

Terminal Board (TB-VOR)

No

20

Wires and Cables


4

4P-Cat5e UTP Cable (interconnection)


Conduits

15mm dia

20mm dia

10

Total to Series Summary


Section B71-6800: Fire Detection And Alarm
Equipment / Devices
1

Smoke Detector (addressable)

No

Fireman Alarm manual pull station

No

Alarm bell

No

Remote Annunciator Panel

No

Fire Alarm Terminal Cabinet (FATC-LLZ)

No

Remote Telephone Handset

No

10

26

Sum

Wires and Cables


7

1.25 mm TF Wires (interconnection)


Conduits

15 mm dia
Total to Series Summary
Section B71-6900 : Grounding System

Grounding System
Total to Series Summary

Component-4-B7: Navaids Building / Page - 10

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-7: (B7) Navaids Buildings


B72: GS Building Summary
Section B72-4000 Series: Architectural Works
Section B72-5000 Series: Mechanical Works
Section B72-6000 Series: Electrical Works

Total to Subcomponent Summary

Component-4-B7: Navaids Building / Page - 11

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B72-4000 series : Architectural Works


Section B72-4110 : Earthwork
Section B72-4120 : Termite Control
Section B72-4220 : Concrete Works
Section B72-4310 : Blockworks
Section B72-4320 : Waterproofing
Section B72-4340 : Windows/Doors
Section B72-4350 : Metalworks
Section B72-4370 : Finishes
Section B72-4380 : Miscellaneous Fittings & Furniture

Total to B72 GS Building Summary


Section B72-4110 : Earthwork
Excavation
1

Normal Excavation

m3

Excavation in Rock

m3

Filling
3

Backfilling to excavations

m3

Filling/Compaction
Gravel bed; 50mm thick

m2

33

Gravel bed; 50mm think to external sidewalk (29/MD)

106

Polyethylene waterproofing membrane

m2

28

m2

135

Total to Series Summary


Section B72-4120 : Termite Control
1

Soil treatment
Total to Series Summary
Section B72-4220 : Concrete Works
Plain Concrete Class B3 in:

Blinding concrete; 50mm thick

m3

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

Reinforced Concrete Class B1 in:


Column foundations

m3

m3

Columns

Component-4-B7: Navaids Building / Page - 12

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Beams

m3

Suspended slabs

m3

Parapet

m3

Reinforced Concrete Class B2 in:


Ground floor slab

m3

Base slab to external sidewalk (29/MD)

m3

11

Class F1 Formwork in:


10 Column foundations

11 Columns

29

12 Beams

30

13 Suspended slabs

14

14 Walls

27

15 Ground slab

Class F3 Formwork in:


16 Suspended slabs

16

Reinforcement bars - (grade 40 = 276 N/m)


17 10mm ~ 12mm

Kg

842

Reinforcement bars - (grade 60 = 415 N/m)


18 10mm ~ 12mm

Kg

512

67

Local
Peso

Formwork

Reinforcement

Total to Series Summary

Section B72-4310 : Blockwork


Hollow concrete block
Wall; 150mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

Stiffener beam; 150 x 300mm including


formwork and reinforcement

18

Stiffener column; 150 x 300mm including


formwork and reinforcement

14

m2

28

Total to Series Summary


Section B72-4320 : Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing System with insulation
applied to surface (1/RD)

Component-4-B7: Navaids Building / Page - 13

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Waterproofing System applied to parapet


wall (1/RD)

m2

50mm Thick protection concrete with 4mm


diameter at 100mm welded wire mesh in steel
trowel finish (1/RD)

m2

28

25mm Wide contraction gap w/ sealant in


protection concrete (1/RD)

32

350mm wide steel trowel finish roof ditch with


metal lath

No.

Local
Peso

Total to Series Summary


Section B72-4340 : Windows/Doors
WOOD DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
1

1/WD 900 x 2100 mm w/ louver


STEEL DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling

1/SD 1400 x 2400 mm w/ louver

No.

2/SD 900 x 2100 mm

No.

3/SD 900 x 2400 mm w/ louver

No.

Total to Series Summary


Section B72-4350 : Metalworks
1

Roof drain outlet 100 mm diameter. (10/RD)

No.

Trench cover seat, 4.5mm thick checkered steel


plate w/ 40 x 40 x 4.5mm thick steel angle frame
(31/MD)

m2

Trench cover seat, 50 x 50 x 4mm thick steel


angle w/ 10mm diameter dowel bar at 500mm c.c,
including edging frame,25 x 6mm thick
SUS 304 flat bar. (31/MD)

12

m2

13

Total to Series Summary


Section B72-4370 : Finishes

In-situ lnternal Finishes


Cement render to floor; 50mm thick to receive damp, proof
paint

Cement render to floor; 38mm thick, to receive


vinyl tiles

m2

15

Cement render to wall; 20mm thick to receive paint

m2

110

External Finishes

Component-4-B7: Navaids Building / Page - 14

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Cement render to external wall; 20mm thick to receive paint

m2

102

Cement render to sidewalk 30mm thick (29/MD)

m2

59

Flexible Tile/Sheet
300 x 300 x 2mm Thick anti-static vinyl tiles
to floors (F-6)

m2

15

17

m2

18

m2

110

Synthetic resin mixed paint type (P-2) to:


10 Wood Door

m2

Acrylic resin enamel paint (P-7)


11 100mm Diameter uPvc downspout pipe

Synthetic resin mixed paint type B (P-3) to:


12 Steel doors

m2

15

13 Trench cover

m2

Synthetic resin emulsion multi-layer coating (P-4) to:


14 Cement rendered external walls

m2

102

Epoxy resin floor paint (P-6) to:


15 Cement rendered floors (F-8)

m2

19

Polyvinyl soft tile to skirting 100mm high x 2mm


thick (S-4)
Suspended Ceilings and Bulkheads including
supports and suspension system
600 x 600 x 15mm Thick acoustic rockwool
ceiling system (C-1)
Painting/Clear Finishing
Synthetic resin emulsion paint (P-1) to:
Cement rendered wall (W-3); 30mm thick

Local
Peso

Total to Series Summary

Component-4-B7: Navaids Building / Page - 15

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B72-5000 Series: Mechanical Works


Section B72-5100 : Sanitary and Plumbing
Section B72-5200 : Ventilation and Air Condition
Section B72-5300 : Fire Protection

Total to B72 GS Building Summary


Section 5100 : Sanitary and Plumbing
Plumbing and Sanitary

Storm Drain
Galvanized carbon steel pipe, ASTM Sc-40
Incl, Hangers, Supports, Sleeves, Inserts and Accessories.
100mm diameter
Under Ground
Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories.

100mm diameter

10

Roof Drain
100mm diameter

No.

Catch Basin

No.

Catch Basin Cover

No.

No.

Total to Section Summary


Section 5200 : Ventilation and Air Conditioning
Air Conditioning System
Equipment
Air Cooled Packaged Air Conditioner
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
1

Wall Mounted AC Unit


Cooling Capacity 7 kw
Refrigerant pipes, copper pipes type "L"
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories.

6.35 mm diameter

16

15.88 mm diameter

16

Thermal Insulation
Closed cell elastomeric thermal insulation
6.35 mm diameter (30 mm thick)

16

15.88 mm diameter (30 mm thick)

16

Pipe Fittings
Filter Drier
6.35 mm diameter

No.

Component-4-B7: Navaids Building / Page - 16

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

No.

Moisture Indicator
6.35 mm diameter

Condensate Drain Piping; PVC Pipes


Accessories.
25 mm diameter (PVC-VP)

10

Condensate Drain Insulation


Thermal Insulation
Closed cell elastomeric thermal insulation
25 mm diameter (20 mm thick)

10

m2

16

No.

No.

G.I sheets
Incl, Hangers, Supports, Sleeves, Inserts and Accessories.
13 0.6 mm (Ga. # 24)

14 0.8 mm (Ga. # 22)

16

Exhaust Air Grilles (EA)


15 300 x 300 mm

No.

Exhaust Air Louvers (EA)


16 500 x 400 mm

No.

Volume Damper
17 200 x 200 mm

No.

Backdraft Damper
18 300 x 200 mm

No.

Aluminum Cladding
10 Aluminum Sheet (Ga. # 28)

Local
Peso

Mechanical Ventilation System


Equipment
Exhaust Fans
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
11 In-Line Axial Fan Direct Driven
c/w Direct Driven Motor, Q= 170 lps
12 Wall Mounted Exhaust Fan, Q = 150 lps
Duct Works

Total to Section Summary


Section B72-5300 : Fire Protection

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

CO2 Type, 9.0 Kg

No.

CO2 Type, 23.0 Kg

No.

Fire extinguisher bracket W/housing

No.

Total to Section Summary

Component-4-B7: Navaids Building / Page - 17

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B72-6000 Series : Electrical Works


Series Summary
Section B72-6100 : Power Feeder System
Section B72-6200 : Lighting And Receptacle
Section B72-6300 : Telephone and Data System
Section B72-6800 : Fire Detection And Alarm
Section B72-6900 : Lightning Protection and Grounding System
Total to B72 GS Building Summary
Section B72-6100: Power Feeder System
Power Feeder System
1

LPPNE-GS

No.

1C-4mm XLPE

40

5.5mm TW

25

200mm (W) cable ladder

10

Spare parts

Sum

Total to Series Summary


Section B72-6200: Lighting And Receptacle System
Lighting Fixtures
1

1 x 36W Fluorescent fixture, industrial type

No.

1 x 36W Fluorescent fixture, batten type

No.

4 x 18W Fluorescent fixture, louver type

No.

1 x 18W PLC

No.

Wiring Devices & Receptacle


5

Duplex convenience outlet

No.

Two-gang switch

No.

Three-gang switch

No.

30AT, 100AF, 2P ECB

No.

420

130

Wires & Cables


9

3.5mm THHN
Conduits

10

15mm dia
Total to Series Summary

Component-4-B7: Navaids Building / Page - 18

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B72: GS Building
Section B72-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B72-6300: Telephone and Data System


Equipment / Devices
1

Telephone outlet with RJ11 Device

No

Single Line Telephone

No.

Terminal Board (TB-VOR)

No

35

Wires and Cables


4

4P-Cat5e UTP Cable (interconnection)


Conduits

15mm dia

20mm dia

14

Total to Series Summary


Section B72-6800: Fire Detection And Alarm
Equipment / Devices
1

Smoke Detector (addressable)

No

Fireman Alarm manual pull station

No

Alarm bell

No

Remote Annunciator Panel

No

Fireman's Telephone Jack w/ Handset

No

Fire Alarm Terminal Cabinet (FATC-GS)

No

10

30

Sum

Wires and Cables


7

1.25 mm TF Wires (interconnection)


Conduits

15 mm dia
Total to Series Summary
Section B72-6900 : Grounding System

Grounding System
Total to Series Summary

Component-4-B7: Navaids Building / Page - 19

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Subcomponent-4-7: (B7) Navaids Buildings


B73: VOR Building Summary
Section B73-4000 Series: Architectural Works
Section B73-5000 Series: Mechanical Works
Section B73-6000 Series: Electrical Works

Total to Subcomponent Summary

Component-4-B7: Navaids Building / Page - 20

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B73-4000 series : Architectural Works


Section B73-4110 : Earthwork
Section B73-4120 : Termite Control
Section B73-4220 : Concrete Works
Section B73-4310 : Blockworks
Section B73-4320 : Waterproofing
Section B73-4340 : Windows/Doors
Section B73-4350 : Metalworks
Section B73-4370 : Finishes
Section B73-4380 : Miscellaneous Fittings & Furniture]

Total to B73 VOR Building Summary


Section B73-4110 : Earthwork

Excavation
Normal Excavation

m3

Excavation in Rock

m3

Filling
Backfilling to excavations

m3

Filling/Compaction
4

Gravel bed; 50mm thick

m2

56

Gravel bed; 50mm think to external sidewalk (29/MD)

122

Polyethylene waterproofing membrane

m2

51

m2

180

Total to Series Summary


Section B73-4120 : Termite Control
1

Soil treatment
Total to Series Summary
Section B73-4220 : Concrete Works
Plain Concrete Class B3 in:

Blinding concrete; 50mm thick

m3

Blinding layer; 50 mm thick to external sidewalk (29/MD)

m3

Reinforced Concrete Class B1 in:


Column foundations

m3

Columns

m3

Beams

m3

Component-4-B7: Navaids Building / Page - 21

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Suspended slabs

m3

Walls

m3

Reinforced Concrete Class B2 in:


Ground floor slab

m3

Base slab to external sidewalk (29/MD)

m3

12

Class F1 Formwork in:


10 Column foundations

11 Ground slab

12 Columns

44

13 Beams

29

14 Suspended slabs

28

15 Parapet

12

Class F3 Formwork in:


16 Suspended slabs

23

Kg

1160

Kg

777

66

Local
Peso

Formwork

Reinforcement
Reinforcement bars - (grade 40 = 276 N/m)
17 10mm ~ 12mm
Reinforcement bars - (grade 60 = 415 N/m)
1

10mm ~ 12mm
Total to Series Summary

Section B73-4310 : Blockwork


Hollow concrete block
Wall; 150mm thick
Reinforced Concrete Class B2 in Lintels and
Stiffeners

Lintel beam above opening; 150 x 200mm


including formwork and reinforcement

Stiffener beam; 150 x 300mm including


formwork and reinforcement

17

Stiffener column; 150 x 300mm including


formwork and reinforcement

17

m2

51

Total to Series Summary


Section B73-4320 : Waterproofing

Waterproofing Membrane
Built-up Bitumen Felt Water Proofing System; WP-1
Waterproofing System with insulation
applied to surface (1/RD)

Component-4-B7: Navaids Building / Page - 22

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Waterproofing System applied to parapet


wall (1/RD)

m2

50mm Thick protection concrete with 4mm


diameter at 100mm welded wire mesh in steel
trowel finish (1/RD)

m2

51

25mm Wide contraction gap w/ sealant in


protection concrete (1/RD)

43

350mm wide steel trowel finish roof ditch with


metal lath

13

No.

Local
Peso

Total to Series Summary


Section B73-4340 : Windows/Doors
WOOD DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling
1

1/WD 900 x 2100 mm w/ louver


STEEL DOOR SETS ; flush type as shown on door &
window schedule drawing : including ironmongery,
louvers, openings, glazing, thresholds, frame set and
fixing lug, mortar bedding/filling

1/SD 1400 x 2400 mm w/ louver

No.

2/SD 1400 x 2100 mm

No.

Total to Series Summary


Section B73-4350 : Metalworks
1

Roof drain outlet 100 mm diameter. (10/RD)

No.

Trench cover, 4.5mm thick checkered steel


plate w/ 40 x 40 x 4.5mm thick steel angle frame
(31/MD)

m2

11

Trench cover seat, 50 x 50 x 4mm thick steel


angle w/ 10mm diameter dowel bar at 500mm c.c,
including edging frame,25 x 6mm thick
SUS 304 flat bar. (31/MD)

25

m2

19

Total to Series Summary


Section B73-4370 : Finishes

In-situ lnternal Finishes


Cement render to floor; 50mm thick to receive damp, proof
paint

Cement render to floor; 38mm thick, to receive


vinyl tiles

m2

32

Cement render to wall; 20mm thick to receive paint

m2

152

Component-4-B7: Navaids Building / Page - 23

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-4000: Architectural Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

External Finishes
4

Cement render to external wall; 20mm thick to receive paint

m2

100

Cement render to sidewalk 30mm thick (29/MD)

m2

122

Flexible Tile/Sheet
300 x 300 x 2mm Thick anti-static vinyl tiles
to floors (F-6)

m2

32

25

m2

16

m2

152

Synthetic resin mixed paint (P-2) to:


10 Wood Door

m2

Acrylic resin enamel paint (P7) to;


11 100 mm diameter uPvc downspout pipe

12 Steel doors

m2

19

13 Trench cover

m2

Synthetic resin emulsion multi-layer coating (P-4) to:


14 Fair faced concrete external walls

m2

99

Epoxy resin floor paint (P-6) to:


15 Cement rendered floors (F-8)

m2

19

Polyvinyl soft tile to skirting 100mm high x 2mm


thick (S-4)
Suspended Ceilings and Bulkheads including
supports and suspension system
600 x 600 x 15mm Thick acoustic rockwool
ceiling system (C-1)
Painting/Clear Finishing
Synthetic resin emulsion paint (P-1) to:
Cement rendered wall (W-3); 30mm thick

Total to Series Summary

Component-4-B7: Navaids Building / Page - 24

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-5000: Mechanical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B73-5000 : Mechanical Works


Section B73-5100 : Sanitary and Plumbing
Section B73-5200 : Ventilation and Air Condition
Section B73-5300 : Fire Protection

Total to B73 VOR Building Summary


Section 5100 : Sanitary and Plumbing
Plumbing and Sanitary

Storm Drain
Galvanized carbon steel pipe, ASTM Sch-40
Incl, Hangers, Supports, Sleeves, Inserts and Accessories.
100mm diameter
Under Ground
Polyvinyl chloride pipe (VP)
Incl, Hangers, Supports, Sleeves, Inserts, Excavation, Back
filling, Sand Bedding and Accessories.

100mm diameter

10

Roof Drain
100mm diameter

No.

Catch Basin

No.

Catch Basin Cover

No.

No.

Total to Section Summary


Section 5200 : Ventilation and Air Conditioning
Air Conditioning System
Equipment
Air Cooled Packaged Air Conditioner
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
1

Wall Mounted AC Unit


Cooling Capacity 7 kw
Refrigerant pipes, copper pipes type "L"
Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories.

6.35 mm diameter

16

15.88 mm diameter

16

Thermal Insulation
Closed cell elastomeric thermal insulation
6.35 mm diameter (30 mm thick)

16

15.88 mm diameter (30 mm thick)

16

Pipe Fittings
Filter Drier
6.35 mm diameter

No.

Component-4-B7: Navaids Building / Page - 25

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-5000: Mechanical Works
Rate

Item
No.

Unit

Qty

No.

10

10

m2

16

No.

No.

G.I sheets
Incl, Hangers, Supports, Sleeves, Inserts and Accessories.
13 0.6 mm (Ga. # 24)

14 0.8 mm (Ga. # 22)

16

Exhaust Air Grilles (EA)


15 300 x 300 mm

No.

Exhaust Air Louvers (EA)


16 500 x 400 mm

No.

Volume Damper
17 200 x 200 mm

No.

Backdraft Damper
18 300 x 200 mm

No.

Description

Moisture Indicator
6.35 mm diameter

Local
Peso

Condensate Drain Piping; PVC Pipes


Incl, Fittings, Hangers, Supports, Sleeves, Inserts and
Accessories.
8

25 mm diameter

(PVC-VP)

Condensate Drain Insulation


Thermal Insulation
Closed cell elastomeric thermal insulation
25 mm diameter (20mm)

Aluminum Cladding
10 Aluminum Sheet (Ga. # 28)
Mechanical Ventilation System
Equipment
Exhaust Fans
Incl, Vibration Isolator, Hangers, Supports, Inserts and
Accessories.
11 In-Line Axial Fan Direct Driven
c/w Direct Driven Motor, Q= 170 lps
12 Wall Mounted Exhaust Fan, Q = 150 lps
Duct Works

Total to Section Summary


Section 5300 : Fire Protection

Portable Fire Extinguisher


ABC Type, 4.5 kg

No.

CO2 Type, 9.0 Kg

No.

CO2 Type, 23.0 Kg

No.

Fire extinguisher bracket W/housing

No.

Total to Section Summary

Component-4-B7: Navaids Building / Page - 26

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Section B73-6000 series : Electrical Works


Series Summary
Section B73-6100 : Power Feeder System
Section B73-6200 : Lighting And Receptacle
Section B73-6300 : Telephone and Data System
Section B73-6800 : Fire Detection And Alarm
Section B73-6900 : Lightning Protection and Grounding System

Total to B73 VOR Building Summary


Section B73-6100: Power Feeder System
Power Feeder System
1

LPPNE-VOR

No.

1C-6mm XLPE

No.

15

1C-4mm XLPE

25

5.5mm TW

25

200mm (W) cable ladder

10

Total to Series Summary


Section B73-6200: Lighting And Receptacle System
Lighting Fixtures
1

1 x 36W Fluorescent fixture, industrial type

No.

1 x 36W Fluorescent fixture, batten type

No.

4 x 18W Fluorescent fixture, louver type

No.

1 x 18W PLC

No.

Wiring Devices & Receptacle


5

Duplex convenience outlet

No.

Two-gang switch

No.

Three-gang switch

No.

30AT, 100AF, 2P ECB

No.

500

150

Wires & Cables


9

3.5mm THHN
Conduits

10

15mm dia

Component-4-B7: Navaids Building / Page - 27

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-4: Building Works

New Bohol Airport Construction and Sustainable Environmental Protection Project


Subcomponent-4-7: Navaids Buildings
B73: VOR Building
Section B73-6000: Electrical Works
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Total to Series Summary


Section B73-6300: Telephone and Data System
Equipment / Devices
1

Telephone outlet with RJ11 Device

No

Single Line Telephone

No.

Terminal Board (TB-VOR)

No

35

Wires and Cables


4

4P-Cat5e UTP Cable (interconnection)


Conduits

15mm dia

20mm dia

15

Total to Series Summary


Section B73-6800: Fire Detection And Alarm
Equipment / Devices
1

Smoke Detector (addressable)

No

Fireman Alarm manual pull station

No

Alarm bell

No

Fire Alarm Control Panel(FACP-3) (1-loop)

No

15

35

Sum

Wires and Cables


5

1.25 mm TF Wires (interconnection)


Conduits

15 mm dia

Total to Series Summary


Section B73-6900 : Grounding System
1

Grounding System
Total to Series Summary

Component-4-B7: Navaids Building / Page - 28

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
COMPONENT-5:
N: AIR NAVIGATION FACILITIES

Component-5: Air Navigation Facilities

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: (N) Air Navigation Facilities


Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Component-5: Air Navigation Facilities (N)


Subcomponent Summary
Subcomponent-5-0 : (N0) General
Subcomponent-5-1 : (N1) ILS
Subcomponent-5-2 : (N2) VOR/DME
Subcomponent-5-3 : (N3) ATS and Telecommunications
Subcomponent-5-4 : (N4) Meteorological Observation System

Total to Component-5

Component-5: Air Navigation Facilities / Page - 1

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-5: Air Navigation Facilities

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: (N) Air Navigation Facilities


Section N-8050: General Requirements
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-5-0 : (N0) General


Section Summary
Section N-8050 : General

Total to Subcomponent-5 Summary


Section N-8050 : General
1

Tools and appliances for ILS

Sum

Tools and appliances for VOR/DME

Sum

Tools and appliances for ATS

Sum

Tools and appliances for Meteorological

Sum

Measuring equipment for ILS

Sum

Measuring equipment for VOR/DME

Sum

Measuring equipment for ATS

Sum

Measuring equipment for Meteorological

Sum

Spare parts for ILS

Sum

10

Spare parts for VOR/DME

Sum

11

Spare parts for ATS

Sum

12

Spare parts for Meteorological

Sum

13

Training of personnel for ILS

Sum

14

Training of personnel for VOR/DME

Sum

15

Training of personnel for ATS

Sum

16

Training of personnel for MET

Sum

Total to Section Summary

Component-5: Air Navigation Facilities / Page - 2

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-5: Air Navigation Facilities

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: (N) Air Navigation Facilities


Section N-8100: ILS
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-5-1 : (N1) ILS


Section Summary
Section N-8110 : Localizer
Section N-8120 : Glide Slope
Section N-8130 : T-DME
Section N-8140 : Remote Control and Monitoring System

Total to Subcomponent-5-1
Section N-8110 : Localizer
Equipment
1

Dual transmitter system (2f type)

Sum

D.C. power supply system

Sum (Included in transmitter system)

Antenna system with lightning protection

Sum

Cable, Duct, Terminal Board, Power Distribution Board,


Handholes and Grounding system

Sum

Communication Cable from CTO EQ room

Sum

Installation Works

Sum

Total to Section Summary


Section N-8120 : Glide Slope
Equipment
1

Dual transmitter system (2f type)

Sum

D.C. power supply system

Sum (Included in transmitter system)

Antenna system with lightning protection

Sum

Monitor Antenna Ground Mat

Sum

Cable, Duct, Terminal Board, Power Distribution Board,


Handholes and Grounding system

Sum

Communication Cable from CTO EQ room

Sum

Installation Works

Sum

Sum

Total to Section Summary


Section N-8130 : T-DME
Equipment
1

Dual Transponder System

Component-5: Air Navigation Facilities / Page - 3

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-5: Air Navigation Facilities

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: (N) Air Navigation Facilities


Section N-8100: ILS
Rate

Item
No.

2
3
4

Description

Unit

Qty

Sum

Sum

Sum

Remote Control and Monitoring Unit

Sum

Navaids Monitor Display Unit

Sum

Cables among Equipment and Terminal board

Sum

Calibration Receiver

Sum

Installation Works

Sum

Antenna system

Cable, Duct, Handholes and Grounding system


Installation Works

Local
Peso

Total to Section Summary


Section N-8140 : Remote Control and Monitoring System
Equipment

Total to Section Summary

Component-5: Air Navigation Facilities / Page - 4

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-5: Air Navigation Facilities

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: (N) Air Navigation Facilities


Section N-8200: VOR/DME
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-5-2 : (N2) VOR/DME


Section Summary
Section N-8210 : DSB Type Doppler VOR
Section N-8220 : DME

Total to Subcomponent-5-2
Section N-8210 : DSB Type Doppler VOR
Equipment
1

Dual transmitting system with antenna and lightning


protection

Sum

Cable, Duct, Terminal Board, Power Distribution Board,


Handholes and Grounding system

Sum

Communication Cable from CTO EQ room

Sum

Counterpoise

Sum

Theodolite pad

Sum

(Included in Counterpoise)

Grounding system

Sum

(Included in Counterpoise)

Total to Section Summary


Section N-8220 : DME
Equipment
7

Dual transponder system

Sum

DC power supply with battery and charger

Sum (Included in transponder system)

VOR/DME local control and status monitor

Sum (Included in transponder system)

10

VOR/DME remote control and status monitor


(Desktop type PC)

Sum (Included in ILS Monitoring system)

11

Operational status monitor


(Desktop type PC)

Sum

12

Audio alarm box

Sum

13

Cable and Duct

Sum

14

Theodolite pad

Sum

15

Installation Works

Sum

(Included in Counterpoise)
1

Total to Section Summary

Component-5: Air Navigation Facilities / Page - 5

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: Air Navigation Facilities

Component-5: (N) Air Navigation Facilities


Section N-8300: ATS and Telecommunications
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-5-3 : (N3) ATS and Telecommunications


Section Summary
Section N-8300: ATS and Telecommunication

Total to Subcomponent-5-3
Section N-8300: ATS and Telecommunication
ATC Communication Control System Equipment
Communication Control System Console
1

Approach Control Console

Sum

Aerodrome Control Console

Sum

FD aux Control Console

Sum

SUPV Control Console

Sum

Voice Communication Control Unit


5

Communication Control Unit

Sum

Master Clock System

Sum

Slave Digital Clock for ATS

Sum

(Included in Item No.6)

Slave Digital Clock for Building works

Sum

(Included in Item No.6)

Slave Analog Clock for Building works

Sum

(Included in Item No.6)

Voice Recorder
10

Voice recorder and reproducer

Sum

A/G Fixed Communication System Equipment


VHF Air/Ground Equipment
TX
11

VHF Transmitter (50W dual set)

Sum

12

VHF Wide Band antenna

Sum

RX
13

VHF Receiver (dual set)

Sum

14

VHF Wide Band antenna

Sum

15

TX and RX rack w/ antenna changeover circuits

Sum

Antenna Tower

Component-5: Air Navigation Facilities / Page - 6

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: Air Navigation Facilities

Component-5: (N) Air Navigation Facilities


Section N-8300: ATS and Telecommunications
Rate

Item
No.

Description

Unit

Qty

16

TX Antenna pole with lightning protection

Sum

17

RX Antenna pole with lightning protection

Sum

18

Antenna feeder for TX

Sum

19

Antenna feeder for RX

Sum

20

A/G TRCV with antenna

Sum

21

Cable and antenna feeder

Sum

Local
Peso

VHF FM Transceiver for SMC


22

FM TRCV with charger and antenna

Sum

23

Cable and antenna feeder

Sum

Sum

Sum

VHF A/G transceiver for Fire Engine


24

A/G TRCV with antenna (mobile)


VHF FM Handie Talkie for Fire Comm.

25

FM handie talkie with battery charger


HF Comm.

26

HF Transceiver

Sum

27

HF SSB TRCV rack with antenna


Change-over circuits

Sum

28

Antenna w/ antenna pole & antenna feeder

Sum

29

Remote Control Unit (VFR Console built-in type)

Sum

Sum

AG Monitor Receiver
30

VHF multi-band receiver


ATS Intercom System

31

Maintenance intercom PABX

Sum

32

Telephone set

Sum

Other Items
33

Signaling lamp (Light Gun)

Sum

34

Siren

Sum

35

Binoculars

Sum

Sum

Power Distribution Board (PDB)


36

EQ Room in CTO

Component-5: Air Navigation Facilities / Page - 7

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: Air Navigation Facilities

Component-5: (N) Air Navigation Facilities


Section N-8300: ATS and Telecommunications
Rate

Item
No.

Description

Unit

Qty

37

VFR Room

Sum

38

FOBS Room in CTO

Sum

39

FOBS Remote Room in PTB

Sum

40

Observation Room in FSM

Sum

Local
Peso

TB
41

Main Distribution Frame in CTO

Sum

42

VFR Room

Sum

43

FOBS Room in CTO

Sum

44

FSS Room in CTO

Sum

45

FOBS Remote Room in PTB

Sum

46

Observation Room in FSM

Sum

1
1

Cable Rack
47

W800 mm wide

Sum

48

W500 mm wide

Sum

49

W400 mm wide

Sum

50

W250 mm wide

Sum

51

W250 mm wide duct

Sum

1
1

UPS
52

20 KVA UPS, 3 Phase, 230 V for CTO

Sum

53

1.5 KVA UPS, 3 Phase, 230 V for FSM

Sum

Cable
54

Power Cable

Sum

55

Communication Cable

Sum

Total to Section Summary

Component-5: Air Navigation Facilities / Page - 8

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

Component-5: Air Navigation Facilities (N)

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-5: (N) Air Navigation Facilities


Section N-8400: Meteorological Observation System
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Subcomponent-5-4 : (N4) Meteorological Observation System


Section Summary
Section N-8400: Meteorological Observation System

Total to Subcomponent-5-4
Section N-8400: Meteorological Observation System
MET Observation Field Equipment
1

Transmissometer and RVR converter

Sum

Anemometer and wind vane (RWY 21)

Sum

Anemometer and wind vane (RWY 03)

Sum

Temperature probe/Dew Point temperature probe

Sum

Ceilometer

Sum

Cables, cable ducts & handholes (RWY21)

Sum

Cables, cable ducts & handholes (RWY03)

Sum

Cable ducts & handholes for Ceilometer

Sum

Power distribution box and terminal box

Sum

Sum

EQ Room
10

Weather data processor and distribution system

FOBS Briefing Room at PTB


11

Weather data display unit

Sum

12

WS/WD display indicator

Sum

Cable
13

Power cable

Sum

14

Communication cable

Sum

Total to Section Summary

Component-5: Air Navigation Facilities / Page - 9

Amount
Foreign
Yen

Local
Peso

Foreign
Yen

BILL OF QUANTITIES
OF
COMPONENT-6:
G: AERONAUTICAL GROUND

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Component Summary
Item
No.

Rate
Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Component-6: Aeronautical Ground Lighting (L)


Component Summary
Subcomponent-6-0: (L0) General
Subcomponent-6-1: (L1) Approach Lighting System
Subcomponent-6-2: (L2) Precision Approach Path Indicator
Subcomponent-6-3: (L3) Runway Lighting System
Subcomponent-6-4: (L4) Taxiway Lighting System
Subcomponent-6-5: (L5) Other Lighting
Subcomponent-6-6: (L6) Apron Floodlighting
Subcomponent-6-7: (L7) Underground Cable Ducts
Subcomponent-6-8: (L8) Control and Monitoring System

Total to Work Summary

Component-6: Aeronautical Ground Lighting / Page - 1

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-0: (L0) General
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-0: (L0) General


1

Tools and appliances

Sum

Spare parts

Sum

Factory Training

Sum

Factory Test

Sum

Site Training

Sum

Site acceptance test

Sum

Flight check

Sum

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 2

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-1: (L1) Approach Lighting System
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-1: (L1) Approach Lighting System


PALS (Rwy 21)
1

Light Fittings, (200 W) elevated type

No.

161

Light Fittings, (105W x 3) surface type

No.

No.

Shallow base box for surface light including foundation

Isolating transformer, 200W, 6.6A/6.6A, 5kV, 60Hz

No.

161

Isolating transformer, 300W, 6.6A/6.6A, 5kV, 60Hz

No.

Primary cable, 5kV XLPE/PVC, 8mm - 1C

12,222

Secondary cable, 600V 2PNCT 4.0mm-2C

513

Connector kit, 54B-E4-E4 with static lock

No.

166

Secondary connector kit 90P

No.

166

10

Secondary connector kit 90R for Inset Type

No.

11

Crimp type terminal lug 14mm

No.

498

12

Splicing kit, #82-A1

No.

16

13

Rubber tapes, #23, 3M Brand

No.

55

14

PVC electrical tape #33, 3M Brand

No.

66

15

32mm RSC conduit with Concrete Encasement & accessories

90

16

FEP65 with accessories for Circuit no.1,2

2,119

17

Aluminum conduit, complete


with frangible coupling

No.

161

18

2" Frangible collar

No.

19

Concrete foundation for five (5) approach light

No.

29

20

Concrete foundation for five (8) approach light

No.

SALS (Rwy 03)


21

Light Fittings, (200 W) elevated type

No.

51

22

Isolating transformer, 200W, 6.6A/6.6A, 5kV, 60Hz

No.

51

23

Primary cable, 5kV XLPE/PVC, 8mm - 1C

3,230

24

Secondary cable, 600V 2PNCT 4.0mm-2C

153

25

Connector kit, 54B-E4-E4 with static lock

No.

51

26

Secondary connector kit 90P

No.

51

27

Crimp type terminal lug 14mm

No.

153

28

Splicing kit, #82-A1

No.

29

Rubber tapes, #23, 3M Brand

No.

17

Component-6: Aeronautical Ground Lighting / Page - 3

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-1: (L1) Approach Lighting System
Item
No.

Rate
Description

Unit

Qty

No.

20

515

30

PVC electrical tape #33, 3M Brand

31

FEP65 with accessories for Circuit no.1,2

32

Aluminum conduit, complete


with frangible coupling

No.

51

33

Concrete foundation for five (5) approach light

No.

34

Concrete foundation for five (8) approach light

No.

Local
Peso

Amount
Foreign
Yen

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 4

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-2: (L2) Precision Approach Path Indicator
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-2: (L2) Precision Approach Path Indicator


PAPI
1

Light unit 3 x 200W with accessories

Sum

Isolating transformer, 200W, 6.6A/6.6A, 5kV, 60Hz

No.

24

Connector kit, 54B-E4-E4 with static lock

No.

Concrete foundation

No.

Primary cable, 5kV XLPE/PVC, 8mm - 1C

4,864

Secondary connector kit 90P

No.

24

Crimp type terminal lug 14mm

No.

72

Splicing kit, #82-A1

Set

Rubber tapes, #23, 3M Brand

No.

10

PVC electrical tape #33, 3M Brand

No.

10

11

FEP65 with accessories

122

12

Concrete pavement

Lot

13

Secondary cable, 600V 2PNCT 4.0mm-2C

72

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 5

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-3: (L3) Runway Lighting System
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-3: (L3) Runway Lighting System


Rwy Edge Light
1

Light fitting, 150 W (W-W)

No.

24

Light fitting, 150 W (W-Y)

No.

35

Surface light, 100 W x 2 (W-W)

No.

Surface light, 100 W x 2 (W-Y)

No.

Light fitting (TP) (Blue) 100 W

No.

12

Shallow base box for runway surface light including


foundation

No.

Isolating transformer, 200W, 6.6A/6.6A, 5kV, 60Hz

No.

Isolating transformer, 150W, 6.6A/6.6A, 5kV, 60Hz

No.

59

Isolating transformer, 100W, 6.6A/6.6A, 5kV, 60Hz

No.

12

10

Primary cable, 5kV XLPE/PVC, 8mm - 1C

9,761

11

Secondary cable, 600V 2PNCT 4.0mm-2C


(For inset)
Connector kit, 54B-E4-E4 with static lock

179

No.

77

No.

No.

15

Secondary connector kit 90P


(For inset)
Secondary connector kit 90R
(For inset)
Crimp type terminal lug 14mm

No.

231

16

Rubber tapes, #23, 3M Brand

No.

26

17

PVC electrical tape #33, 3M Brand

No.

31

18

4,360

4,360

20

FEP65 with Concrete Encasement & accessories for Circuit


No.1
FEP65 with Concrete Encasement & accessories for Circuit
No.2
32mm RSC conduit with Concrete Encasement & accessories

240

21

Concrete foundation for REDL, TPEL, STWL

No.

70

Light fittings (Green) (200 W), elevated type


(RTHL)
Light fittings (Red) (100 W), elevated type
(RENL)
Light fittings for wing bar (Green) (200 W), elevated type
(WBAR)
Light fittings (Red) (100 W), elevated type
(STWL)

No.

34

No.

12

No.

10

No.

10

26

Isolating transformer, 200W, 6.6A/6.6A, 5kV, 60Hz

No.

44

27

Isolating transformer, 100W, 6.6A/6.6A, 5kV, 60Hz

No.

22

28

Connector kit, 54B-E4-E4 with static lock

No.

66

29

Crimp type terminal lug 14mm

No.

66

12
13
14

19

Rwy Threshold, Wing Bar and End Lights


22
23
24
25

Component-6: Aeronautical Ground Lighting / Page - 6

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-3: (L3) Runway Lighting System
Item
No.

Rate
Description

Unit

Qty

30

Rubber tapes, #23, 3M Brand

No.

22

31

PVC electrical tape #33, 3M Brand

No.

26

32

2- 65mm RSC conduit with accessories

126

33

Concrete foundation for RTHL, RENL and WBAR

No.

66

Local
Peso

Amount
Foreign
Yen

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 7

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-4: (L4) Taxiway Lighting System
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-4: (L4) Taxiway Lighting System


TEDL
1

Light fitting (Blue) LED Type 7.5W

No.

77

Isolating transformer, 10/15W, 6.6A/6.6A, 5kV

No.

77

Primary cable, 5 kV XLPE/PVC, 8mm-1C

4,000

Connector kit, 54B-E4-E4 with static lock

No.

77

Crimp type terminal lug 14mm

No.

231

Rubber tapes, #23, 3M Brand

No.

26

PVC electrical tape #33, 3M Brand

No.

31

FEP65 with Concrete Encasement & accessories

2,200

Concrete foundation for TEDL

No.

77

TXGS
11

3-L Single sided (54W LED) with accessories

No.

12

7-L Single sided (84W LED) with accessories

No.

13

Isolating transformer, 65W, 6.6A/6.6A, 5kV

No.

14

Isolating transformer, 100W, 6.6A/6.6A, 5kV

No.

15

Connector kit, 54B-E4-E4 with static lock

No.

10

16

Secondary connector kit 90P

No.

10

17

Crimp type terminal lug 14mm

No.

30

18

Rubber tapes, #23, 3M Brand

No.

19

PVC electrical tape #33, 3M Brand

No.

20

Concrete foundation for 3 letters

No.

21

Concrete foundation for 7 letters

No.

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 8

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-5: (L5) Other Lighting
Rate

Item
No.

Description

Unit

Qty

No.

No.

No.

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-5: (L5) Other Lighting


Aerodrome Beacon
1
2

Aerodrome Beacon with OB Light (LED Type)


Liquid tight adapter 15mm with S/S bushing 32mm x 15mm

Liquid tight flexible conduit 15mm

Insulated bushing 36mm

36mm RSC conduit with accessories

15

Cable 600V XLPE/PVC 8.0mm - 3C

140

No.

No.

No.

No.

Wind Direction Indicator Lights


7
8

10

Wind Cone, Light Fittings (LED Type)


with OB Light (LED Type)
Step-down dry transformer (single phase 1.5 kVA) with box

Step-up dry transformer (single phase 1.5 kVA)

11

Concrete foundation

12

Cable 600V XLPE/PVC 22mm - 2C

2,823

13

FEP65 with accessories

125

14

Concrete circular band 15 meter diameter

No.

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 9

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-6: (L6) Apron Floodlighting
Rate

Description

Item
No.

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-6: (L6) Apron Floodlighting


Apron Floodlighting
1

660W NH Floodlights

No.

1000W M Floodlights

No.

16

25m High mast with Lowering gear and Foundation

No.

Ballast Panel

No.

600V XLPE/PVC 14mm x 3C

935

600V XLPE/PVC 8mm x 3C

466

600V XLPE/PVC 5.5mm x 3C

3,250

PDB for APR N/E & N

No.

10

5 - SGP65A with Concrete Encasement & accessories

122

11

4 - SGP65A with Concrete Encasement & accessories

62

12

3 - SGP65A with Concrete Encasement & accessories

62

13

2 - SGP65A with Concrete Encasement & accessories

62

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 10

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-7: (L7) Underground Cable Ducts
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-7: (L7) Underground Cable Ducts


Cable duct
1

10 - FEP100 with accessories

258

7- FEP100 with accessories

70

6 - FEP100 with accessories

121

5 - FEP100 with accessories

1,042

4 - FEP100 with accessories

1,093

3 - FEP100 with accessories

3,084

2 - FEP100 with accessories

768

10 - SGP100A with Concrete Encasement & accessories

96

7 - SGP100A with Concrete Encasement & accessories

70

10

4 - SGP100A with Concrete Encasement & accessories

70

11

3 - SGP100A with Concrete Encasement & accessories

160

No.

54

12

Manhole for MT
Handhole and Grounding system

13

Handhole for lighting with accessories


for PALS, RTH, REDL Surface, PAPI, APR, WDIL

No.

65

14

Grounding System

No.

93

15

Counterpoise Wire

15,667

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 11

Local
Peso

Foreign
Yen

Component-6:
(L) Aeronautical Ground Lighting Works

New Bohol Airport Construction and Sustainable Environment Protection Project

Component-6: (L) Aeronautical Ground Lighting Works


Subcomponent-6-8: (L8) Control and Monitoring System
Rate

Item
No.

Description

Unit

Qty

Local
Peso

Amount
Foreign
Yen

Subcomponent-6-8: (L8) Control and Monitoring System


Equipment
1

CCR, 5 steps, 30kVA for PALS no.1, no.2


and Standby

No.

CCR, 5 steps, 20kVA for SALS, REDL No.1, No.2


and Standby

No.

CCR, 5 steps, 15 kVA for SALS

No.

CCR, 5 steps, 10 kVA for TEDL and TGXS

No.

CCR, 5 steps, 5 kVA for PAPI no.1, no.2 and Standby

No.

Power Distribution Board (AGL-1, AGL-2)

No.

Remote control monitoring system

No.

UPS 3kVA for RCMS

Sum

Cable for remote control system

Sum

10

Cable 600V XLPE/PVC 95mm - 1C

75

10

Cable 600V XLPE/PVC 70mm - 1C

30

11

Cable 600V XLPE/PVC 16mm - 1C

90

12

Cable 600V XLPE/PVC 60mm - 2C

60

13

Cable 600V XLPE/PVC 22mm - 2C

60

14

Cable 600V XLPE/PVC 14mm - 2C

20

15

Cable 600V XLPE/PVC 5.5mm - 2C

80

16

IV14mm

415

17

IV8mm

30

Total to Subcomponent Summary

Component-6: Aeronautical Ground Lighting / Page - 12