ISO 22000 - Control of Documents and Records
ISO 22000 - Control of Documents and Records
PEPSI-COLA, BUGSHAN
ISO 22000:2005
FOOD SAFETY MANAGEMENT
SYSTEM
SIPCO
PEPSI-COLA, BUGSHAN
TOPICS:
Control of Documents
Control of Records
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
DOCUMENT FORMAT
DOCUMENT CREATION
TEMPORARY CHANGES TO DOCUMENTS
DOCUMENT REVISION/REPRODUCTION OF FSMS
DOCUMENTS
DELETION OF FSMS DOCUMENTS
EXTERNAL DOCUMENTS VALIDATION
DOCUMENT DISTRIBUTION
DOCUMENT CONTROL PROCESS REVIEW
DOCUMENT NUMBERING SYSTEM
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO1
SIPCO2
SIPCO3
SIPCO
PEPSI-COLA, BUGSHAN
Indicates that the document is part of the Food Safety Management System
PREREQUISITE PROGRAM CODES
01
02
18
19
03
Control of Records
20
04
05
06
07
08
09
10
11
12
13
14
15
16
Management Responsibility
Job Descriptions
Internal and External Communication
Emergency Preparedness and Response
Competence, Awareness and Training
PRP: Visitors Access
PRP: Personal Hygiene
PRP: Cleaning and Sanitation
PRP: Pest Control
PRP: Premises
PRP: Maintenance
PRP: Foreign Object Control
PRP: Control of Suppliers
21
22
23
24
25
26
27
28
29
30
31
32
33
17
PRP: Purchasing
SIPCO
PEPSI-COLA, BUGSHAN
PR
Projects Section
QC
ACE
ACE Plant
QA
Quality Assurance
SC
SR
Syrup Production
FG
WT
RM
ML
Microbiological Laboratory
PA
RO
OED
MFG
Manufacturing Department
HR
AQF
Aquafina Line
CPS
Corporate Purchasing
CSD
CSD Line
SM
TEC
Technical Department
FN
Finance Department
ME
Mechanical Section
IT
Information Technology
EL
Electrical Section
HSE
UT
Utilities Section/Boiler/Compressor
MEM
MEM
FL
Fleet
CO2
AC
SIPCO
PEPSI-COLA, BUGSHAN
Guidelines
CK
Checklist
PG
Program
PL
Plans
PO
Policy
JD
Job Description
PR
EX
External Document
WI
Work Instruction
IN
Internal Document
JA
Job Aids
TO
LG
Log sheet
TA
Table
RG
DW
Drawings, Diagrams
IR
FR
Forms
LT
Letter
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
Examples:
Raw Materials:
SIPCO2-FS19-RM-CK-01: Incoming Vehicle Inspection Checklist
QA
SIPCO2-FS19-QA-IR-01: Sugar Inspection Report
Production:
SIPCO2-FS19-PD-PR-01: Filler Standard Operating Procedure
Syrup room:
SIPCO2-FS19-QC-LG-02:Finished Syrup Analysis
Mechanical:
SIPCO2-FS14-ME-EX-01: SMI 1
Electrical:
SIPCO2-FS14-EL-EX-01: KHS Line 1
Full Goods Warehouse
SIPCO2-FS19-FG-PR-01: FIFO/FEFO Procedure
SIPCO
PEPSI-COLA, BUGSHAN
Examples:
Cleaning and Sanitation:
SIPCO2-FS11-FSM-PL-03: Master Cleaning and Sanitation Schedule
SIPCO2-FS11-ML-WI-01: AC Grills Cleaning
SIPCO
PEPSI-COLA, BUGSHAN
Document Structure
All Procedures and Work Instructions have the document number,
title, revision and page number in Page X of Y format in the footer of
each page of the document.
The document should contain, at a minimum, the following
information on each document:
Policy;
Purpose;
Scope;
Responsibilities;
Safety;
Procedures;
Reference;
Records; and
Revision History
SIPCO
PEPSI-COLA, BUGSHAN
TOPIC
Control of Records
SIPCO
PEPSI-COLA, BUGSHAN
CONTROL OF RECORDS
IMPORTANCE
SIPCO
PEPSI-COLA, BUGSHAN
CONTROL OF RECORDS
WHAT IS A RECORD?
- Anything, such as a document or a photograph, providing
permanent evidence of or information about past events.
Requirement:
- All records must be clear and legible, complete and adequate (no
blank spaces left out, or NA is indicated if not applicable),
actual data, on time, readily accessible traceable to process
owner.
- Written records should have proper reference number, completed
in permanent ink (Blue) to help ensure legibility and to protect them
from unauthorized change.
SIPCO
PEPSI-COLA, BUGSHAN
CONTROL OF RECORDS
Requirement:
- Changes or corrections to hardcopy records should be made with a single
line through the incorrect entry, dated and initialed by the person making
the change. Correction fluid or tape should not be used.
- All pages of records are numbered (for forms with more than 1 pages).
- Traceable to the latest documented SOPs.
- Electronic records of food safety management activity should be
automatically generated and activity logs kept.
SIPCO
PEPSI-COLA, BUGSHAN
CONTROL OF RECORDS
Records Retention:
SIPCO
PEPSI-COLA, BUGSHAN
CONTROL OF RECORD
Records Maintenance:
SIPCO
PEPSI-COLA, BUGSHAN
CONTROL OF RECORD
RECORD CHARGE OUT PROCEDURE
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
PR
Projects Section
QC
ACE
ACE Plant
QA
Quality Assurance
SC
SR
Syrup Production
FG
WT
RM
ML
Microbiological Laboratory
PA
MFG
Manufacturing Department
OED
AQF
Aquafina Line
HR
Organizational Effectiveness
Business Unit
Human Resource Department
CSD
CSD Line
CPS
Corporate Purchasing
TEC
Technical Department
SD
ME
Mechanical Section
FN
EL
Electrical Section
IT
Information Technology
UT
Utilities Section
CO2
PR
Fleet / MEM
Spare Parts Store
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
Division
Blue
Manufacturing (Mfg)
Orange
Department
Section
QC - 01
SIPCO2-FS11-QC-WI-01
Cleaning & Sanitation
Work Instruction
Records
Retention Code
Record Code
Records
Description
SIPCO2-FS11-FSM-CK-01
Cleaning & Sanitation
Checklist
YEAR
: ________
VOLUME: ________
Pink
Light
Blue
White
Black
Utilities (UT)
Red
Period of Data
Collection
Refers to No. of
Folder generated
of the Same RRS
Code
Section Record
Color Code
Electrical (EL)
Green
Mechanical (ME)
Yellow
CO2
Violet
Gray
Light
Green
AC Workshop (HVAC)
Technical (TEC)
Dark
Blue
Maroon
SIPCO
PEPSI-COLA, BUGSHAN
1. DEPARTMENT DOCUMENTS
(Lifetime Documents)
2. DEPARTMENT RECORDS
(Records with Disposal Period)
DOC NO.
SIPCO2-FS14-EL-EX-01
RRS CODE
QC-01
IN-PROCESS
NOT APPLICABLE
IN-PROCESS
ACTIVE
NOT APPLICABLE
ACTIVE
INACTIVE
NOT APPLICABLE
INACTIVE
DISPOSAL DATE
NOT APPLICABLE
DISPOSAL DATE
JAN 2014
METHOD OF
DISPOSAL
NOT APPLICABLE
METHOD OF
DISPOSAL
SHRED
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
SIPCO
PEPSI-COLA, BUGSHAN
END
THANK YOU