Project Name Project No.: Eekly Eport

1) This weekly report summarizes construction progress from May 1st to January 10th, including work completed, equipment and staffing resources used, inspections conducted, submittals received and construction problems encountered. 2) Construction activities included earthworks, installing curbs and a base course. Issues included damages to the prime coat on several roads that required letters to address. 3) The contractor deployed various equipment and staff to complete the work, including trucks, compactors and over 60 workers, and logs were maintained to track inspections, submittals and problems through the reporting period.

Uploaded by

ahmed
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Project Name Project No.: Eekly Eport

1) This weekly report summarizes construction progress from May 1st to January 10th, including work completed, equipment and staffing resources used, inspections conducted, submittals received and construction problems encountered. 2) Construction activities included earthworks, installing curbs and a base course. Issues included damages to the prime coat on several roads that required letters to address. 3) The contractor deployed various equipment and staff to complete the work, including trucks, compactors and over 60 workers, and logs were maintained to track inspections, submittals and problems through the reporting period.

Uploaded by

ahmed
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

WEEKLY REPORT #001

Project Name

Period

Project No.

From : 05/01/2013

To : 10/01/2013

Contractor Name:
Original Contract Amount

L.E. 20,000,000

Total Contract Amount

L.E. 20,000,000

Additional Contract Amount

N/A

Agreement Signing Date

Starting Date :
Anticipating:
Actual:

Contract Duration:
Original:

6 Months

Days

Extension:

N/A

Days

Actual:

N/A

Days

Contract Completion Date:


Original:
After Extension:

N/A

CES

Total Works
No.

Report No.

Date

Const. works
Earth works

06/01/201
3

07/01/201
3

08/01/201
3

09/01/201
3

10/01/201
3

Base Course

Curbs

Prime
Coat

Binder
Cours
e

Tack
Coat

Wearing
surface

LOG

T ON SITE:

CONTRACTORS FORCE:

Equipment

pe

Total Number

Total Working
Hours/week

Comments

Staf
Position

Total Number

Total Working
Hours/week

48

Project Manager

48

Site Manager

60

12

96

Engineers

nk

12

96

Admin

57

57

Surveyors

12

96

ucks

18

144

Controls Engineer

Safety Officer

60

12

96

Foreman

18

171

Office Boys

16

Operator

Mechanic

12

114

ader

mpactor

ctor

Direct Labor

Total Number

Comm

rane

RACTOR

FORCE:

Manpower

tion

Total Number

CTION

Total Working
Hours/week

Comments

Electrician

57

Truck Drivers

Other Drivers

60

600

Unskilled

Total Number

Night Watchman

12

120

Cleaner

12

120

57

Gate Keeper

LOG:
No.

Ins. No.

Date

1.

225

05/01/2013

2.

226

05/01/2013

3.

227

05/01/2013

4.

228

05/01/2013

5.

229

05/01/2013

6.

230

05/01/2013

7.

231

05/01/2013

8.

232

06/01/2013

9.

233

06/01/2013

10.

234

08/01/2013

11.

235

08/01/2013

Description of Inspection

Revision
No.

No. of
Copies

SUBMITTALS LOG:
No.

1.
2.

Sub.
No.

Description

Type

98

3.
4.

CONSTRUCTION PROBLEMS:
Description:

1- Damages in Prime Coat at Road 27


2- Damages in Curbs at Ring Road, and MCO & Curbs at Road 27
3- Damages in Prime Coat at Road 02 & Road 22 intersection

Rev. No.

Date
Submitted

Received

Action Required/Taken:

Letter ref.EG/ECG/GHPNC/RW/012013/LT-104
2- Letter ref.EG/ECG/GHPNC/RW/012013/LT-107
3- Letter ref.EG/ECG/GHPNC/RW/012013/LT-110
1-

Copy to:
Head Office

Consultant

QS

Other

____________