Project Diary: Batch No.
Project Diary: Batch No.
Project Diary
BATCH No. :
Project Title
Sl.No.
ROLL
NUMBER
1
2
3
4
GUIDE NAME :
REGISTER
NUMBER
STUDENT NAME
Register No.:
Student Name:
Project
Review
Max. Marks
Date
Committe
e marks
Guide
marks
Guide sign
Total
marks
CM
3
GM
2
/10
/10
/10
/15
TOTAL
/50
2. Roll No:
Co-ordinator
sign
/5
Register No.:
Student Name:
Project
Review
Max. Marks
Date
Committe
e marks
Guide
marks
Guide sign
Total
marks
CM
3
GM
2
/10
/10
/10
/15
TOTAL
/50
3. Roll No:
Co-ordinator
sign
/5
Register No.:
Student Name:
Project
Review
Max. Marks
Date
Committe
e marks
Guide
marks
Guide sign
Total
marks
CM
3
GM
2
/10
/10
/10
/15
TOTAL
/50
4. Roll No:
Co-ordinator
sign
/5
Register No.:
Student Name:
Project
Review
Max. Marks
Date
Committe
e marks
Guide
marks
Guide sign
Total
marks
CM
3
GM
2
/10
/10
/10
/15
TOTAL
/50
Co-ordinator
sign
/5
Signature of HOD/CIVIL
Page 2
INDEX
Sl.No.
DESCRIPTION
PAGE N0.
PROJECT PROPOSAL
10
11-40
Page 3
Page 4
Page 5
REVIEW/EVALUATION COMMITTEE
S. No
Name
Designation
1.
Mr.B.Sugumaran
HOD
2.
Ms.S.Suthaviji
Project Coordinator, AP/CE
3.
Mr.R.Srinivasaprabhu
Asst Prof /CE
4.
Mr.J.Robinson
Asst Prof /CE
5.
GUIDE/CO-GUIDE
Role
Chair
Co - Chair
Member
Member
Convener
AVOID PLAGIARISM
Plagiarism by definition is the act of using someone elses words and calling them your own.
It is stressed here that plagiarism may lead to failure of the project. As a practical rule
plagiarism exists if a student attempts to give the impression that he or she is the originator of
an idea, a text, a layout, etc., even though the originator is in fact someone else. This should be
avoided in the project report/presentation. However, students are entitled to use and quote from
the works of other authors provided they give due credit to those works and authors.
Page 6
achieved in the project. Project report should describe the problem and explain how it has
been tackled by the students. It should also include students own assessment of how
successful the project was and how it could have been improved.
The project report is to be prepared as per the guidelines/format/standards given by
the Anna University at the time of submission.
SUBMISSION OF PROJECT REPORT
Three copies of the project report have to be submitted (one for SECE central library, one
for the department library and the third for the guide. If there are more than one guide, extra
copies are to be submitted.) along with a softcopy in PDF format. The certificate should
consist of names and roll numbers of all members of the team in the above three copies.
Format/standards issued by the University at the time of submission are to be followed.
PROJECT ASSESSMENT
The basic purpose is to assess the competencies of the students with regard to their project
work; more specifically, to assess the students individual contribution to the project, to
establish the level of understanding of project and to ensure that the student has good
understanding in design and development decisions taken in the course of the project. The
assessment of the project will be undertaken by the guide and the review committee. The
committee shall adopt a clear and consistent pattern of asking questions from general to
specific aspects of the project. The projects are to be evaluated as per the table given below
for awarding internal marks in each review.
Review
Proposed Committee
Guide
Based on
Number
Date
Marks
Marks
1st
3
2
21.07.16
6
4
11.08.16
2nd
27.08.16
23.09.16
20.10.16
3rd
4th
Project
Report
Technical competence
Technical achievemet
Presentation
Viva-voce
Task done to complete the work
30
20
Page 7
Date :
Roll
number
Register
number
Student name
Signature with
date
Project Co-ordinator
HoD/Civil
Page 8
Page 9
Description
Date of
Completion
20.10.16
Page 10
Date :
Target :
Period :
Location:
Present
Absent
Work done :
Task completed :
Comments of Guide :
Signature of Guide
Date :
Date :
Target :
Period :
Project Co-ordinator
No. of Hours:
Location:
Present
Absent
Work done :
Task completed :
Comments of Guide :
Signature of Guide
Date :
Project Co-ordinator