0% found this document useful (0 votes)
287 views1 page

De-Watering Method Statement

This document outlines a method statement for dewatering at an excavation site. It describes collecting groundwater in two pits as the excavation progresses, covering the pits with hollow barrels and wire mesh to prevent sand collection, and pumping the water out using submersible pumps to divert it to the city's wastewater line. The method aims to efficiently remove groundwater during construction to keep the work area dry.

Uploaded by

Supun Sandaruwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
287 views1 page

De-Watering Method Statement

This document outlines a method statement for dewatering at an excavation site. It describes collecting groundwater in two pits as the excavation progresses, covering the pits with hollow barrels and wire mesh to prevent sand collection, and pumping the water out using submersible pumps to divert it to the city's wastewater line. The method aims to efficiently remove groundwater during construction to keep the work area dry.

Uploaded by

Supun Sandaruwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

METHOD STATEMENT OF DEWATERING

Scope
To provide efficient and effective dewatering system in the way of economically.
Introduction
If the ground water table will be above the excavation depth, the water will be collected
to basement level. These water should be removed for construction. Therefore this report
will be provided the method of pumping ground water.
Methodology
1. While excavation there should be kept two pits to collect water as indicated in the
following drawing.
2. These pits will be covered with hollow barrels and hexagonal wire mash to
prevent collecting of sand.
3. After that water can be pumped by using submersible pumps. The rate of pump
will be decided after inspection of collecting rate.
4. The pump water will be carried to man hole and diverted to Colombo Municipal
Councils main waste water line.
5. the detailed will be presented in the drawing.
Equipments
1) Two submersible pump
2) Hollowed barrels
3) Hexagonal wire mesh
4) Hose
5) Electricity supply equipment