0% found this document useful (0 votes)
12 views

Rate Analysis For Reinforced Cement Concrete

This document provides a rate analysis for reinforced cement concrete (RCC) including material quantities, labor costs, and pricing. The wet and dry volume of concrete is 0.06 m3 and 0.10 m3 respectively. Material quantities include 0.52 bags of cement, 0.03 m3 of sand, and 0.05 m3 of aggregate. Labor requirements are 0.37 days for masons, 3.5 days for general labor, and 0.071 days each for a bar bender and mixer operator. The prime cost is Rs. 1137.66 and additional costs include 1.5% for water charges and 7.5% for sundries. The total cost per m3 of R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Rate Analysis For Reinforced Cement Concrete

This document provides a rate analysis for reinforced cement concrete (RCC) including material quantities, labor costs, and pricing. The wet and dry volume of concrete is 0.06 m3 and 0.10 m3 respectively. Material quantities include 0.52 bags of cement, 0.03 m3 of sand, and 0.05 m3 of aggregate. Labor requirements are 0.37 days for masons, 3.5 days for general labor, and 0.071 days each for a bar bender and mixer operator. The prime cost is Rs. 1137.66 and additional costs include 1.5% for water charges and 7.5% for sundries. The total cost per m3 of R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

3

RATE ANALYSIS FOR REINFORCED CEMENT CONCRETE


DOWNLOADED FROM THECONSTRUCTOR.ORG
RCC

:1.5

:3

Analysis for

Wet Volume

0.06

Dry Volume

0.10

MATERIAL
CEMENT BAGS

Qty.
0.52

SAND

0.03

Aggregate
Reinforcement

0.05
10.05

LABOUR With
Mechanical Mixer & Vibrartor
MASON
LABOUR
WATER CARRIER
BAR BENDER
MIXER OPERTOR

Days
0.37
3.50
1.39
0.10
0.071

MIXER VIBRATOR

0.071
0.00

PRIME COST (Rs.):


Water Charges 1.5%
Sundries (including mixer machine, transportation etc) 7.5 %
Contractor's Profit

14

Total Cost per m3 of RCC =

Cost of RCC for Given

ENT CONCRETE
Steel % by volume of

NSTRUCTOR.ORG

Concrete

2
m

Units
bags

Rs. / Unit
300

SLAB

1.00%

BEAM

2.00%

COULMN

2.50%

Road

0.60%

AMOUNT
(Rs.)
155

m3

900

24

m
Kg

700
60

38
603

SUBTOTAL
(Rs.)

819.63

300
200
200
200
200

111.00
700.00
278.00
20.10
14.28

200

14.28

1137.66

1957
29
147
%

otal Cost per m3 of RCC =


Cost of RCC for Given Data = Rs.

274
37617
2407