Project Completion PPM Version 2.0
Project Completion PPM Version 2.0
Completion
Report
PPM Version
2.0
<Solution Name>
U.S. Department of Housing and Urban Development
<Month, Year>
Solution Information
Information
Solution Name
<Solution Name>
Solution Acronym
<Solution Acronym>
<PCAS Identifier>
Document Owner
<Owner Name>
Primary Segment
Sponsor
Version/Release Number
<Version/Release Number>
Document History
<Provide information on how the development and distribution of the Project
Completion Report is controlled and tracked. Use the table below to provide the
version number, date, author, and a brief description of the reason for creating the
revised version.>
Version
No.
Date
Author
Revision Description
Page 1
Contents
1.
2.
3.
Background.................................................................................................... 2
1.2
1.3
Findings............................................................................................................... 3
2.1
Management Effectiveness............................................................................ 3
2.2
Cost................................................................................................................ 3
2.3
Schedule........................................................................................................ 3
2.4
Side-Effects.................................................................................................... 3
2.5
Residual Risks................................................................................................ 3
Performance Metrics...................................................................................... 4
3.2
4.
Open Issues......................................................................................................... 6
5.
Lessons Learned.................................................................................................. 7
5.1
6.
Recommendations......................................................................................... 7
Contract Closure.................................................................................................. 8
Appendix A: References.............................................................................................. 9
Appendix B: Key Terms............................................................................................. 10
Page 2
Planned Finish
Date
Funding Sources:
Resources Used:
HUD Staff
Contractor
Other
Yes
No
Not Applicable
Yes
No
Not Applicable
Explanation of
Variances:
Date
Page 1
1.1 Background
<Explain the background to this project/release, including why it was launched and
how it was implemented. You can also explain how the Post-Implementation Review
was conducted and how its results are feeding this report.>
<Include here the members of the team who participated in the PostImplementation Review.
The personnel that participated in the Post-Implementation Review are shown in the
table below:
Name
Position
Business Lead
IT Project Manager
System Administrator
IT Operations Lead
Page 2
2. Findings
2.1 Management Effectiveness
<Summarize how effectively the management needs of the customer and project
were met: objectives of the project, strategies to accomplish each objective,
activities specific to each objective, results per objective, and how objectives were
evaluated upon completion.
Highlight the significance of approved changes to the baseline, their impact on the
project, and how they were managed. Compare the baseline schedule to the actual
schedule and describe discrepancies.
Identify and discuss specific issues that challenged the project/project team, and
what measures were implemented to address the problems. Consider areas such as
cost, schedule, scope, quality, risk, communication, implementation, transition,
regulatory compliance, and overall project team performance.
Outline the main outputs delivered and broader outcomes achieved as a result of
the project>
2.2 Cost
<Assess whether the project was completed within planned budget and that
financial estimates were as predicted.>
2.3 Schedule
<Assess whether the change/project/release was executed within the scheduled
timeframe. Check if all key milestones and deliverables were met in the predicted
time.>
The planned and actual completion date for each milestone is shown in the Table 2:
Milestones Completion
Milestone /
Deliverable
Planned
completion
date
Actual
completion
date
Deviation [days]
2.4 Side-Effects
<Explain unexpected or undesired side-effects that might have been appeared as a
consequence of the change/project/release Develop and describe the remediation
plans for each of the side-effects identified.>
PPM Version 2.0 May 2015
Page 3
Response
Yes
No
Yes
No
Yes
No
<Determine whether the implemented solution has achieved its proposed outcome
and has provided the desired benefits in support of the mission and goals.>
Objective/Requir
ement
Fix Form A to
submit request to
appropriate
personnel for
approval
Initial
State
Current
request
stays within
system and
does not
email out to
appropriate
personnel
Target
Outcome
Deviation
Email the
request for
approval to
appropriate
personnel
The form
now emails
to the
appropriate
approvals
in a timely
manner
N/A
Page 4
Objective/Requir
ement
Initial
State
Target
Outcome
Deviation
SLA
Initial
Final/Curre
nt
Status
Page 5
4. Open Issues
<List any open issues and the agreed-upon resolutions after discussion with Operations and other Stakeholders
have concluded.>
Issue #
Assigned To
Agreed-Upon
Resolution
Page 6
5. Lessons Learned
<Summarize project lessons learned including the cause of issues and the reasoning behind the corrective action
chosen. Identify and discuss specific issues that challenged the project/project team. Sample fields are listed in the
table below.>
ID
#
Date
of
Lesso
n
Learn
ed
PPM
Phase
Impact
ed
Categ
ory1
Impa Problem/Succe
ct
ss Description
POC
Name
Lessons
Learned and
Recommendati
ons
Background/
Other
5.1 Recommendations
<include both project/release-specific recommendations and recommendations to improve the overall IT
change/project/release management processes. Recommendation must be as much actionable as possible.>
To solve the problems detected in this Post-Implementation Review and to improve results in future changes and
projects, the following recommendations are given:
1.
2.
1 Suggested Categories: scope, time, cost, quality, human resources, communications, risk, procurement,
infrastructure, security, system integration, requirements, architecture/design/specifications, development, testing,
implementation, training and documentation, configuration management, legal and policy, and other
PPM Version 2.1 May 2015
Page 7
Page 8
6. Contract Closure
<Summarize project contract closure activities such as formally closing all contracts
associated with the completed project. Sample questions are listed in the table
below.>
Respond to each question. For each No response, include an issue in Section 4
Open Issues.
Question
Response
Have all tasks been completed and all work products accepted by the
GTR/GTM?
Yes
No
Have all procedures from OCPO been followed and completed regarding
contract and task order closeout?
Yes
No
Have all resources (including, but not limited to, staff, contractors,
hardware, software, and tools) been appropriately released?
Yes
No
Yes
No
Yes
No
Page 9
Appendix A: References
<Insert the name, version number, description, and physical location of any
documents referenced in this document. Add rows to the table as necessary.>
Table 5 below summarizes the documents referenced in this document.
Document Name
<Document name and
version number>
Description
<Document description>
Location
<URL to where document is
located>
Table 5 - References
Page 10
Definition
<Provide definition of terms and acronyms used in this
document>
Page 11