Api 653 Report-Hydrolic Test PDF
Api 653 Report-Hydrolic Test PDF
OLEFIN PLANT
Ilam Petrochemical Complex
Bina Consulting
RnPineera
T.imited
DOC.no. :I
0-VD-PCJ-QC-351144
Rev. no. : 2
Sheet no. : 1 1 11+1
HYDROSTATIC AND
SETTLEMENT TESTS
PROCEDURE
Hydrostatic And
Settlement
Tests
Procedure
1.Mar.09
For Approval
R.N
01
28.Dec.08
For Approval
R.N
Rev.
Date
Description
Prepare.
Tech.
Dep.
Tech.
Dep.
Chk.
A.S
A.S
App.
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 2 / 11
CONTENT
1.0
Scope
2.0
3.0
Test Stages
4.0
Sequence of Work
5.0
Water
6.0
Method
7.0
10
8.0
Cleaning
10
11
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 3 / 11
This procedure briefly describes the general methods to be performed for Hydrostatic and
Settlement testing after completing welding operation and performing required N.D.T.
Test for Storage Tanks.
Before hydrostatic test, reports of all inspection and test as per relevant QCP such as joint
history N.D.T map, punch list, test certificate, general drawing etc. approval by the
owners representative shall be provided.
1.0. Scope
The purpose of performing following test is to controlling and measuring any changes to
body and foundation level and also to prove integrity of Storage Tanks body.
This document applies to Nine Storage Tanks of OLEFIN PLANT ILAM
PETROCHEMICAL COMPLEX.
After completing erection and performing required Tests, Visual Inspection, Vacuum
Box Testing, Pneumatic Test, Hydrostatic operation and settlement test will be
performed. Accoding Applicable codes and standards as defined in item 20.
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
Settlement
Monitoring
Leak test
Water Filling
Holding Stage
Holding Stage
Holding Stage
Hydrostatic Test
Water Discharge
Holding Stage
Emptying Stage
Cleaning and Drying
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 4 / 11
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 5 / 11
5.0. Water
For accomplishment of hydrostatic test, storage tanks must filled with plant water and
prior to filling the Storage Tank with water.
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 6 / 11
If any problems meet in visual inspection, following corrective action must be performed
before starting next stage of the test:
Removing all of the defects by using mechanical means or thermal gouging processes.
Repairing arc strikes which have been discovered in or adjacent to weld lines by
grinding and re-welding as required.
The repaired weld shall be visually examined for defects.
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 7 / 11
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 8 / 11
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 9 / 11
concerning speculation upon soil settlement and soil bearing capacity which have been
concluded from ground research.
Considering and marking 12 points (0, 30, 60, 90, 120, 150, 180, 210, 240, 270,
300, 330) around storage tank base ring as leveling references and measuring the
elevation with 1mm accuracy with dial gauge. Before filling tanks with water the level at
each mentioned reference point will be registered. Permanent reference level will be
established in unaffected location of tanks (Bench Mark). Gauge contact surfaces should
be provided with glued glass plates or similar for a smooth contact.
6.4.4. Filling
6.4.4.1. Filling operation
The test water shall be filled slowly until the water level reaches minimum 300 mm
height. The water-filling rate shall not exceed 900 mm depth per hour, and then inlet
nozzle shall be gradually opened and continuing filling operation. Water will be filled in
to the tanks by approximately filling rate about
to1/3Ht, at such a head, filling will stop for 6 hours and level at the reference points will
be recorded.
Continuing filling operation with 900mm/hr water flow rate up to water level reached to
2/3Ht of required hydro test level at such a head, filling will stop for 12 hours and levels
will be measured and checked and comparing with registered measure before start of
filling (while tanks were empty) to ensure that uneven settlement have not occur. In this
situation, filling will proceed by the same rate up to water leveled reached to required
height. Each day levels at reference points will register and recorded. (Refer to page 12
for filling diagram).
The filled tanks will be maintained for 24 hours and provided levels remain
consistent, the tank can be off loaded prior to calibration for service.
As filling of tanks, according to the mentioned method, will be done gradually and in
steps, it prevents non-uniform settlement.
During hydro test and after finishing of each one of filling steps or emptying stages,
checking will be made on followings:
\\Server\Users New\monshi\Monshi\SAYER MON 1 Projects\Olefin Petroshimi Ilam\procedure\ITP-02.doc
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 10 / 11
Settlement Monitoring
All shell welding joints lower than liquid level
Corner joints including the fillet weld between shell and bottom, which shall visually
check for water tightness.
Shell roundness
Note: For repair of any leakage ad weld, water level shall be drained 330 mm below the
failure point and after repair, hydrostatic test shall re-started from actual level.
It must be mentioned prior to the roof installation, fixed roof column supports shall be
inspected for plumbness and tank shells shall be inspected for distortion or ovalization.
Roof support columns which are out-of-plumb by more than 15mm in every 3m and/or
more than 60mm for the total length shall be realigned.
7.0. Assessment and Report
Gauge measurements and visual inspection shall be assessed and reported together with
measurement records, including gauge plots relative to water levels.
The measurement records shall be issued to the engineering manager and company and
the engineering manager shall review and interpret measurement records if anomalies are
happened, the engineering manager shall instruct the site immediately to stop the water
filling, and shall discuss with Company.
8.0. Cleaning
The tanks shall be completely drained and thoroughly dried immediately after hydrostatic
Test. If necessary during discharging the test water, put the inflatable boat on the test
water and brushing the wall by using the boat as water level goes down.
After the tanks were emptied, surfaces of the bottom plates shall be cleaned with fresh
water. Water, which will be used for cleaning, shall be same quality as test water. All
sand, sludge and rubbish shall be removed from the tanks bottom.
After final draining and drying, brushing, broom or vacuum cleaner shall clean surface of
the tanks bottoms.
OLEFIN PLANT
Ilam Petrochemical
Complex
Hydrostatic And
Settlement Test Procedure
No. : 10-VD-PCJ-QC-351144
Rev. No. : 02
Sheet no. : 11 / 11
Reference Point
Date
0
30
60
90
120
150
180
210
240
270
300
330
Time