33KV CT Test Report

This document provides a test report on current transformers (CTs) located at a site. It includes details of the CTs such as make, serial number, ratios, and winding resistances. Insulation resistance tests were performed and results reported for each phase. Polarity, DC resistance, and ratio tests were also conducted to check functionality. A checklist verifies proper installation including earthing, shorting of unused cores, and termination of links at control panels. Remarks provide any additional notes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
405 views

33KV CT Test Report

This document provides a test report on current transformers (CTs) located at a site. It includes details of the CTs such as make, serial number, ratios, and winding resistances. Insulation resistance tests were performed and results reported for each phase. Polarity, DC resistance, and ratio tests were also conducted to check functionality. A checklist verifies proper installation including earthing, shorting of unused cores, and termination of links at control panels. Remarks provide any additional notes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

TRANSMISSION CORPORATION OF A.P.

LIMITED
SITE :

DATE :

TEST REPORT ON CURRENT TRANSFORMER


1. Designation
Location

:
:

2. Name Plate Details

Make
Serial No

:
R-phase

Core
ref

Ratio

Y-Phase

Burden Class
(VA)

3. Insulation Resistance Test


Megger Make:
Circuit Ref
Megger
applied
voltage
Primary to earth

B-Phase

KPV
(volts)

Winding
Resistance
(in ohms)

purpose

Ambient Temp:
deg C
Motorised: yes / no
R phase
Y phase
B phase
(M)
(M)
(M)

Primary to Secondary Core-1


Primary to Secondary Core-2
Secondary Core-1to earth
Secondary Core-2 to earth

4. Polarity test:
Circuit ref

R Phase

Y Phase

B Phase

Remarks

Core-1
Core-2

6. DC Resistance Measurement:
Test Kit:
Circuit ref
R Phase
()

Y Phase
()

B Phase
())

Remarks

Core-1
Core-2
8 (b). Ratio Test on CTs with measurement taken at C&R Panels:
Primary Injection Test Kit:

8. Final Check list for CTs


a) P 1 of CT Towards Bus

Y / N

b) CT secondary in Star

Y / N

c) Star point made with S 2

Y / N

d) CT tank earthing

Y / N

e) Star point of CT secondary earthed

Y / N

f) Un used cores shorted at CT secondary only

Y / N

g) All TB links made thru at Control and relay panels

Y / N

9. REMARKS

NOTE: When current injected in specified phase, the measurement shown above is taken
in the same phase while other phases no values are recorded.