Science Research Technicians
Science Research Technicians
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
ENGINEER III
Head of Production Division, DepED - NSTIC
DepED National Science Teaching Instrumentation Center
Director III
All Production Employees
JOB SUMMARY
Salary Grade
Revision Code
19
Effectivity Date
Supervises, provides specific/detailed instructions necessary resources, performance standards, safety rules and standard procedures to ensure
completion of jobs as scheduled with utmost efficiency and safety for men and equipment in the Production Division.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Bachelors degree in Engineering relevant to the job
2 years of relevant experience
RA 1080
8 hours of relevant training
Qualifications
Masters Degree units relevant to the job
4 years of relevant experience with supervisory functions
RA 1080
24 hours of relevant training
Objectives
Outputs
Personnel Development
4 Production Staff
trained
Individual
Performance Report
Maintenance
Schedule updated
Well- maintainedt
tools, equipment anf
facilities
APP/PPMP
Updated specs of
assigned SMEs
Maintenance
manual of procured
SME/prototype set
Fabricated prototype
SME
Learning Resources
Objectives
SMEs to be prototyped as per schedule
set in the Individual Work assignment
Technical Assistance
Quality Assurance
Training
Outputs
Objectives
Performance
Objectives
Outputs
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Recommended 4
production staff for
training within 70
days of current
year
Submitted IPT on
or before the 2nd
week of January
Managed
the
conduct of weekly
maintenance
of
100% of the NSTIC
tool... more than 1
day
before
Recommended 4
production staff
for training within
71-80 days of
current year
Submitted IPT on
the 2nd week of
January
Managed
the
conduct of weekly
maintenance of
100% of the
NSTIC tool... a
day
before
Recommended 4
production staff
for training within
81-90 days of
current year
Submitted IPT on
the 3rd week of
January
Managed
the
conduct of weekly
maintenance of
100% of the
NSTIC tool... on
schedule
Recommended 4
production staff
for training within
91-110 days of
current year
Submitted IPT on
the 4th week of
January
Managed
the
conduct of weekly
maintenance of
100% of the
NSTIC tool... 1
day after schedule
Recommended 4
production staff for
training
after
111days of current
year
Submitted IPT after
4th
week
of
January
Managed
the
conduct of weekly
maintenance
of
100% of the NSTIC
tool... more than 1
day schedule
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
schedule
Submitted
prepared
procurement plan
before the 2nd
week of January
updated 100% of
the specifications
of assigned SMEs
more than 5 days
before the end of
the 1st quarter
130% of designs
supervised more
than 2 days of the
alloted time
130%
of
fabrications
supervised more
than 2 days of the
alloted time
Provided
assistance to 130%
of the private
manufacturers
more than 2 days
before
the
schedule
Provided technical
assistance on the
schedule
Submitted
prepared
procurement plan
on 2nd week of
January
updated 100% of
the specifications
of assigned SMEs
5 days before the
end of the 1st
quarter
115-129%
of
designs
supervised within
2 days before the
alloted time
115-129%
of
fabrications
supervised within
2 days before the
alloted time
Provided
assistance to 115129% of the
private
manufacturers 2
days before the
schedule
Provided technical
assistance on the
Submitted
prepared
procurement plan
on the 3rd week of
January
updated 100% of
the specifications
of assigned SMEs
by the end of the
1st quarter
100-114%
of
designs
supervised within
the alloted time
100-114%
fabrications
supervised within
the alloted time
Provided
Submitted
prepared
procurement plan
on the 4th week of
January
updated 100% of
the specifications
of assigned SMEs
1-5 days after the
end of the 1st
quarter
51-99%
of
designs
supervised
1-2
days after
the
alloted time
51-99%
fabrications
supervised
1-2
days after
the
alloted time
Provided
assistance to 5199% of the private
manufacturers 1-2
days
after
schedule
Provided technical
assistance on the
Submitted
prepared
procurement plan
after 4th week of
January
updated 100% of
the specifications
of assigned SMEs
more than 5 days
after the end of the
1st quarter
50% of designs
supervised more
than 2 days after
the alloted time
50% of fabrications
supervised more
than 2 days after
the alloted time
Provided
assistance to 50%
of the private
manufacturers
more than 2 days
after schedule
Provided technical
assistance on the
Provided technical
assistance on the
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
planned Repair
and Maintence of
SMEs activities in
115-129% of the
public schools 2
days before the
schedule
115-129% of the
qualilty assurance
activities
supervised 2 days
before
the
schedule
115-129% of the
qualilty assurance
activities
supervised 2 days
before
the
schedule
planned Repair
and Maintence of
SMEs activities in
100-114% of the
public schools on
schedule
planned Repair
and Maintence of
SMEs activities in
51-99% of the
public schools 1-2
days
after
schedule
51-99% of the
qualilty assurance
activities
supervised
1-2
days
after
schedule
51-99% of the
qualilty assurance
activities
supervised
1-2
days
after
schedule
Prepared training
design
on
maintenance of
SMEs 2 days
before
the
schedule
115-129% of the
training sessions
conducted 5 days
ahead of schedule
Prepared training
design
on
maintenance of
SMEs
on
schedule
Prepared training
design
on
maintenance of
SMEs 1-2 days
after schedule
Prepared training
design
on
maintenance
of
SMEs more than 2
days after schedule
100-114% of the
training sessions
conducted
on
schedule
51-99% of the
training sessions
conducted
1-5
days more than
the schedule
100-114% of the
qualilty assurance
activities
supervised
on
schedule
100-114% of the
qualilty assurance
activities
supervised
on
schedule
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Revision Code
16
Effectivity Date
Operator of various Computer Numerical Controlled Machines, such as the Universal Milling Drilling Machine, etc. and performs other related duties as may be
assigned from time to time.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Completion of two years studies in college relevant to the job (Mechanical Technology)
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Objectives
Performance
Assessment
CNC Milling
Machine
Maintenance
Learning
Resources
Research and
Development
per schedule
Recommended
specifications
and
fabication
processes for planned number of prototype
SMEs
as per schedule
Fabricated the planned number of
prototype SMEs as
per scedule
Technical
Assistance
Quality
Assurance
Training
of
the
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Submitted Individual Performance Submitted IPT more Submitted IPT 2 days Submitted IPT on the Submitted IPT 1-2 Submitted IPT more
than 3 days after
Target (IPT) by the 21st
than 3 days before
before the
21st
21st calendar day of
days after the 21st
the 21st calendar
calendar day of January
the 21st calendar day
calendar day
of
January
calendar day of
day of January
of January
January
January
Submitted Annual Maintenance Submitted
schedule Submitted
schedule Submitted schedule on Submitted schedule 1- Submitted schedule
more than 3 days
Schedule of equipment on the
more than 3 days
more than 2 days
the 21st calendar
2 days after the
after
the 21st
21st calendar day of January
before
the 21st
before
the 21st
day of January
21st calendar day
calendar day of
calendar day
of
calendar day
of
of January
January
January
January
Conducted weekly maintenance of
130% of equipment
115-129% of equipment 100-114% of equipment 51-99% of equipment 50% and below of
the equipment and submit report
maintained and report
equipment
maintained and report
maintained
and
maintained
and
by 2nd day of the succeeding
submitted on
maintained
and
submitted
on
report submitted on
report submitted on
week
schedule
report submitted
schedule
schedule
schedule
on schedule
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
115-129% of on-site
training of teachers
conducted
100-114% of on-site
training of teachers
conducted
51-99% of on-site
training of teachers
conducted
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Revision Code
16
Effectivity Date
Prepares a detailed engineering design and working drawing of science and math equipment developed by the Research and Development Division as the basis
for the production of prototype
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Bachelors Degree - Engineering (Mechanical)
4 years of relevant experience
Eligibility
Trainings
Performance
Assessment
Objectives
Documents and
Design Filing System
Learning Resources
Objectives
Research and
Development
Technical Assistance
Quality Assurance
Objectives
Training
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Submitted Individual
Performance Target by the
21st calendar day of
January.
Submitted IPT 2
days before the
21st calendar day
of January
Maintained an effective
filing system (hard and
soft copy) for all SME
design specifications and
graphics
for
easy
accessibility and retrieval
Maintained an effective
filing system (hard and
soft copy) for SME project
documents
130% of graphics
and specification
files maintained
115-129%
of
graphics
and
specification files
maintained
100-114%
graphics
specification
maintained
130% of SME
project document
files maintained
115-129% of SME
project document
files maintained
100-114% of SME
project document
files maintained
Submitted IPT on
of
and
files
Submitted
IPT
more than 3 days
after the 21st
calendar day of
January
of
and
files
51-99% of SME
project document
files maintained
51-99%
graphics
specification
maintained
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
provided 130% of
graphic
design/illustration
for
Maintenance
Manual
provided
115-
129% of graphic
design/illustrations
for Maintenance
Manual
provided 100-114%
of
graphic
design/illustration
for
Maintenance
Manual
provided 51-99%
of
graphic
design/illustration
for Maintenance
Manual
Developed Maintenance
Manual for the planned
number of SMEs per
schedule set
Prepared designs for the
planned standard SMEs
prototype per schedule
Provided
technical
assistance on the planned
repair and maintenance
activities of SMEs in the
public schools as per
schedule
Provided
technical
assistance to the private
manufacturer to mass
produce
the
SMEs
developed by NSTIC as
per schedule set in the
130%
of
Maintenance
Manual developed
115-129%
of
Maintenance
Manual developed
100-114%
of
Maintenance
Manual developed
51-99%
of
Maintenance
Manual developed
130% of designs
was prepared
of
was
130%
technical
assistance
was
provided
100-114%
of
designs
was
prepared
100-114% technical
assistance
was
provided
51-99% of designs
was prepared
115-129%
designs
prepared
115-129%
technical
assistance
provided
100-114% technical
assistance
was
provided
51-99% technical
assistance
was
provided
130%
technical
assistance
was
provided
115-129%
technical
assistance
provided
was
was
51-99% technical
assistance
was
provided
provided 50%
and below of
graphic
design/illustrati
on
for
Maintenance
Manual
50% and below
of Maintenance
Manual
developed
50% and below
of designs was
prepared
50% and below
technical
assistance was
provided
Performance
Objectives
contract
Conducted evaluation of
sample SMEs prior to
awarding as per schedule
set
Conducted pre-delivery
inspection of procured
SMEs as per schedule
set.
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
130% of sample
SMEs evaluated
115-129%
sample
evaluated
130% pre-delivery
inspection
of
procured
SMEs
conducted
of
SMEs
of
SMEs
51-99% of sample
SMEs evaluated
115-129%
pre-
delivery inspection
of procured SMEs
conducted
100-114%
pre-
delivery inspection
of procured SMEs
conducted
51-99%
pre-
delivery inspection
of procured SMEs
conducted
100-114%
sample
evaluated
Conducted pre-delivery
inspection
of
mass
produce SMEs as per
schedule set.
130% pre-delivery
inspection of mass
produced
SMEs
conducted
115-129%
pre-
delivery inspection
of mass produced
SMEs conducted
100-114%
pre-
delivery inspection
of mass produced
SMEs conducted
51-99%
pre-
delivery inspection
of mass produced
SMEs conducted
Conducted training of
teachers on the Use and
Care and Improvizations
of SMEs as per schedule
set
130% of training of
teachers
was
conducted
115-129%
training
teachers
conducted
of
of
was
100-114%
of
training of teachers
was conducted
51-99% of training
of teachers was
conducted
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Revision Code
16
Effectivity Date
Performs quality control inspection of all items/assemblies already completed or still in process both in the Center or to any outside manufacturer or from
local procurement seeing to it that all products processed should meet the specified ISO quality standards.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Bachelors Degree relevant to the job
4 years of relevant experience
Career Service Professional
24 hours of relevant training
Objectives
Performance Assessment
Technical Assistance
Quality Assurance
Training
Objectives
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Individual
work
performance target
submitted within10
days
130% complete
Individual
work
performance
target submitted
within 15 days
115-129%
complete
Individual
work
performance
target submitted
within 21 days
100-114%
complete
Individual
work
performance
target submitted
within 30 days
51-99% complete
Individual work
performance
target submitted
within 35 days
50% and below
complete
130% of precision
measuring
tools
and
equipment
maintained
115-129%
of
precision
measuring tools
and
equipment
maintained
115-129%
assistance
provided
100-114%
of
precision
measuring tools
and
equipment
maintained
100-114%
assistance
provided
51-99%
of
precision
measuring tools
and
equipment
maintained
51-99%
assistance
provided
51-99% technical
assistance
provided
of
51-99% of quality
130% assistance
provided
130%
technical
assistance
provided
130%
of
quality
115-129%
technical
assistance
provided
115-129%
of
100-114%
technical
assistance
provided
100-114%
Performance
Objectives
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
assurance activities
conducted
quality assurance
activities
conducted
quality assurance
activities
conducted
assurance
activities
conducted
of
quality
assurance
activities
conducted
130% of quality
assurance activities
conducted
115-129%
of
quality assurance
activities
conducted
100-114%
of
quality assurance
activities
conducted
51-99% of quality
assurance
activities
conducted
130% of training
sessions
conducted
115-129%
of
training sessions
conducted
100-114%
of
training sessions
conducted
51-99% of training
sessions
conducted
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Indicators
Salary Grade
Effectivity Date
Revision Code
16
JOB SUMMARY
Handles all the designing and application of the electronic circuits in the prototype of science equipment. Makes a study of the most economical,
appropriate and locally available materials, processes and technology for the science equipment production.
CSC Prescribed
Education
Experience
Eligibility
Trainings
B Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Bachelors Degree-Engineering (Electronics)
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
1
2
Makes a study of the most economical, appropriate and locally available materials, processes and technology for the science equipment production.
Acts as quality control for electronic installation in the science equipment production.
Handles the maintenance of all electronic appliances in the Center such as computers, photocopier, etc.
Confers with superior on matters as unusual problems related to operation which needs his immediate attention.
Is responsible for equipment and materials which are part of the electronic workshop.
Objectives
Performance
Assessment
Maintenance of
Facilities
Submitted
Annual
Maintenance
Schedule of equipment on the 21st
calendar day of January in coordination
with the Electrical Maintenance
Learning Resources
Drafted/updated
Manual as
per schedule
SME
Maintenance
Research and
Development
Technical Assistrance
Objectives
Quality Assurance
Training
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Individual
work
performance target
submitted within10
days
130% of weekly
maintenance
of
equipment
conducted
130%
of
Individual
work
performance
target submitted
within 15 days
115-129%
of
weekly
maintenance of
equipment
conducted
115-129%
of
Individual
work
performance
target submitted
within 21 days
100-114%
of
weekly
maintenance of
equipment
conducted
100-114%
of
Individual
work
performance
target submitted
within 30 days
51-99% of weekly
maintenance of
equipment
conducted
51-99%
of
Individual work
performance
target submitted
within 35 days
50% and below
of
weekly
maintenance of
equipment
conducted
50% and below
Performance
Objectives
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
specifications
of
SMEs
reviewed
and recommended
130% of SME
Maintenance
Manual
drafted/updated
Indicators
specifications of
SMEs reviewed
and
recommended
115-129% of SME
Maintenance
Manual
drafted/updated
specifications of
SMEs reviewed
and
recommended
100-114% of SME
Maintenance
Manual
drafted/updated
specifications of
SMEs reviewed
and
recommended
51-99% of SME
Maintenance
Manual
drafted/updated
130% of circuit
designs prepared
115-129%
of
circuit
designs
prepared
100-114%
of
circuit
designs
prepared
51-99% of circuit
designs prepared
130% of designs of
improvised SMEs
prepared
130%
technical
assistance
provided
115-129%
of
designs
of
improvised SMEs
prepared
115-129%
technical
assistance
provided
115-129%
technical
assistance
provided
100-114%
of
designs
of
improvised SMEs
prepared
100-114%
technical
assistance
provided
100-114%
technical
assistance
provided
51-99%
of
designs
of
improvised SMEs
prepared
51-99% technical
assistance
provided
130%
technical
assistance
provided
130% evaluation of
115-129%
100-114%
51-99% technical
assistance
provided
51-99%
of specifications
of
SMEs
reviewed and
recommended
50% and below
of
SME
Maintenance
Manual
drafted/updated
50% and below
of
circuit
designs
prepared
50% and below
of designs of
improvised
SMEs prepared
50% and below
technical
assistance
provided
50% and below
technical
assistance
provided
50% and below
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
samples
conducted
was
130% pre-delivery
inspection
was
conducted
evaluation
of
samples
was
conducted
115-129%
pre-
delivery inspection
was conducted
evaluation
of
samples
was
conducted
100-114%
pre-
delivery inspection
was conducted
evaluation
of
samples
was
conducted
51-99%
pre-
delivery inspection
was conducted
130% pre-delivery
inspection
was
conducted
115-129%
pre-
delivery inspection
was conducted
100-114%
pre-
delivery inspection
was conducted
51-99%
pre-
delivery inspection
was conducted
130% training of
teachers
was
conducted
115-129% training
of teachers was
conducted
100-114% training
of teachers was
conducted
51-99% training of
teachers
was
conducted
evaluation
of
samples was
conducted
50% and below
pre-delivery
inspection was
conducted
50% and below
pre-delivery
inspection was
conducted
50% and below
training
of
teachers was
conducted
Revision Code
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
13
Effectivity Date
Handles fabrication of metal-based types of science and math equipment prototypes. Sets-up and performs the operation of the different types of
precision conventional equipment in the Metal Workshop such as the Lathe Machine, Universal Drilling and Milling Machine, Metal Bandsaw, etc., aimed
at attaining optimum production with utmost in efficiency, safety and quality.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
3 years of relevant experience in Machine Shop Operation
Career Service Sub-Professional
16 hours of relevant training
Qualifications
Completion of two years studies in college (Mechanical Technology) relevant to the job
3 years of relevant experience in Machine Shop Operations
Career Service Sub-Professional
16 hours of relevant training
2. Receives instructions from supervisor/foreman as to work assignment and prepares the equipment with its corresponding tools.
3. Studies drawings/sketches to ensure correct interpretation prior to execution and refers all problems encountered to his superior.
4. Mounts and sets-up workpiece to machine and determines appropriate jigs/fixtures to ensure rigid mounting in reference to the instructions of the
superior.
5. Performs housekeeping of the machine assigned and his respective work area.
6. Handles with extra care assigned machine/tools and reports to superior any defects/wear that may develop in the course of its operation.
7. Considers safety as a top priority in performing his assigned task by following all safety rules and regulations of the Center.
Objectives
Performance
Assessment
Lathe Machine
Maintenance
Research and
Development
Technical Assistance
Quality Assurance
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Individual
work
performance target
submitted within
10 days
130%
maintenance
of
Lathe
Machine
conducted
130% of planned
number of SME
protypes
fabricated
Individual
work
performance target
submitted within
15 days
115-129%
maintenance
of
Lathe
Machine
conducted
115-129%
of
planned number of
SME
protypes
fabricated
130%
technical
assistance
provided
115-129%
technical
assistance
provided
130%
quality
assurance
of
procured
SMEs
conducted
115-129% quality
assurance
of
procured
SMEs
conducted
Individual work
performance
target submitted
within 21 days
100-114%
maintenance of
Lathe Machine
conducted
100-114%
of
planned number
of SME protypes
fabricated
100-114%
technical
assistance
provided
100-114%
quality
assurance
of
procured SMEs
conducted
Individual work
performance
target submitted
within 30 days
51-99%
maintenance of
Lathe Machine
conducted
51-99%
of
planned number
of SME protypes
fabricated
51-99%
technical
assistance
provided
51-99% quality
assurance
of
procured SMEs
conducted
Individual work
performance
target submitted
within 35 days
50% and below
maintenance of
Lathe Machine
conducted
50% and below
of
planned
number of SME
protypes
fabricated
50% and below
technical
assistance
provided
50% and below
quality assurance
of procured SMEs
conducted
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Revision Code
13
Effectivity Date
Performs quality control inspection of all items/assemblies already completed or still in process both in the center or to any outside manufacturer wherein
there is a job intended or requested by the Center.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
3 years of relevant experience
Career Service Sub-Professional
16 hours of relevant training
Qualifications
Bachelors Degree-Engineering or Mechanical Technology
4 years of relevant experience as Quality Control in Machine Shop Operations
Career Service Sub-Professional
16 hours of relevant training
Objectives
Performance
Assessment
Precision Measuring
Tools and Equipment
Maintenance
Research and
Development
Technical Assistance
Quality Assurance
Outputs
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Individual work
performance
target submitted
within10 days
130%
maintenance of
measuring tools
and equipment
conducted
130% in-process
inspection
of
SME prototypes
Individual work
performance
target submitted
within 15 days
115-129%
maintenance of
measuring tools
and equipment
conducted
115-129%
in-
process
inspection
of
Individual work
performance
target submitted
within 21 days
100-114%
maintenance of
measuring tools
and equipment
conducted
100-114%
in-
process
inspection
of
Individual work
performance
target submitted
within 30 days
51-99%
maintenance of
measuring tools
and equipment
conducted
51-99%
in-
process
inspection
of
Individual work
performance
target submitted
within 35 days
50% and below
maintenance of
measuring tools
and equipment
conducted
50% and below
in-process
inspection
of
Performance
Objectives
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
conducted
130% technical
assistance
provided
130%
quality
assurance
activities
conducted
Position Title
Indicators
130%
quality
assurance
of
procured SMEs
conducted
SME prototypes
conducted
115-129%
technical
assistance
provided
115-129%
quality
assurance
actiivities
conducted
SME prototypes
conducted
100-114%
technical
assistance
provided
100-114%
quality
assurance
activities
conducted
SME prototypes
conducted
51-99%
technical
assistance
provided
51-99% quality
assurance
activities
conducted
SME prototypes
conducted
At least 50%
technical
assistance
provided
50% and below
quality assurance
activities
conducted
115-129%
quality
assurance
of
procured SMEs
conducted
100-114%
quality
assurance
of
procured SMEs
conducted
51-99% quality
assurance
of
procured SMEs
conducted
Salary Grade
Revision Code
11
Parenthetical Title
Office Unit
Reports to
Position Supervised
Effectivity Date
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
2 years of relevant experience
Career Service Sub-Professional
8 hours of relevant training
Qualifications
Completion of two years studies in college relevant to the job (Mechancial Technology)
4 years of relevant experience
Career Service Sub-Professional
8 hours of relevant training
Objectives
(MFOs)
(KRAs)
(KPIs)
Performance
Assessment
Learning Resource
Production
Research and
Development
Computer Software/
Hardware and
Webpage
Management
Performance
Objectives
and
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Individual
work
performance target
submitted within 10
days
130% of planned
number
of
graphics/illustration
s provided
Individual
work
performance
target submitted
within 15 days
115-129%
of
planned number
of
graphics/illustratio
Individual
work
performance
target submitted
within 21 days
100-114%
of
planned number
of
graphics/illustratio
Individual
work
performance
target submitted
within 30 days
51-99%
of
planned number
of
graphics/illustratio
Individual work
performance
target submitted
within 35 days
At least 50% of
planned number
of
graphics/illustrati
Assignment
Provided planned number of
standard prototype SME designs
130%
planned
number of standard
SME
designs
provided
130% maintenance
and updating of
webpage
conducted
ns provided
115-129%
planned number
of standard SME
designs provided
ns provided
100-114%
planned number
of standard SME
designs provided
ns provided
51-99% planned
number
of
standard
SME
designs provided
115-129%
maintenance and
updating
of
webpage
conducted
100-114%
maintenance and
updating
of
webpage
conducted
51-99%
maintenance and
updating
of
webpage
conducted
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Effectivity Date
ons provided
At least 50%
planned number
of standard SME
designs
provided
At least 50%
maintenance
and updating of
webpage
conducted
Revision Code
11
Handles all electrical instruments of the Center as well as the electrical design of science and math equipment prototypes.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
2 years of relevant experience
Career Service Sub-Professional
8 hours of relevant training
Qualifications
Completion of two years studies in college relevant to the job
4 years of relevant experience of equipment maintenance and trouble shooting
Career Service Sub-Professional
8 hours of relevant training
Objectives
Performance
Assessment
Maintenance of Building
and Facilities
Learning
Resource
Production
Research
Development
and
Technical Assistance
Objectives
Quality Assurance
Training
Performance
Objectives
Outstanding
(5)
Indicators
Very Satisfactory
(4)
Satisfactory
(3)
Unsatisfactory
(2)
Submitted
Individual
Performance Target by the 21st
calendar day of January.
Individual work
performance
target submitted
within 10 days
Individual work
performance
target submitted
within 15 days
Individual work
performance
target submitted
within 21 days
Individual work
performance
target submitted
within 30 days
130% of weekly
maintenance of
equipment
conducted
115-129%
of
weekly
maintenance of
equipment
conducted
100-114%
of
weekly
maintenance of
equipment
conducted
51-99%
of
weekly
maintenance of
equipment
conducted
Poor
(1)
Individual work
performance
target
submitted
within 35 days
50%
and
below
of
weekly
maintenance
of equipment
conducted
Performance
Objectives
Outstanding
(5)
Indicators
Very Satisfactory
Satisfactory
(4)
Unsatisfactory
(3)
Poor
(2)
(1)
130% of planned
number
of
specifications of
SME reviewed
115-129%
of
planned number
of specifications
of SME reviewed
100-114%
of
planned number
of specifications
of SME reviewed
51-99%
of
planned number
of specifications
of SME reviewed
Drafted/
Updated
planned
number of SMEs Maintenance
Manual) as per schedule set in
the Individual Work assignment
130% of planned
number of SMEs
drafted
and
updated
115-129%
of
planned number
of SMEs drafted
and updated
100-114%
of
planned number
of SMEs drafted
and updated
51-99%
of
planned number
of SMEs drafted
and updated
130%
of
specifications for
planned number
of
SME
recommended
115-129%
of
planned number
of SMEs drafted
and updated
100-114%
of
planned number
of SMEs drafted
and updated
51-99%
of
planned number
of SMEs drafted
and updated
130%
planned
number
of
standard
SME
fabricated
115-129%
planned number
of standard SME
fabricated
100-114%
planned number
of standard SME
fabricated
51-99% planned
number
of
standard SME
fabricated
130% assistance
115-129%
100-114%
51-99%
50%
and
below
of
planned
number
of
specifications
of
SME
reviewed
50%
and
below
of
planned
number
of
SMEs drafted
and updated
50%
and
below
of
planned
number
of
SMEs drafted
and updated
50%
and
below
planned
number
of
standard SME
fabricated
50%
and
Performance
Objectives
Outstanding
Very Satisfactory
(5)
(4)
provided
130% of
delivery
inspection
conducted
Indicators
115-129%
pre-delivery
inspection
conducted
Unsatisfactory
(3)
assistance
provided
pre-
Satisfactory
(2)
assistance
provided
of
100-114%
pre-delivery
inspection
conducted
assistance
provided
of
51-99% of pre-
delivery
inspection
conducted
Poor
(1)
below
assistance
provided
50%
and
below of predelivery
inspection
conducted
Conducted on-site training on the Outstanding training Very
satisfactory Satisfactory training Unsatisfactory
Poor
training
Use and Care and Improvizations evaluation
by training evaluation evaluation
by training evaluation evaluation
by
ofSMEs.
participants
by participants
participants
by participants
participants
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Revision Code
Effectivity Date
Handles the overall maintenance of all the mechanical equipment in NSTIC such as: Lathe Machines, Universal Drilling and Milling Machine (CNC &
Conventional) Metal and Wood Bandsaw, Power Hacksaw Pedestal Drill, Air Compressor, Diesel Engine for 68 KVA Genset, etc.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Qualifications
Completion of two years studies in college
2 years of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Objectives
Learning
Resource
Production
Research
and
Development
Technical Assistance
Quality Assurance
Training
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Submitted
Individual
Performance Target by the 21st
calendar day of January.
Individual work
performance
target submitted
within 10 days
Individual work
performance
target submitted
within 15days
Individual work
performance
target submitted
within 21 days
Individual work
performance
target submitted
within 30 days
130% of weekly
maintenance of
equipment
conducted
115-129%
of
weekly
maintenance of
equipment
conducted
100-114%
of
weekly
maintenance of
equipment
conducted
51-99%
of
weekly
maintenance of
equipment
conducted
130% of planned
115-129%
of
100-114%
of
51-99%
of
Individual work
performance
target
submitted
within 35 days
50%
and
below
of
weekly
maintenance
of equipment
conducted
50%
and
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
number of specifications of
Science and Math Equipment as
per schedule set in the Individual
Work Assignment
number
of
specifications of
SMEs reviewed
planned number
of specifications
of
SMEs
reviewed
planned number
of specifications
of
SMEs
reviewed
planned number
of specifications
of
SMEs
reviewed
130% of planned
number
of
standard
and
improvised SMEs
fabricated
115-129%
of
planned number
of standard and
improvised
SMEs fabricated
100-114%
of
planned number
of standard and
improvised
SMEs fabricated
51-99%
of
planned number
of standard and
improvised
SMEs fabricated
130%% technical
assistance
provided
115-129%
technical
assistance
provided
130% of planned
number
of
prototype SMEs
inspected
115-129%
of
planned number
of
prototype
SMEs inspected
100-114%
technical
assistance
provided
100-114%
of
planned number
of
prototype
SMEs inspected
51-99%
technical
assistance
provided
51-99%
of
planned number
of
prototype
SMEs inspected
below
of
planned
number
of
specifications
of
SMEs
reviewed
50%
and
below
of
planned
number
of
standard and
improvised
SMEs
fabricated
50%
and
below
technical
assistance
provided
50%
and
below
of
planned
number
of
prototype
SMEs
Performance
Objectives
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Outstanding
training
evaluation
participants
by
Very satisfactory
training
evaluation
by
participants
Position Title
Parenthetical Title
Office Unit
Reports to
Indicators
Satisfactory
training
evaluation
participants
by
Unsatisfactory
training
evaluation
by
the participants
Salary Grade
Effectivity Date
inspected
Poor training
evaluation by
the
participants
Revision Code
Position Supervised
None
JOB SUMMARY
C. CSC Prescribed
Education
Experience
Eligibility
Trainings
D. Preferred
Education
Experience
Eligibility
Trainings
1.
2.
3.
4.
5.
QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Performance
Assessment
Learning
Resource
Objectives
Production
Research
and
Development
Technical Assistance
Training
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Submitted
Individual
Performance Target by the 21st
calendar day of January.
Assisted in
the conduct of
teachers training on repair and
maintenance
Fabricated planned number of
prototype SMEs
Individual work
performance
target submitted
within 10 days
130% assistance
provided
130%planned
number
of
prototype SMEs
fabricated
130% assistance
provided
130%
maintenance and
inventory
of
equipment
conducted
130% of planned
number
of
prototype SMEs
inspected
Outstanding
training
evaluation
by
participants
Individual work
performance
target submitted
within 15 days
115-129%
assistance
provided of
115-129%
planned number
of
prototype
SMEs fabricated
115-129%
assistance
provided
115-129%
maintenance
and inventory of
equipment
conducted
115-129%
of
planned number
of
prototype
SMEs inspected
Very satisfactory
training
evaluation
by
participants
Individual work
performance
target submitted
within 21 days
100-114%
assistance
provided
100-114%
planned number
of
prototype
SMEs fabricated
100-114%
assistance
provided
100-114%
maintenance
and inventory of
equipment
conducted
100-114%
of
planned number
of
prototype
SMEs inspected
Satisfactory
training
evaluation
by
participants
Individual work
performance
target submitted
within 30 days
51-99%
assistance
provided
51-99% planned
number
of
prototype SMEs
fabricated
51-99%
assistance
provided
51-99%
maintenance
and inventory of
equipment
conducted
51-99%
of
planned number
of
prototype
SMEs inspected
Unsatisfactory
training
evaluation
by
the participants
Individual work
performance
target submitted
within 35days
50% and below
assistance
provided
50% and below
planned number
of
prototype
SMEs fabricated
50% and below
assistance
provided
50% and below
maintenance and
inventory
of
equipment
conducted
50% and below of
planned number
of
prototype
SMEs inspected
Poor
training
evaluation by the
participants
Revision Code
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Effectivity Date
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Performance
Assessment
Computer
Software/Hardwaere
and
Webpage
Management
Learning
Resource
Production
Objectives
Developed
planned
number
of
maintenance manual for SMEs
Fabricated plannednumber of prototypes
for planned and improvised SMEs
Provided technical assistance on the
planned repair and maintenance of SME
actitivies in the public schools
Conducted pre-delivery inpections of
planned number of prototype SMEs
Conducted on-site training on the use
and care and improvisation of SMEs
Research
and
Development
Technical Assistance
Quality Assurance
Training
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Submitted
Individual
Performance Target by the 21st
calendar day of January.
Individual work
performance
target submitted
within 10 days
Individual work
performance
target submitted
within 15 days
130% of the
Centers
webpage updated
115-129%
Centers
webpage
updated
130% of planned
number
of
graphic designs
provided
115-129%
of
planned number
of
graphic
designs provided
100-114%
of
planned number
of
graphic
designs
provided
51-99%
of
planned number
of
graphic
designs
provided
130%
planned
number
of
maintenance
manual
developed
115-129%
planned number
of maintenance
manual
developed
100-114%
planned number
of maintenance
manual
developed
51-99% planned
number
of
maintenance
manual
developed
of
Individual work
performance
target submitted
within 21days
100-114%
Centers
webpage
updated
of
Individual work
performance
target submitted
within 30 days
51-99%
Centers
webpage
updated
of
Individual work
performance
target
submitted
within 35 days
50%
and
below
of
Centers
webpage
updated
50%
and
below
of
planned
number
of
graphic
designs
provided
50%
and
below
planned
number
of
maintenance
manual
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Fabricated plannednumber of
prototypes for planned and
improvised SMEs
130%
maintenance and
updating
of
webpage
conducted
115-129%
maintenance
and updating of
webpage
conducted
130% assistance
provided
115-129%
assistance
provided
130% of planned
number
of
prototype SMEs
inspected
115-129%
of
planned number
of
prototype
SMEs inspected
100-114%
of
planned number
of
prototype
SMEs inspected
51-99%
of
planned number
of
prototype
SMEs inspected
Outstanding
training
evaluation
participants
Very satisfactory
training
evaluation
by
participants
Satisfactory
training
evaluation
participants
Unsatisfactory
training
evaluation
by
the participants
by
100-114%
maintenance
and updating of
webpage
conducted
100-114%
assistance
provided
by
51-99%
maintenance
and updating of
webpage
conducted
51-99%
assistance
provided
developed
50%
and
below
maintenance
and updating
of webpage
conducted
50%
and
below
assistance
provided
50%
and
below
of
planned
number
of
prototype
SMEs
inspected
Poor training
evaluation by
the
participants
Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised
Salary Grade
Effectivity Date
Revision Code
1. Performs layouting, filling, grinding and other finishing work while assembling the science equipment prototypes
2. Prepares the jibs and fixtures needed in the metal workshop.
3. Operates the following equipment as the need arises:
3.1 Power Hacksaw
3.2 Metal and Wood Bandsaw
3.3 Pedestal Drill
3.4 Gas Welding
3.5 Arc Welding (Tig & Stick)
4. Consider safety as a top priority in performing assigned task by following all safety rules and regulations of the Center,
Objectives
Performance
Assessment
Milling
Machine
Maintenance
Learning
Resource
Production
Research
and
Development
Technical Assistance
Quality Assurance
Training
Performance
Objectives
Submitted
Individual
Performance Target by the 21st
calendar day of January.
Conducted maintenance
equipment on a daily basis
of
Assisted in
the conduct of
teachers training on repair and
maintenance
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
Individual work
performance
target submitted
within 21 days
Individual work
performance
target submitted
within 40 days
Individual work
performance
target submitted
within 60 days
Individual work
performance
target submitted
within 80 days
115-129%
maintenance of
equipment
conducted
100-114%
maintenance of
equipment
conducted
51-99%
maintenance of
equipment
conducted
130%
maintenance
equipment
conducted
of
130% assistance
provided
115-129%
assistance
provided of
100-114%
assistance
provided
51-99%
assistance
provided
Individual work
performance
target
submitted
within
100
days
50%
and
below
maintenance
of equipment
conducted
50%
and
below
assistance
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
provided
130% of planned
number
of
prototypes
standard
and
improvised SMEs
fabricated
115-129%
of
planned number
of
prototypes
standard
and
improvised
SMEs fabricated
130% assistance
provided
115-129%
assistance
provided
130% of planned
number
of
prototype SMEs
inspected
115-129%
of
planned number
of
prototype
SMEs inspected
100-114%
of
planned number
of
prototype
SMEs inspected
51-99%
of
planned number
of
prototype
SMEs inspected
Outstanding
training
evaluation
Very satisfactory
training
evaluation
by
Satisfactory
training
evaluation
Unsatisfactory
training
evaluation
by
by
100-114%
of
planned number
of
prototypes
standard
and
improvised
SMEs fabricated
100-114%
assistance
provided
by
51-99%
of
planned number
of
prototypes
standard
and
improvised
SMEs fabricated
51-99%
assistance
provided
50%
and
below
of
planned
number
of
prototypes
standard and
improvised
SMEs
fabricated
50%
and
below
assistance
provided
50%
and
below
of
planned
number
of
prototype
SMEs
inspected
Poor training
evaluation by
the
Performance
Objectives
Indicators
Outstanding
Very Satisfactory
Satisfactory
Unsatisfactory
Poor
(5)
(4)
(3)
(2)
(1)
the participants
participants
participants
participants
participants