This document outlines the position, qualifications, duties and responsibilities, and performance objectives for an Engineer III who will serve as the Head of Production Division at the DepEd - NSTIC (National Science Teaching Instrumentation Center). The Engineer III will supervise all production employees to ensure jobs are completed efficiently and safely. Key duties include ensuring proper procedures are followed, reviewing designs, coordinating with other departments, and monitoring employee performance. Qualifications for the role include a bachelor's degree in engineering, 2 years of relevant experience, and required trainings. Preferred qualifications are a master's degree and 4 years of supervisory experience. Performance objectives cover areas like personnel development, production and maintenance, research and

Uploaded by

jay jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

Science Research Technicians

This document outlines the position, qualifications, duties and responsibilities, and performance objectives for an Engineer III who will serve as the Head of Production Division at the DepEd - NSTIC (National Science Teaching Instrumentation Center). The Engineer III will supervise all production employees to ensure jobs are completed efficiently and safely. Key duties include ensuring proper procedures are followed, reviewing designs, coordinating with other departments, and monitoring employee performance. Qualifications for the role include a bachelor's degree in engineering, 2 years of relevant experience, and required trainings. Preferred qualifications are a master's degree and 4 years of supervisory experience. Performance objectives cover areas like personnel development, production and maintenance, research and

Uploaded by

jay jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 64

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

ENGINEER III
Head of Production Division, DepED - NSTIC
DepED National Science Teaching Instrumentation Center
Director III
All Production Employees
JOB SUMMARY

PCP no. ____

Salary Grade

Revision Code

19

Effectivity Date

Supervises, provides specific/detailed instructions necessary resources, performance standards, safety rules and standard procedures to ensure
completion of jobs as scheduled with utmost efficiency and safety for men and equipment in the Production Division.

A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Bachelors degree in Engineering relevant to the job
2 years of relevant experience
RA 1080
8 hours of relevant training
Qualifications
Masters Degree units relevant to the job
4 years of relevant experience with supervisory functions
RA 1080
24 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Ensures that proper procedures are being followed by all Technicians in the workshop in performing their respective duties, instruction correctly
implemented to safeguard both men and machine.
2. Reviews drawings, plans or samples of science equipment to be fabricated as prototype and determines the nature of work to be done. Prepares
workloads to different machines with estimated manhours to process the work.
3. Confers with superior on matters as unusual problems related to operation which needs immediate attention.
4. Coordinates with Senior Science Equipment Designer and the Senior Science Research Specialist on matters of mutual concern.
5. Acts as Safety Engineer of the Center and conducts routinary safety inspection of assigned areas; prepares and submits weekly & monthly safety
inspections and loss control reports to the Technical Director.
6. Prepares/submits daily and monthly production reports with regards to the accomplishment of his area of responsibility to the Technical Director.
7. Monitors the efficiency of direct reports and recommends to the Technical Director, who among them deserve increases, promotions, change in status
and/or disciplinary actions such as warnings, suspension, and even termination.
8. Initiates the concept of quality control in process.
9. Prepares a preventive maintenance schedule for all equipment of the Center including the facilities such as airconditioning units, generator sets, etc.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Outputs

Personnel Development

Recommended within ninety (90)


calendar days of the current year, 4
Production Staff for training

4 Production Staff
trained

Performance Management and


Assessment

Submitted Individual Performance Target


for Production Division to be submitted on
the 3rd week of January.

Individual
Performance Report

Production and Maintenance


Supplies

Reviewed Annual Maintenance Schedule


of equipment on the 4th week of January

Maintenance
Schedule updated

Managed the conduct of Weekly


maintenance of the NSTIC tool,
equipment and facilities

Well- maintainedt
tools, equipment anf
facilities

Prepared procurement plan to be


submitted on the 3rd week of January.

APP/PPMP

Conducted annual updates on the


speciffications of assigned Science and
Math Equipment (SMEs) identified for
procurement, by the end of 1st quarter of
the current year

Updated specs of
assigned SMEs

Developed Maintenance Manual for every


procured SME and prototype equipment
as per schedule set

Maintenance
manual of procured
SME/prototype set

Conducted coordination meeting with


Research and Development Division on

Fabricated prototype
SME

Learning Resources

Research and Development

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives
SMEs to be prototyped as per schedule
set in the Individual Work assignment

Technical Assistance

Supervised design of planned number of


prototype SMEs within the alloted time

Supervised fabrication of planned number


of prototype SMEs within the alloted time

Assisted private manufacturers in the


mass production of NSTIC developed
SMEs as per schedule set

Provided technical assistance on the


planned Repair and Maintence of SMEs
activities in the public schools as per
schedule set

Supervised the conduct of Quality


Assurance for Center operation to include
SMEs prototypes, procurement of
supplies and materials,repair and
maintenance of building, facilities and
vehicle within the alloted time

Supervised the conduct of Quality


Assurance of prucured SMEs to include
sample evaluation before contracting for
market items,sample evaluation after
contracting for mass produce items and
pre-delivery inspection within the alloted
time

Prepared training design on maintenance


of SMEs

Quality Assurance

Training

Outputs

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Performance
Objectives

Recommended within ninety (90)


calendar days of the current year, 4
Production Staff for training

Submitted Individual Performance Target


(IPT) for Production Division to be
submitted on the 3rd week of January.
Managed the conduct of Weekly
maintenance of the NSTIC tool,
equipment and facilities

Outputs

Conducted training session as per training


design and schedule approved by the
NSTIC Director

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Recommended 4
production staff for
training within 70
days of current
year
Submitted IPT on
or before the 2nd
week of January
Managed
the
conduct of weekly
maintenance
of
100% of the NSTIC
tool... more than 1
day
before

Recommended 4
production staff
for training within
71-80 days of
current year
Submitted IPT on
the 2nd week of
January
Managed
the
conduct of weekly
maintenance of
100% of the
NSTIC tool... a
day
before

Recommended 4
production staff
for training within
81-90 days of
current year
Submitted IPT on
the 3rd week of
January
Managed
the
conduct of weekly
maintenance of
100% of the
NSTIC tool... on
schedule

Recommended 4
production staff
for training within
91-110 days of
current year
Submitted IPT on
the 4th week of
January
Managed
the
conduct of weekly
maintenance of
100% of the
NSTIC tool... 1
day after schedule

Recommended 4
production staff for
training
after
111days of current
year
Submitted IPT after
4th
week
of
January
Managed
the
conduct of weekly
maintenance
of
100% of the NSTIC
tool... more than 1
day schedule

Performance
Objectives

Prepared procurement plan to be


submitted on the 3rd week of January

Conducted annual updates on the


specifications of assigned Science and
Math Equipment (SMEs) identified for
procurement, by the end of 1st quarter of
the current year

Supervised design of planned number of


prototype SMEs within the alloted time

Supervised fabrication of planned number


of prototype SMEs within the alloted time

Assisted private manufacturers in the


mass production of NSTIC developed
SMEs as per schedule set

Provided technical assistance on the


planned Repair and Maintence of SMEs

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

schedule
Submitted

prepared
procurement plan
before the 2nd
week of January
updated 100% of
the specifications
of assigned SMEs
more than 5 days
before the end of
the 1st quarter
130% of designs
supervised more
than 2 days of the
alloted time
130%
of
fabrications
supervised more
than 2 days of the
alloted time
Provided

assistance to 130%
of the private
manufacturers
more than 2 days
before
the
schedule
Provided technical
assistance on the

schedule
Submitted
prepared
procurement plan
on 2nd week of
January
updated 100% of
the specifications
of assigned SMEs
5 days before the
end of the 1st
quarter
115-129%
of
designs
supervised within
2 days before the
alloted time
115-129%
of
fabrications
supervised within
2 days before the
alloted time
Provided
assistance to 115129% of the
private
manufacturers 2
days before the
schedule
Provided technical
assistance on the

Submitted

prepared
procurement plan
on the 3rd week of
January
updated 100% of
the specifications
of assigned SMEs
by the end of the
1st quarter

100-114%
of
designs
supervised within
the alloted time

100-114%

fabrications
supervised within
the alloted time

Provided

assistance to 100114% of the


private
manufacturers on
schedule

Submitted
prepared
procurement plan
on the 4th week of
January
updated 100% of
the specifications
of assigned SMEs
1-5 days after the
end of the 1st
quarter
51-99%
of
designs
supervised
1-2
days after
the
alloted time
51-99%
fabrications
supervised
1-2
days after
the
alloted time
Provided
assistance to 5199% of the private
manufacturers 1-2
days
after
schedule

Provided technical
assistance on the

Submitted
prepared
procurement plan
after 4th week of
January
updated 100% of
the specifications
of assigned SMEs
more than 5 days
after the end of the
1st quarter
50% of designs
supervised more
than 2 days after
the alloted time

50% of fabrications
supervised more
than 2 days after
the alloted time

Provided
assistance to 50%
of the private
manufacturers
more than 2 days
after schedule

Provided technical
assistance on the

Provided technical
assistance on the

Performance
Objectives

activities in the public schools as per


schedule set

Supervised the conduct of Quality


Assurance for Center operation to include
SMEs prototypes,
procurement of
supplies and materials,repair and
maintenance of building, facilities and
vehicle within the alloted time
Supervised the conduct of Quality
Assurance of procured SMEs to include
sample evaluation before contracting for
market items,sample evaluation after
contracting for mass produce items and
pre-delivery inspection within the alloted
time
Prepared training design on maintenance
of SMEs

Conducted training session as per training


design and schedule approved by the
NSTIC Director

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

planned Repair and


Maintence of SMEs
activities in 130%
of
the
public
schools more than
2 days before the
schedule
130% of the qualilty
assurance activities
supervised more
than 2 days before
the schedule
130% of the qualilty
assurance activities
supervised more
than 2 days before
the schedule
Prepared training
design
on
maintenance
of
SMEs more than 2
days before the
schedule
130%
of
the
training sessions
conducted
more
than 5 days ahead
of schedule

planned Repair
and Maintence of
SMEs activities in
115-129% of the
public schools 2
days before the
schedule
115-129% of the
qualilty assurance
activities
supervised 2 days
before
the
schedule
115-129% of the
qualilty assurance
activities
supervised 2 days
before
the
schedule

planned Repair
and Maintence of
SMEs activities in
100-114% of the
public schools on
schedule

planned Repair
and Maintence of
SMEs activities in
51-99% of the
public schools 1-2
days
after
schedule
51-99% of the
qualilty assurance
activities
supervised
1-2
days
after
schedule
51-99% of the
qualilty assurance
activities
supervised
1-2
days
after
schedule

planned Repair and


Maintence of SMEs
activities in 50% of
the public schools
more than 2 days
after schedule

Prepared training
design
on
maintenance of
SMEs 2 days
before
the
schedule
115-129% of the
training sessions
conducted 5 days
ahead of schedule

Prepared training
design
on
maintenance of
SMEs
on
schedule

Prepared training
design
on
maintenance of
SMEs 1-2 days
after schedule

Prepared training
design
on
maintenance
of
SMEs more than 2
days after schedule

100-114% of the
training sessions
conducted
on
schedule

51-99% of the
training sessions
conducted
1-5
days more than
the schedule

50% of the training


sessions
conducted on 5
days or more of the
schedule

100-114% of the
qualilty assurance
activities
supervised
on
schedule
100-114% of the
qualilty assurance
activities
supervised
on
schedule

50% of the qualilty


assurance activities
supervised more
than 2 days after
schedule
50% of the qualilty
assurance activities
supervised more
than 2 days after
schedule

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN IV


CNC Machine Technician
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

PCP no. ____

Salary Grade

Revision Code

16

Effectivity Date

Operator of various Computer Numerical Controlled Machines, such as the Universal Milling Drilling Machine, etc. and performs other related duties as may be
assigned from time to time.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Completion of two years studies in college relevant to the job (Mechanical Technology)
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Sets-up, prepares computer programs and operates various Computer Numerical Controlled Machines, such as the Universal Milling Drilling Machine, etc.
Performs other related duties as may be assigned from time to time.
2. Received/interprets blueprints/drawings and sketches, materials and instructions from supervisor/foreman as to work assignments and prepares the machine and
its corresponding tools.
3. Studies drawing/sketches to ensure correct interpretation prior to work execution and refers all problems encountered to his superior.
4. Prepares appropriate computer program and selects the required tools for the specific operation.
5. Mounts and sets-up workpiece in the machine and determines appropriate jigs/fixtures to ensure correct/rigid mounting in reference to instructions/requirements of
the job as may be required.
6. Performs housekeeping of machine assigned and his respective work area.
7. Reports to his superior any defects/wear that may develop from his assigned machine in the course of its operation.
8. Must consider safety as a top priority in performing his assigned task by following all safety rules and regulations of the Center.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Key Performing Indicators


(KPIs)

Performance
Assessment

Submitted Individual Performance Target


by the 21st calendar day of January.

Individual Performance Target submitted by


the 21st calendar day of January

CNC Milling
Machine
Maintenance

Submitted Annual Maintenance Schedule


of equipment on the 21st calendar day of
January

Maintenance Schedule submitted by the


21st calendar day of January

Equipment well maintained and report


submitted by the 3rd day of the succeeding
week

Completed specifications 80-90 percent of


total quantities

Completed darft/update of 80-90 percent of


total quantities

Completed specifications and fabrication

Learning
Resources

Conducted weekly maintenance of the


equipment and submit report by 2nd day
of the succeeding week

Recommended specifications of Science


and Math
Equipment (SMEs) as per schedule

Drafted/updated SME Maintenance Manual


as

Research and
Development

per schedule

Recommended
specifications
and
fabication
processes for planned number of prototype
SMEs
as per schedule
Fabricated the planned number of
prototype SMEs as
per scedule

Technical
Assistance

Quality
Assurance

Training

-Assisted private manufacturers in the


mass production of NSTIC developed
SMEs
-Provide technical assistance on the
planned Repair and Maintence of SMEs
activities in the public schools
Conduct pre-delivery inspection of the
procured
(market items) SMEs as per schedule in
the
contract and submit report three (3) days
after travel
Conduct pre-delivery quality inspection on
planned
number of mass produced equipment as
per
schedule in the contract and submit report
three (3) days after travel
Conduct on-site training of teachers on the
Use
and Care and Improvizations of SMEs as
per
schedule set

process 80-90 percent of total quantities

Fabricated 80 to 90 percent of the planned


number of prototyped SMEs per schedule

Technology transfer completed as per


schedule in the contract and report
submitted
Technical assistance provided as per
schedule and submitted report indicating the
number of SMEs repaired

Conducted inspection on the procured


SMEs as per schedule and submitted report
two (2) days after travel

Conducted inspection on the mass


produced SMEs as per schedule and report
submitted report two (2) days after travel

Training Evaluation Rating


participants is satisfactory

of

the

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Submitted Individual Performance Submitted IPT more Submitted IPT 2 days Submitted IPT on the Submitted IPT 1-2 Submitted IPT more
than 3 days after
Target (IPT) by the 21st
than 3 days before
before the
21st
21st calendar day of
days after the 21st
the 21st calendar
calendar day of January
the 21st calendar day
calendar day
of
January
calendar day of
day of January
of January
January
January
Submitted Annual Maintenance Submitted
schedule Submitted
schedule Submitted schedule on Submitted schedule 1- Submitted schedule
more than 3 days
Schedule of equipment on the
more than 3 days
more than 2 days
the 21st calendar
2 days after the
after
the 21st
21st calendar day of January
before
the 21st
before
the 21st
day of January
21st calendar day
calendar day of
calendar day
of
calendar day
of
of January
January
January
January
Conducted weekly maintenance of
130% of equipment
115-129% of equipment 100-114% of equipment 51-99% of equipment 50% and below of
the equipment and submit report
maintained and report
equipment
maintained and report
maintained
and
maintained
and
by 2nd day of the succeeding
submitted on
maintained
and
submitted
on
report submitted on
report submitted on
week
schedule
report submitted
schedule
schedule
schedule
on schedule

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Recommended specifications of recommended 130% of recommended 115-129% recommended


Science and Math Equipment
specifications of
of specifications of
114%
(SMEs) as per schedule
SMEs
SMEs
specifications
SMEs

100- recommended 51-99% Recommended 50%


of
of specifications of
and below of
of
SMEs
specifications of
SMEs

Drafted/ updated SME Maintenance drafted/updated


SME drafted/updated
SME drafted/updated SME drafted/updated SME drafted/updated SME
Manual as per schedule
Maintenance Manual
Maintenance Manual
Maintenance Manual
Maintenance
Maintenance
1 week before the
3 days before the
on the schedule
Manual 1-2 days
Manual more than
schedule
schedule
after the schedule
2 days after the
schedule
Recommended specifications and recommended 130% of recommended 115-129% recommended
100- recommended 51-99% recommended 50%
fabication processes for planned
specifications
and
of specifications and
114%
of
of
specifications
and below
of
number of prototype SMEs
fabrication processes
fabrication processes
specifications and
and
fabrication
specifications and
fabrication
processes
fabrication
as per schedule
processes
processes
Fabricated the planned number of 130% of planned number 115-129% of planned 100-114% of planned 51-99% of planned 50% and below of
prototype SMEs as per scedule
of prototype SMEs
number of prototype
number of prototype
number
of
planned number of
fabricated
SMEs fabricated
SMEs fabricated
prototype
SMEs
prototype SMEs
fabricated
fabricated
Assisted private manufacturers in the provided assistance to provided assistance to provided assistance to provided assistance to provided assistance
mass production of NSTIC
to 50% and below
130% of the private
115-129% of the
100-114% of the
51-99% of the
developed SMEs
of the private
manufacturers
private manufacturers
private
private
manufacturers
manufacturers
manufacturers
Provided technical assistance on the 130%
technical 115-129%
technical 100-114%
technical 51-99%
technical 50% and below
planned Repair and Maintence of
assistance provided
assistance provided
assistance provided
assistance provided
technical
SMEs activities in the public
assistance
schools
provided

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Conducted pre-delivery inspection of conducted 130% pre- conducted


115-129% conducted 100-114% conducted
51-99% conducted 50% and
the procured (market items) SMEs
delivery inspection of
pre-delivery
pre-delivery
pre-delivery
below
preas per schedule in the contract
procured SMEs
inspection of procured
inspection
of
inspection
of
delivery inspection
and submit report three (3) days
SMEs
procured SMEs
procured SMEs
of procured SMEs
after travel
Conducted
pre-delivery
quality 130%
pre--delivery 115-129% pre--delivery 100-114% pre--delivery 51-99% pre--delivery 50% and below pre-inspection on planned number of
quality inspection on
quality inspection on
quality inspection on
quality inspection
delivery
quality
mass produced equipment as per
planned number of
planned number of
planned number of
on planned number
inspection
on
schedule in the contract and
mass
produced
mass
produced
mass
produced
of mass produced
planned number of
submit report three (3) days after
equipment conducted
equipment conducted
equipment
equipment
mass
produced
travel
conducted
conducted
equipment
conducted
Conducted on-site training of 130% of on-site training
teachers on the Use and Care and
of teachers
Improvizations of SMEs as per
conducted
schedule set

115-129% of on-site
training of teachers
conducted

100-114% of on-site
training of teachers
conducted

51-99% of on-site
training of teachers
conducted

50% and below of


on-site training of
teachers
conducted

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN IV


Senior Science Equipment Designer
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

PCP no. ____

Salary Grade

Revision Code

16

Effectivity Date

Prepares a detailed engineering design and working drawing of science and math equipment developed by the Research and Development Division as the basis
for the production of prototype
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Bachelors Degree - Engineering (Mechanical)
4 years of relevant experience

Eligibility
Trainings

Career Service Sub-Professional


24 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Prepares drawings and illustrations needed in the preparation of users manual and manual for experiments using science equipment to be developed by
the Center.
2. Integrates drawings and illustrations in the users manual and experiments manual in a format ready for printing.
3. Checks and validates test runs and final run of printed manuals to verify printers compliance to qualify standards and specifications set by the Center as
to graphics, illustrations and prints.
4. Makes a study of the most economical, appropriate and locally available materials, processes and technology for the equipment to be designed.
5. Verifies and checks if the prototypes produced are in accordance with the approved designed and working drawings.
6. Coordinates with the mass producers and regularly checks the mass production of science equipment to ensure that the design and working drawings
are followed.
7. Coordinates with the Workshop and Quality Control Engineer and Senior Science Research Specialist on matters of mutual concern.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Performance
Assessment

Objectives

Documents and
Design Filing System

Learning Resources

Submitted Individual Performance


Target by the 21st
calendar day of January.

Maintained an effective filing system


(hard and soft copy) for all SME
design specifications and graphics for
easy accessibility and retrieval

Maintained an effective filing system


(hard and soft copy) for SME project
documents

Provided graphic design/ illustrations

Key Performing Indicators


(KPIs)

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

for Maintenance Manual to planned


number of SMEs per schedule.

Recommended specifications for


SMEs per schedule

Developed Maintenance Manual for


the planned number of SMEs per
schedule set
Prepared designs for the planned
standard SMEs prototype per
schedule
Provided technical assistance on the
planned repair and maintenance
activities of SMEs in the public
schools as per schedule

Research and
Development

Technical Assistance

Quality Assurance

Provided technical assistance to the


private manufacturer to mass produce
the SMEs developed by NSTIC as per
schedule set in the contract

Conducted evaluation of sample SMEs


prior to awarding as per schedule set

Conducted pre-delivery inspection of


procured SMEs as per schedule set.

Key Performing Indicators


(KPIs)

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Training

Conducted pre-delivery inspection of


mass produce SMEs as per schedule set.
Conducted training of teachers on the
Use and
Care and Improvizations of SMEs as per
schedule set

Performance

Objectives

Key Performing Indicators


(KPIs)

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Submitted Individual
Performance Target by the
21st calendar day of
January.

Submitted IPT more


than 3 days before
the 21st calendar day
of January

Submitted IPT 2
days before the
21st calendar day
of January

Maintained an effective
filing system (hard and
soft copy) for all SME
design specifications and
graphics
for
easy
accessibility and retrieval
Maintained an effective
filing system (hard and
soft copy) for SME project
documents

130% of graphics
and specification
files maintained

115-129%
of
graphics
and
specification files
maintained

100-114%
graphics
specification
maintained

130% of SME
project document
files maintained

115-129% of SME
project document
files maintained

100-114% of SME
project document
files maintained

Submitted IPT on

the 21st calendar day


of January

of
and
files

Submitted IPT 1-2


days after the 21st
calendar day of
January

Submitted

IPT
more than 3 days
after the 21st
calendar day of
January

of
and
files

50% and below


of graphics and
specification
files maintained

51-99% of SME
project document
files maintained

50% and below


of SME project
document files
maintained

51-99%
graphics
specification
maintained

Performance

Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Provided graphic design/


illustrations
for
Maintenance Manual to
planned number of SMEs
per schedule.

provided 130% of
graphic
design/illustration
for
Maintenance
Manual

provided
115-
129% of graphic
design/illustrations
for Maintenance
Manual

provided 100-114%
of
graphic
design/illustration
for
Maintenance
Manual

provided 51-99%
of
graphic
design/illustration
for Maintenance
Manual

Developed Maintenance
Manual for the planned
number of SMEs per
schedule set
Prepared designs for the
planned standard SMEs
prototype per schedule
Provided
technical
assistance on the planned
repair and maintenance
activities of SMEs in the
public schools as per
schedule
Provided
technical
assistance to the private
manufacturer to mass
produce
the
SMEs
developed by NSTIC as
per schedule set in the

130%
of
Maintenance
Manual developed

115-129%
of
Maintenance
Manual developed

100-114%
of
Maintenance
Manual developed

51-99%
of
Maintenance
Manual developed

130% of designs
was prepared

of
was

130%
technical
assistance
was
provided

100-114%
of
designs
was
prepared
100-114% technical
assistance
was
provided

51-99% of designs
was prepared

115-129%
designs
prepared
115-129%
technical
assistance
provided

100-114% technical
assistance
was
provided

51-99% technical
assistance
was
provided

130%
technical
assistance
was
provided

115-129%
technical
assistance
provided

was

was

51-99% technical
assistance
was
provided

provided 50%
and below of
graphic
design/illustrati
on
for
Maintenance
Manual
50% and below
of Maintenance
Manual
developed
50% and below
of designs was
prepared
50% and below
technical
assistance was
provided

50% and below


technical
assistance was
provided

Performance

Objectives

contract
Conducted evaluation of
sample SMEs prior to
awarding as per schedule
set
Conducted pre-delivery
inspection of procured
SMEs as per schedule
set.

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

130% of sample
SMEs evaluated

115-129%
sample
evaluated

130% pre-delivery
inspection
of
procured
SMEs
conducted

of
SMEs

of
SMEs

51-99% of sample
SMEs evaluated

115-129%
pre-
delivery inspection
of procured SMEs
conducted

100-114%
pre-
delivery inspection
of procured SMEs
conducted

51-99%
pre-
delivery inspection
of procured SMEs
conducted

100-114%
sample
evaluated

Conducted pre-delivery
inspection
of
mass
produce SMEs as per
schedule set.

130% pre-delivery
inspection of mass
produced
SMEs
conducted

115-129%
pre-
delivery inspection
of mass produced
SMEs conducted

100-114%
pre-
delivery inspection
of mass produced
SMEs conducted

51-99%
pre-
delivery inspection
of mass produced
SMEs conducted

Conducted training of
teachers on the Use and
Care and Improvizations
of SMEs as per schedule
set

130% of training of
teachers
was
conducted

115-129%
training
teachers
conducted

of
of
was

100-114%
of
training of teachers
was conducted

51-99% of training
of teachers was
conducted

50% and below


of
sample
SMEs
evaluated
50% and below
pre-delivery
inspection of
procured SMEs
conducted
50% and below
pre-delivery
inspection of
mass produced
SMEs
conducted
50% and below
of training of
teachers was
conducted

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN IV


Senior Quality Control Technician
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

PCP no. ____

Salary Grade

Revision Code

16

Effectivity Date

Performs quality control inspection of all items/assemblies already completed or still in process both in the Center or to any outside manufacturer or from
local procurement seeing to it that all products processed should meet the specified ISO quality standards.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Bachelors Degree relevant to the job
4 years of relevant experience
Career Service Professional
24 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Performs quality control inspection of all items/assemblies already completed or still in process
2. Prepares quality inspection reports on all items being inspected.
3. Conducts periodic inspections on all parts or assembled science equipment being mass produced by qualified manufacturers.
4. Conducts inspection and evaluation on all raw materials, tools and equipment ordered by the Center.
5. Handles re-calibration of all precision measuring instruments to maintain the highest level of accuracy and sees to it that all measuring instruments used
in the Center are in good condition.
6. Handles parts measurements in the event that a drawing or sketch is needed to reproduce or repair a certain item.
7. Reviews all technical drawings or sketches prepared by the designers to ensure proper dimensioning that conforms with the ISO standard
8. Ensures that all precision measurements needed by the designers would come or be prepared by the Quality Control Technician.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Performance Assessment

Precision Measuring Tools and


Equipment Maintenance

Submitted Individual Performance Target


by the 21st calendar day of January.
Submitted Annual Maintenance Schedule
of equipment submitted to Engineer III on the
15th working days of the current year

Research and Development

Conducted maintenance of precesion


measuring tools and equipment as per
shedule

Conducted in-process inspection of SME


prototypes and discuss results with
concerned parties within 15 mins after
inspection

Key Performing Indicators


(KPIs)

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Technical Assistance

Quality Assurance

Training

Objectives

Assisted private manufacturers in the


mass production of NSTIC developed
SMEs as per schedule in the contract

Provided technical assistance on the


planned Repair and Maintence of SMEs
activities in the public schools as per
schedule set

Conducted Quality Assurance for Center


operation to include SME prototypes,
procurement of supplies and
materials,repair and maintenance of
building, facilities and vehicle within the
alloted time

Conducted of Quality Assurance of


procured SMEs to include sample
evaluation before contracting for market
items,sample evaluation after contracting
for mass produce items and pre-delivery
inspection within the alloted time
Conducted training session on
maintenance of SMEs as per training
design and schedule

Key Performing Indicators


(KPIs)

Performance
Objectives

Submitted Individual Performance


Target by the 21st calendar day of
January.

Submitted Annual Maintenance


Schedule of equipment submitted to
Engineer III on the 15th working
days of the current year
Conducted maintenance of precision
measuring tools and equipment as
per shedule

Assisted private manufacturers in


the mass production of NSTIC
developed SMEs as per schedule in
the contract
Provided technical assistance on the
planned Repair and Maintence of
SMEs activities in the public schools
as per schedule set
Conducted of Quality Assurance for

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Individual
work
performance target
submitted within10
days
130% complete

Individual
work
performance
target submitted
within 15 days
115-129%

complete

Individual
work
performance
target submitted
within 21 days
100-114%

complete

Individual
work
performance
target submitted
within 30 days
51-99% complete

Individual work
performance
target submitted
within 35 days
50% and below
complete

130% of precision
measuring
tools
and
equipment
maintained

115-129%
of
precision
measuring tools
and
equipment
maintained
115-129%

assistance
provided

100-114%
of
precision
measuring tools
and
equipment
maintained
100-114%

assistance
provided

51-99%
of
precision
measuring tools
and
equipment
maintained
51-99%

assistance
provided

50% and below


of
precision
measuring tools
and equipment
maintained
50% and below
assistance
provided

51-99% technical
assistance
provided

of

51-99% of quality

50% and below


technical
assistance
provided
50% and below

130% assistance
provided

130%
technical
assistance
provided
130%

of

quality

115-129%
technical
assistance
provided
115-129%

of

100-114%
technical
assistance
provided
100-114%

Performance
Objectives

Center operation to include SME


prototypes, procurement of supplies
and
materials,repair
and
maintenance of building, facilities
and vehicle within the alloted time
Conducted of Quality Assurance of
procured SMEs to include sample
evaluation before contracting for
market items,sample evaluation
after contracting for mass produce
items and pre-delivery inspection
within the alloted time
Conducted training session on
maintenance of SMEs as per
training design and schedule

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

assurance activities
conducted

quality assurance
activities
conducted

quality assurance
activities
conducted

assurance
activities
conducted

of
quality
assurance
activities
conducted

130% of quality
assurance activities
conducted

115-129%
of
quality assurance
activities
conducted

100-114%
of
quality assurance
activities
conducted

51-99% of quality
assurance
activities
conducted

50% and below


of
quality
assurance
activities
conducted

130% of training
sessions
conducted

115-129%
of
training sessions
conducted

100-114%
of
training sessions
conducted

51-99% of training
sessions
conducted

50% and below


of
training
sessions
conducted

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

Indicators

SCIENCE RESEARCH TECHNICIAN IV


Science Equipment Technician - Electronics
DepED National Science Teaching Instrumentation Center
Engineer III
None

PCP no. ____

Salary Grade
Effectivity Date

Revision Code

16

JOB SUMMARY
Handles all the designing and application of the electronic circuits in the prototype of science equipment. Makes a study of the most economical,
appropriate and locally available materials, processes and technology for the science equipment production.

CSC Prescribed
Education
Experience
Eligibility
Trainings
B Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training
Qualifications
Bachelors Degree-Engineering (Electronics)
4 years of relevant experience
Career Service Sub-Professional
24 hours of relevant training

1
2

DUTIES AND RESPONSIBILITIES


Handles all the designing and application of the electronic circuits in the prototype of science equipment.
Handles the application/installation of the designed circuits to the developed prototype, including electromechanical apparatus.

Sees to it that material used in the designs will be available locally.

Makes a study of the most economical, appropriate and locally available materials, processes and technology for the science equipment production.

Acts as quality control for electronic installation in the science equipment production.

Handles the maintenance of all electronic appliances in the Center such as computers, photocopier, etc.

Confers with superior on matters as unusual problems related to operation which needs his immediate attention.

Is responsible for equipment and materials which are part of the electronic workshop.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Key Performing Indicators


(KPIs)

Performance
Assessment

Submitted Individual Performance Target


by the 21st calendar day of January.

Maintenance of
Facilities

Submitted
Annual
Maintenance
Schedule of equipment on the 21st
calendar day of January in coordination
with the Electrical Maintenance

Conducted weekly maintenance of the


equipment and submit report by 2nd day
of the succeeding week in coordination
with the Electrical Maintenance
Conducted review and recommend
specifications of Science and Math
Equipment (SMEs) as per schedule

Learning Resources

Drafted/updated
Manual as
per schedule

SME

Maintenance

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Research and
Development

Technical Assistrance

Objectives

Prepared circuit design for planned


number of SMEs prototypes per
schedule.

Prepared design of improvised SMEs per


schedule
Provided technical assistance on the
planned repair and maintenance
activities of SMEs in the public schools
as per schedule

Quality Assurance

Training

Provided technical assistance to the


private manufacturer to mass produce
the SMEs developed by NSTIC as per
schedule set in the contract
Conducted evaluation of sample SMEs
prior to awarding as per schedule set

Conducted pre-delivery inspection of


procured SMEs as per schedule set.

Conducted pre-delivery inspection of


mass produce SMEs as per schedule
set.
Conducted training of teachers on the
Use and
Care and Improvizations of SMEs as per
schedule set

Key Performing Indicators


(KPIs)

Performance
Objectives

Submitted Individual Performance


Target by the 21st calendar day of
January.

Conducted weekly maintenance of


the equipment and submit report by
2nd day of the succeeding week in
coordination with the Electrical
Maintenance
Conducted review and recommend

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Individual
work
performance target
submitted within10
days
130% of weekly
maintenance
of
equipment
conducted
130%

of

Individual
work
performance
target submitted
within 15 days
115-129%
of
weekly
maintenance of
equipment
conducted
115-129%
of

Individual
work
performance
target submitted
within 21 days
100-114%
of
weekly
maintenance of
equipment
conducted
100-114%
of

Individual
work
performance
target submitted
within 30 days
51-99% of weekly
maintenance of
equipment
conducted
51-99%

of

Individual work
performance
target submitted
within 35 days
50% and below
of
weekly
maintenance of
equipment
conducted
50% and below

Performance
Objectives

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

specifications of Science and Math


Equipment (SMEs) as per schedule

specifications
of
SMEs
reviewed
and recommended

Drafted/updated SME Maintenance


Manual as per schedule

130% of SME
Maintenance
Manual
drafted/updated

Prepared circuit design for planned


number of SMEs prototypes per
schedule.

Indicators

specifications of
SMEs reviewed
and
recommended
115-129% of SME
Maintenance
Manual
drafted/updated

specifications of
SMEs reviewed
and
recommended
100-114% of SME
Maintenance
Manual
drafted/updated

specifications of
SMEs reviewed
and
recommended
51-99% of SME
Maintenance
Manual
drafted/updated

130% of circuit
designs prepared

115-129%
of
circuit
designs
prepared

100-114%
of
circuit
designs
prepared

51-99% of circuit
designs prepared

Prepared design of improvised


SMEs per schedule

130% of designs of
improvised SMEs
prepared

Provided technical assistance on the


planned repair and maintenance
activities of SMEs in the public
schools as per schedule
Provided technical assistance to the
private manufacturer to mass
produce the SMEs developed by
NSTIC as per schedule set in the
contract
Conducted evaluation of sample

130%
technical
assistance
provided

115-129%
of
designs
of
improvised SMEs
prepared
115-129%

technical
assistance
provided
115-129%

technical
assistance
provided

100-114%
of
designs
of
improvised SMEs
prepared
100-114%

technical
assistance
provided
100-114%

technical
assistance
provided

51-99%
of
designs
of
improvised SMEs
prepared
51-99% technical
assistance
provided

130%
technical
assistance
provided

130% evaluation of

115-129%

100-114%

51-99% technical
assistance
provided

51-99%

of specifications
of
SMEs
reviewed and
recommended
50% and below
of
SME
Maintenance
Manual
drafted/updated
50% and below
of
circuit
designs
prepared
50% and below
of designs of
improvised
SMEs prepared
50% and below
technical
assistance
provided
50% and below
technical
assistance
provided
50% and below

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

SMEs prior to awarding as per


schedule set

samples
conducted

Conducted pre-delivery inspection of


procured SMEs as per schedule set

was

130% pre-delivery
inspection
was
conducted

evaluation
of
samples
was
conducted
115-129%
pre-
delivery inspection
was conducted

evaluation
of
samples
was
conducted
100-114%
pre-
delivery inspection
was conducted

evaluation
of
samples
was
conducted
51-99%
pre-
delivery inspection
was conducted

Conducted pre-delivery inspection of


mass produce SMEs as per
schedule set

130% pre-delivery
inspection
was
conducted

115-129%
pre-
delivery inspection
was conducted

100-114%
pre-
delivery inspection
was conducted

51-99%
pre-
delivery inspection
was conducted

Conducted training of teachers on


the
Use
and
Care
and
Improvizations of SMEs as per
schedule set

130% training of
teachers
was
conducted

115-129% training
of teachers was
conducted

100-114% training
of teachers was
conducted

51-99% training of
teachers
was
conducted

POSITION AND COMPETENCY PROFILE

PCP no. ____

evaluation
of
samples was
conducted
50% and below
pre-delivery
inspection was
conducted
50% and below
pre-delivery
inspection was
conducted
50% and below
training
of
teachers was
conducted

Revision Code

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN III


Senior Science Equipment Technician (Metal)
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

Salary Grade

13

Effectivity Date

Handles fabrication of metal-based types of science and math equipment prototypes. Sets-up and performs the operation of the different types of
precision conventional equipment in the Metal Workshop such as the Lathe Machine, Universal Drilling and Milling Machine, Metal Bandsaw, etc., aimed
at attaining optimum production with utmost in efficiency, safety and quality.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
3 years of relevant experience in Machine Shop Operation
Career Service Sub-Professional
16 hours of relevant training
Qualifications
Completion of two years studies in college (Mechanical Technology) relevant to the job
3 years of relevant experience in Machine Shop Operations
Career Service Sub-Professional
16 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Handles fabrication of metal-based SME prototypes

2. Receives instructions from supervisor/foreman as to work assignment and prepares the equipment with its corresponding tools.
3. Studies drawings/sketches to ensure correct interpretation prior to execution and refers all problems encountered to his superior.
4. Mounts and sets-up workpiece to machine and determines appropriate jigs/fixtures to ensure rigid mounting in reference to the instructions of the
superior.
5. Performs housekeeping of the machine assigned and his respective work area.
6. Handles with extra care assigned machine/tools and reports to superior any defects/wear that may develop in the course of its operation.
7. Considers safety as a top priority in performing his assigned task by following all safety rules and regulations of the Center.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Performance
Assessment

Submitted Individual Performance Target


by the 21st calendar day of January.

Lathe Machine
Maintenance
Research and
Development
Technical Assistance

Quality Assurance

Conducted maintenance of Lathe


machine as per schedule
Fabricated planned number SME
prototypes as per schedule
Provided technical assistance on the
planned repair and maintenance of
SMEs activities in the public schools as
per schedule set
Conducted quality assurance of procured
SMEs to include sample evaluation after
contracting for mass produce items and
pre-delivery inspection within the alloted
time

Key Performing Indicators


(KPIs)

Performance
Objectives

Submitted Individual Performance


Target by the 21st calendar day
of January.

Conducted maintenance of Lathe


machine as per schedule

Fabricated planned number SME


prototypes as per schedule

Provided technical assistance on


the
planned
repair
and
maintenance of SMEs activities in
the public schools as per schedule
set
Conducted quality assurance of
procured SMEs to include sample
evaluation after contracting for
mass produce items and predelivery inspection within the
alloted time

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Individual
work
performance target
submitted within
10 days
130%

maintenance
of
Lathe
Machine
conducted
130% of planned
number of SME
protypes
fabricated

Individual
work
performance target
submitted within
15 days
115-129%

maintenance
of
Lathe
Machine
conducted
115-129%
of
planned number of
SME
protypes
fabricated

130%
technical
assistance
provided

115-129%
technical
assistance
provided

130%
quality
assurance
of
procured
SMEs
conducted

115-129% quality
assurance
of
procured
SMEs
conducted

Individual work
performance
target submitted
within 21 days
100-114%

maintenance of
Lathe Machine
conducted
100-114%
of
planned number
of SME protypes
fabricated
100-114%
technical
assistance
provided

100-114%

quality
assurance
of
procured SMEs
conducted

Individual work
performance
target submitted
within 30 days
51-99%

maintenance of
Lathe Machine
conducted
51-99%
of
planned number
of SME protypes
fabricated
51-99%
technical
assistance
provided

51-99% quality
assurance
of
procured SMEs
conducted

Individual work
performance
target submitted
within 35 days
50% and below
maintenance of
Lathe Machine
conducted
50% and below
of
planned
number of SME
protypes
fabricated
50% and below
technical
assistance
provided
50% and below
quality assurance
of procured SMEs
conducted

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN III


Quality Control Technician
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

PCP no. ____

Salary Grade

Revision Code

13

Effectivity Date

Performs quality control inspection of all items/assemblies already completed or still in process both in the center or to any outside manufacturer wherein
there is a job intended or requested by the Center.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
3 years of relevant experience
Career Service Sub-Professional
16 hours of relevant training
Qualifications
Bachelors Degree-Engineering or Mechanical Technology
4 years of relevant experience as Quality Control in Machine Shop Operations
Career Service Sub-Professional
16 hours of relevant training

DUTIES AND RESPONSIBILITIES


Prepares quality inspection reports on all items being inspected.
Conducts periodic inspections on all parts or assembled science equipment being mass produced by qualified manufacturers.
Also, conducts inspection and evaluation on all raw materials, tools and equipment ordered by the Center.
Handles parts measurements in the event that a drawing or sketch is needed to reproduce or repair a certain item.
Conducts upon the supervision and guidance of a Senior Quality Control Technician a re-calibration of all precision measuring instruments to maintain the
highest level of accuracy, and sees to it that all measuring instruments used in the Center are in good condition.
6. Conduct quality control in process for all on-going works.
1.
2.
3.
4.
5.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Performance
Assessment

Precision Measuring
Tools and Equipment
Maintenance

Research and
Development

Technical Assistance

Quality Assurance

Submitted Individual Performance Target by


the 21st calendar day of January.
Conducted maintenance of precision
measuring tools and equipment as per
schedule
Conducted in-process inspection of SME
prototypes and discuss results with
concerned parties within 15 minutes after
inspection
Provided technical assistance on the
planned repair and maintenance of SMEs
activities in the public schools as per
schedule set
Conducted quality assurance for Center
operations to include SME prototypes,
procurement of supplies and materials,

Outputs

repair and maintenance of building, facilities


and vehicles within two days after receipt of
items

Conducted of Quality Assurance of procured


SMEs to include sample evaluation before
contracting for market items,sample
evaluation after contracting for mass
produce items and pre-delivery inspection
within the alloted time

Performance
Objectives

Submitted Individual Performance


Target by the 21st calendar day of
January.

Conducted maintenance of precision


measuring tools and equipment as
per schedule

Conducted in-process inspection of


SME prototypes and discuss results
with concerned parties within 15

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Individual work
performance
target submitted
within10 days
130%

maintenance of
measuring tools
and equipment
conducted
130% in-process
inspection
of
SME prototypes

Individual work
performance
target submitted
within 15 days
115-129%

maintenance of
measuring tools
and equipment
conducted
115-129%
in-
process
inspection
of

Individual work
performance
target submitted
within 21 days
100-114%

maintenance of
measuring tools
and equipment
conducted
100-114%
in-
process
inspection
of

Individual work
performance
target submitted
within 30 days
51-99%

maintenance of
measuring tools
and equipment
conducted
51-99%
in-
process
inspection
of

Individual work
performance
target submitted
within 35 days
50% and below
maintenance of
measuring tools
and equipment
conducted
50% and below
in-process
inspection
of

Performance
Objectives

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

minutes after inspection

conducted

Provided technical assistance on the


planned repair and maintenance of
SMEs activities in the public schools
as per schedule set

130% technical
assistance
provided

Conducted quality assurance for


Center operations to include SME
prototypes, procurement of supplies
and
materials,
repair
and
maintenance of building, facilities
and vehicles within two days after
receipt of items
Conducted quality assurance of
procured SMEs to include sample
evaluation after contracting for mass
produce items and pre-delivery
inspection within the alloted time

130%
quality
assurance
activities
conducted

Position Title

Indicators

130%
quality
assurance
of
procured SMEs
conducted

SME prototypes
conducted
115-129%

technical
assistance
provided
115-129%

quality
assurance
actiivities
conducted

SME prototypes
conducted
100-114%

technical
assistance
provided
100-114%

quality
assurance
activities
conducted

SME prototypes
conducted
51-99%

technical
assistance
provided
51-99% quality
assurance
activities
conducted

SME prototypes
conducted
At least 50%
technical
assistance
provided
50% and below
quality assurance
activities
conducted

115-129%

quality
assurance
of
procured SMEs
conducted

100-114%

quality
assurance
of
procured SMEs
conducted

51-99% quality
assurance
of
procured SMEs
conducted

50% and below


quality assurance
of procured SMEs
conducted

POSITION AND COMPETENCY PROFILE

PCP no. ____

SCIENCE RESEARCH TECHNICIAN II

Salary Grade

Revision Code

11

Parenthetical Title
Office Unit
Reports to
Position Supervised

Science Equipment Designer


DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

Effectivity Date

Designs science and math equipment to be prototyped


A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
2 years of relevant experience
Career Service Sub-Professional
8 hours of relevant training
Qualifications
Completion of two years studies in college relevant to the job (Mechancial Technology)
4 years of relevant experience
Career Service Sub-Professional
8 hours of relevant training

DUTIES AND RESPONSIBILITIES


Provides complete design of science and math equipment to be prototyped
Receives instructions from the Senior Science Equipment Designer as to work assignment and refers to him any problem relative to the assigned task.
Prepares a detailed plan/working drawing of science and math equipment to be made into prototype and to be mass produced.
Keeps and preserves files of the original drawings for references.
Initiates periodic inventory of necessary supplies to attain an efficient drafting work and advise the direct superior or the supply officer any
materials/supplies lacking.
6. Safeguards all tools and equipment and keep them in good shape all the time and reports to superior any defects or wear observed in the course of its
operation.
7. Updates all drawings according to changes that may arise from prototype or mass production needs.
1.
2.
3.
4.
5.

Major and Final Output

Key Result Areas

Objectives

Key Performing Indicators

(MFOs)

(KRAs)

(KPIs)

Performance
Assessment

Submitted Individual Performance Target


by the 21st calendar day of January.

Learning Resource
Production

Provided planned number of graphic


design/ illustrations for Maintenance
Manual as per schedule set in the
Individual Work Assignment

Research and
Development

Provided planned number of standard


prototype SME designs

Computer Software/
Hardware and
Webpage
Management

Conducted weekly updating


maintenance of Centers webpage

Performance
Objectives

Submitted Individual Performance


Target by the 21st calendar day of
January.

Provided planned number of


graphic design/ illustrations for
Maintenance Manual as per
schedule set in the Individual Work

and

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Individual
work
performance target
submitted within 10
days
130% of planned
number
of
graphics/illustration
s provided

Individual
work
performance
target submitted
within 15 days
115-129%
of
planned number
of
graphics/illustratio

Individual
work
performance
target submitted
within 21 days
100-114%
of
planned number
of
graphics/illustratio

Individual
work
performance
target submitted
within 30 days
51-99%
of
planned number
of
graphics/illustratio

Individual work
performance
target submitted
within 35 days
At least 50% of
planned number
of
graphics/illustrati

Assignment
Provided planned number of
standard prototype SME designs

Conducted weekly updating and


maintenance of Centers webpage

130%
planned
number of standard
SME
designs
provided
130% maintenance
and updating of
webpage
conducted

ns provided
115-129%

planned number
of standard SME
designs provided

ns provided
100-114%

planned number
of standard SME
designs provided

ns provided
51-99% planned
number
of
standard
SME
designs provided

115-129%

maintenance and
updating
of
webpage
conducted

100-114%

maintenance and
updating
of
webpage
conducted

51-99%

maintenance and
updating
of
webpage
conducted

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN II


Science Equipment Technician (Electrical)
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

PCP no. ____

Salary Grade
Effectivity Date

ons provided
At least 50%
planned number
of standard SME
designs
provided
At least 50%
maintenance
and updating of
webpage
conducted

Revision Code

11

Handles all electrical instruments of the Center as well as the electrical design of science and math equipment prototypes.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
2 years of relevant experience
Career Service Sub-Professional
8 hours of relevant training
Qualifications
Completion of two years studies in college relevant to the job
4 years of relevant experience of equipment maintenance and trouble shooting
Career Service Sub-Professional
8 hours of relevant training

DUTIES AND RESPONSIBILITIES


1.
2.
3.
4.
5.

Provides electrical design of SME prototypes


Prepares electrical preventive maintenance schedule (PMS) on every electrically operated equipment of the Center.
Prepares material requirements for every electrical installation.
Receives instructions from his direct superior with regard to the work assignment.
Acts as Quality Control inspector for the electrical systems of the mass produced science equipment.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Performance
Assessment

Maintenance of Building
and Facilities

Learning
Resource
Production

Conducted review of planned number


of specifications of Science and Math
Equipment (SMEs) as per schedule
set in the Individual Work assignment

Drafted/ Updated planned number of


SMEs Maintenance Manual) as per
schedule set in the Individual Work
assignment
Recommended specifications for
planned number of SMEs as per
schedule set in the Individual Work
Assignment

Research
Development

and

Technical Assistance

Submitted Individual Performance


Target by the 21st calendar day of
January.
Conducted Weekly maintenance of
equipment on the 2nd day of the
week.

Fabricated planned number of


prototype SMEs as per schedule set
in the Individual Work assignment.
Provided technical assistance on the
planned number of Repair and
Maintence of SMEs activities in the
public schools as per schedule set in

Key Performing Indicators


(KPIs)

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Quality Assurance

Training

the Individual Work Assignment


Conducted pre-delivery inspection of
planned number of procured SME as
specified in the official travel.
Conducted on-site training on the
Use and Care and Improvizations
ofSMEs.

Performance
Objectives

Outstanding

(5)

Key Performing Indicators


(KPIs)

Indicators

Very Satisfactory

(4)

Satisfactory

(3)

Unsatisfactory

(2)

Submitted
Individual
Performance Target by the 21st
calendar day of January.

Individual work
performance
target submitted
within 10 days

Individual work
performance
target submitted
within 15 days

Individual work
performance
target submitted
within 21 days

Individual work
performance
target submitted
within 30 days

Conducted Weekly maintenance


of equipment on the 2nd day of
the week.

130% of weekly
maintenance of
equipment
conducted

115-129%
of
weekly
maintenance of
equipment
conducted

100-114%
of
weekly
maintenance of
equipment
conducted

51-99%
of
weekly
maintenance of
equipment
conducted

Poor

(1)

Individual work
performance
target
submitted
within 35 days
50%
and
below
of
weekly
maintenance
of equipment
conducted

Performance
Objectives

Outstanding

(5)

Indicators

Very Satisfactory

Satisfactory

(4)

Unsatisfactory

(3)

Poor

(2)

(1)

Conducted review of planned


number of specifications of
Science and Math Equipment
(SMEs) as per schedule set in
the Individual Work assignment

130% of planned
number
of
specifications of
SME reviewed

115-129%
of
planned number
of specifications
of SME reviewed

100-114%
of
planned number
of specifications
of SME reviewed

51-99%
of
planned number
of specifications
of SME reviewed

Drafted/
Updated
planned
number of SMEs Maintenance
Manual) as per schedule set in
the Individual Work assignment

130% of planned
number of SMEs
drafted
and
updated

115-129%
of
planned number
of SMEs drafted
and updated

100-114%
of
planned number
of SMEs drafted
and updated

51-99%
of
planned number
of SMEs drafted
and updated

Recommended specifications for


planned number of SMEs as per
schedule set in the Individual
Work Assignmen

130%
of
specifications for
planned number
of
SME
recommended

115-129%
of
planned number
of SMEs drafted
and updated

100-114%
of
planned number
of SMEs drafted
and updated

51-99%
of
planned number
of SMEs drafted
and updated

Fabricated planned number of


prototype SMEs as per schedule
set in the Individual Work
assignment

130%
planned
number
of
standard
SME
fabricated

115-129%

planned number
of standard SME
fabricated

100-114%

planned number
of standard SME
fabricated

51-99% planned
number
of
standard SME
fabricated

Provided technical assistance on

130% assistance

115-129%

100-114%

51-99%

50%
and
below
of
planned
number
of
specifications
of
SME
reviewed
50%
and
below
of
planned
number
of
SMEs drafted
and updated
50%
and
below
of
planned
number
of
SMEs drafted
and updated
50%
and
below
planned
number
of
standard SME
fabricated
50%
and

Performance
Objectives

Outstanding

Very Satisfactory

(5)

the planned number of Repair


and Maintence of SMEs activities
in the public schools as per
schedule set in the Individual
Work Assignment
Conducted
pre-delivery
inspection of planned number of
procured SME as specified in the
official travel.

(4)

provided

130% of
delivery
inspection
conducted

Indicators

115-129%
pre-delivery
inspection
conducted

Unsatisfactory

(3)

assistance
provided

pre-

Satisfactory

(2)

assistance
provided

of

100-114%
pre-delivery
inspection
conducted

assistance
provided

of

51-99% of pre-
delivery
inspection
conducted

Poor

(1)

below
assistance
provided

50%
and
below of predelivery
inspection
conducted
Conducted on-site training on the Outstanding training Very
satisfactory Satisfactory training Unsatisfactory
Poor
training
Use and Care and Improvizations evaluation
by training evaluation evaluation
by training evaluation evaluation
by
ofSMEs.
participants
by participants
participants
by participants
participants

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN I


Production Equipment Maintenance Technician
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

PCP no. ____

Salary Grade

Revision Code

Effectivity Date

Handles the overall maintenance of all the mechanical equipment in NSTIC such as: Lathe Machines, Universal Drilling and Milling Machine (CNC &
Conventional) Metal and Wood Bandsaw, Power Hacksaw Pedestal Drill, Air Compressor, Diesel Engine for 68 KVA Genset, etc.

A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Qualifications
Completion of two years studies in college
2 years of relevant experience
Career Service Sub-Professional
4 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Monitors and performs the preventive maintenance schedule as prepared by the superior.
2. Ensures all mechanical equipment are always in good condition and report immediately to the direct superior any defects or abnormalities noted, to
avoid delay in science equipment prototype production.
3. Monitors the stock level of lubricants and fuel needed, and immediately inform the superior for proper replenishment to maintain efficient operation of the
equipment.
4. Considers safety as a top priority in performing the assigned task by following all safety rules and regulations of the Center.
5. Performs housekeeping on the following equipment:
a) Air Compressor
b) 68 KVA Generating Set

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)
Performance
Assessment
Maintenance
of
Building and Facilities

Objectives

Learning
Resource
Production

Research

and

Submitted Individual Performance Target


by the 21st calendar day of January.
Conducted weekly maintenance of
equipment on the 15th working day of
the current year
Conducted review of planned number of
specifications of Science and Math
Equipment as per schedule set in the
Individual Work Assignment
Fabricated planned number of prototype

Key Performing Indicators


(KPIs)

Development

Technical Assistance

Quality Assurance

Training

for standard and improvised SMEs as


per schedule set in the Individual Work
Assignment
Provided technical assistance on the
panned Repair and Maintenance of
SMEs activities in the public schools
Conducts in-process quality inspection
on planned number of prototype SMEs
Conducted on-site training on the use
and care of improvised SMEs

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Submitted
Individual
Performance Target by the 21st
calendar day of January.

Individual work
performance
target submitted
within 10 days

Individual work
performance
target submitted
within 15days

Individual work
performance
target submitted
within 21 days

Individual work
performance
target submitted
within 30 days

Conducted weekly maintenance


of equipment on the 15th working
day of the current year

130% of weekly
maintenance of
equipment
conducted

115-129%
of
weekly
maintenance of
equipment
conducted

100-114%
of
weekly
maintenance of
equipment
conducted

51-99%
of
weekly
maintenance of
equipment
conducted

Conducted review of planned

130% of planned

115-129%

of

100-114%

of

51-99%

of

Individual work
performance
target
submitted
within 35 days
50%
and
below
of
weekly
maintenance
of equipment
conducted
50%
and

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

number of specifications of
Science and Math Equipment as
per schedule set in the Individual
Work Assignment

number
of
specifications of
SMEs reviewed

planned number
of specifications
of
SMEs
reviewed

planned number
of specifications
of
SMEs
reviewed

planned number
of specifications
of
SMEs
reviewed

Fabricated planned number of


prototype for standard and
improvised SMEs as per
schedule set in the Individual
Work Assignment

130% of planned
number
of
standard
and
improvised SMEs
fabricated

115-129%
of
planned number
of standard and
improvised
SMEs fabricated

100-114%
of
planned number
of standard and
improvised
SMEs fabricated

51-99%
of
planned number
of standard and
improvised
SMEs fabricated

Provided technical assistance on


the
panned
Repair
and
Maintenance of SMEs activities in
the public schools

130%% technical
assistance
provided

115-129%
technical
assistance
provided

Conducted in-process quality


inspection on planned number of
prototype SMEs

130% of planned
number
of
prototype SMEs
inspected

115-129%
of
planned number
of
prototype
SMEs inspected

100-114%
technical
assistance
provided

100-114%
of
planned number
of
prototype
SMEs inspected

51-99%
technical
assistance
provided

51-99%
of
planned number
of
prototype
SMEs inspected

below
of
planned
number
of
specifications
of
SMEs
reviewed
50%
and
below
of
planned
number
of
standard and
improvised
SMEs
fabricated
50%
and
below
technical
assistance
provided
50%
and
below
of
planned
number
of
prototype
SMEs

Performance
Objectives

Conducted on-site training on the


use and care of improvised SMEs

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Outstanding
training
evaluation
participants

by

Very satisfactory
training
evaluation
by
participants

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to

Indicators

SCIENCE RESEARCH TECHNICIAN I


Science Equipment Technician - Mechanic
DepED National Science Teaching Instrumentation Center
Engineer III

Satisfactory
training
evaluation
participants

by

Unsatisfactory

training
evaluation
by
the participants

PCP no. ____

Salary Grade
Effectivity Date

inspected
Poor training
evaluation by
the
participants

Revision Code

Position Supervised

None
JOB SUMMARY

Handles the assembling and fitting work of science equipment prototypes.

C. CSC Prescribed
Education
Experience
Eligibility
Trainings
D. Preferred
Education
Experience
Eligibility
Trainings

1.
2.
3.
4.

5.

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training

DUTIES AND RESPONSIBILITIES


Handles the assembly and fitting work of science equipment prototypes.
Performs layouting, filing, grinding, and other finishing work while assembling the science equipment prototype.
Prepares the jibs and fixtures needed in the metal workshop.
Operates the following equipment as the need arises:
4.1 Power Hacksaw
4.2 Metal and Wood Bandsaw
4.3 Pedestal Drill
4.4 Gas Welding
4.5 Arc Welding (Tig & Stick)
Consider safety as a top priority in performing assigned task by following all safety rules and regulations of the Center,

Major and Final Output


(MFOs)

Key Result Areas

Performance
Assessment
Learning
Resource

Objectives

Submitted Individual Performance Target


by the 21st calendar day of January.
Assisted in the conduct of teachers

Key Performing Indicators


(KPIs)

Production
Research
and
Development
Technical Assistance

Jigs, Fixture Bench


Table and Support
Equipment
Management
Quality Assurance

Training

training on repair and maintenance


Fabricated planned number of prototype
SMEs
Provided technical assistance on the
planned repair and maintenance of
SMEs activities in the public schools
Conducted inventory and weely
maintenance of equipment

Conducted in-process inspection of


planned number of SME prototypes
Conducted on-site training on the use
and care and improvisation of SMEs

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Submitted
Individual
Performance Target by the 21st
calendar day of January.

Assisted in
the conduct of
teachers training on repair and
maintenance
Fabricated planned number of
prototype SMEs

Provided technical assistance on


the
planned
repair
and
maintenance of SMEs activities in
the public schools
Conducted inventory and weekly
maintenance of equipment

Conducted in-process quality


inspection on planned number of
prototype SMEs

Conducted on-site training on the


use and care of improvised SMEs

Individual work
performance
target submitted
within 10 days
130% assistance
provided
130%planned

number
of
prototype SMEs
fabricated
130% assistance
provided

130%

maintenance and
inventory
of
equipment
conducted
130% of planned
number
of
prototype SMEs
inspected
Outstanding

training
evaluation
by
participants

Individual work
performance
target submitted
within 15 days
115-129%
assistance
provided of
115-129%
planned number
of
prototype
SMEs fabricated
115-129%
assistance
provided

115-129%

maintenance
and inventory of
equipment
conducted
115-129%
of
planned number
of
prototype
SMEs inspected
Very satisfactory
training
evaluation
by
participants

Individual work
performance
target submitted
within 21 days
100-114%
assistance
provided
100-114%
planned number
of
prototype
SMEs fabricated
100-114%
assistance
provided

100-114%

maintenance
and inventory of
equipment
conducted
100-114%
of
planned number
of
prototype
SMEs inspected
Satisfactory

training
evaluation
by
participants

Individual work
performance
target submitted
within 30 days
51-99%
assistance
provided
51-99% planned
number
of
prototype SMEs
fabricated
51-99%
assistance
provided

51-99%

maintenance
and inventory of
equipment
conducted
51-99%
of
planned number
of
prototype
SMEs inspected
Unsatisfactory

training
evaluation
by
the participants

Individual work
performance
target submitted
within 35days
50% and below
assistance
provided
50% and below
planned number
of
prototype
SMEs fabricated
50% and below
assistance
provided
50% and below
maintenance and
inventory
of
equipment
conducted
50% and below of
planned number
of
prototype
SMEs inspected
Poor
training
evaluation by the
participants

Revision Code

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN I


Science Equipment Technician Metal
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

PCP no. ____

Salary Grade

Effectivity Date

Handles fabrication of various types of science and math equipment prototypes


QUALIFICATIONS STANDARD
E. CSC Prescribed
Education
Experience
Eligibility
Trainings
F. Preferred
Education
Experience
Eligibility
Trainings

Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Handles fabrication of various types of science and math equipment prototypes, sets-up and performs the operation of different types of convnetional
equipment in the metal workshop
2. Receives instruction from metal workshop supervisor as to work assignment and prepares the equipment with its corresponding tools
3. Studies sketches/drawings to ensure correct interpretation prior to execution and refers all problems encountered to his supervisor
4. Performs housekeeping of the machine assigned and his respective work area
5. Handles with extra care his assigned machine/tools and reports to superior any defects/wear that may develop in the course of its operation
6. Considers safety as a top priority in performing his assigned tasks by following all safety rules and regulations of the center

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Performance
Assessment
Computer
Software/Hardwaere
and
Webpage
Management
Learning
Resource
Production

Objectives

Submitted Individual Performance Target


by the 21st calendar day of January.
Conducted
weekly
updating
of
theCentrers webpage

Provided planned number of graphic


designs

Developed
planned
number
of
maintenance manual for SMEs
Fabricated plannednumber of prototypes
for planned and improvised SMEs
Provided technical assistance on the
planned repair and maintenance of SME
actitivies in the public schools
Conducted pre-delivery inpections of
planned number of prototype SMEs
Conducted on-site training on the use
and care and improvisation of SMEs

Research
and
Development
Technical Assistance

Quality Assurance

Training

Key Performing Indicators


(KPIs)

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Submitted
Individual
Performance Target by the 21st
calendar day of January.

Individual work
performance
target submitted
within 10 days

Individual work
performance
target submitted
within 15 days

Conducted weekly updating of


the Centrers webpage

130% of the
Centers
webpage updated

115-129%
Centers
webpage
updated

Provided planned number of


graphic designs

130% of planned
number
of
graphic designs
provided

115-129%
of
planned number
of
graphic
designs provided

100-114%
of
planned number
of
graphic
designs
provided

51-99%
of
planned number
of
graphic
designs
provided

Developed planned number of


maintenance manual for SMEs

130%
planned
number
of
maintenance
manual
developed

115-129%

planned number
of maintenance
manual
developed

100-114%

planned number
of maintenance
manual
developed

51-99% planned
number
of
maintenance
manual
developed

of

Individual work
performance
target submitted
within 21days
100-114%
Centers
webpage
updated

of

Individual work
performance
target submitted
within 30 days
51-99%
Centers
webpage
updated

of

Individual work
performance
target
submitted
within 35 days
50%
and
below
of
Centers
webpage
updated
50%
and
below
of
planned
number
of
graphic
designs
provided
50%
and
below
planned
number
of
maintenance
manual

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Fabricated plannednumber of
prototypes for planned and
improvised SMEs

130%

maintenance and
updating
of
webpage
conducted

115-129%

maintenance
and updating of
webpage
conducted

Provided technical assistance on


the
planned
repair
and
maintenance of SME actitivies in
the public schools
Conducted
pre-delivery
inspection on planned number of
prototype SMEs

130% assistance
provided

115-129%
assistance
provided

130% of planned
number
of
prototype SMEs
inspected

115-129%
of
planned number
of
prototype
SMEs inspected

100-114%
of
planned number
of
prototype
SMEs inspected

51-99%
of
planned number
of
prototype
SMEs inspected

Conducted on-site training on the


use and care of improvised SMEs

Outstanding
training
evaluation
participants

Very satisfactory
training
evaluation
by
participants

Satisfactory
training
evaluation
participants

Unsatisfactory

training
evaluation
by
the participants

by

100-114%

maintenance
and updating of
webpage
conducted

100-114%
assistance
provided

by

51-99%

maintenance
and updating of
webpage
conducted
51-99%
assistance
provided

developed
50%
and
below
maintenance
and updating
of webpage
conducted
50%
and
below
assistance
provided
50%
and
below
of
planned
number
of
prototype
SMEs
inspected
Poor training
evaluation by
the
participants

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH TECHNICIAN I


Science Equipment Technician Mechanic/Milling Machine
DepED National Science Teaching Instrumentation Center
Engineer III
None
JOB SUMMARY

Handles the assembling and fitting work of science equipment prototypes.


QUALIFICATIONS STANDARD
G. CSC Prescribed Qualifications
Education Completion of two years studies in college
Experience 1 year of relevant experience
Eligibility Career Service Sub-Professional
Trainings 4 hours of relevant training
H. Preferred
Qualifications
Education Completion of two years studies in college
Experience 1 year of relevant experience
Eligibility Career Service Sub-Professional
Trainings 4 hours of relevant training

DUTIES AND RESPONSIBILITIES

PCP no. ____

Salary Grade
Effectivity Date

Revision Code

1. Performs layouting, filling, grinding and other finishing work while assembling the science equipment prototypes
2. Prepares the jibs and fixtures needed in the metal workshop.
3. Operates the following equipment as the need arises:
3.1 Power Hacksaw
3.2 Metal and Wood Bandsaw
3.3 Pedestal Drill
3.4 Gas Welding
3.5 Arc Welding (Tig & Stick)
4. Consider safety as a top priority in performing assigned task by following all safety rules and regulations of the Center,

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Objectives

Performance
Assessment
Milling
Machine
Maintenance
Learning
Resource
Production

Research
and
Development
Technical Assistance

Quality Assurance

Training

Submitted Individual Performance Target


by the 21st calendar day of January.
Conducted maintenance of equipment
on a daily basis
Assisted in the conduct of teachers
training on repair and maintenance of
SMEs
Fabricated planned number of prototype
standard and improvised SMEs
Provided technical on the planned repair
and maintenance of SMEs activitiies in
the public schools
Conducted in-process quality inspection
on planned number of prototype SMEs
Conducted on-site training on the use
and care and improvisation of SMEs in
the pubcli schools

Key Performing Indicators


(KPIs)

Performance
Objectives

Submitted
Individual
Performance Target by the 21st
calendar day of January.

Conducted maintenance
equipment on a daily basis

of

Assisted in
the conduct of
teachers training on repair and
maintenance

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Individual work
performance
target submitted
within 21 days

Individual work
performance
target submitted
within 40 days

Individual work
performance
target submitted
within 60 days

Individual work
performance
target submitted
within 80 days

115-129%

maintenance of
equipment
conducted

100-114%

maintenance of
equipment
conducted

51-99%

maintenance of
equipment
conducted

130%
maintenance
equipment
conducted

of

130% assistance
provided

115-129%
assistance
provided of

100-114%
assistance
provided

51-99%
assistance
provided

Individual work
performance
target
submitted
within
100
days
50%
and
below
maintenance
of equipment
conducted
50%
and
below
assistance

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

provided

Fabricated planned number of


prototype
standard
and
improvised SMEs

130% of planned
number
of
prototypes
standard
and
improvised SMEs
fabricated

115-129%
of
planned number
of
prototypes
standard
and
improvised
SMEs fabricated

Provided technical on the


planned repair and maintenance
of SMEs activitiies in the public
schools
Conducted
pre-delivery
inspection on planned number of
prototype SMEs

130% assistance
provided

115-129%
assistance
provided

130% of planned
number
of
prototype SMEs
inspected

115-129%
of
planned number
of
prototype
SMEs inspected

100-114%
of
planned number
of
prototype
SMEs inspected

51-99%
of
planned number
of
prototype
SMEs inspected

Conducted on-site training on the


use and care of improvised SMEs

Outstanding
training
evaluation

Very satisfactory
training
evaluation
by

Satisfactory
training
evaluation

Unsatisfactory

training
evaluation
by

by

100-114%
of
planned number
of
prototypes
standard
and
improvised
SMEs fabricated

100-114%
assistance
provided

by

51-99%
of
planned number
of
prototypes
standard
and
improvised
SMEs fabricated

51-99%
assistance
provided

50%
and
below
of
planned
number
of
prototypes
standard and
improvised
SMEs
fabricated
50%
and
below
assistance
provided
50%
and
below
of
planned
number
of
prototype
SMEs
inspected
Poor training
evaluation by
the

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

the participants