Impact of Setup/Changeover Time On Capacity. Inventory, and Flow Time
Impact of Setup/Changeover Time On Capacity. Inventory, and Flow Time
Assumptions:
1. There are 8 different injection molded parts to be produced for Toyota
2. The plant runs for 30 days a month
3. Changeover time between any pair of products is the same
4. Products are produced in a cyclic order from 1-8 and again 1-8
Inputs
Setup/Changeover Time
Operating Time / Day
Duration of a Production Cycle
1,400
1,200
8 hours
24 hours
720 hours
1,000
800
600
Feasible
400
200
0
Product 1 Demand
64.47 hours
1
17
1,000
2
17
1,000
720 hours
1.00
8.00
64.00 hours
470.59
656.00 hours
1
2
82.00
82.00
1,394.0 1,394.0
697.0
697.0
20.91
20.91
1,394
1,394
Yes
Yes
720
64.00
3
17
1,000
4
17
1,000
5
17
1,000
6
17
1,000
Maximum Monthly
Production
7
17
1,000
800
700
600
500
400
300
200
100
0
Produc tion
T ime / Month
3
82.00
1,394.0
697.0
20.91
1,394
Yes
Changeover
T ime / Month
4
5
6
7
82.00
82.00
82.00
82.00
1,394.0 1,394.0 1,394.0 1,394.0
697.0
697.0
697.0
697.0
20.91
20.91
20.91
20.91
1,394
1,394
1,394
1,394
Yes
Yes
Yes
Yes
Effec tive
Produc tion
T ime / Month
656.00
1,000
###
0.08889
0.65359
0.25752
over
Month
Maximum Monthly
Production
8
17
1,000
Effec tive
Produc tion
T ime / Month
8
82.00
1,394.0
697.0
20.91
1,394
Yes