Output Rate Dce
Output Rate Dce
NO
Activity
Description
Manpower
Equipment
Unit
Output
Day
Day
Day
M2/Day
1
50
70
Hand Tools
Hand Tools
Shovel
Shovel
JCB
J.C.B
M3/Day
M3/Day
M3/Hr
M3/Hr
M3/Hr
M3/Hr
3
1
40
25
20
10
Shovel
Roller Compr
Shovel
Roller Compr.
M3/Hr
M2/Day
M3/Hr
M2/Day
30
100
100
200
Roller compr.
M2/Day
M2/Day
M2/Day
M2/Day
200
200
60
150
1H
1M+2H
1M+1H
1M+1H
R.M/Day
R.M/Day
R.M/Day
R.M/Hr
10
35
15
20
1M+2H
1M+2H
2M+4H
2M+4H
3M+8H
1M+6H
2M+6H
3M+5H
3M+5H
3M+5H
M2/Day
M2/Day
M2/Day
M3/Day
M3/Day
M3/Day
M3/Day
M3/Day
M3/Day
M3/Day
30
40
250
40
120
20
50
30
45
60
MANPOWER
01-GENERAL REQUIREMENT
TEMPORARY FACILITIES
a
b
c
d
(Duration x 2H)
(dhs.contract value
1C+2H+1P
1C+1H
02-EARTH WORK
EXCAVATION
a
b
c
d
e
f
1H
1H
BACKFILLING
a
b
c
d
Filling in foundation,plinth
Level,Compaction
Spreading 200 mm layer(Subkha,Road base)
Compaction 200 mm layer(Subkha,Road Base)
1H
1H
Compaction/Levelling
Spreading Sand and Brushing
Laying Tiles
Filling,Compaction
2H
2H
1M+2H
1H
Plate Compr.
03-CONCRETE
CONCRETE CASTING
a
c
d
e
f
g
h
i
j
k
Cast.Blinding 5 cm
Cast.Blinding 10 cm
Cast.Blinding 5 cm,10 cm
Cast.of Footing
Cast of Footing (Pump)
Cast of Strap/Tie Beam
Cast of Tie Beam (Pump)
Cast of Ground Floor Slab 10 cm
Cast of Ground Floor Slab ,15 cm
Cast of Ground Floor Slab 20 cmn
Pump
Pump
Pump
NO
m
n
o
p
q
r
s
t
u
v
Activity
Description
Cast of Column
Cast of Beam of Slab
Cast of Roof Slab
Cast of Lintel
Cast of Copying Beam 20x20 cm (upto 2.5m)
Cast of Copying beam 20x20 cm(above 2.5m)
Cast of Parapet
Cast of Arch Lintel
Casting of Neck Column
Casting of Staircase
Manpower
Unit
Output
M3/Day
M3/Day
M2/Day
Nos/Hour
RM/Day
RM/Day
M3/Day
M3/Day
M3/Day
M3/Day
4
12
50
4
150
60
10
5
4
12
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
20 % of shuttering w
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
L.M/Day
M2/Day
M2/Day
35
15
20
5
12
20
14
10
10
12
10
6
6
12
6
70
8
12
1SF+2H
M2/Day
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
1M+4H
1M+4H
2M+2C+5H
1M+2H
1C+5H
1C+5H
1M+1C+4H
1M+3H
1M+3H
1C+1H
Equipment
Pump
Pump
CONCRETE FORMWORK
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q
r
s
Shuttering of Blinding
Shuttering of Footing ( Plywood)
Shuttering of Footing(Plates)
Shuttering of Stub Column
Shuttering of Strap/Tie Beam(Plywood)
Shuttering of Strap/Tie Beam(Plates)
Shuttering of Wall
Shuttering of Column 20x20
Shuttering of Column 20x40
Shuttering of Beam with support
Shuttering of Roof Slab
Shuttering of Lintel
Shuttering of Copying beamn 20x20cm
Shuttering of Parapet
Shuttering of Arch Lintel
Expansion Joints/Ground Slab
Shuttering of beam&Column for 8 m to 12 m height
Shuttering of Staircase
Deshuttering works
MESH REINFORCEMENT
a
Mesh Reinforcement
CONCRETE REINFORCEMENT
a
b
c
d
e
f
g
h
i
j
k
l
m
Reinforcement of Fooring
Reinf.of Stub column
Reinf.of Strap Beam
Reinf.of Tie Beam
Reinf.of Wall
Reinf.of Column
Reinf.of Beam
Reinf.of Solid Slab
Reinf.of Lintel
Reinf.Coping Beam 20 cmx20 cm
Reinf.of parapet
Reinf.of Arch lintel
Reinf.of Staircase
400
250
300
350
400
300
300
300
150
200
300
150
250
NO
Activity
Description
Manpower
Equipment
Unit
Output
1M+1H
1M+2H
1M+1H
1M+1H
1M+2H
1M+2H
1M+1H
Nos./Day
Nos./Day
Nos./Day
Nos./Day
Nos./Day
Nos./Day
Nos./Day
150
140
150
180
140
100
120
1M+2H
Nos./Day
140
1M+1H
1M+1H
M2/Day
M2/Day
10
8
1P+1H
1P+1H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
1E+3H
1E+3H
1E+3H
1E+3H
1E+3H
M2/Day/Coat
M2/Day/Coat
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
Rm/Day
No
No
No/Day
50
40
250
175
350
150
250
100
250
150
80
1
8
6
70
1C+1H
1C+1H
1H
M2/Day
M2/Day
Rm/Day
200
1000
200
1H
2H
M2/Day/coat
M2/Day/coat
100
60
1C+1H
M2/Day
30
1C+1H
1H
Rm/Hr
Rm/Hr
18
7
MASONRY
HOLLOW BLOCK
a
b
c
d
e
f
g
SOLID BLOCK
a
CLAUSTRA BLOCK
a
b
05 METALS
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
BITUMIN PAINT
a
b
BITUMINOUS MEMBRANE
a
SEALERS
a
b
Flexel Board
Sealant
NO
Activity
Description
Manpower
Equipment
Unit
Output
1M+1H
1M+1H
1M+2H
1M+2H
1C+1H
1M+1H
M2/Day
M2/Day
M2/Day
M2/Day
Rm/Day
Rm
10
20
17
15
90
30
1M+1H
1M+2H
1M+2H
M2/Day
M2/Day
M2/Day
20
18
15
1M+1H
1M+1H
1M+1H
1Pol+1H
M2/Day
R.M/Day
R.M/Day
M2/Day
15
40
14
100
1M+1H
1M+1H
1M+1H
1M+1H
1M+1H
1M+1H
1M+1H
1M+1H
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
R.M/Day
10
30
8
12
15
20
40
30
1M+1H
1M+1H
M2/Day
Lm/Day
35
40
1M+1H
1M+1H
1M+1H
1M+1H
M2/Day
M2/Day
R.M/Day
R.M/Day
6
15
30
10
1C+1H
R.M/Day
100
1M+1H
1M+1H
M2/Day
R.M/Day
50
25
1M
R.M/Day
10
1C+1H
M2/Day
25
09 FINISHES
INTERNAL PLASTER
a
b
c
d
e
f
Ceiling Plaster
Wall plaster upto 3 m Height
Wall plaster 3m to 6m Height
Wall plaster above 6m Height
Fixing of Plaster Mesh
Fixing of Corner Beed
EXTERNAL PLASTER
a
b
c
TILES
MOSAIC
a
b
c
d
CERAMIC
a
b
c
d
e
f
g
h
PVC FLOOR
a
b
PVC Tiles
PVC Skirting
MARBLE
a
b
c
d
Marble Wall
Marble Floor
Marble Skirting
Marble Steps(Tread&Riser)
WOODEN SKIRTING
Timber
THRESHOLD
Threshold
FALSE CEILING
False Ceiling-Suspended Type
NO
Activity
Description
Manpower
Equipment
Unit
Output
1C+1H
M2/Day
20
1M+1H
1M+1H
M2/Day/Coat
M2/Day/Coat
100
100
1P
1P
1P
1P
M2/Day/Coat
M2/Day/Coat
M2/Day/Coat
M2/Day/Coat
200
80
100
60
1P+1H
M2/Day/Coat
50
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
R.M/Day
R.M/Day
R.M/Day
R.M/Day
12
20
75
60
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum
1M+1H
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
2
2
3
2
2
2
2
1
2
1Plum+1H
Nos/Day
1Electrician+1H
1Electrician+1H
R.M/Day
R.M/Day
50
50
Laying Cables
1Electrician+2H
R.M/Day
150
Wiring
1Electrician+1H
R.M/Day
300
1Electrician+1H
1Electrician+1H
Nos/Day
Nos/Day
2
1
NORMAL PAINT(EMULSION/OIL)
a
b
c
d
Primer
Stucco(Putty)
Emulsion Paint
Oil Paint
EPOXY PAINTING
a
Epoxy Painting
MECHANICAL
PIPE&FITTINGS
a
b
c
d
PLUMBING FIXTURES
a
b
c
d
e
f
g
h
i
Showel Tray
Kitchen Sink
Urinals+Partition
Wash Basin
W/C Asian
W/C Western
Bidet
Booster Pump
Manhole 60 cm to 90 cm
PLUMBING APPLIANCES
a
Water Heater
ELECTRICAL
RACE WAYS
a
b
Conduits
Trunking
CONDUITS&GROUNDING
a
WIRING
a
BOARDS
a
b
D.Bs
M.D.B.s