This quality assurance plan outlines the inspection process for cable trays. It details the raw materials, components, and characteristics that will be checked at various stages of production. Checks include visual inspections, dimensional measurements, chemical composition testing, and performance testing to standards. Sampling plans are defined for checks. The final inspection will examine dimensions, load capacity, coating uniformity, thickness, and adhesion. Test certificates must be submitted and the customer performs witness, verification, and hold point reviews.

Uploaded by

veerendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (4 votes)
2K views

Model Qap Cable Tray

This quality assurance plan outlines the inspection process for cable trays. It details the raw materials, components, and characteristics that will be checked at various stages of production. Checks include visual inspections, dimensional measurements, chemical composition testing, and performance testing to standards. Sampling plans are defined for checks. The final inspection will examine dimensions, load capacity, coating uniformity, thickness, and adhesion. Test certificates must be submitted and the customer performs witness, verification, and hold point reviews.

Uploaded by

veerendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

QUALITY ASSURANCE PLAN (MODEL)

PROJECT :
NAME OF
EQUIPMENT : Cable Tray
SR. NO. ITEM /COMPONENTS &
CHRACTERISTICS
A
Raw Material & Bought Out
Items.
1
(MS Sheet/Channel/Angle)
Chemical composition
a
Physical Properties
b
Surface Finish
c
Dimensions
d
2
Fasteners and Hardwares
Visual and Dimensional
a

CLIENT:
VENDOR :
NIT/P.O. REFERENCE :
NATURE OF
CHECKS

QUANTUM OF
CHECKS

REFERENCE
DOCUMENTS

ACCEPTANCE RECORD
NORMS
FORMAT

INSP. AGENCY
Perform Witness Verify

REMARKS

Chem.
Test
Visual
Measurement

Sampling Plan
-do-do-do-

Tech.Spec./ Appd.drg./IS:1079
-do-doTech.Spec./ Appd.drg./IS:1852

TC
TC
TC
TC

3/2
3/2
3/2
3/2

1
1
1
1

TC
TC
TC
TC

Visual &
Measurement
Measurement

-do-

Tech.Spec./ Appd.drg./IS:1367

TC

3/2

TC

-do-

-do-

TC

3/2

TC

Quantity of Zinc Deposit Over


Threaded Portion

B
1

Chem./Visual

Sampling plan

Tech.Spec./ Appd.drg./IS:2629

TC

3/2

TC

2
a)
b)
c)

In Process Inspection
Galvanishing
Galvanisation, Chemical
Composition of Zinc, Surface
Defects, Bath Temperature.
Galvanished Trays
Surface Defects
Uniformity of Zinc Coating
Thickness of Zinc Coating

Visual
Test
Measurement

Sampling Plan
-do-do-

-doTech.Spec./ Appd drg./IS:2633


Tech.Spec./ Appd drg.

TC
TC
TC

3/2
3/2
3/2

1
1
1

TC
TC
TC

d)
e)

Adhesion Test
Weight of Zinc Coating

Physical
Measurement

-do-do-

Tech.Spec./ Appd drg./IS:2629


Tech.Spec./ Appd drg./IS:6745

TC
TC

3/2
3/2

1
1

TC
TC

Visual
-doTech.Spec./ Appd drg.
TC
3/2
1
TC
3
Dicromating
Note: a. In Inspection Agencycolumn figure 1,2,or 3 to be filled. 1- will indicate CUSTOMER, 2- will indicate supplier & 3- will indicate sub-supplier.
b. In Remarks column following abbreviations shall be used - RR-Review of Records, T.C. - Test Certificate Submission & CHP - Customer Hold Point.
c. Test certificates shall be submitted at the time of final inspection.

Signature

Signature & Seal


(VENDORS Q.C. DEPT. OR REPRESENTATIVE)
Page 154

QUALITY ASSURANCE PLAN(MODEL)


PROJECT :
NAME OF
EQUIPMENT : Cable Tray
SR. NO. ITEM /COMPONENTS &
CHRACTERISTICS
C
1
2
3
4
5
6
7
8

Final Inspection
Dimension/ Finish of Trays &
Covers
Load Capacity
Surface defects / Black Spot
Uniformity of Zinc Coating
Weight of Zinc Coating
Check for Dicromating
Thickness of Zinc Coating
Adhesion Test

CLIENT:
VENDOR :
NIT/P.O. REFERENCE :
NATURE OF
CHECKS

Measurement
& Visual
Deflection Test
Visual
Test
Measurement
Visual
Measurement
Hammer Test

QUANTUM OF
CHECKS

REFERENCE
DOCUMENTS

ACCEPTANCE RECORD
NORMS
FORMAT

INSP. AGENCY
Perform Witness Verify

REMARKS

Sampling Plan

-do-

TC

3/2

TC

-do-do-do-do-do-do-do-

-do-doTech.Spec./ Appd drg./IS:2633


Tech.Spec./ Appd drg./IS:6745
Tech.Spec./ Appd drg./IS:2629
Tech.Spec./ Appd drg.
Tech.Spec./ Appd drg./IS:2629

TC
TC
TC
TC
TC
TC
TC

3/2
3/2
3/2
3/2
3/2
3/2
3/2

1
1
1
1
1
1
1

TC
TC
TC
TC
TC
TC
TC

Note: a. In Inspection Agencycolumn figure 1,2,or 3 to be filled. 1- will indicate CUSTOMER, 2- will indicate supplier & 3- will indicate sub-supplier.
b. In Remarks column following abbreviations shall be used - RR-Review of Records, T.C. - Test Certificate Submission & CHP - Customer Hold Point.
c. Test certificates shall be submitted at the time of final inspection.

Signature

Signature & Seal


(VENDORS Q.C. DEPT. OR REPRESENTATIVE)