Primavera P6 Course Material
Primavera P6 Course Material
Introduction
The purpose of this course is to provide a method for planning, scheduling and controlling projects
using Primavera P6 Version 8 within an established Enterprise Project database or a blank database up
to an intermediate Ievel.
This course covers the following topics:
Understand the steps required to create a project plan and monitor a project's progress
Understand the Primavera P6 environment
Create a project and set up the preferences
Define calendars
Creating a Work Breakdown Structure and adding activities
Format the display
Add logic and constraints
Use Filters, Group, Sort and Layouts
Print reports
Record and track progress of an un-resourced schedule
User and Administration Preferences and Scheduling Options
Create and assign roles and resources
Resource optimization including leveling
Update a project containing resources
Other methods of organizing data and Global Change
Managing the enterprise environment including multiple project scheduling.
Page 1 of 130
Project Management is the application of knowledge, skills, tools and techniques to project activities
to meet the project requirements.
Page 2 of 130
Initiating Process Group: Those processes performed to define a new project or a new phase of an
existing project by obtaining authorization to start the project or phase.
Planning Process Group: Those processes required to establish the scope of the project, refine the
objectives, and define the course of action required to attain the objectives that the project was
undertaken to achieve.
Executing Process Group: Those processes performed to complete the work defined in the project
management plan to satisfy the project specifications.
Monitoring and Controlling Process Group: Those processes required to track, review, and regulate
the progress and performance of the project; identify any areas in which changes to the plan are
required; and initiate the corresponding changes.
Closing Process Group: Those processes performed to finalize all activities across all Process Groups
to formally close the project or phase.
Page 3 of 130
Page 4 of 130
P6 Web Services
P6 Web Services uses open standards including XML, SOAP, and WSDL to seamlessly integrate P6
project management functionality into other applications. Using P6 Web Services, organizations can
share P6 project management data between applications independent of operating system or
programming language.
P6 Integration API
The P6 Integration API (Application Programming Interface) is a Java-based API and server that enable
developers to create client code that can directly and seamlessly access Primaveras project
management database.
There are four modes or Levels in which planning and scheduling software may be used.
Course Levels
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
Page 5 of 130
If you do not already have a connection set up, click on the Database ellipse button near the bottom
of the screen to add and edit database connections.
Click Add and you will get a dialog asking for two pieces of information.
Page 6 of 130
Database alias: This is a name for your own use to identify the connection. It can be anything. It is
helpful to make the alias descriptive enough to remind you to which system it connects.
A good practice is to identify the name of the server and the database that the alias represents.
Driver type: There are three options:
Oracle
Microsoft SQL Server/SQL Express
Primavera Compression Server
The next screen asks you to specify oracle connection string.
These are the credentials of a database account set up specifically for the P6 client application. By
default this is named privuser and its password is privuser, but the specific name may be
different, so check with your system administrator.
The Public group ID should be set to 1.
Page 7 of 130
Click Next to validate the connection. If the validation succeeds, then click Finish. You will now see the
new database alias in the Edit Database Connections screen.
Enter login name and password, then press Ok, and you will be logged into the P6 client.
Page 8 of 130
When you log into P6 the first time, you should be presented with a screen similar to the following
screenshot:
At the very top is the set of application menus that are standard to most Windows applications, such
as File, Edit, View, and Help, plus a few that are specific to P6: Project, Enterprise, and Tools.
The main screen also contains toolbars across the top, left, and right-hand sides. These toolbars
contain icons which provide quick ways to access parts of the program. They are highly customizable.
Floating toolbar: This toolbar will remain on top of the screen while you work on the main screen, and
can be moved around as desired.
The central portion of the screen is filled with a set of screens which appear as tabs as you open up
different modules. These are the main screens for working on projects.
Page 9 of 130
Projects generally shows all projects available to the user. If a particular Portfolio is selected, then
only those projects within the portfolio will be shown.
Resources shows global and project resources available.
Reports show the reports that are available within the Windows client.
Tracking lets you compare project properties in a 3-pane window.
Activities are the main screen for managing project activities.
WBS is the main screen for managing project Work Breakdown Structure.
Resource Assignments is the main screen for managing resources.
WP & Docs is for managing Work Products and Documents.
Project Expenses is for creating and managing project expenses.
Project Thresholds sets the threshold for triggering issues.
Project Issues lets you manage and track project issues.
Risks (not available in the Optional Client) are used to manage project risks.
Opening a Project
Open projects from the project table in the projects window or the open project dialog box. The open
project dialog box shows all projects you are authorized to open.
Open a single project by Right click and then select open project,
Select project and click on button
Select project and press Ctrl+O
Page 10 of 130
The Users Tab shows which users are assigned to the OBS node. When users are assigned, they
are also assigned a specific Project Security profile which determines their access within the
EPS, Project, or WBS element associated with the OBS node.
Page 11 of 130
Responsibility Tab is where users are assigned to specific elements in P6. An OBS element (and
hence its users) may be associated with an EPS node. In that case the security level is passed
down to all projects within that EPS node.
An OBS can be associated with a specific project, or even with WBS elements within a project.
Page 12 of 130
In Professional, choose Enterprise > Enterprise Project Structure to bring up the EPS management
screen.
The first two are straightforward. EPS ID is a unique identifier, a convenient and short way to describe
the element, whereas the EPS name is a more verbose description. Responsible Manager shows what
OBS element has rights over that particular EPS node.
Note that the OBS elements shown have the same name as their EPS nodes.
In the upper left-hand corner of the main EPS screen is a dropdown called Display: EPS. This can be
used to alter how the EPS is displayed.
By default the EPS screen is shown in table view, which lists the EPS elements in a tree. You can also
choose Chart View to see a chart-centric display of the EPS.
Page 13 of 130
The Chart View shows the EPS as you might display it on a wall chart.
Now that we have seen how to manage the EPS, let us examine what EPS does. Every project in P6
must exist within a single EPS node. One of the standard project layouts in P6 shows all projects within
the EPS structure. This is a common way of displaying projects.
Page 14 of 130
Next, provide a project ID and name. Choosing a good project ID is important, as this will simplify
updates, reporting, and managing backup and restore files.
The next screen lets you enter the Project Planned Start date and optionally, the date by which the
project must finish.
Page 15 of 130
Note: that we highly discourage entering a project finish date. After all, a foundational strength of P6
is its ability to calculate the finish date!)
Next, choose the Responsible Manager for the project. This is the OBS element that will own the
project.
The next screen lets you choose the default billing rate to use for roles and resources assigned to
activities.
Page 16 of 130
At last, the final wizard screen lets you press Finish to complete your project.
By default, not all of the tabs are shown in this screenshot. To add and remove tabs from the project
details screen, right-click anywhere in the Details tab and choose Customize Project Details.
The General tab lets you set certain high-level information about the project. While the Project ID,
Project Name, and Responsible Manager were entered in the wizard screens, they may be changed
here as well.
Project Status can be set to one of four values:
Planned: Progress Reporter users cannot access the activities
Active: Progress Reporter users can access activities
Inactive: Progress Reporter cannot access activities
What-if: Progress Reporter users cannot access activities, and
closed projects will not show in resource profiles
Page 17 of 130
The Responsible Manager was also set in the new project wizard and it is the OBS element
responsible for the project.
Project Leveling Priority can range from 1 (highest) to 100 (lowest). When multiple projects are
scheduled, this determines the order in which projects are considered when leveling resources across
projects.
Check Out Status shows whether a project is checked in or out and Checked Out By shows who has
checked out the project. The Date Checked Out shows when that user checked out the project. Check
out is very helpful. It allows one user to lock the project for their exclusive use for a period of time.
For example, a scheduler may want to ensure that no one is changing anything about the project
while the schedule status update is being performed. It is important to always check a project back in
after exclusive use is no longer needed.
Notebooks Tab allows you to enter information about a project. The Notebook tab lets you enter a
number of notebook topics, each with its own notebook entry. The notebook topics are set through
the menu item Admin > Admin Categories.
Notebooks exist not only for Projects, but also can be added to any EPS, WBS, or activity.
Budget Log Tab Use the Budget Log to enter project budget information. Note that budgets can also
be entered at the WBS and EPS level. The budget information is not shared among the EPS, Project,
and WBS. Instead, they are treated as independent values. You may enter the original budget
manually.
Page 18 of 130
Spending Plan Tab enters monthly amounts into the Spending Plan tab. This allows you to set the
expected cash outlay for the project. The months shown begin three months before the project start
and extend to four years after the project start date. Unfortunately, there is no way to extend the
spending plan beyond these four years for longer-term projects.
Budget Summary Tab summarizes the information from the Budget tab and the Spending Plan tab. It
is display only.
Dates Tab shows what is a schedule without dates? The Dates tab shows you high-level dates for your
project.
Project Planned Start was entered when the project was created, and can be changed in this tab. If
the project has activities, then this date is based on them. If the project as no activities but does have
an Anticipated Start, then that value is used.
Page 19 of 130
Anticipated Start and Anticipated Finish are dates entered by the user as their best guess about the
project schedule. These dates are completely free of constraints, and can serve as a helpful reality
check on the dates that arise from the scheduling algorithm.
Funding Tab which is your project may have funding sources that you wish to track. In the Funding tab
you can choose funding sources and assign amounts and percentages. The list of funding sources is
defined through the menu item Enterprise > Funding Sources.
Codes Tab (project level) which are project codes allow for grouping, sorting, and filtering projects.
They are used extensively and allow you to organize your project in many ways, particularly for
reporting and when performing portfolio analysis.
The Defaults tab lets you set a variety of activity-level defaults that help you to manage your projects
efficiently. These defaults are project-specific, so apply to all users who are working on the project.
Page 20 of 130
Resources tab also lets you define default settings for resources.
Last Summarized On shows the last time that the project data was summarized. Summary data is
used for reporting and project analysis.
Summarize to WBS Level indicates the level at which the project is summarized. As summarization
can be a slow process, and as summaries are not necessarily needed at every level, you can set the
summarization value so that the level of summary is right for the specific project.
WBS separator is the symbol to use when showing WBS names in the tree. For example, if you have
WBS elements A, B, and C, each as successive children under the other, then by default, they will be
displayed as A.B.C.
.
Fiscal year start month can be set as well to match your company's or your client's fiscal year.
The Baseline for earned value calculations can be set to use the calculated project baseline or user's
primary baseline. If you want all the users to see the same calculations, use the project baseline.
Page 21 of 130
How a project Defines Critical Activities can be set as either those activities that are on the longest
path to complete the project, or those activities whose total float is less than the specified amount.
The Calculations tab lets you set default behaviors for activities and resources in the project.
Project Codes
One key to manage a portfolio of projects is to have meaningful project codes. To edit project codes,
go to Enterprise > Project Codes.
The project codes themselves can be modified by pressing the Modify button that brings up the
following screen:
Page 22 of 130
Page 23 of 130
Page 24 of 130
Within a project, activities can be grouped, filtered, planned, and organized by Work Breakdown
Structure (WBS).
WBS elements representing milestones can be added as well to enable simplified reporting and
tracking.
Page 25 of 130
To see the WBS details, open up the WBS screen, right-click, and choose WBS Details. This will bring
up a tabbed window as shown in this screenshot. If you do not see all of the tabs, right-click on the
top of the Tab window and choose Customize WBS Details.
The General tab shows high-level details about the selected WBS element. WBS Code and WBS
Name can be edited here.
Status can be set to Active, Inactive, Planned and What-if. Responsible Manager is the OBS
element responsible for this WBS item, and governs which users have which security access to
the activities in this WBS item.
Anticipated Start is set during the planning stage, and does not figure into scheduling once
activities are created. Anticipated Finish is set during the planning stage, and does not figure
into scheduling once activities are created.
Notebooks Tab for WBS behaves the same as notebooks for Projects, as described previously.
WBS Milestones Tab at the WBS level allow you to set a list of items to be completed at the
WBS level. These are merely milestones, and do not have dates or resources, or in any way
affect the schedule.
Page 26 of 130
Earned Value Tab is a large topic and will explain in details in Earned Value section. So in this
section we will briefly review the EVM settings available for the Project WBS.
WPs & Docs Tab (Work Products and Documents) allows you to provide documentation for the
project. Examples include material safety data sheets, punch lists, specifications, project
manager notes and reports, product guides, and more.
To add a document, choose Assign, and select the appropriate document. You may also specify
whether the document is a work product, such as an engineering design.
Before you can assign WPs and Docs, you must create them at the project level.
Let's take a quick trip out of the WBS settings to see how that is done. On the left-hand toolbar,
click on the icon to open up the WPs & Docs window
The WPs & Docs window is shown in the following screenshot:
Page 27 of 130
Budget Summary Tab and Spending Plan Tab are the same as the project details section but in
WBS levels.
Page 28 of 130
Lesson 5: Calendar
Calendar overview
Resources by definition are constrained. A person works only so many hours per day. A person also
has a defined set of non-work times such as weekends and holidays. Likewise, equipment may be
available only at certain times. In this section, we mentioned that a resource can be associated with a
calendar.
Let us now discuss the definition and use of calendars. Calendars describe the time available for
project work.
A calendar can be defined at three levels:
A resource calendar is designed to work for a specific resource. Furthermore, calendars can be
assigned to activities and to the resources assigned to that activity.
Global calendars are available to all activities and resources.
Project calendars can only be used within a specific project, and can be assigned to activities
within the project.
A project can also have a default calendar, which may be either a project calendar or a global
calendar.
Resource calendars can be assigned to resources. If a resource calendar is shared with more than one
resource, it is called a shared calendar.
Calendar in P6
To edit calendars, choose from the main menu Enterprise > Calendars.
Page 29 of 130
A screen like the one shown in the previous screenshot appears. Use the buttons at the top to show
global, resource, or project calendars.
Add button brings up a screen to add a new calendar. We will cover this further on.
Delete button will delete a calendar. If the calendar is being used anywhere, then you will be
prompted either to select a replacement calendar or to replace it with the default global
calendar.
Modify button lets you modify the calendar, as discussed further on.
Used by button will show which items are using the selected calendar. This is very helpful to
view before attempting to delete a calendar.
To Global button allows you to copy a specific calendar to the global calendar list.
To Shared Button allows you to copy a personal resource calendar to a shared calendar.
To Personal Button allows you to copy a shared calendar to a specific resource calendar?
Modifying calendars
No matter what kind of calendar you are using, the screen for editing a calendar is always the same,
as shown in the previous screenshot. You set up the normal hours of work for each day of the work
week by choosing the button titled Workweek.
At the top of the screen are two main choices of how you want to assign hours on a daily basis: Total
work hours/day and Detailed work hours/day.
If you choose Total work hours/day, then for each day you simply assign the number of hours
available for work.
Page 30 of 130
In the following screenshot, we choose Sat the 5th and set it to be a non-work day with zero hours.
The following screenshot shows a standard work week with hours worked:
When you choose Detailed work hours/day, things become more fine-grained. The small section
called Work hours/day which changes to show all hours available in a day, broken into 30-minute
increments. You can set any 30-minute interval as available or unavailable for work by double-clicking
on it. By doing this, you can, for example, set lunch hours or other break periods in your calendar.
On the main calendar screen you can also set a day to be a working day by selecting the date and
double-clicking it, or by pressing the Work button.
Likewise, you can make a workday a non-work day by double-clicking or pressing the Nonwork
button.
Page 31 of 130
Hours per time period can be set by pressing the Time Periods button. This tells P6 how to translate
among the various time units. This setting affects the calculations for durations for all components
using this calendar.
When new activities are added to a project, the calendar used is the default calendar for the project.
Calendars in P6 work like umbrellas: imagine overlapping umbrellas and the lowest level is resource
calendars. Above that at the next layer is an activity calendar, then a project calendar, and finally a
global calendar. They all combine to calculate dates in P6 for the scheduled project.
Page 32 of 130
The logic is used to calculate dates, otherwise the default dates will be shown as they relate to the
Datamore on this later.
Milestone Activity which is an important checkpoint of your project is tracked as milestones. Some of
them could be listed in your contract as requirements of successful completion and some could just
be significant points in the project that you want to keep track of.
Page 33 of 130
Sequence Activities
It is the process of identifying and documenting relationships among the project activities. The key
benefit of this process is that it defines the logical sequence of work to obtain the greatest efficiency
given all project constraints.
Precedence Diagramming Method (PDM): Activity-on-node (AON)
The precedence diagramming method (PDM) is a technique used for constructing a schedule model in
which activities are represented by nodes and are graphically linked by one or more logical
relationships to show the sequence in which the activities are to be performed. Activity-on-node
(AON) is one method of representing a precedence diagram. This is the method used by most project
management software packages.
PDM includes four types of dependencies or logical relationships. A predecessor activity is an activity
that logically comes before a dependent activity in a schedule. A successor activity is a dependent
activity that logically comes after another activity in a schedule. These relationships are defined below
and are illustrated in below figure:
Page 34 of 130
Page 35 of 130
Duration Type
None of the Duration Type options affects how the schedule calculates until one or more resource is
assigned to an Activity. The following options are available:
Fixed Units
Fixed Duration and Units/Time
Fixed Units/Time
Fixed Duration & Units
lf you do not plan to add resources to Activities, then you do not need to assign a Duration Type and
it may be left as the default. This topic will be covered in detail in the Assigning Roles and Resources
Expenses lessons.
Percent Complete Type
It should be understood if it is intended to be used to update (status or progress) the schedule. In
Primavera this option may be set for each activity individually and the default for new activities is set
in the Percent Complete Type drop down box. Primavera has many Activity Percent Complete fields
that may be displayed in columns and we will discuss four of them now:
Activity % Complete which may be linked to one only of the three following % Complete fields
and is always linked to the % Complete displayed in the bars:
Physical % Complete which is independent of activity resources and durations,
Duration %Complete which is lined to activities durations, and
Units % Complete which is linked to resources Units.
Page 36 of 130
Default % Complete
There are three percent complete options; each new activity is assigned the project default Percent
Complete Type and then this may be edited for each activity as required.
The Default% Complete Type for each new activity in each project is assigned in the Defaults tab of
the Details form in the Project Window:
Page 37 of 130
Page 38 of 130
Page 39 of 130
Page 40 of 130
Assign resource (in this level, we dont need to add any resources). So press Next button.
Page 41 of 130
Page 42 of 130
Page 43 of 130
Feedback Tab This is where comments made in the timesheet module may be viewer.
WP's&Docs Tab This is where files that have been listed in the Work Products and Documents
Window may be associated with activities and then opened from this form.
Codes Tab Project Codes may be created and activities associated with these codes with this form.
Relationships & Predecessors & Successors Tabs These are where the activity's predecessors and
successors are added, edited and deleted. They will explain in next section.
Page 44 of 130
Page 45 of 130
Page 46 of 130
Formatting Columns
Selecting the Columns to be displayed: The columns are formatted through the Columns form which
may be opened by:
Select View> Columns or
Click on the
button, or
Right-click to open a menu and select Columns.
and
buttons. The
Page 47 of 130
Click Add, and then type the name of the global activity code. Specify the maximum number of
characters for the activity codes values.
Page 48 of 130
Page 49 of 130
Page 50 of 130
Or
Under Group By, click the first available line, then select the project, EPS, or global activity code by
which you want to group.
Page 51 of 130
Display Options
Show Group Totals is a new function in Primavera Version 6.0 which when unchecked hides the summary data
in the bands, which prevents the truncating of Band titles.
Show Grand Totals This displays a Summary band for the project and adds up all the costs and hours
for a project, displays the earliest and latest dates and a summary duration for the whole project. This
feature is very useful when the project is not organized by WBS and therefore has no project total
line, or when multiple projects have been opened to calculate all the projects' values.
Page 52 of 130
Show Summaries Only hides all the activities and displays only the WBS or Codes that have been used
to summarize the activities:
Shrink vertical grouping bands is new to Primavera Version 6.0 and narrows the Vertical Bands on the
left of the screen. This is useful in projects with a number of Ievels in the WBS as this provides more
usable screen space and paper width for printing.
Page 53 of 130
When a hierarchical code such as a WBS is selected and the lndent is NOT selected on a line then the
subsequent bands are NOT completed by the software and other bands may be selected. The WBS is
not displayed hierarchically.
The To Level option decides how many Ievels of the hierarchical code structure such as the WBS will
be displayed. All activities are displayed under the lowest Ievel of WBS, as chosen from the To Level
dropdown box. This option enables other banding below the select Ievel which is not permitted with
the All option.
Group Interval This option is available with some fields such as Total Float, where the interval may be
typed in, and Date fields, where a drop down box enables the selection of the time interval used to
group activities:
Page 54 of 130
Font and Color Double-click these boxes to open the Edit Font and Color form to change the font and
color of each band.
Group By Options
Sort Banding Alphabetically When a hierarchical code is selected; the bands are sorted by the
Code Value. lf this box is checked, the bands will be sorted alphabetically by the Code
Description.
Hide if empty Check this box is used to hide bands that:
Have not been assigned an activity, or
When activities have been filtered out and only the bands remain.
This function is useful when you have filtered on a couple of activities and the screen is filled
with blank bands. This will remove all the blank bands.
Show Title, Show ID I Code and Show Name I Description
These options format the display of the band title. lt is not possible to uncheck all the options as
there then would not be a title in the band. The options change depending on the data
displayed in the band:
Page 55 of 130
Establishing Relationships
View relationships in the Gantt chart
To assign relationships in the Gantt chart, make sure relationships are displayed onscreen. Click the
Layout Options bar, and then choose Bars. Click Options in the Bars dialog box.
Click the General tab in the Bar Chart Options dialog box and mark the Show Relationships checkbox,
then click OK.
Page 56 of 130
To move through the chain of activities, click a predecessor or successor of the selected activity. To
modify the number of predecessor/successor levels, click the Layout Options bar and choose Track
Logic Options.
Page 57 of 130
You can also use the Predecessors or Successors tabs in Activity Details to assign relationships. The
Relationships tab combines the predecessor and successor information in a single tab. The data
stored in the Relationships tab is synchronized with the information in the Predecessors and
Successors tabs.
Page 58 of 130
Page 59 of 130
Three lines
Date Interval sets the timescale and has the options in the picture to the right:
The Week/Day 1 displays the Days like this:
Shift Calendar breaks the day into time intervals to suit the shift intervals when the Day/Shift
option has been selected.
Page 60 of 130
Date Format
Calendar displays a normal calendar.
Fiscal Year displays the fiscal year in the year line. The Fiscal Year Start Month is set in the
Settings tab of the Project Details form in the Projects Window.
Week of the Year displays the week of the year starting from "1" for the first week in January
and is often termed Manufacturing Week.
Ordinal Dates displays the timescale to be counted by the unit selected in the Date lnterval.
This is useful for displaying a schedule when the start of the project is unknown. Ordinal dates
display the time scale by counting in the selected units starting from a user definable start date.
Page 61 of 130
The following notes are the main points for using this function. Detailed information is available in the
help facility by searching for "Bar styles dialog box."
Each bar listed in the table may be displayed on the bar chart by checking the box in the Display
column.
New bars may be added by clicking on the
button.
The
and
buttons are used to move the bars up or down the Iist and
therefore determine which bar is drawn on top of the next.
The Name is the title assigned to the bar and may be displayed in the printout legend.
Page 62 of 130
The bars may be placed on one of three rows numbered from 1 to 3, from top to bottom one bar
above the other. lf multiple bars are placed on the same row, the bar at the top of the Iist will be
drawn first and the ones lower down the Iist will be drawn over the top.
Eng. Ibrahim Farag, PMP, CMRP, Reliability Green Belt
Page 63 of 130
After summarizing:
When formatting the Bar Style for Milestones it is important to take note of the checked boxes and
Filter format. lf the box Show bar for grouping bands is checked, Milestones will appear at the ends of
Summary Bars and not in line with the actual activities they belong too. The filter in this case will read
Summary and not Milestone.
Bar Necking displays a thinner bar during times of inactivity such as weekends and holidays and
applies only to Current Bar setting column in the Bars form.
Calendar non-work time necks the bar based on the activity's calendar.
Activity non-work intervals necks the bar when Out of Sequence Progress options of Actual
Dates or Retained Logic causes a break in the work. See the Advanced Scheduling Options
paragraph.
Page 64 of 130
There is no Resource Bar available and Primavera will not neck on the resource calendar so when an
activity is Resource Dependent and the resource is on a different calendar to the activity then the bar
may neck when the resource is working or not necked when the resource is not working.
Bar Labels Tab
This tab enables the placement of text with a bar, above, below, to the left and to the right. The
following pictures show how the start and finish dates are formatted and displayed on the bar chart:
Select the Position and Label from the drop down boxes in the Bar Labels tab.
Bar Chart Options Form
The Bar Chart Options form is displayed by clicking on the
selecting View > Bar Chart Options:
Page 65 of 130
The General tab has a variety of options for formatting the bar chart which are mainly selfexplanatory.
Show Relationships shows the relationships between activities.
Show Legend Displays a legend on the bar chart in the Activities view, see the following
picture:
The default size of the box displaying a Notebook topic may be set in the Bar Chart Options form,
General tab, which is displayed by clicking on the
button from the Bars form.
The Collapsed Bar tab is to format the bars when a WBS band has been collapsed and displays a
summarized bar.
The Data Date tab is for formatting the Data Date, its style, color and size.
Progress Line Display on the Gantt Chart
A progress line displays how far ahead or behind activities are in relation to the Baseline. Either the
Project Baseline or the Primary User Baseline may be used and there are four options:
Difference between the Baseline Start Date and Activity Start Date,
Difference between the Baseline Finish Date and Activity Finish Date,
Connecting the progress points based on the Activity% Complete,
Connecting the progress points based on the Activity Remaining Duration.
Selecting View > Progress Line to hide or display the Progress Line.
Note: lf you use either of the options of Percent Complete or Remaining Duration then you must
display the appropriate Baseline Bar that has been selected as the Baseline to use for calculating
Progress Line.
Page 66 of 130
Lesson 9: Filters
Understanding Filters
Primavera has an ability to display activities that meet specific criteria. You may want to see only the
incomplete Activities, or the work scheduled for the next couple of months or weeks, or the Activities
that are in-progress.
Primavera defaults to displaying all activities. There are a number of pre-defined filters available that
you may use or edit. You may also create one or more of your own.
A filter may be applied to display or to highlight only those activities that meet a criteria. There are
four types of filters:
Default filters which are supplied with the system and may not be edited or deleted but may be
copied and then edited or modified and are often used in conjunction with the display of bars.
Global filters which are made available to anyone working in the database, and
User-Defined filters which are defined by a user and available only to that user unless it is made
into a Global filter.
Layout filters which make the filter only available when the current Iayout is applied.
Applying a Filter
To apply, edit, create or delete a filter open the Filter form by the following:
Click on the
button, or
Select View > Filters or
Right-click in the columns area and select Filters.
Page 67 of 130
and
New filters will be created in the User-Defined filter area at the bottom of the Iist.
Page 68 of 130
Modifying a Filter
There are a large number of options available to create a filter and from the following examples you
should be able to experiment and add your own filters.
To modify an existing filter, select it from the Filters form and click the
button.
Page 69 of 130
Page 70 of 130
A delay in any one of the critical path activities will cause the entire project to be delayed.
For example:
The Float (Slack) for any activity is the amount of time that it can slip before it causes your project to
be delayed. The goal is to find the float for any activity. Which is float tells you how much extra time
you have.
For above figure the float for next path = 4 (Critical Path) 3 (Other Path) = 1 Day
Page 71 of 130
For Example:
Page 72 of 130
To help understand the calculation of late and early dates, float and critical path, we will now
manually work through an example. The boxes below represent activities.
The forward pass calculates the early dates: EF = ES + DUR- 1
Start the calculation from the first activity and work forward in time.
The backward pass calculates the late dates: LS = LF- DUR + 1
Start the calculation at the last activity and work backwards in time.
Page 73 of 130
Total Float is the difference between either the Late Finish or the Early Finish or the difference
between the Late Start and the Early Start of an activity. The lower 2 days' activity has float of 14- 12 =
2 days. None of the other activities have float.
The Critical Path is the path where any delay causes a delay in the project and runs through the top
row of activities.
Free Float the amount of time that a schedule activity can be delayed without delaying the early start
date of any successor.so it is the difference between the Predecessor Early Finish and the Successor
Early Start.
An activity may not be on the Critical Path and may have more than one predecessor. A Driving
Relationship is the predecessor that determines the Activity Early Start.
Scheduling in Primavera P6
After you have your activities and the logic in place, Primavera calculates the activities' dates/times.
More specifically, Primavera Schedules the project to calculate the Early Dates, Late Dates, Free Float
and the Total Float. This will enable you to review the Critical Path of the project.
Select Tools> Schedule or
Press the F9 button to open the Schedule form or,
Click on
Page 74 of 130
Check the Current Data Date, which before a schedule is progressed should be the start date of the
project.
Click on the
button .
Ensure the "Log to file" checkbox is checked to display the scheduling log report. After scheduling a
project, reopen the scheduling form and click the "View Log" to review the log report.
Sometimes it is preferable to have the software recalculate the schedule each time an edit is made to
an activity which affects an activity dates. To turn on automatic calculation, select Tools > Schedule or
F9 button Then press on
. Select Schedule automatically when a change affects dates.
Page 75 of 130
Page 76 of 130
Assign a Baseline Type from the dropdown box. Baseline Types are defined in the Admin > Admin
Categories form, Baseline Type tab.
Page 77 of 130
Deleting a Baseline
To delete a project baseline from the database:
Open the Baselines form by selecting Project, Maintain Baselines ... ,
Select the baseline project to be deleted, and
Click on the
button.
button.
Page 78 of 130
Page 79 of 130
Page 80 of 130
Percent Complete
The Percent Complete type should be understood if it is intended to be used to update (status or
progress) the schedule. in Primavera this option may be set for each activity individually and the
default for new activities is set in the Percent Complete Type drop down box. Primavera has many
Activity Percent Complete fields that may be displayed in columns and we will discuss four of them
now:
Activity% Complete, which is displayed on the % Complete Bar, may be linked to one only of
the three % Complete fields following:
Physical % Complete
Duration %Complete
Units % Complete
Page 81 of 130
Page 82 of 130
Page 83 of 130
Lesson 4: CONSTRAINTS
Dependency Determination Overview
There are two types of dependencies that are discussed in scheduling:
Mandatory dependencies (Hard Logic): They are those that are legally or contractually required
or inherent in the nature of the work. They often involve physical limitations.
Discretionary dependencies (Soft Logic): They are established based on knowledge of best
practices within a particular application area or some unusual aspect of the project where a
specific sequence is desired, even though there may be other acceptable sequences.
Constraints in P6
They are used to impose logic on activities that may not be realistically scheduled with logic links. This
lesson will deal with the following constraints in detail:
Start On or After
Finish On or Before
These are the minimum number of constraints that are required to effectively schedule a project.
Start On or After (also known as an "Early Start" or "Start No Earlier Than" constraint as it only
affects the Early dates calculation) is used when the start date of an activity is known and does not
have a predecessor. Primavera will not calculate the activity early start date prior to this date.
Finish On or Before (also known as "Late Finish" or "Finish No Later Than" constraint as it only affects
the Late dates calculation) is used when the latest finish date is stipulated. Primavera will not
calculate the activity's late finish date after this date.
The following table summarizes the methods used to assign Constraints to Activities or how to add
notes to activities:
Setting a Primary and Secondary constraint with the Activity Details : Open the Status tab on
the Activity Details form.
Setting Constraints using columns The following columns may be displayed and the constraints
assigned or edited:
Primary Constraint
Primary Constraint Date
Secondary Constraint
Secondary Constraint Date
Expected Finish Date
Page 84 of 130
Page 85 of 130
Mandatory Finish:
This relationship prevents float being calculated through this activity and effectively breaks a
schedule into two parts.
Expected Finish:
An Expected Finish sets the Early Start to equal the Expected Finish constraint date and
calculates the Remaining Duration from the Early Start date for an un-started activity, or Data
Date if the activity is in-progress, and the assigned Expected Finish date.
Earlier Than constraints operate on the Early Dates, and Later Than constraints operate on Late
Dates.
Assigning Constraints
Number of Constraints per Activity
Two constraints are permitted against each activity. They are titled Primary and Secondary Constraint.
After the Primary has been set, a Secondary may be set when the combination is logical and therefore
a reduced Iist of constraints is available from the Secondary Constraint Iist after the Primary has been
set.
Setting a Primary Constraint Using the Activity Details Form To assign a constraint using the Activity
Details form:
Select the activity requiring a constraint,
Open the Status tab on the Activity Details form,
Select the Primary Constraint type from the Date drop down Iist under Primary:
Page 86 of 130
Setting a Secondary Constraint Using the Activity Details Form To assign a constraint using the
Activity Details form:
Select the activity requiring a constraint,
Open the Status tab on the Activity Details form,
Select the Secondary Constraint type from the Date drop down Iist under Secondary:
Page 87 of 130
Imposing a Must Finish By date makes Primavera calculate the late dates from the Must Finish By
date rather than the calculated early finish date. This will introduce positive float to activities when
the calculated Early finish date is prior to the Must Finish By date.
This will also create negative float when the activity's calculated early finish date is after to the must
finish by date, but it is not obvious where the negative float is being driven from as there are no
constraints assigned to activities:
Note: lt is not obvious where the float is being generated after a Must finish by date is imposed on a
project. This is often confusing to people new to scheduling and it is recommended that you do not
use a Must finish by date. Instead tie all activities to a Finish milestone which has a Late finish
constraint.
Eng. Ibrahim Farag, PMP, CMRP, Reliability Green Belt
Page 88 of 130
Understanding Layouts
A standard Load of Primavera is supplied with a number of predefined Layouts for some of the
Windows which are defined by default as Global Layouts and any user on the system may apply these.
These Layouts may be copied and shared with other users or be available to the current user in a
similar way as filters. Primavera Version 6.0 introduced Project Layouts for the Activity Window.
Project Layouts are only available when a project is open and may be exported with a project and
therefore minimizes the need for Global Layouts.
Applying an Existing Layout
Layouts may be applied from the Open Layout form by:
Selecting the Open option from the Layout Options bar:
The Open Layout form will be displayed and an alternative Iayout may be selected from the Iist. The
Iist will has three headings after a project Iayout has been created, Global, User and Project:
Page 89 of 130
This Iayout may now be edited and the edits saved by selecting:
From the menu View > Layout, Save, or
From the Layout bar Layout, Save.
Changing Activity Layout Types in Panes
To change a Layout Type in a pane select from the menu:
View, Show on Top, or
View, Show on Bottom.
Page 90 of 130
Page 91 of 130
Activity Cost
Direct Cost
(Resources)
Time Related
In-Direct Cost
(Expenses)
Unit Related
Labor
(Persons)
Non-Labor
(Equipment)
Material
Category 1
Category 2
.......
Page 92 of 130
Understanding Resources
There are typically two methods of using the Resource function for resource planning:
Individual Resources, and
Group Resources
Individual Resources
These resources are individual people who are often responsible for completing the activity or tasks
associated with activities to which they have been assigned. This is typically work undertaken in an
office environment, such as an IT development project, where timesheets are often completed by the
people undertaking the work and the timesheet system is directly linked to the scheduling system.
ln this situation, the updating of Activities that are in-progress is completed by the person assigned as
a Resource to an Activity, often via the timesheet system, and the scheduler has a review function in
the project updating.
Group Resources
These resources represent groups of people, such as trades or disciplines on a construction site. On
very large projects gangs or crews, which would be made up of equipment and a number of different
trades, could also be considered. The person responsible for the work is not a resource assigned to an
activity and individual people doing the work will not be assigning their timesheets directly to
activities in the schedule.
Also, in this environment the scheduler normally updates the activities and the resources. ln this
situation it is recommended that a minimum number of resources be assigned to activities. This is
because every resource added to the schedule will need to be updated and as more resources are
added, the scheduler's workload will increase.
Page 93 of 130
Creating Roles
Roles are created, edited and deleted in a similar method as WBS's.
To create, edit or delete a Role select
Enterprise > Role. to open the Roles form.
Page 94 of 130
ln the Price tab each Role may be assigned Up to 5 rates (the same number of rates as resources) may be
assigned to roles which may be used for estimating and cash flow forecasting of projects before the actual
resource completing the work is assigned to the activity.
All data columns in this form may be sorted by clicking on the column titles. The default rate for a
project is selected when a project is created and may be changed in the Projects Window > Resources
tab, Assignment Details area.
Page 95 of 130
Page 96 of 130
Adding Resources
New Resources are added and deleted in a similar method to adding Activities in the Activity Window.
Use the Insert key, right-click and select Add, or use the Command toolbar by clicking on
The
button.
General Tab
The fields in this tab are self-explanatory:
The Resource ID and Resource Name are mandatory,
The Employee ID, E-Mail Address, Title and Office Phone are optional, and
When the Active box is unchecked, the Resource is inactive and indicates that the resource is
not available. When assigning Resources to Activities there is a filter to display only active
Resources.
Page 97 of 130
Codes Tab
Resource Codes are assigned to Resources allowing additional facilities to sort and report on them in
the Resource Usage Spreadsheet.
Details Tab
Resource Types
There are three types of Resource:
Labor, intended for people
Non Labor, intended for equipment used to perform project work
Material, intended for materials/supplies.
Material Resources may be leveled and have the following differences from other resources:
They may be assigned a Unit of Measure, which is created in the Admin > Admin Categories
then go to unit of Measure tab. This is not available to Labor and Non-labor resources.
Currency
An alternative Currency may be associated with a resource. This will not affect how the Resource
Unit Rates costs are entered but provide a further tagging mechanism for sorting and reporting.
Overtime
A Labor Resource may be allowed to record Overtime in the Primavera timesheet system when the
Overtime box is checked and the costs derived from the Unit Rates are multiplied by the Overtime
Factor.
Page 98 of 130
Calendar
The Resource is assigned a Global or Resource Calendar in this form. This calendar is used to display
the resource Limits.
Default Units/Time
The Default Units/Time is the value that a resource adopts when it is first assigned to an activity.
Select Edit, User Preferences, Time/Units tab and select the preferred display from the Units/Time
Format section:
Page 99 of 130
Shifts
Resource Shifts are used when leveling and should not be assigned unless they are being used.
Resource Shifts are created in the Resource Shifts form which is opened by selecting Enterprise
> Resource Shifts.
The Resource Shifts and the number of shifts a resource works is assigned in the Units and
Prices tab, Shifts Calendar.
Roles Tab
A Resource may be assigned more than one role, and their Proficiency for the Role, in this tab.
When multiple Roles are assigned, one is assigned as the Primary Role.
Notes Tab
Notes may be added here in the similar way as with Activities but there are no Note book topics
available.
Expenses
Expenses are intended to be used for one off non-resource type costs and could include:
Purchase of office equipment to set up a project office,
Travel costs,
Payment for a consultant's report,
Insurance costs, and
Training courses.
Expenses may be created using the:
Expenses Window and assigned to an activity, or
Created in the Expenses tab of an activity.
Creating a new Expense is similar to creating a new activity:
Select Edit, Add, or
Strike the Ins key.
The Select Activity form will then be displayed and the activity the expense is to be associated
with is selected.
Activity tab displays information mainly adopted from an activity, the Accrual Type, is editable:
Accrual Type - this enables you to select if the costs are accrued or cash flowed at the
beginning, end, or uniformly over the duration of the activity.
Description tab is where you enter an extended description of the Expense item.
In resource smoothing, as opposed to resource leveling, the projects critical path is not
changed and the completion date may not be delayed.
Automatically Level resources when scheduling- Levels the schedule each time the schedule is
recalculated.
Consider assignments in other projects with priority equal/higher than. Levels resources and
at the same time considers the demands of other projects. The leveling priority is set in the
Projects Window, General tab.
Preserve scheduled early and late dates-in simple terms, when unchecked enables the option
of Late Leveling. This is explained in more detail in the following paragraphs as the
computations are a little more complicated. Late Leveling pushes toward in time activities from
their late dates to meet the resource availability and provides the latest dates the activities may
be started and finished without delaying the finish date of the project.
Recalculate assignment costs after leveling - is used with the resource Effective date and
Price/Unit. These facilities allow a change in the cost of a resource over time. The Resource
Costs are recalculated based on the resource Price/Unit if an activity is moved into a different
price bracket when this check box is marked.
Level all resources- if checked, the schedule Ievels all the resources; if unchecked, enables the
Select Resources form to be opened and one or more resources selected for leveling.
Level resources only within activity Total Float
When checked, the leveling process will not generate negative float but may not
completely Level a schedule. Thus, the activities will only be delayed until all float is
consumed and leveling will not extend the finish date of the project. This option will also
check the Preserve scheduled early and late dates option.
When unchecked, leveling will allow activities to extend beyond a Project Must Finish By
date, when assigned in the Projects Window Dates tab or beyond the latest date
calculated by the schedule and may create Negative Float.
Preserve minimum float when leveling- works with Level resources only within Total
Float and will not Level activities if their float will drop below the assigned value.
Max percent to over-allocate resources - works with Level resources only within activity
Total Float and enables the doubling of the resource availability, although this is not
displayed in the histograms.
Leveling priorities: - sets leveling the priorities and activities are assigned resources according
to the Data item chosen in the first line. lf two activities have the same value in the first line
then the priority in the second line is used. The Activity ID is the final value used to assign
resources. There are many options for leveling priority and the following are some to consider:
Activity Leveling Priority is a field that may be set from 1 Top to 5 Lowest, the default is 3
Normal. Those with a priority 1 Top are assigned resources first.
Activity Codes or User Defined Fields and many other data fields such as Remaining
Duration, Early Start, Total Float and Late Start may be used to set the priority for leveling.
Resource Curves
Resource Curves enable a non-linear assignment of resources to schedules. These are often used on
long activities where there is not a requirement for a linear assignment of resources.
Select Enterprise > Resource Curves ... to open the Resource Curves form:
The Activity Percent Complete may be updated in the Status tab of the Activities Window where the
Percent Complete Type is also displayed:
Each Percent Complete Type has its own data column. There is also an Activity % Complete column
which is linked to and displays the value from the Percent Complete Type column that has been
assigned to the activity. See the following picture:
The Actual Duration is calculated from the duration of Actual Start to the Current Data Date.
The Activity Units Percent Complete is still calculated from the Resource Units.
Updating Resources
There are many permutations available for calculating resource data. Due to the number of options
available in Primavera, it is not feasible to document all the combinations available for resource
calculation.
Resource units and costs may be updated by either:
Estimating Progress automatically, a process titled Applying Actuals, or
Entering the data using the Resource tab in the Activities Window, or
Entering the data using the right section of the General tab in the Activities Window.
Resource Tab
The Resources tab may be used to update the resource Units (and Costs if the Units and Costs have
been unlinked with the Cost Units Linked field). An updating Iayout could be created and the columns
in the Resources tab formatted to your updating method see the following picture:
Status Tab
The right window may be used for updating the resources.
When there is one resource there will be a direct link between this form and the values
assigned to the resource.
When there is more than one resource there will be a proportional change to all the resource
values when a change is made in this form.
Applying Actuals
This function automatically:
Statuses activities with resources as if they went according to the Planned Dates (this may
change Actual Dates and current schedule dates) and only updates activities in the period from
the old to the New Data Date.
To Apply Actuals:
Select Tools > Apply Actuals ... to open the Apply Actuals form,
lf more than one project is open a different data date may be selected for each project.
The Activity requires the Task Auto Compute Actuals field checked for this function to apply to
an Activity and all the Resources assigned to an activity.
There are some important issues with using Apply Actuals that must be understood:
This function uses the Planned Dates not the current schedule dates to progress a schedule so
Actual Start Dates and the Early Finish dates may be changed by this function. This calculation
process makes this function of little use to most schedulers.
The Apply Actuals function only updates resourced activities and un-resourced activities such as
milestones have to be updated manually when the task Auto Compute Actuals is not checked.
With the introduction of Progress Spotlight there would appear to be no need to use Apply
Actuals to automatically update a project and Update Progress and/or Progress Spotlight could
be used. But as the Update Progress function also re sets Actual Dates to Planned Dates this
make this function also of little use to many schedulers.
Updating Expenses
Expenses are updated in a similar way to resources and will not be covered.
Printing
When a Layout is split, the lower pane may also be printed at the same time unless it is an Activity
Details pane.
Print settings are applied to the individual Layouts and the settings are saved with that Layout. There
are three commands used when printing:
File > Page Setup.
File > Print Preview
File, Print... or Ctrl + P
Print Preview
To Preview the printout, use the Primavera Print Preview option. Select File > Print Preview or click
the
Page Setup
To open the Page Setup ... form:
Click the
button on the Print Preview toolbar, or
Select File > Page Setup ... to display the Page Setup form:
Reports
Click the button on
the Directory Toolbar or select Tools, Reports > Reports to open the Reports
Window:
The reports are grouped under a hierarchical structure that may be modified by opening the
Tools, Reports > Reports Groups form.
Multiple reports may be run by using the Tools, Reports > Batch Reports
form or clicking the
A single report may be run by right-clicking on a report and selecting Run, or clicking the
button in the Reports Window:
Reports may be cut, copied and pasted using the toolbars or right-clicking.
Some reports are created with the Report Wizard and some with the Report Writer.
Those created with the Report Wizard are edited with the Report Wizard and have
by the report name.
Those created with the Modify are edited with the Modify and have a
by the report
name.
To create a new report or modify an existing report that was created with the Report Wizard,
run the Report Wizard by clicking the
button on the Command toolbar, or selecting
Tools, Report Wizard ... or right-clicking on a report and selecting Modify.
The Report Editor may be used to modify any existing report. Refer to the User Manual for full
details.
S-Curve Graph