All Scheme Applications Format
All Scheme Applications Format
TECHNICAL EDUCATION
7th Floor Chander Lok Building,
Janpath, New Delhi-110 001
G R O U P
b) Please carry out a Literature and Patent search for Techno-Commercial Status of
Proposed Research
Significance of undertaking the project in context of current status (in brief)
Does the project have any commercial application or patentability? (in brief)
Activity Block
Note: A time activity chart may also be submitted indicating time schedule along
with deliverables.
05. Budget (In Rupees)
A. Non-Recurring (e.g. equipment, accessories, etc.)
S. No.
Item
Year 1
Year 2
1
2
3
4
5
Total (A)
B. Recurring
S. No.
Manpower
Consumables
Contingency
Travel
Total (B)
Year 2
Total
Date
Note: Recurring expenditure should not exceed 15% of the proposed cost. AICTE support is only at a
reasonable level to enable faculty members and research scholars in the project. AICTE expects that this
support will result in a multiplier effects leading to major projects for support from other agencies. AICTE
does not encourage hiring of secretarial manpower for the project.
RESUME OF CO-PRINCIPAL INVESTIGATOR
b) Address
STA
TE
PIN
c) Contact Details:
STD
CO
DE
PH
ON
E
NO.
FAX
NO.
EMAIL ID:
Institute
Field
Name of the
Degree
Year
Division
Post Doctoral
Any other
03. a) Designation
PERMANENT
CONTRACT
ADHOC
Period
From
Designation
Type of
Nature of work
Experience
(Teaching /
Research /
Industry / Others
Pay Scale,
Basic Pay &
Total
Emoluments
To
d) Field of Specialization:
05. Publication (mention only number of publications during the last five years with
proof)
National
International
Referred Journals
Proceedings
Books
Patents
Any other
Duration
Amount
Status
Sanctioned Completed /
Ongoing
Others)
From
To
Place
Date
REGION
Refer Annexure I
STATE
Refer Annexure I
ADDRESS
CITY
PINCODE
NAME OF DEPT.
YEAR OF ESTABLISHMENT
ACCREDITATION BY NBA,
(YES/NO)
NAME OF THE PRINCIPAL
INVESTIGATOR
E-MAIL ID OF THE PRINCIPAL
INVESTIGATOR
TITLE OF THE PROJECT
PROJECT COST
J
K
N
O
P
Place
Date
Annexure-I
DISTRIBUTION OF ZONES AND STATES
REGION
REGION CODE
STATE/UNION
TERRITORY
STATE CODE
Central
CR
East
ER
North
NR
North West
NW
South
SR
South Central
South West
SC
SW
West
WR
Madhya Pradesh
Gujarat
Chhattisgarh
Mizoram
Sikkim
Orissa
West Bengal
Tripura
Meghalaya
Arunachal Pradesh
Andaman and Nicobar
Assam
Manipur
Nagaland
Jharkhand
Bihar
Uttar Pradesh
Uttaranchal
Chandigarh
Haryana
Jammu and Kashmir
New Delhi
Punjab
Rajasthan
Himachal Pradesh
Pondichery
Tamilnadu
Andhra Pradesh
Karnataka
Kerala
Maharashtra
Goa
Daman and Diu
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Annexure-II
GROUP
Departments/Disciplines/Subjects
Group 1
Group 2
Group 3
Group 4
Group 5
Computer
Science/Technology/Engineering
Mechanical Engineering
Group 6
Pharmacy
Group 7
Management
Group 8
Group 9
Annexure-III
1. University department
2. Deemed University
3. Govt. Engg. College
4. Govt Aided Engg. College
5. Self-Financing Engg. College
6. North Eastern Region Institutes
7. Others (please mention)
4
5
6
7
8
9
10
11
12
13
Biotechnology
1 Bio process engineering
2 Online measurement control system and development tools for current control.
3 Calorimetry
4 Bio informatics and software for data mining.
5 Development of hardware for touch speed computation system and communication
set ups.
6 Domain software in hard core engineering subjects as civil engineering mechanical
engineering etc. (this is framed in view of the than developing
7 our own national skills in hard core technology.
8 Development of instrumentation for biotechnology.
9 Nano chemistry and truck design.
10 Development of micro air raise system for Gene Screening.
Architecture
1 Sustainable urban growth and conservation of agricultural land.
2 Internet for participatory education in Urban & Regional Development
3 Planning.
4 Rural roads and socio-economic development
5 Coastal ecosystem and settlement planning.
6 Peri-urban developments.
7 Globalisation and real estate market.
8 Energy conscious residential development.
1
2
3
4
Civil
New Materials: This would include development and evaluation of corrosion, fire
and weather protective coating FRP Composites, HPC, waste based components wood
substitutes.
Water Management: Rain water harvesting, monsoon studies and problems of hill
areas.
Natural Hazards: This would include, earthquakes, landslides, cyclones, floods and
droughts. Man-made Hazards: Fire & explosion in industrial plants, Transportation of
Chemicals, Dam breaks, Probabilistic risks assessment.
Chemical:
Separation Science and Engineering: Membrane Technology/Downstream
processing/Reactive separations.
1
2
1
2
3
4
Gas Hydrates
Fuel Cells
Solar Photo Voltaics
Eco-design
Development of herbal medicines for viral diseases like TB, cancer, leprosy, Aids,
herpes.
d) Programme Summary
03. a) Whether any ongoing Project in the Institute? (if yes give details)
S. No.
Year
Title
Funding
agency
Amount
Sanctioned
Status:
Ongoing /
Completed
Item
Year 1
Year 2
1
2
3
4
5
Total (A)
B. Recurring
S. No.
Manpower
Consumables
Contingency
Travel
Year 2
Total (B)
Grand Total of Budget ( A+ B )______________
Place
Date
Total
b) Relevance of Programme
c) Major Equipments / Machines and Infrastructure available in the Institution, which will
be committed to NAFETIC
S.No.
Name &
Designation
Date of Joining
the Inst.
Deptt.
Field of
Specialization
Highest Degree
ST
AT
E
STD
CO
DE
PI
N
PH
ON
E
NO.
FAX
NO.
WEB SITE
EMAIL ID:
d) Annual Turn-over
e) Main Client(s)
Sl. No.
Year
Title
Funding
Agency
Amount
Sanctioned
Status /
Ongoing /
Completed
07. Whether Industry Institute Partnership Cell is already functioning? (Yes / No) if yes
a) Give relevant details
Item
Year 1
Year 2
1
2
3
4
5
Total (A)
B. Recurring
S. No.
Manpower
Consumables
Contingency
Travel
Year 2
Total
Total (B)
Grand Total of Budget ( A+ B )______________
09. Statistical Information about Intake and Performance of Students:
Period
(Last 4 years)
Name of Department
Number of Students
Admitted
Pass %age
Date
Weeks
b) Major equipment (Costing more than Rs.1.0 lakh, both individual and grouped
similar items for e.g. Computers) available in the proposed Lab (to be funded)
S. No.
Name of the
Equipment
Cost
(in lakhs)
Age of Equipment
c) Percentage increase in current assets as per proposed MODROBS Scheme:Cost of Proposed Equipment x 100%
Cost of existing Installed Equipment
Specify Improvements in Project Work for which the Equipment could be used
06. Specify the other indirect benefits to students and staff expected
Exiting
Activity / Event
2008-09
Value
(in Lakhs)
Proposed
2009-10
Value
(in Lakhs)
2010-11
Value
(in Lakhs)
2011-12 Value
(in Lakhs)
Continuing
Education
Programmes
Training for
Industrial Worker
Consultancy
07. Please indicate through an Activity Chart schedule for Completion of Project.
08. Budget (In Rupees)
A. Non-Recurring (e.g. equipment, accessories, etc.)
S. No.
Item
Year 1
Year 2
1
2
3
4
Total (A)
B. Recurring
S. No.
Manpower
Consumables
Contingency
Travel
Year 2
Total
Total (B)
Grand Total of Budget ( A+ B )______________
Place
Date
Note: AICTE would not be responsible for paying any Maintenance / Service
Charges after completion of the Project
SUMMARY SHEET FOR MODROBS
REGION
Refer Annexure I
STATE
Refer Annexure I
ADDRESS
CITY
PINCODE
NAME OF DEPT.
YEAR OF ESTABLISHMENT
ACCREDITATION BY NBA,
(YES/NO)
NAME OF THE PI / HOD
J
K
L
PROJECT COST
N
O
P
Place
Date
Annexure-I
DISTRIBUTION OF ZONES AND STATES
REGION
REGION CODE
STATE/UNION
TERRITORY
STATE CODE
Central
CR
East
ER
Madhya Pradesh
Gujarat
Chhattisgarh
Mizoram
Sikkim
Orissa
West Bengal
Tripura
Meghalaya
Arunachal Pradesh
Andaman and Nicobar
01
02
03
04
05
06
07
08
09
10
11
North
NR
North West
NW
South
SR
South Central
South West
SC
SW
West
WR
Assam
Manipur
Nagaland
Jharkhand
Bihar
Uttar Pradesh
Uttaranchal
Chandigarh
Haryana
Jammu and Kashmir
New Delhi
Punjab
Rajasthan
Himachal Pradesh
Pondichery
Tamilnadu
Andhra Pradesh
Karnataka
Kerala
Maharashtra
Goa
Daman and Diu
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Annexure-II
GROUP
Departments/Disciplines/Subjects
Group 1
Group 2
Group 3
Group 4
Group 5
Computer
Science/Technology/Engineering
Mechanical Engineering
Group 6
Pharmacy
Group 7
Management
Group 8
Group 9
Item
Year 1
Year 2
1
2
3
4
5
Total (A)
B. Recurring
S. No.
Manpower
Consumables
Contingency
Travel
Total (B)
Year 2
Total
Year
Title
Funding
Agency
Amount
Ongoing /
Sanctioned & Completed
Year of
Sanction
07. Information about faculty members. Indicate if any faculty member possesses
experience or training in entrepreneurship (Specifically Chief Coordinator)
S. No.
Name
Designation Highest
& DOJ
Academic
Degree
08. Name and address of Industries where possible interaction (R&D / Sponsored
Project Consultancy / Related Services) in the specific areas can be developed.
S. No.
Areas
Type of Interaction
Date of Starting
Date of
Completion
Activities Proposed
Place
Date
02.
Objectives of Proposed Cell
03. Whether Industry Institute Partnership Cell is already functioning has been
sanctioned before by AICTE? If, Yes give details)
Industrial Visits
Consultancy
Joint R&D
Guest Lectures / Seminars
UG/PG Students Project work
completed
Sponsored Programme
6.
05. Attach Endorsement from major industry / medium industries (in the related areas /
that the industry will allow its managing staff for guest lecturers / academic
consultancy / guiding projects of UG / PG students / developing curriculum etc).
Name of the industry / industries
Size of the industry (Turnover and employee
size)
Nature of Industry
Name of
Managerial
Personnel
Designation
Qualification
Experience
Date of Starting
Date of
completion
Item
Year 1
Year 2
1
2
3
4
Total (A)
B. Recurring
S. No.
Manpower
Consumables
Contingency
Travel
Year 2
Total (B)
Grand Total of Budget ( A+ B )______________
08. Any other information to support the proposal:
Place
Date
TRAVELGRANT (TG)
Total
b)
Date of Conference
Venue
City
State
Country
07. Purpose of the visit (Put tick mark against the appropriate place)
a)
b)
c)
d)
Poster Presentation
e)
ST
AT
E
Des
ign
atio
n
Hig
hes
t
Qu
alifi
cati
on
PIN
08. Whether any grant been received under Travel Grant Scheme of AICTE in the Past
(Yes/No), (if yes, give the following details)
Year
09. Travel Plan (from the place of work to the Conference and Back).
Date
Time
From
To
Mode
10. Details of Expenditure & assistance requested from AICTE. (ceiling of Rs. 1 Lac.)
Head
Total Expenditure
Registration Fee
(Equivalent in Indian Currency
only)
Air Fare
Requested
Sanctioned
Registration Fee
Requested
Sanctioned
Per diem
Requested
Place
Date
SEMINAR (SEM)
01. Name of the Convenor / Coordinator
Remarks
Sanctioned
ST
AT
E
PIN
c) Discipline
International
Outstation
Total
j) Details of total grant received from other organizations for the conduct of the
seminar / conference.
Sl. No.
Name of Agency
Grant Received
ST
AT
E
Topics to Discuss
Future Outcome
PIN
Name, address of resource persons delivering Keynote / Plenary / Invited Lectures with
theme
05. Name & Designation of Chairperson and Members of the Organizing Committee
Sl. No.
Name
Designation
1
2
3
06. Whether any other such events were fulfilled by the organization / institution earlier
during the least three years?
(if yes, please give details)
Cost
Place
Date
04. How will these Induction Training Programme going to benefit faculty?
(in brief)
05. Whether the Institution / College / University already conducted SDP in the last
three years.
(if yes, please give details)
7 a) Whether the activity was funded by AICTE (Yes/No)
(if yes) AICTE File Ref. No.
Programme Date
From
To
c)
d) Number of Participants attended
e) Amount of grant received Rs.
f) Whether Utilization Certificate submitted or not?
Place
Date
ST
AT
E
ST
D
CO
DE
PIN
PH
ON
E
NO.
FAX
NO.
WEB SITE
EMAIL ID
ST
AT
E
ST
D
CO
DE
WEB SITE
PIN
PH
ON
E
NO.
FAX
NO.
EMAIL ID
b) Date of Superannuation
c) Age as on 07.02.2011:
d) Last pay scale and basic drawn
03. Whether No Objection Certificate from the Institute where Intending to work is
submitted?
Yes
No
c) Area of Proposed Work (Give details of Major area and specialization within the
Major area)
d) Brief statement of the purpose / importance of the proposed work (< 50 words)
05. Name and Address of Five Experts (in India) actively engaged in the general area
of Proposed Work of the Applicant
S.No.
Place
Date
b)
c)
India
d)
India
e)
Abroad
Number of Presentations / Publications in
conferences / Seminars / Symposia / work
shops
Abroad
Patents applied for
India
f)
Abroad
Patents sealed
India
Abroad
g)
h)
Courses Developed
Courses Taught:
i)
j)
Research activity
Specify Major Area / Theme to be undertaken during the tenure of the Career Award
Teaching
Research
Expected Outcome
Patent
To Industries
To Society
07. Whether the Institution has agreed to extend facilities to carry on work (attach a
copy of the letter from the concerned authority granting the permission) (YES/NO)
Place
Date
ST
AT
E
ST
D
CO
DE
PIN
PH
ON
E
NO.
FAX
NO.
WEB SITE
EMAIL ID
ST
AT
E
ST
D
CO
DE
PIN
PH
ON
E
NO.
FAX
NO.
EMAIL ID
ST
AT
E
ST
D
CO
DE
PIN
PH
ON
E
NO.
FAX
NO.
WEB SITE
EMAIL ID
b) Date of Superannuation
c) Age
c) Last pay scale and basic drawn
04. Research Projects Coordinated and the name of the sponsoring body
Place
Date