Cycle Time Loading Chart: Manual Cycle Times (MCT'S) Total MCT

This document provides information for calculating staffing needs based on manual cycle times, takt time, and total processing time. It lists the total manual cycle time, takt time as the available time divided by customer demand, and minimum staffing as the total manual cycle time divided by the takt time to determine the number of people needed.

Uploaded by

Anonymous rvXfvF
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views

Cycle Time Loading Chart: Manual Cycle Times (MCT'S) Total MCT

This document provides information for calculating staffing needs based on manual cycle times, takt time, and total processing time. It lists the total manual cycle time, takt time as the available time divided by customer demand, and minimum staffing as the total manual cycle time divided by the takt time to determine the number of people needed.

Uploaded by

Anonymous rvXfvF
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Cycle Time Loading Chart

Process:

Manual Cycle Times (MCT's)

TOTAL MCT:

Time

TAKT TIME:

(available time)
(customer demand)

MIN. STAFFING:
(total MCT)
(takt time)

Number of People Needed


Breakthrough Management Group International. Unpublished proprietary work available only under license. All rights reserved.
Page 1 of 2

Cycle Time Loading Chart

Process:

Breakthrough Management Group International. Unpublished proprietary work available only under license. All rights reserved.
Page 2 of 2