MOC Requirement Guidelines and Examples
MOC Requirement Guidelines and Examples
QC-PSM-GNL-00-0001
MOC Requirement Guidelines and Examples
No list can cover all situations. This list is a guideline to the thinking necessary to determine whether a MOC is required or not.
Change Category
Buildings:
Permanent & Temporary
Keywords
Add, Remove, or Relocate
Pressurization
Ventilation
Addition of New Chemical
Additives
Composition
Function/Reaction
Lubricants
Specifications
Engineering Design
Specifications
Equipment Blinding
Equipment Electrical
& Power Distribution
Upgrades
Welding
Electrical Power
Fuses & Breakers
Motor
Power Distribution
Page 1 of 5
QC-PSM-GNL-00-0001
Change Category
Keywords
Chemical Containers
Equipment General
Equipment Type
Insulation & Fireproofing
Material
Portable (Leased / Rental)
Upgrades
Capacity
Capacity
Lubrication
Equipment Mixers,
Drivers, Compressors
& Motors
Material/Construction
Rating
Seal
Equipment Bolts
Bolt Cutting
Page 2 of 5
QC-PSM-GNL-00-0001
Change Category
Keywords
Bleeders & Vents
Clamps & Leak Repair
Flange Face
Hot Taps/Stopples
Material
Pipe Specification
Equipment Piping
& Flanges
Rating
Schedule
Size
Temporary
Utility Drops/Tracing
Utility Lines
Appurtenances
Capacity
Equipment Pumps
& Turbine
Equipment Valves
Lubrication System
Materials
Pressure Rating
Seal
Type
Internals
Material
Rating
Size
Style
Page 3 of 5
QC-PSM-GNL-00-0001
Change Category
Keywords
Internals
Equipment Valves
Material
Rating
Size
Style
Appurtenance/Accessories
Internals
Material/Composition
Nozzle/Shell Inlays
Tube Design
Facility Safety
Equipment
Emergency Lighting
Fire Suppression
Monitors
Page 4 of 5
QC-PSM-GNL-00-0001
Change Category
Keywords
Range / Multiplier
Control Strategy
Tuning
Procedures General
New
Acceptable Tolerance &
Standard
Revision
Welding
Procedures Operations
Revisions
Revisions
PSI
Procedures Maintenance
Page 5 of 5