Corp Fin Project Requirements-1
Corp Fin Project Requirements-1
l.
1.
What to do
How to do it
Rectify
market size
calculated in
first
submission.
2.
Computing
Depreciation
Wages and
Salaries
4.
Raw
materials
5.
Utilities
a. Which of the
equipment in our
CAPEX are heavy
equipment and which
are not heavy
equipment.
a. Different categories of
personnel.
b. Number of personnel
needed in each
category.
c. Salaries for each
category.
d. Number of people
needed to operate
each equipment.
a. What raw materials
are needed to produce
each unit of ceramic
table-ware.
b. What are their
proportions in each
unit?
c. The price of raw
materials.
a. What are the major
type of utilities we
need for our
production- electricity,
gas, water.
b. 12 months electric,
gas, and water bills for
a similar company.
c. Units produced by that
company per month
6.
Other costs