Yard Management System: Automation Division Tata Steel Ltd. CII Steel Summit, Delhi On 4 November, 2009
Yard Management System: Automation Division Tata Steel Ltd. CII Steel Summit, Delhi On 4 November, 2009
By
AutomationDivision
TataSteelLtd.
At
CIISteelsummit,Delhi
On4th November,2009
CONTENTS
YMS Function
(Sachin Gupta)
Why ?
Functions
Benefits
Highlights
A Trailer Arrives
With Some Material
PLZ..PLZPLZ do
this
Manual Reporting of
Material Arrivals or At Berth
YARD
YARD
Crane Operation By
Hand/Manual Signaling
YARD
YARD
YARD
YARD
YARD
YARD
YARD
YARD
YARD
YARD
YARD
End Results
YARD
YARD
YARD
YARD
YARD
YARD
YARD
YARD
Manual Search Of
Materials In Yard
Problems Encountered
YMS: Highlights
Single window Logistics solution
Inbound
In Process
Outbound
Inter/Intra yard material flow scheduling
Yard optimization
Contingency handling
Equipment Control, Tracking & Interlocking
Crane control
Transfer car tracking
Coil conveyor tracking
YMS: Highlights
Smart information management
Transparent information flow and consistency
Seamless connectivity with lower (process) and
higher (SAP/MES) level systems
User defined reporting and visualization
Scalable and Expandable
Bay extensions/additions
Yard re-configurations
Principal Components
Remote
Clients
RF Networking &
Mobile Hand Held
Terminals
Loading/Unloading
Yard Map Updating
Process Interlocking
Conveyors
Transfer Cars
Cranes
Crane Automation
Guidance System
Auto-Positioning
Process
Interfaces
Line L-1/2
S.A.P.
M.E.S.
Man Machine
Interfaces
Yard Management
Crane Automation
Applicationsoftware
Server SunJava
RFNetwork
OnGround 2.4GHzDSSS
OnCrane 2.4GHzDSSS
Others
Crane C#2.0
PLC/Drives(Cranes)
LaserDistanceMeters
DataBase
Server Oracle10G
ComputerHardware
Server HPProliant
Crane None
Clients PanelPC.
CASESTUDY
CTTS/SYMS
At
TataSteelLtd.
CONTENTS
Details of CRM
Layout of CRM
Operations in the yard
CTTS system configuration
Interfaces of CTTS
Various process times of coil handling
Benefits
COMPLEXITY IN THE
DIFFERENT YARD OPERATIONS
SYSTEM ARCHITECTURE
LAYER 3 SWITCH
SWITCH AT YARD2
SWITCH AT YARD3
SWITCH AT YARD4
SWITCH AT YARD1
RADIO
ACCESS
POINT
RADIO
ACCESS
POINT
RADIO
ACCESS
POINT
RF
CRANE
RADIO
ACCESS
POINT
RF
RF
CRANE
CRANE
RF
CRANE
CYMS Server
HR Coil Transport
PDI
Coil Supply Request
Weighing Result
Tracking Information
Returning
Result
Picking List
(Conveyor/Coil Car)
Movement Control
Order Management
Picking
Result
Lock/Unlock
request
Saddle Status
Lock Result
Level-I
SAP
CTTS Server
Lock/Unlock
request
Lock/Unlock
result
Work
Information
Crane Work result
Crane Position
Line Computer
(PLTCM, SPM, RCL, CPL)
Trailer Arrival
Work Result
Crane Computer
HHT
Waiting for
despatch
18%
Loading Time
4%
Stocking Time
1%
Time of Coil
on Saddle
62%
FACTORS INFLUENCING
YARD OPERATION
Delay in Stocking
due to Manual
Coordination
5%
Coil Tracing time
for Loading
31%
Wrong Trailor
Loading
17%
Delay in Trailor
arrival Inf.
27%
Delay in Stocking
time, Information
to Crane
5%
Wrong Trailor
Loading
17%
WIRELESS DATA
CONNECTIVITY TO
CRANE ENABLES
INSTANT MESSAGING.
Delay in Trailor
arrival
Information
27%
LOCATION BASED
TRACKING SYSTEM
WITH AUTOPOSITIONING