Power House D-30 generates steam for electricity, process heating, and space heating. It operates and maintains boilers, turbines, alternators, and engines. It manages an 11kV power distribution network through SCADA. Its installed capacity is 25MW but it currently generates 10-12MW due to natural gas availability issues. It has various steam and power generation units from the 1950s-1990s. Current constraints include only receiving 5-6 MMCFD of natural gas against its sanctioned 12-13 MMCFD due to gas crises.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
358 views

Power House POF Report

Power House D-30 generates steam for electricity, process heating, and space heating. It operates and maintains boilers, turbines, alternators, and engines. It manages an 11kV power distribution network through SCADA. Its installed capacity is 25MW but it currently generates 10-12MW due to natural gas availability issues. It has various steam and power generation units from the 1950s-1990s. Current constraints include only receiving 5-6 MMCFD of natural gas against its sanctioned 12-13 MMCFD due to gas crises.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

POWER HOUSE D-30

FUNCTION

TO GENERATE STEAM FOR ELECTRIC


PROCESS AND SPACE HEATING.

POWER GENERATION,

OPERATION
/
MAINTENANCE
OF
BOILERS,
ALTERNATOR & RECIPROCATING ENGINES.

TO MANAGE THE 11KV POWER DISTRIBUTION


CENTRALLY THROUGH SCADA SYSTEM.

DISTRIBUTION OF STEAM AND MAINTENANCE OF STEAM LINE.

TURBINES,

NETWORK

POWER HOUSE D-30


MAN POWER STATUS
CATEGORY

IN POSITION

MANAGER

01

A.M

01

T.O

09

ATO / CMAN

40

Staff (Aux)

02

REs

189

POWER HOUSE D-30


MODE OF POWER GENERATION
STEAM THERMAL POWER PLANT
RECIPROCATING ENGINES FIRED ON NATURAL GAS I.E. GENSETS

ELECTRIC POWER GENERATION


INSTALLED CAPACITY
RUNNING CAPACITY @ 80% OUTPUT
PRESENT GENERATION

=
=
=

25MW
19-20 MW
10-12 MW

(GENERATION IS ACCORDING TO AVAILABILITY OF NATURAL GAS)

PEAK LOAD IN SUMMER


PEAK LOAD IN WINTER
PRESENT SHORT FALL
FUTURE REQUIREMENTS
AVG. CONSUMPTION / MONTHLY SUMMER
AVG. CONSUMPTION / MONTHLY WINTER
AVG. GENERATION / MONTHLY SUMMER
AVG. GENERATION / MONTHLY WINTER
RATIO OF GEN VS CONSUMPTION (WINTER)
RATIO OF GEN VS CONSUMPTION (SUMMER)
CURRENT AVG GEN VS CONS MAR-2015
CURRENT AVG GEN VS CONS FOR HOLIDAYS

=
=
=
=
=
=
=
=
=
=
=
=

30-32 MW
23-24 MW
10-12 MW
10 MW
143,93,771 KWH
103,52,497 KWH
71,50,911 KWH
58,17,197 KWH
49.60%
56.19%
64.62 %
87.62 %
4

POWER HOUSE D-30


POWER GENERATION UNITS
DESCRIPTION
TURBO ALTERNATOR 6/8 MW

QTY
02 NOS.

(MAKE AEG GERMANY)


TURBO ALTERNATOR 8.5/10.3MW

YEAR OF INSTALLATION
1974
1988

01 NO

1992

5 NOS.

2002

(MAKE B & V GERMANY)


GAS FIRED ENGINE GENERATORS
2 MW EACH (PRESENT GENERATION
CAPACITY 1 MW EACH)
(MAKE WARTSILA FRANCE)

POWER HOUSE D-30


BOILERS
DESCRIPTION

QTY

CAPACITY

YEAR OF
INSTALLATION

06 Nos

27
Ton / Hr Each

1958-1986

01 No

30
Ton /Hr

16 Nos

0.25-8.0
Ton / Hr Each

MAIN BOILER

SMALL BOILERS

2002

1952-1994

TOTAL STEAM GENERATION CAPACITY

200 TPH

TOTAL LENGTH OF STEAM LINE

22 KM

POWER HOUSE D-30


STEAM GENERATION
DESCRIPTION

QTY

LOCATION

YEAR OF
INSTALLATION

MAIN BOILER
a.

27 Ton / Hr (Each)

06

P.H

1958-1986

b.

30 Ton / Hr

01

P.H

2002

8 Ton / Hr ( Each)

02

Clothing

1988

2.5 Ton / Hr (Each)

02

1.5 Ton / Hr (Each)

02

A-50/1- WW

1955-1976

1 Ton / Hr

01

2.5 Ton / Hr (Each)

02

5 Ton / Hr

01

0.50 Ton / Hr

01

HOSPITAL

1955-1982

1 Ton / Hr

01

4 Ton / Hr

02

Brass Mill

1976

0.5 Ton / Hr

01

0.25 Ton / Hr

01

Hotel

1955

SMALL BOILER
a.

b.

c.

d.
e.

POWER HOUSE D-30


STEAM GENERATION
Year

Total Steam
Generation
(KG)

Steam Used for


Elect. Gen
(KG)

Steam used for


Process
(KG)

2010-11

611,179,788

460,126,006

151,053,782

2011-12

521,606,669

348,636,348

172,970,321

2012-13

601,815,271

439,956,948

161,858,323

2013-14

448,997,883

293,717,225

155,280,658

2014-15

305,823,337

195,795,400

110,027,937

POWER HOUSE D-30


700,000,000

600,000,000
601,815,271

300,000,000

200,000,000

July 14 March 15
305,823,337

448,997,883

400,000,000

521,606,669

611,179,788

500,000,000

100,000,000

2010-11

2011-12

2012-13

2013-14

2014-15

POWER HOUSE D-30


ELECTRIC GENERATION
Year

Total Elect.
Generation
(KWH)

PP-I Generation
(KWH)

PP-II Generation
(KWH)

2010-11

99,771,155

90,611,940

9,159,215

2011-12

84,857,361

66,002,620

18,854,741

2012-13

102,192,963

84,617,300

17,575,663

2013-14

73,213,938

56,188,520

17,025,418

2014-15

51,398,397

41,630,500

9,767,897

POWER HOUSE D-30


120,000,000

73,213,938

60,000,000

84,857,361

99,771,155

80,000,000

102,192,963

100,000,000

51,398,397

40,000,000

July 14 March 15

20,000,000

2010-11

2011-12

2012-13

2013-14

2014-15

POWER HOUSE D-30


GAS CONSUMPTION
Year

Gas Consumption
(HM3)

Total Amount
(Rs.)

Gas Rate
(HM3)

2010-11

682,346

1,137,843,586

1,667.55

2011-12

616,805

1,270,915,412

2,060.48

2012-13

696,250

1,506,210,805

2,163.32

2013-14

529,612

1,342,174,581

2,534.26

2014-15

374,782

1,037,052,396

2,767.08

POWER HOUSE D-30

529,612

400,000

696,250

500,000

616,805

600,000

682,346

700,000

300,000

374,782

200,000

July 14 March 15

100,000
0
2010-11

2011-12
2012-13

2013-14
2014-15

POWER HOUSE D-30


JOBS IN HAND
INSTALLATION/COMMISSIONING OF SCADA SYSTEM
FOR 25 SUBSTATIONS

CONTRACT NO

0092-DS-LP-CAPT-43, Dt.26-05-2014

SUPPLIER

M/s. SCHNEIDER ELECTRIC PAKISTAN (Pvt) Ltd.

COST (RS)

145.57 MILLION

PRESENT STATUS

DELIVERY OF STORE

P.D.C

COMPLETED

31.05.2015.

POWER HOUSE D-30


PRESENT STATUS
STORE

TOTAL

INSTALLED

109

102

LINE DIFFERENTIAL PROTECTION


RELAYS (MiCOM P521)

83

04

BATTERY CHARGER 110V & 30V DC


56Ah (FITTED WITH BATTERIS)

25

25

REMOTE TERMINAL UNIT


(RTU T2001)

25

NIL

FEEDER PROTECTION RELAYS


(MiCOM P122)

POWER HOUSE D-30


CONSTRAINTS
NON AVAILABILITY OF NATURAL GAS
SANCTIONED

12 -13 MMCFD

AVAILABLE

5 6 MMCFD

SNGPL AUTHORITIES HAVE BEEN APPROACHED TO PROVIDE THE


SANCTIONED GAS PRESSURE/SUPPLY BUT THE GAS PRESSURE
COULD NOT BE MAINTAINED BY SNGPL DUE CURRENT GAS CRISES
IN THE COUNTRY.