The document of PROJECT EXECUTION PLAN is developed by PT. BORNEO
MITRA SINERGI solely to meet the requirement of Bid Ref. OPS/14/010 on
On a weekly basis BMS will submit an official progress report based on actual
progress achieved. Progress report will be approved by Company. Base line
schedule and its pertinent S-Curve shall always be updated to reflect the actual
progress and tendencies.
Project management team will be located in Sengkang and Jakarta
See in POIN 1.3
COMPANY may conduct Peer reviews during project execution. BMS will submit a
statement letter on a acceptance to participate, jointly, performed, and allocate
time for peer review conducted by COMPANY.
See POIN 1.5
As a supplement to the above, BMS will submit, as part of this project control plan,
relevant samples to this Project control plan.
See POIN 1.6
1.7 PROJECT MASTER SCHEDULE
BMS will develop and submit a proposed project master schedule (PMS) using the
latest version of Microsoft Project, The PMS will detail out all activities to reflect
scope of work as described in Exhibit B
The project master schedule will demonstrate that the work describe in exhibit B
scope of work will be completed within (165) days from Contract effective date
As a minimum, the following will be included :
-
Critical path
Detailed Engineering
BMS will carry out detailed engineering that is necessary to take ownership of the
end design. The construction documentation represents a complete, efficient and
practicable design and to enable BMS to provide the requested warranty period for
the detailed engineering work.
BMS should clearly describe the detailed engineering works per each discipline of
engineering that will be performed to demonstrate to COMPANY that BMS has
clear understanding of the scope of work based on COMPANY supplied
documents as listed in Exhibit F.
BMS will provide a list of the BMSs technical deliverables that will be created by
BMS as results of the detail engineering works (documents &drawing) by
supplying a proposed MDR.
Construction and Installation Engineering
Note for detail scope of work of topography survey BMS will refer to POIN A
(request for topography survey)
See POIN 1.11
Location for construction work activities for this project, if there are other
projects on the construction site at the same time as this project, their
location will be indicated as well.
BMS will provide list of procedures that will be used for the construction activities
in this project. Cover page of each procedure to be enclosed.
BMS will describe strategy/methodology for relocation and transportation of
module including lifting operation from COMPANY staging area to construction
site/ integration site
BMS
will
provided
names
worksites
fabrications
manager,
site
construction/installation manager and field engineering as describe in exhibit D
along with their CVs
See POIN 1.12