100% found this document useful (1 vote)
653 views

SDCS02 Part6

SEC Installations SDCS02-PART6

Uploaded by

Ayman Saber
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
653 views

SDCS02 Part6

SEC Installations SDCS02-PART6

Uploaded by

Ayman Saber
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 13
0/02 2012 9:21 AM FAX 70505, JUB_MANG @ 0018/0030 € Saudi Electricity Company G el aS 3 yeu) AS SII SDCS-02 SEC DISTRIBUTION CONSTRUCTION STANDARDS Dated: MAY 2011 PART 6 INSTALLATION OF UNDERGROUND FIBER OPTIC CABLES AND DUCTS PAGE LOF | 0/02 2012 9:21 AN FAX 78505 JUB MANG E Saudi Electricity Company g @ 0019/0030 S| sh aS yo ycuut! 2 SEC DISTRIBUTION CONSTRUCTION STANDARDS SDCS-02 Dated: MAY 2011 TABLE OF CONTENTS CLAUSE DESCRIPTION PAGE NO. 1 SCOPE 2 SERVICES CONDITION AND CONSTRUCTION PARAMETERS 3 LAYING OF FIBER OPTIC CABLES 4 LAYING DUCT WITH LV POWER CABLE 0/02 2012 9:21 AM FAX 76505 UB kane @ 0020/0030 4 Saudi Electricity Company C. lag Aya geal AS 2 : NJ SEC DISTRIBUTION CONSTRUCTION STANDARDS SDCS-02 Dated: MAY 2011 1, SCOPE: This standard specifies the guidelines and requirement governing the design and installation of underground fiber optic cables, to be laid along with the medium voltage cables and the HDPE duct with the plastic rope inside to be placed below the low voltage cable for future usc. 2, SERVICES CONDITION AND CONSTRUCTION PARAMETERS: For construction and operation of underground fiber optical cable, the service i condition and requirement shall be given in latest revision of SEC and General Specification No. 01-SDMS-01 h 3. LAYING OF FIBER OPTIC CABLES: Fiber optic cables shall be laid together with medium voltage cable in the underground distribution system for a scheme connecting the two sub- stations, Contractor strictly to adhere the procedure and the dimensions of the cable trench specified in the under ground construction standard (SDCS-02). Fiber optic cable of 96 cores of type “ non metallic direct buried “ shall be laid along with the medium voltage cables as shown in the drawing nos. 1,2 & 3. ! At the end of fiber optic cable, contractor should leave a loop of 25 meter inside the primary sub station and hang this to any wall near to the termination point of 13.8 KV cable, For a unit sub-station, contractor should leave 5 meter fiber optic cable loop and hang at any wall near to the side of 13,8KV cable termination. Page 3 of 13 0/02 2012 9:21 AM FAX 76505 JUB KANG @ 0021/0030 Saudi Electri ity Company ie SEC DISTRIBUTION CONSTRUCTION STANDARDS SDCS-02 Dated: MAY 2011 : 3.1. SAFETY INES FOR PLACING FIBER OPTIC CABLE : While laying the fiber optic cable, contractor has to abide precautionary measures to avoid the damaging the cable by making sharp bends, crushing the cable and ‘excessive pulling of the cable which may change the transmission characteristics of fiber. 8.2 PULLING PROCEDURES OF FIBER OPTIC CABLE It is important that all personnel who are engaged in the laying work shall be familiar with the fiber optic cable laying practices. Contractor should follow the international standard procedure for pulling fiber optic cable. Fig 4 which shaws correct and incorrect method of pulling. 4. LAYING DUCT WITH LV POWER CABLE Duct HDPE of size 50mm diameter complete with a pla: : under the LV power cable as shown in the Fig.5,6 & 7 rope inside, shall be laid Fig. 8, shows the arrangement of duet together with a plastic rope inside for pulling, i purpose. There should be one cap at the end of cach duct to prevent entering of the water, Fig 9, specifies the details of placing the ducts at the consumer prc! Fig 10, shows arrangement of laying duct in the trench of LV cable. Fig.11, Arrangement of laying ducts in LV feeder trench for different customers. Page 4 of 13, 0/02 2012 9:21 AM FAX 76505, JUB MANG @ 0022/0030 Ao soul) WS SSI SDCS -02 Dated: MAY 2011 Saudi Electricity Company G el aS) SEC DISTRIBUTION CONSTRUCTION STANDARDS FINISHED ROADISIDEWALK SURFACE OR FINAL. GROUND LEVEI. FIBRE OPTIC CABLE Tian dia MN. CABLE = FINF.SAND, [ow ‘MV TRENCH CONFIGURATION WITIL FIBRE OPTIC CABLE, FIG! FINISHED ROAD/SIDEWALK SURFACE OR FINAL GROUND LEVEL. WARNING TAPE _BACKFILL FUBRE OPTIC CABLE Mina alse No) MLV. CABLE [Fst MY TRENCH CONFIGURATION WITH TWO FIRE OPTIC CABLES weal PAGE SOF 0/02 2012 9:21 AM FAK 76505 UB MANG @ 0023/0030 Saudi Electricity Company g sb aS oye) Ast | SDCS-02 I Dated: MAY 2011 SEC DISTRIBUTION CONSTRUCTION STANDARDS FIRE OPTIC CABLE Tamim diag Nosy MV. CABLE FINE SAND. ] MY TRENCH CONFIGURATION WITH THI FIGS | AIG PAGEGOF IS /o2 2012 9:21 AN FAX T6505 UB MAN & 0024/0030 Saudi Electricity Company Gg eh eSU Ao gc) 2S 2) SDCS-02 Dated: MAY 2011 SEC DISTRIBUTION CONSTRUCTION STANDARDS INCORRECT INCORRECT : CORRECT AND INCORRECT PULLING METHOD FIGURE.4 PAGE 70F 13, 102 2012 22 AM FAX 76505 JUB-MANG & 0025/0030 || Saudi Electricity Company Gy sh aS tao genul 82d) sSDCS-02 SEC DISTRIBUTION CONSTRUCTION STANDARDS Dated: MAY 2011 (Are “TWENCH CONFIGURATION WITH HDPE DUCT FINISHED ROAD/SIDEWALK SURFACY. OR FINAL GROUND LEVEL WARNING TAPE BACKEILL FINE SAND. CABLE, HDPE DUCT. ‘50mm dia Nos) L-TRENCH CONFIGURATION wi WO) HDPE DUCT PAGEROFT Saudi Electricity Company iS} sb yaSU Aya ged) AS SI 1/02 2012 0:22 AM FAX 76505 UB MAN 0026/0030 SDCS-02 SEC DISTRIBUTION CONSTRUCTION STANDARDS Dated) MAY 2011 FINISHED ROAD/SIDEWALK SURFACE OR FINAL GROUND LEVEL _. WARNING TAPE, HDPE DucT ‘50mm din(2 Nox) LV TRENCH CONFIGURATION WITH THREE HDPE DUCT FIG: FAGLDOF 13 | | 1/02 2012 9:22 AM FAK 76505 UB MANG @ 0027/0030 Saudi Electricity Company Gg eh aS Ayo gee! 2S I SDCS-01 Dated: MAY 2011 SEC DISTRIBUTION CONSTRUCTION STANDARDS DUCT TOGETHER WITH PLASTIC ROPE AND END CAP End Cap Plastic Rope End Cal FIGURE-8 PAGE s0OF 1» /02 2012 8:22 AN FAX 76505 SUB MANG @ 0028/0030 Saudi Electricity Company ey eh eS Aya 5c] AS II SDCS -02 Dated: MAY 2011 SEC DISTRIBUTION CONSTRUCTION STANDARDS WAY OF CONNECTION OF HDPE, DUCT FOR A CONSUMER — TEND Cap T END CAP oy a aa Ta nfm dD qr - TWO PIPES(ONE INCOMING & ONE. OUTGOING) NEAR TO CONSUMER WALL AT 5CM ABOVE STREET LEVEL. DUCTS ARE CLOSED WITH END CAP FIGURE. 9 PAGE HOF: /02 2012 9:22 AM FAK 76505 UB MANG @ 0029/0030 Saudi Electricity Company & sb aS As youu! AF St SDCS-01 SEC DISTRIBUTION CONSTRUCTION STANDARDS Dated: MAY 2011 CAVING DUCTS IN THE. TRENCH OF LY CABLE ricuRE 702 2012 9:22 AM FAX 76508 JUB MANG @ 0030/0030 Saudi Electricity Company iS eh aS Sage) ASI SDCS-02 Dated: MAY 2011 SEC DISTRIBUTION CONSTRUCTION STANDARDS LAYING DUCTS IN LV FEEDER TRENCH FOR DIFFERENT CUSTOMERS 1xS0mm Dia, a[e]e[alelafaj ' ONEDUCTFORLAST Two DUCTS UN-oUT) CONSUMER FOR CONSUMER CONNECTION H UNITSISTATION FIGURE-L

You might also like