SDCS-02
SEC DISTRIBUTION CONSTRUCTION STANDARDS
Dated: MAY 2011
PART 6
INSTALLATION OF UNDERGROUND
FIBER OPTIC CABLES
AND
DUCTS
PAGE LOF
|0/02 2012 9:21 AN FAX 78505 JUB MANG
E Saudi Electricity Company g
@ 0019/0030
S|
sh aS yo ycuut! 2
SEC DISTRIBUTION CONSTRUCTION STANDARDS
SDCS-02
Dated: MAY 2011
TABLE OF CONTENTS
CLAUSE DESCRIPTION PAGE
NO.
1 SCOPE
2 SERVICES CONDITION AND CONSTRUCTION PARAMETERS
3 LAYING OF FIBER OPTIC CABLES
4 LAYING DUCT WITH LV POWER CABLE0/02 2012 9:21 AM FAX 76505 UB kane @ 0020/0030
4 Saudi Electricity Company C. lag Aya geal AS 2
: NJ
SEC DISTRIBUTION CONSTRUCTION STANDARDS
SDCS-02
Dated: MAY 2011
1, SCOPE:
This standard specifies the guidelines and requirement governing the design
and installation of underground fiber optic cables, to be laid along with the
medium voltage cables and the HDPE duct with the plastic rope inside to be
placed below the low voltage cable for future usc.
2, SERVICES CONDITION AND CONSTRUCTION PARAMETERS:
For construction and operation of underground fiber optical cable, the service
i condition and requirement shall be given in latest revision of SEC and General
Specification No. 01-SDMS-01
h 3. LAYING OF FIBER OPTIC CABLES:
Fiber optic cables shall be laid together with medium voltage cable in the
underground distribution system for a scheme connecting the two sub-
stations, Contractor strictly to adhere the procedure and the dimensions of the
cable trench specified in the under ground construction standard (SDCS-02).
Fiber optic cable of 96 cores of type “ non metallic direct buried “ shall be laid
along with the medium voltage cables as shown in the drawing nos. 1,2 & 3.
! At the end of fiber optic cable, contractor should leave a loop of 25 meter inside
the primary sub station and hang this to any wall near to the termination point
of 13.8 KV cable, For a unit sub-station, contractor should leave 5 meter fiber
optic cable loop and hang at any wall near to the side of 13,8KV cable
termination.
Page 3 of 130/02 2012 9:21 AM FAX 76505 JUB KANG @ 0021/0030
Saudi Electri
ity Company ie
SEC DISTRIBUTION CONSTRUCTION STANDARDS
SDCS-02
Dated: MAY 2011
: 3.1. SAFETY INES FOR PLACING FIBER OPTIC CABLE :
While laying the fiber optic cable, contractor has to abide precautionary measures to
avoid the damaging the cable by making sharp bends, crushing the cable and
‘excessive pulling of the cable which may change the transmission characteristics of
fiber.
8.2 PULLING PROCEDURES OF FIBER OPTIC CABLE
It is important that all personnel who are engaged in the laying work shall be familiar
with the fiber optic cable laying practices. Contractor should follow the international
standard procedure for pulling fiber optic cable.
Fig 4 which shaws correct and incorrect method of pulling.
4. LAYING DUCT WITH LV POWER CABLE
Duct HDPE of size 50mm diameter complete with a pla:
: under the LV power cable as shown in the Fig.5,6 & 7
rope inside, shall be laid
Fig. 8, shows the arrangement of duet together with a plastic rope inside for pulling,
i purpose. There should be one cap at the end of cach duct to prevent entering of the
water,
Fig 9, specifies the details of placing the ducts at the consumer prc!
Fig 10, shows arrangement of laying duct in the trench of LV cable.
Fig.11, Arrangement of laying ducts in LV feeder trench for different customers.
Page 4 of 13,0/02 2012 9:21 AM FAX 76505, JUB MANG @ 0022/0030
Ao soul) WS SSI
SDCS -02
Dated: MAY 2011
Saudi Electricity Company G el aS)
SEC DISTRIBUTION CONSTRUCTION STANDARDS
FINISHED ROADISIDEWALK SURFACE OR FINAL. GROUND LEVEI.
FIBRE OPTIC CABLE
Tian dia
MN. CABLE
= FINF.SAND,
[ow
‘MV TRENCH CONFIGURATION WITIL FIBRE OPTIC CABLE,
FIG!
FINISHED ROAD/SIDEWALK SURFACE OR FINAL GROUND LEVEL.
WARNING TAPE
_BACKFILL
FUBRE OPTIC CABLE
Mina alse No)
MLV. CABLE
[Fst
MY TRENCH CONFIGURATION WITH TWO FIRE OPTIC CABLES
weal
PAGE SOF0/02 2012 9:21 AM FAK 76505 UB MANG @ 0023/0030
Saudi Electricity Company g sb aS oye) Ast |
SDCS-02 I
Dated: MAY 2011
SEC DISTRIBUTION CONSTRUCTION STANDARDS
FIRE OPTIC CABLE
Tamim diag Nosy
MV. CABLE
FINE SAND.
] MY TRENCH CONFIGURATION WITH THI
FIGS
| AIG
PAGEGOF IS/o2 2012 9:21 AN FAX T6505 UB MAN & 0024/0030
Saudi Electricity Company Gg eh eSU Ao gc) 2S 2)
SDCS-02
Dated: MAY 2011
SEC DISTRIBUTION CONSTRUCTION STANDARDS
INCORRECT
INCORRECT
: CORRECT AND INCORRECT PULLING METHOD
FIGURE.4
PAGE 70F 13,102 2012
22 AM FAX 76505 JUB-MANG & 0025/0030
|| Saudi Electricity Company Gy sh aS tao genul 82d)
sSDCS-02
SEC DISTRIBUTION CONSTRUCTION STANDARDS
Dated: MAY 2011
(Are
“TWENCH CONFIGURATION WITH HDPE DUCT
FINISHED ROAD/SIDEWALK SURFACY. OR FINAL GROUND LEVEL
WARNING TAPE
BACKEILL
FINE SAND.
CABLE,
HDPE DUCT.
‘50mm dia Nos)
L-TRENCH CONFIGURATION wi
WO) HDPE DUCT
PAGEROFTSaudi Electricity Company iS} sb yaSU Aya ged) AS SI
1/02 2012 0:22 AM FAX 76505 UB MAN 0026/0030
SDCS-02
SEC DISTRIBUTION CONSTRUCTION STANDARDS Dated) MAY 2011
FINISHED ROAD/SIDEWALK SURFACE OR FINAL GROUND LEVEL
_. WARNING TAPE,
HDPE DucT
‘50mm din(2 Nox)
LV TRENCH CONFIGURATION WITH THREE HDPE DUCT
FIG:
FAGLDOF 13
|
|1/02 2012 9:22 AM FAK 76505 UB MANG @ 0027/0030
Saudi Electricity Company Gg eh aS Ayo gee! 2S I
SDCS-01
Dated: MAY 2011
SEC DISTRIBUTION CONSTRUCTION STANDARDS
DUCT TOGETHER WITH PLASTIC ROPE AND END CAP
End Cap
Plastic Rope
End Cal
FIGURE-8
PAGE s0OF 1»/02 2012 8:22 AN FAX 76505 SUB MANG @ 0028/0030
Saudi Electricity Company ey eh eS Aya 5c] AS II
SDCS -02
Dated: MAY 2011
SEC DISTRIBUTION CONSTRUCTION STANDARDS
WAY OF CONNECTION OF HDPE, DUCT FOR A CONSUMER
—
TEND Cap T END CAP
oy a aa Ta nfm dD
qr -
TWO PIPES(ONE INCOMING & ONE. OUTGOING) NEAR TO CONSUMER WALL
AT 5CM ABOVE STREET LEVEL. DUCTS ARE CLOSED WITH END CAP
FIGURE. 9
PAGE HOF:/02 2012 9:22 AM FAK 76505 UB MANG @ 0029/0030
Saudi Electricity Company & sb aS As youu! AF St
SDCS-01
SEC DISTRIBUTION CONSTRUCTION STANDARDS
Dated: MAY 2011
CAVING DUCTS IN THE. TRENCH OF LY CABLE
ricuRE702 2012 9:22 AM FAX 76508 JUB MANG @ 0030/0030
Saudi Electricity Company iS eh aS Sage) ASI
SDCS-02
Dated: MAY 2011
SEC DISTRIBUTION CONSTRUCTION STANDARDS
LAYING DUCTS IN LV FEEDER TRENCH
FOR DIFFERENT CUSTOMERS
1xS0mm Dia,
a[e]e[alelafaj
' ONEDUCTFORLAST Two DUCTS UN-oUT)
CONSUMER FOR CONSUMER CONNECTION
H UNITSISTATION
FIGURE-L