Design Change Request Form 2013-08 Rev 2
Design Change Request Form 2013-08 Rev 2
PROJECT NAME
CONTRACT #
CHANGE REQUEST #
WBS #
DATE
DATE REQUIRED
Rev 2-08.2013
Page 1 of 5
5. TECHNICAL/OPERATIONS IMPACT:
7. SCHEDULE IMPACT:
a) DESIGN:
b) CONSTRUCTION:
8. COST IMPACT:
a) DESIGN:
b) CONSTRUCTION:
Rev. 2-08.2013
Page
2 of 5
AMENDMENT
TASK ORDER
BUDGET REALLOCATION
TRANSFER AMENDMENT
10. CLASSIFICATION LEVEL:
DIRECTOR
CHIEF ENGINEER OF D&C
ASSISTANT GM FOR D&C
GENERAL MANAGER
SECRETARY OF TRANSPORTATION
BOARD OF DIRECTORS
ASSISTANT GM FOR D&C
$0 - $25,000
>$25,000 - $100,000
>$100,000 - $250,000
>$250,000 - $5,000,000
>$5,000,000 - $15,000,000
>$15,000,000
TIME EXTENSION
SUBMITTED BY:
DATE
TITLE:
STATEMENT OF CONCURRENCE:
DESIGNER
:
DATE
TITLE:
Rev. 2-08.2013
Page
3 of 5
SIGNATURE:
DIRECTOR OF DESIGN
Concur
Not Concur
Concur
Not Concur
Approved
Not Approved
Approved
Not Approved
Approved
Not Approved
______
DATE
COMMENTS:
SIGNATURE:
______
DATE
DIRECTOR OF
PROJECT CONTROLS
COMMENTS:
SIGNATURE:
AREA DIRECTOR
DATE
COMMENTS:
SIGNATURE:
CHIEF ENGINEER OF
DESIGN & CONSTRUCTION
DATE
COMMENTS:
SIGNATURE:
AGM OF DESIGN
& CONSTRUCTION
DATE
COMMENTS:
Rev. 2-08.2013
Page
4 of 5
REQUIRED ATTACHMENTS:
DESIGN EXTRA WORK ORDER REQUEST LETTER AT AUTHORIZED LEVEL
CMS REPORT CMS-PS-020 - ACTION LIMIT SUMMARY
INDEPENDENT COST ESTIMATE
DESIGN CHANGE REQUEST LOG
Rev. 2-08.2013
Page
5 of 5