0% found this document useful (0 votes)
45 views

Support Pack Check List

This document provides a checklist for applying a support pack to an inShare system. The checklist includes 25 steps to check for licenses, download patches, check disk space, backup the existing kernel, apply patches, verify patches were applied correctly, and start a new database backup. Key steps involve extracting and moving patches, importing the support pack, testing, taking screenshots before and after to validate the kernel update, and notifying security teams.

Uploaded by

Kishore Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

Support Pack Check List

This document provides a checklist for applying a support pack to an inShare system. The checklist includes 25 steps to check for licenses, download patches, check disk space, backup the existing kernel, apply patches, verify patches were applied correctly, and start a new database backup. Key steps involve extracting and moving patches, importing the support pack, testing, taking screenshots before and after to validate the kernel update, and notifying security teams.

Uploaded by

Kishore Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Support Pack Check List

inShare

Sr No. Points Status


1 Check For Maintenance License
2 Download the recommended Patches
3 Check for the Executable drive space
4 Moves the Patches on the server
5 Extract the Kernel and Patches
6 Move the Patches to EPS/in
7 Backup old Kernel
8 Password For Basis client 000
9 Test import of Support Pack
10 Provide the list of TRs to Technical/Functional while test import
11 Make sure latest backup is completed
12 Mail to Security Team List of user IDs to be kept unlocked while Support Pack
13 Take the screen shot of old Kernel (disp+work at cmd)
14 Stop the SAP application
15 Move the Kernel to \usr\sap\SID\SYS\exe\nuc or uc\NTAMD64
16 Start the SAP application
17 Take the screen shot of new Kernel (disp+work at cmd)
18 Run report BTCTRNS1
19 Run transaction SPAM and proceed with Patch upgrade.
20 Verify the Paches applied
21 Run report BTCTRNS2
22 Run SGEN transaction
23 Mail to Security Team to Unlock all the user IDs
24 Update all, Patching done for respective system.
25 Start New DB Backup

You might also like