0% found this document useful (0 votes)
26 views2 pages

Udupas Statement1.2.17

Udupa Enterprises provided materials for stalls and tables to two events - the National College Grounds and the Palace Grounds. For the National College Grounds, Udupa provided 84 units of stall materials and 65 units of table materials. For the Palace Grounds, Udupa only provided table materials while Monuments handled setup. Monuments provided materials and services to Udupa for four events - White Orchid, Taj Vivantha, Ashoka Hotel, and TATA Event Referral. The amounts owed by Udupa to Monuments totaled Rs. 225,860 which included Rs. 196,400 for materials, Rs. 29,460 in sales tax, and transportation costs.

Uploaded by

Naveen Chandran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Udupas Statement1.2.17

Udupa Enterprises provided materials for stalls and tables to two events - the National College Grounds and the Palace Grounds. For the National College Grounds, Udupa provided 84 units of stall materials and 65 units of table materials. For the Palace Grounds, Udupa only provided table materials while Monuments handled setup. Monuments provided materials and services to Udupa for four events - White Orchid, Taj Vivantha, Ashoka Hotel, and TATA Event Referral. The amounts owed by Udupa to Monuments totaled Rs. 225,860 which included Rs. 196,400 for materials, Rs. 29,460 in sales tax, and transportation costs.

Uploaded by

Naveen Chandran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Statement of Udupa Enterprises

Materials Udupa's to Monuments


Slno Particulars Qty

Octonorm Stall Material to National College


1 Grounds 84
2 Octonorm Table Material to Palace Grds 65

Only Material was provided for Stalls


without Table and Chair and setup was
done by Monuments, Electricals were
supplied by Udupas
Only Table Materials were supplied at
Palace Grounds by Udupa, Setup was
done by Monuments

Materials from Monuments to Udupa's


Slno Particulars Qty Rate Amount

A White Orchid (Gruha Pravesha Event)


1 Stalls in Sqmtrs 660 150 99000
2 Wall Panneling 47 200 9400
3 Registration Counter 2 1000 2000
4 Transportation 1 5000 5000

B Taj Vivantha
1 Stalls in Sqmtrs 198 150 29700
2 Octonorm Tables 50 200 10000
3 Transportation 1 5000 5000

C Ashoka Hotel
1 Stalls in Sqmtrs 150 150 22500
2 Wall Panneling 5 200 1000
3 Registration Counter 7 1000 7000
4 Octonorm Tables 4 200 800
5 Transportation 1 5000 5000

Total Amount 196,400


S.Tax @ 15% 29,460
Grand Total 225,860

D TATA Event Referal

You might also like