This document summarizes a construction project for a 5-storey building for the Document Processing Division at BIR Revenue Region No. 5 in Caloocan City. The scope includes electrical works with a contract cost of P3,478,848.19 and an approved budget of P4,524,332.97. The overall contract cost is P37,638,904.50 with an approved budget of P40,000,000. The contracting parties are BIR Revenue Region No. 5 and Specified Contractor and Development, Inc., with a contract date of October 15, 2012.

Uploaded by

bernardabatayo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Electrical Home Run

This document summarizes a construction project for a 5-storey building for the Document Processing Division at BIR Revenue Region No. 5 in Caloocan City. The scope includes electrical works with a contract cost of P3,478,848.19 and an approved budget of P4,524,332.97. The overall contract cost is P37,638,904.50 with an approved budget of P40,000,000. The contracting parties are BIR Revenue Region No. 5 and Specified Contractor and Development, Inc., with a contract date of October 15, 2012.

Uploaded by

bernardabatayo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT Construction of 5-Storey Building for the Document Processing

Division at BIR Revenue Region No. 5 (Caloocan City)

NGS Cluster II Legislative and Oversight


SCOPE AND Electrical Works
COST CONTRACT: P 3,478,848.19
AB: P 4,524,332.97
CONTRACT P 37,638,904.50
COST
ABC P 40,000,000.00
Contracting BIR Revenue Region No. 5 (Caloocan City) and Specified Contractor
Parties and Development, Inc.
Contract Date October 15, 2012

Phelp Dodge Thhn Pricelist Stranded Wire Original! beware of fake phelpdodge!
THHN #14 2.0MM2- 1,755.00 (150 METERS PER BOX)
THHN #12 3.5MM2 2,574.00 (150 METERS PER BOX)
THHN #10 5.5MM2 3,939.00 (150 METERS PER BOX)
THHN #8 8.0MM2 6,162.00 (150 METERS PER BOX)
THHN #6 14.0MM2 9,808.50 (150 METERS PER BOX)
THHN #4 22.0MM2 15,405.00 (150 METERS PER BOX)

THHN #2 30.0mm2 22,444.50 (150 meters per box)

electrical home run


A electrical home run is a wiring run that is not branched from another circuit or wiring run, but
that connects directly to the building's main electrical panel.

FACP fire alarm control panel

Note:
Outlet distance from finished floor: 300 cm
Lighting fixtures allowance from ceiling: 0. 3m (3 m usually height ng building)
Conduits for wires ng lighting, outlet etc, except main branches do not use elbows
Couplings, elbows, bushing, locknut etc. compute manually
Lgs means length standard size ng tubo ay 3 meters, meron ding 6 meters, etc.
Wires always x 2, same with ground but different wire size ang ground
Be aware of drop length like that of chandelier
In wiring 3 phase, x 2 always (2 wires), third is ground (different type and size of wire)

Receptacle and outlet the same

Note/observations:
2 x 20 watts FL recessed type is 2 x 40 VA per plans