Given Values: Calculated Values According To Running Time of Plant

This document provides calculations for cold room requirements for an ante room at a plant. It gives specifications for the room dimensions and materials. It then calculates the transmission heat load through the walls, floor, and ceiling. Additional heat loads from air changes, product loading, occupants, lighting, and equipment are also determined. Finally, the total heat load is calculated as 11.52 kW for 24-hour operation. Running times from 16 to 20 hours are analyzed, with the required capacity ranging from 16.31 kW at 18 hours to 14.68 kW at 20 hours of daily operation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

Given Values: Calculated Values According To Running Time of Plant

This document provides calculations for cold room requirements for an ante room at a plant. It gives specifications for the room dimensions and materials. It then calculates the transmission heat load through the walls, floor, and ceiling. Additional heat loads from air changes, product loading, occupants, lighting, and equipment are also determined. Finally, the total heat load is calculated as 11.52 kW for 24-hour operation. Running times from 16 to 20 hours are analyzed, with the required capacity ranging from 16.31 kW at 18 hours to 14.68 kW at 20 hours of daily operation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ARAB AC Cold room calculation Carrier Middle East Ltd.

QATAR P.O.Box 61249


Jebel Ali
QATAR Dubai, UAE
Fon. Fon.: Telefon
Fax. Fax.: Telefax
E-Mail : E-Mail
Homepage : Internet
Project : NPP Plant : ANTE ROOM 1 Planner : JILSHAD
(CIRCULATION ROOM)

Given values
Length 61.8 m Width 6.19 m Height 4.5 m Area 382.54 m Volume 1721.44 m
Temperature 10 C Humidity 90 % Run. time 18 h/d Cool. time 24 h

Insulation Area Name U-factors Outs. tem. Outs. hum. Door heig. Door witdh Ac-rate Air ch.
m W/(m K) C % m m 1/24h m/24h

Wall 1 Length 278.10 Cell 100 mm 0.2 35 65 2 1 1.8 3093


Wall 2 Width 27.86 Cell 100 mm 0.2 35
Wall 3 Length 278.10 Cell 100 mm 0.2 35
Wall 4 Width 27.86 Cell 100 mm 0.2 35
Floor 382.54 Cell 100 mm 0.2 35
Ceiling 382.54 Cell 100 mm 0.2 35 Room size

Persons 2 Number 5 h/24h Light 10 W/m 8 h/24h Apparatus 3 kW 3 h/24h

Good category Cooling good Storage Storage Loading Loading Load. temp. Cool. temp.
kg % kg/24h % C C

Meat Meat general 5423 1 500 9 25 10

The calculations and results have to be checked by the user.

Calculated values according to 24 h/d

All values in kW Wall 1 Length Wall 2 Width Wall 3 Length Wall 4 Width Floor Ceiling Total

Transmission 1.39 0.14 1.39 0.14 1.91 1.91 6.88


Air change 2.62 2.62

Meat
general
Loading 0.28 0.28

Persons Light Apparatus


Others 0.09 1.28 0.38 1.74
--------------
Total 11.52

Calculated values according to running time of plant

Running time Capacity Defrost time Defrost capacity Fan capacity Total capacity
h/d kW h/d kW kW kW

16.00 17.28 1.50 0.00 1.07 18.36


17.00 16.27 2.00 0.00 1.01 17.28
18.00 15.36 2.00 0.00 0.95 16.31
19.00 14.55 2.00 0.00 0.90 15.45
20.00 13.83 2.00 0.00 0.86 14.68

20

Capacity: 16.31 kW
Transmission (56.3%) 15
Capacity [kW]

Air change (21.4%) Transmission


Loading (2.3%) Air change
Persons (0.7%) 10 Loading
Apparatus (3.1%) Persons
Light (10.4%) Apparatus
Fan (5.8%) Light
5 Fan
Heating (0.0%)
Heating

0
16 17 18 19 20
Running time [h/24h]

Version: 6.40 Side 1 Date : 12-11-14