0% found this document useful (0 votes)
325 views

Hazards Analysis and Risk Control Record HSE-RAC

This document provides a template for conducting a risk assessment and control procedure. It includes sections to identify hazards, assess initial and residual risk levels after control measures, and approve the assessment. Control measures aim to reduce both the likelihood and severity of risks.

Uploaded by

HSE S4
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
325 views

Hazards Analysis and Risk Control Record HSE-RAC

This document provides a template for conducting a risk assessment and control procedure. It includes sections to identify hazards, assess initial and residual risk levels after control measures, and approve the assessment. Control measures aim to reduce both the likelihood and severity of risks.

Uploaded by

HSE S4
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Page 1 of 2

HSE PROCEDURE Doc. No. NUS-HSE-RAC/01


RISK ASSESSMENT AND CONTROL Rev 03
PROCEDURE Date 26/07/2016

Hazard Analysis and Risk Control Record

Doc ref: Task/Process Assessed:


Date: Assessment Team:
Operation:
HAZARD INITIAL RISK CONTROL MEASURES RESIDUAL RISK

Hazard Description Loss List all Current and Planned Control Measures, taking into Account all

Likelihood

Likelihood
Risk Level

Risk Level
Category Contributing and Escalating Factors

Severity

Severity
Activity Steps and Worst Case
Consequences with no Population
Prevention or Mitigation Affected Current and Planned Prevention Current and Planned Mitigation
Measures in Place Measures to reduce Likelihood Measures to reduce Severity
Page 2 of 2
HSE PROCEDURE Doc. No. NUS-HSE-RAC/01
RISK ASSESSMENT AND CONTROL Rev 03
PROCEDURE Date 26/07/2016

Hazard Analysis and Risk Control Record

Prepared by Position Date:

Approved by Position Date: