Checklist For Painting Works

This checklist summarizes the key steps for painting works on a construction project. It includes 12 items to check such as inspecting the walls for cracks and moisture, applying the appropriate number of coats, ensuring full coverage without brush marks, cleaning up afterwards, and getting final approval. The checklist is used to ensure all painting tasks are completed according to specifications before a quality assurance engineer signs off.

Uploaded by

Ifeanyi Iwualla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views

Checklist For Painting Works

This checklist summarizes the key steps for painting works on a construction project. It includes 12 items to check such as inspecting the walls for cracks and moisture, applying the appropriate number of coats, ensuring full coverage without brush marks, cleaning up afterwards, and getting final approval. The checklist is used to ensure all painting tasks are completed according to specifications before a quality assurance engineer signs off.

Uploaded by

Ifeanyi Iwualla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Checklist for Painting works

Project : Doc. No.


Client : Project Location

SITE LOCATION

Painting for Walls

1 Check for any wall cracks, Curing period completed or not

1 Check the material/paints as approved make

2 Check color shade approved

3 Cleaning of walls to be checked (Scrapping), Surface finishing

4 Cracks, Dampness, any leakages to be identified and repaired.

5 Apply primary coat

6 Application of coat as per specs to be checked

7
Check others materials covered neatly with masking tape (protection of other
materials from damage like Electrical switches plate, door/window joints, glass
partitions, wardrobes)

8 Check for no of coat applied & final touch up work are completed

9 Check for overall coverage andy brush marks


10 Check for cleaning in flooring, window/door glasses & joinery
fitting after painting

11 Check for any incomplete and addition and alteration

12 Check for floor polishing before final coat ( in case of Marble flooring)
Remarks of Quality Assurance Engineer:

Signature Date
Checked By:
Approved By:
: QA/CL-CON/
roject Location :

DATE

YES NO NA

otection of other
ndow joints, glass
Remarks/ Comments