Current and Future Brazilian Heavy Lift Offshore and Subsea Installation Markets PDF
Current and Future Brazilian Heavy Lift Offshore and Subsea Installation Markets PDF
Pipelay Conference
Amsterdam, 2015
Leonardo Roncetti
www.techcon.eng.br
[email protected]
FPSO Cidade de Marica at Brasa Shipyard
Source: akersolutions.com
Offshore Construction, Heavy Lift & Pipelay Conference
TechCon Engineering & Consulting
Lines of Research
Software for coupled dynamic analysis for
offshore lifting:
+ environmental loads
+ Ship
+ Crane
+ CFD
Source: akersolutions.com
World scenario of oil & gas production
Ultra deepwater expectancy
40
35
30
25
20
15
10
Proven Reserves
Balance Imports/Exports (Jan-mar/2015) Oil 16.2 billion barrels * Considering only
Oil 399 thousand barrels/day Gas 471 billion m3 discoveries already made,
especially in the pre-salt
Gas 47,6 million m3/day Near Future: x2 area.
Current scenario of oil & gas production in Brazil
Brazilian oil production, 2008-2015
Source: ANP, 2015
Brazilian Oil Production: 20082015
Production (Feb./2015)
Oil and NGL 2.53 million barrels/day
Gas 95.4 million m3/day
Near Future: x2
3,0
Million Barrels per day
2,5
2,0
1,5
1,0
0,5
0,0
Petrobras, 2777k
Shell, 77.1k
Statoil, 71.9k
OGX, 15.9k
Chevron, 14.2k
Others, 12.6k
Gas;
Onshore; 20%
7%
Offshore;
93% Oil;
80%
PETROBRAS Business & Management Plan
2015-2019 investments
Source: PETROBRAS, 2015
3.0 (3%)
11.3
(10%)
4.9 (5%)
Focus in
Exploration & Production
Increase revenue
Production Development
Operational Support
Pre-salt DW & UDW
89.4 Exploration
(82%) Investments Abroad
PETROBRAS Business & Management Plan
2015-2019 - forecast for increase of oil & gas production
5.3
3.2 3.7
3.1
37 approved companies
125.045,9 km
None in pre-salt
Deck crane: 1 / 3 / 16 t
DOF Offshore crane : 22 t
Subsea vessel
Skandi Chieftain AHC winch: 10 t
A-frame: 30 t
Source: akersolutions.com
Heavy lift vessel demand and availability in Brazil
Current fleet in Brazil
DOF
Deck crane: 2 / 3 / 5 t
Skandi Hav Subsea vessel
Offshore crane: 15 t
Deck crane: 3 x 3 t
Offshore crane: 250 t
DOF 2500 m
Subsea vessel
Niteri Offshore crane II: 50 / 100 t
2000 m
Tower: OSLT 270 t (VLS)
Source: akersolutions.com
Heavy lift vessel demand and availability in Brazil
Current fleet in Brazil
Deck crane: 3 t
DOF Offshore crane : 140 t
Subsea vessel
Skandi Salvador 2545 m
AHC winch: 250 t
Deck crane: 2 x 15 t
DOF Offshore crane: 250 t
Subsea vessel 2500 m
Skandi Vitria Offshore crane II: 50 t
Tower: IMECA 350 t (VLS)
Subsea 7 Construction /
Offshore crane: 2 x 30 t
Flex-lay
Kommandor 3000 A-frame: 200 t
(Horizontal)
Source: akersolutions.com
Heavy lift vessel demand and availability in Brazil
Current fleet in Brazil
Subsea 7 Construction /
AHC crane: 250 t
Flex-lay
Normand Seven 2000 m
(Horizontal)
Source: akersolutions.com
Heavy lift vessel demand and availability in Brazil
Current fleet in Brazil
Allseas
Special crane: 300 t
Solitaire Pipelay
A-frame: 400 t
(expected)
Source: akersolutions.com
Offshore Construction, Heavy Lift & Pipelay Conference
TechCon Engineering & Consulting
Deck crane: 20 t
FARSTAD Main crane: 250 t
Subsea vessel
Far Samson 3500 m
A-frame: 315 t
Locar Derick /
Main crane: 250 t
Locar-pipe Lay barge
Source: akersolutions.com
Offshore Construction, Heavy Lift & Pipelay Conference
TechCon Engineering & Consulting
BSL Servios
Main crane: 2050 t
(Brasa Shipyard) Sheerleg
101 m
Pelicano 1
Source: akersolutions.com
Deep and ultra deepwater projects 2014-19
2014 forecast
Closing remarks
$17 bi
$140 bi
12% udw
$14 bi
Siemens subsea$14
powerbi
grid
$14 bi 15% udw
$55 bi
$185 bi
3% udw $70 bi $23 bi
$30 bi
Global deepwater capital
expenditure 2014-2020
Deepwater projects (> 450 m)
Ultra deepwater projects (> 1280 m)
Deep and ultra deepwater projects 2015-19
2015 forecast
Closing remarks