This document provides standard drawings for subdrain details under monolithic concrete curb and sidewalk as well as concrete curb and gutter. It includes details for a 150mm diameter perforated polyethylene subdrain pipe surrounded by 19mm clear stone and wrapped in a non-woven filter cloth. Notes specify that the filter cloth must be overlapped and installed according to specification TS 405 and that the subdrain can be placed behind an existing curb.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
533 views1 page

T-216.02-8 Rev3 Nov2014

This document provides standard drawings for subdrain details under monolithic concrete curb and sidewalk as well as concrete curb and gutter. It includes details for a 150mm diameter perforated polyethylene subdrain pipe surrounded by 19mm clear stone and wrapped in a non-woven filter cloth. Notes specify that the filter cloth must be overlapped and installed according to specification TS 405 and that the subdrain can be placed behind an existing curb.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CURB AND SIDEWALK

FINISHED ROAD SURFACE

GRANULAR A BASE

SUBGRADE
CLASS 1 NON-WOVEN 150

300
FILTER CLOTH
150 mm DIA. PERFORATED POLYETHYLENE
SUBDRAIN WITH KNITTED FILTER SOCK 50
19 mm CLEAR STONE
300

TYPICAL SUBDRAIN DETAIL FOR


MONOLITHIC CONCRETE CURB AND SIDEWALK

CURB AND GUTTER

FINISHED ROAD SURFACE

GRANULAR A BASE

SUBGRADE CLASS 1
NON-WOVEN
150

300
FILTER CLOTH

150 mm DIA. PERFORATED POLYETHYLENE


SUBDRAIN WITH KNITTED FILTER SOCK 50

19 mm CLEAR STONE
300

TYPICAL SUBDRAIN DETAIL FOR


CONCRETE CURB AND GUTTER

NOTES:

1. FILTER CLOTH SHALL BE OVERLAPPED AT TOP AND INSTALLED ACCORDING TO TS 405.

2. IF THE EXISTING CONCRETE CURB AND GUTTER IS TO REMAIN IN PLACE, THE SUBDRAIN
SHALL BE PLACED BEHIND THE CURB UNDER THE STONE BASE. THE SUBDRAIN
SHALL BE PLACED AS CLOSE AS POSSIBLE TO THE CENTRELINE OF THE CURB.

3. LEDGE BEHIND CURB IS FOR ILLUSTRATION ONLY, REFER TO T-600.05-1 FOR DETAIL.

All dimensions are in millimetres unless otherwise shown.

ENGINEERING & CONSTRUCTION SERVICES STANDARD DRAWING


REV 3 NOV 2014

T-216.02-8
ROADWAY SUBDRAINS