Installation, operation and
maintenance instructions for 2 PREMIUM
ENBRIL
fluid couplings
tyne PSC 24R - Sizes 18 to 41
PEMBRIL
FLUID COUPLINGSeee enone
CUSTOMER :
PEMBRIL CONTRACT NO.
COUPLING TYPE & SIZE
BAFFLE SIZE
KW TO BE TRANSMITTED
CUSTOMER / DISTRIBUTOR ORDER NO. :
RPM:
Oil quantity :
(approximate) fluid coupling :
(not including oil required for
long pipe runs) cooler :
Water quantity :
flow in m*/hr
Pressure loss :
(on water side of cooler)
IMPORTANT
his Installation, Operation, Maintenance
Manual has been prepared primarily for the
mechanics who will be responsible for the
operation and maintenance of the ‘PEMBRIL’
Fluid Coupling and it is MOST IMPORTANT that
the book is handed to the men actually concerned.
Persons responsible for the equipment
must ensure that it is properly and safely installed
‘and maintained & operated at the specified
conditions, stipulated in the manual.
Any similar Instructions for the overall plant in
Which the equipment is to be incorporated, which
have an influence on the equipment application, must
be strictly followed.
Statutory and local requirements conceming
work practices, safety and / or health precautions
must be observed.INSTRUCTION MANUAL
for Installation, Operation and
Maintenance
PEMBRIL
FLUID COUPLING.
PSC 24 R - SIZE 18 TO 41
Manufactured by :
PEMBRIL ENGINEERING PVT. LTD.
G-56-57, MIDC Industrial Area, Chikalthana,
AURANGABAD - 431210, INDIA
TEL : (0240) 485521
FAX : (0240) 485756
E-mail : [email protected]
FLUIDCOUPLINGS